Loading...
HomeMy WebLinkAboutPermit PG13-087 - BOEING #2-80 - GAS PIPINGBOEING #2-80 8123 EAST MARGINAL wys PG1 3-087 City oil/Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-431-2451 Web site: http://www.TukwilaWA.gov PLUMBING/GAS PIPING PERMIT Parcel No.: 0001600020 Address: 8123 EAST MARGINAL WY S TIIKW Project Name: BOEING #2-80 Permit Number: PG13-087 Issue Date: 06/21/2013 Permit Expires On: 12/18/2013 Owner: Name: BOEING COMPANY THE Address: PROPERTY TAX DEPT , PO BOX 3707 M/C 20-00 98124 Contact Person: Name: KEN PHILLIPS Address: 8657 S 190 ST , KENT WA 98031 Email: K.PHILLIPS@DESIGN-AIR.COM Contractor: Name: DESIGN AIR, LTD. Address: 8657 SOUTH 190TH ST , KENT, WA 98031 Contractor License No: DESIGL*212DG Phone: 253 854-2770 Phone: (253) 854-2770 Expiration Date: 03/07/2014 DESCRIPTION OF WORK: INSTALL GAS PIPING FROM POINT OF CONNECTION TO NEW OWNER SUPPLIED HEATER Value of Plumbing/Gas Piping: Fees Collected: Electrical Service Provided by: $14,720.00 $120.75 Permit Center Authorized Signature: I hereby certify that I have read and e governing this work will be complied amin th, Uniform Plumbing Code Edition: International Fuel Gas Code Edition: 2009 2009 Date: this permit and know the same to be true and correct. All provisions of law and ordinances ether specified herein or not. The granting of this permit does not pres e to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this plumbing/gas piping permit and agree to the conditions on the back of this permit. Signature: i% Date: Print Name: 0F_ This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. .1....• limn A/A!1 on AQ7 Drin}ud• na291_)A1 PERMIT CONDITIONS Permit No. PG 13-087 1: ***PLUMBING AND GAS PIPING*** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R-3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 guage. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor/ceiling assemblies and fire -resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. doc: UPC -4/10 PG13-087 Printed: 06-21-2013 CITY OF TUKA Community Development Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, IVA 98/88 http://www.TukwilaWA.gov • Plumbing/Gas Permit No. Project No. Date Application Accepted: Date Application Expires: (2, [ID -DM 040) ttl (For office use only) PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.: Mato --oow Site Address: Bldg 2-127 Yard 1823 E Marginal Way South — Seattle, WA Suite Number: Floor: New Tenant: ❑ Yes X.No Tenant Name: The Boeing Co. PROPERTY OWNER Name: Ken Phillips Name: The Boeing Co. Address: 8657 S 190th Street Address: PO Box 3707 M/C 20-00 City: Kent State: WA City: Seattle State: WA Zip: 98124 CONTACT PERSON — person receiving all project communication Name: Ken Phillips Address: 8657 S 190th Street Address: 8657 S 190th Street Phone: 253.854.2770 Fax: 253.854.6131 City: Kent State: WA Zip: 98031 Phone:253.854.2770 Fax:253.854.6131 Email: k.phillips@design-air.com PLUMBING CONTRACTOR INFORMATION Company Name: Design Air, Ltd. Address: 8657 S 190th Street City: Kent State: WA Zip: 98031 Phone: 253.854.2770 Fax: 253.854.6131 Contr Reg No.: DESIGL*212DG Exp Date: 03/07/2014 Tukwila Business License No.: BUS -0101108 Valuation of Project (contractor's bid price): $ 12,533 Scope of Work (please provide detailed information): Install Gas Piping to new PSE Meter Building Use (per Int'I Building Code): Occupancy (per lnt'l Building Code): Utility Purveyor: Water: H:\Applications\Forms-Applications On Line\201 I Applications \Plumbing Permit Application Revised 8-9-11.docx Revised: August 2011 bh Sewer: Page 1 of2 Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity oelow: Fixture Type Qty Bathtub or combination bath/shower Dishwasher, domestic with independent drain Shower, single head trap Sinks Rain water system — per drain (inside building) Grease interceptor for commercial kitchen (>750 gallon capacity) Each additional medical gas inlets/outlets greater than 5 Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1-5) Fixture Type Qty Bidet Drinking fountain or water cooler (per head) Lavatory Urinal Water heater and/or vent Repair or alteration of water piping and/or water treatment equipment Backflow protective device other than atmospheric - type vacuum breakers 2 inch (51 mm) diameter or smaller Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Fixture Type Qty Clothes washer, domestic Food -waste grinder, commercial Wash fountain Water closet Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Repair or alteration of drainage or vent piping Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Gas piping outlets Fixture Type Qty Dental unit, cuspidor Floor drain Receptor, indirect waste Building sewer and each trailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1-5 inlets/outlets for a specific gas Each lawn sprinkler system on any one meter including backflow protection devices PERMIT APPLICATION NOTES Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: 40,411 Print Name: Mike Deniger j� Mailing Address: 8657 S 190th Street 1r.\Applications\Forms-Applications On Line \2011 Applications\Plumbing Permit Application Revised 8-9-1 I.docz Revised. August 2011 bh Date:6//.2 Day Telephone: 253.854.2770 Kent City WA State 98031 Zip Page 2 of 2 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.TukwilaWA.gov RECEIPT Parcel No.: 0001600020 Permit Number: PG13-088 Address: 8123 EAST MARGINAL WY S TUKW Status: PENDING Suite No: Applied Date: 06/18/2013 Applicant: BOEING #2-127 Issue Date: Receipt No.: R13-01909 Payment Amount: $120.75 Initials: JEM Payment Date: 06/18/2013 01:49 PM User ID: 1165 Balance: $0.00 Payee: DESIGN AIR TRANSACTION LIST: Type Method Descriptio Amount Payment Check 97596 120.75 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts GAS - NONRES PLAN CHECK - NONRES 000.322.103.00.00 96.60 000.345.830 24.15 Total: $120.75 Drinlurl• (IAA A27111'i INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. t3 -��� CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 e , (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Projec Type !<InspAec(tion Address: c 23 _ Ant�'NA-L Date Iled: (cou6 __ , Special Instructions: Date Wante r+//� t� ''� a �. p.m. Requester: Phone No: — 34 /--2 3,3 Approved per applicable codes. Corrections required prior to approval. COMMENTS: I I REINSPECTION FEE R QUIRED. Prior to next inspection, fee must be , paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Pe Plan revie Approval thc: v dation of any ado of approved Feld Copy STEAM HEATED PROPANE VAPORIZER SOUTH WALL OF LASF 8"-A300 1 � M621 COPY V' (-71 0 C 12"-A300 EL 3'-6 3L4" ABOVE GRADE nE PSV V-27 PROPANE s subject tot&rors d nmi, Binns_ cons ru ►documents does nct 4. €a ABOVE \ code or ordinance;. Rec pt acknowledged: BY Date: 4/z/13 PIPE SUPPORT City Of Tbkwila BUILDING DIPN- NO 9" SCALE: 1 /4"=1'-0" 13 HEATER (Th 1M212,1M62,RFM62 44621 6001 FLANGE O 6"-A1000 (U/G)— TO NBF — C 12"-A300 (U/G) TO NEW, BTWT, AND 2-85 M621 M62121 20'-0" REVISIONS a3'!s3/a' No changes shall be made to the scopervE C71^DE of work without prior approval of Tukwila Building Division. /� NOTE: Revisions will require a new plan submittzl and may ins udet 1ddtionai plan review fee 3. I USF ROOF 20'-0" SOUTH WALL OF LASF 13" l- jj P. P.O.C. } s ''�. •LVE IN RISER '�' EE 2.YD �. 2 ' X4" � - PSV V-2 • CONT. SEISMIC/ olsc RI VALVE S 621 N_ 4" M� 8"-A1r.. (U/0) Ne '� TONG 2 .A3oo (u/c) TD ,r4.11.=.11'.::4:11.=.41NBjBIWf, AND 2 -BS II V101 PRV102 V44 1000 (U/0) 4" 4" -DJ V144 V143 Addendum 2 Feb 26 2013 1) Cold air inlet pipe will be installed by Boeing to align with Stahl flange without a horizontal bend. Boeing will furnish the air pipe between the Stahl flange and the supply pipe, for installation by contractor. See drawing 750X1001 2) Contractor shall cut off and reweld flange on hot air pipe at the location shown on 750x1001. Boeing will fumish the pipe between that flange and the Stahl flange, for installation by contractor. 3) Contractor is to fumish and install the gas piping. Connect to Stahl heater at location shown on Dwg 34141 1 134 FOR M621 -12"x8" �8" RUPTURE DISC PSV 0-27 V101 PRV102 V44 SAFETY VALVE RELIEF PIPINQ (RUPTURE DISC PIPING SIMILAR) VENT TO ATMOS VENT PIPE C VALVE OUTLET 12"x8" RED TEE CAP DETAIL SCALE: N 12-A3 1C-0" GRADE �tl REVIEWED FOR CODE COMPLIANCE APPROVED JUN 21 2013 EL City of BUILDING V143 V144 EL 2'-11" ABOVE GRADE \I� 1-01 a a I SECTION SCALE 1/4"=1'-0" M62.±4621 BG)Q # TO )==') S 7* 4-0 PPPE- ITEMS SHOWN ARE PART OF VALVE ASSEMBLY t✓ la ISION CL 12-A300 (u/G) TO NBF, BTWT, AND 2-85 GENERAL NOTES 1. FOR MECHANICAL PIPING GENERAL NOTES, SEE DRAWINGS 2-YD-M2D AND 2-YD-M2b. 2. FOR MECHANICAL PIPING LEGEND AND SYMBOLS, SEE DRAWING 2 -YD -MO. REFERENCE DRAWINGS 2-83-OM110 2 -YD -M3 2-YD-M3b 2 -YD -M134 2 -YD -M325 1 > 2-83-E533 2 -YD -E84 2-83-E535 2-83-E536 13> PLUMBING PLAN COMPRESSED AIR BLOCK DIAGRAM HIGH PRESSURE AIR DIAGRAM PLUMBING PIPING HP AIR SYSTEM PRV INSTR. LOCATION PLAN PLC -117 I/O SCHEMATICS SHT. 1 120/208V & GROUND PLC -117 I/O SCHEMATICS SHT. 3 PLC- 0 SCHEMATICS S 1 4 CONSTRUCTION NOTES ISOLATE AND PURGE GAS LINE. REMOVE 6" CAP AND SMALLER VALVE ON TOP. REPLACE WITH 6" RATED SHUT OFF VALVE IN RISER. RUN PIPE FROM NEW VALVE TO STAHL HEATER. PIPE AND FITTINGS TO MATCH EXIST. ADD SEISMIC VALVE PAINT PIPE BLACK TO WEATHER PROOF. LABEL NEW PIPE NATURAL GAS. RUN NEW PIPE. SUPPORT PIPE AT THE APPROX INTERVALS SHOWN. PIPE TO BE 2'-0" ABOVE GRADE(APPROX.) TO MATCH TIE-IN POINT. SEEM 22 FOR PIPE SUPPORT DETAIL TIE INTO DEVICE GAS CONNECTION AT THIS POINT. ® MODIFY SUPPLY AND RETURN AIR TO TIE INTO STAHL HEATER. FIELD VERIFY REOUIRED MODIFICATIONS. AIR PIPE MATERIAL,INSULATION AND FITTINGS TO MATCH EXIS INSULATE HOT AIR PIPE ONLY. SEE ATTACHED CUSTOMER GENERATED DRAWINGS FOR AIR PIPING DETAILS. FIELD VERIFY PIPE ROUTE THIS AREA. PIPE MAY NEED TO RISE TO PROVIDE MAINTENANCE ACCESS. CONTRACTOR TO DETERMINE BEST ROUTE IN FIELD. IImII 044 DOMING PIPING 2111 • ► 4111.11l► "�►SLI■0.111r PRV102 V101 '� 111' SECTION SCALE: 1/4"=1'-0" E>0 62112 -YD - 91 AUXILIARY REGULATOR FOR TESTING (NOT USED) p PI HIGH I PRESSURE REGULATOR PARATE PERMIT EQUIRED FO Mitheeicel l.s Electrical Iumbing ❑ Gas Piping DETAIL PLAN -WITH HEATER n SCALE: 1/4"=1'-0" 1M112,1M212 44621 SYM BY 041E 5044 DA RECORD DRAWING 4982179 HGI/HEW 1.15.99 A ADD PIPE 4100673098 BOWL 4/7/03 CHANGE DWG FROM YD TO 02-080 WDB 04.07.10 INSTALL STAHL HEATER ID#19719 WD8 2.8.13 VOLUME BOOSTER FILTER POSITIONER City of Tukwila Bl�ILQIN[, DfV --me+31Lm ;V44 M6211.1+...4621 985 PSIG TO NBF ISI A1000 A300 EL 2'-11" ABOVE GRADE RECEIVED V-14LITY OF TUKWILA V-144 JUN 1 8 2013 E L_5 PSIG 9 TO LASF CONTROL VALVE DIAGRAMP&tS 0'61 1985 PSIG FROM 2 -PERMIT CENTER SCALE: N.T.S. M�21 / 195 DESIGN AND/OR SPECIFICATION IS APPROVED glAramezArce 0 H. WARDELL LHLCKtu S. SHRIVER APPROVED B0 DEPT. DATE S. 0041056 CHECKED R. BERRY APPROVED R. BERRY APPROVED L. COSTELLO 12.22.98 2.08.99 12.12.98 2.08.99 2.08.99 2.08.99 5 s COMPRESSED AIR REDUCING STATION SECTION AND DETAILS CURRENT REVISION 1419719 SYMBOL DA 2.8.13 TITLE MECHANICAL MASTER 02-080 PLANT 2 SHEET M621 MEIN 1000673098 COMP 2-080-M621 6 5 4 3 b 2 1 PONE X REV DESCRIPTIONIONs X X o TE APPROVED D — D 261.00 Existing Pae I 60.00 Pad Extension 1 \ I /Man Hole Cover AY--{ REVIEWED FOR 1 ---____L..--- CODE COMPLIANCE APPROVED JUN 21 2013 C �; _ 1 ) • City of Tukwila BUILDING DIVISION c - 54.00 1 �I� Stahl Heater / i 6', 60010 Flanges / Neater Outlet \ 6', Heater 3001b Flanges Inlet Noise SSGn�5s. ,�v/J��� Es), (/ Lab \ > S SG E n n II ... _ _EL___ _L'— Line of Responsibility h' �� Esistinp Structure 1111/ D i I i / B .• Noise ois- _ Noise �.� -- Lab t t H A.t—_i B k.W �° RECEIVED ,� : --�� �~�..III CITY OF TUKWILA c L Plan view Scale: ,:,D ------. � , � JUN 1 8 2013 , PERMIT A NOTES: 1O AIR CD/EIRE/AMINO PLUMBINO COMPONENTS SHOWN ON THI5 i CENTER Section view A -A MUSING Dal BE FURNISHED BV NOISE LAB Scale: 1 10 CATIA DATASET NAME: 7500100 S0/ R -- CATIA DATABASE NAME: \\fi1 blv-15\enpdes ign\Archives\Catia_V5_Archives\Modelo\75XX __ X p n r- Noise - LSAT\ . 7:?er" .a .:�," .," .. -1 GRA.. 0/0/10 BOEZING g PART 110. NEXT MCA%1ECx6G 1"OGR.N LSAFxxxx CORPORATE OFFICES29124 1 Gs STRESSIST - - - - - - - E< 1 EVA/SR No 1 UNLESSAPPLOTHERWISE IED 1sloN ARE - .12 n. ErA 2 Inst' 1, GE -UPS Plumbing - 1 - - 1 -01 Inst•1 { - _ _ - - - 1 - Iv INCHES eaaruuwE No 1 BOEING PROPRIETARY _ - - -1 r 6E00 F.nT an NwE ANGLES v6 7 P...,n. .n112 sizE CAGE aME MAG. 1, ..,,..ax, 0000..: - y5F0 ON I06211FVINS MAID CA 9120021 1P 05' 100' I SPECIFICATION MCP s:II Ns -1R 11216R P1 -1R: I REV MOLD J1 e(1 750X1001 g _ j .05 �,N ..T ................1,.....,,... 750x1001 1110.1 PARTS LIST x....026 B-XT64 000 28 191 1 of a a 6 5 4 3 4 2 1 SOUTH WALL OF LASE STEW HEATED PROPANE VAPORIZER 8"-A300 1-1/2' STM 3/4" C 1 PROPANE PUMP PROPANE TANK NOT SHOWN TO - PROVIDE ALTERNATE LOCATION FOR HEAT EXCHANGER SEE M621 FOR PROPANE TANK. PROPANE HEAT EXCHANGER fi�� PIPE SUPPORT 8"-A300 300/ 1-1/2" STM FLANGE PC 61 ' 6 M62,4!..940 CONDENSATE PUMP DETAIL (( )1 8"M6' — V101 I CP 8"K6" (WP 2) Tritx6 600/ - FLANGE DETAIL PLAN- STEAM SCALE: 1/4"=1'-0" 1M62,1M212 M621 3/4" SOLENOID VALVE ASCO{j822A50, N.C. SARCO P/T REGULATOR 3-30 PSI BYPASS 1-1/2" STM 03 PRV102 V44 4' 4" IY-`D V144 V143. (u VERTICAL 3/4" C 2 V 1 PSV V-27 £8'R RE DISC 2"-A300 € EL 10'-0" ABOVE GRADE EL 2'- 1' ABOVE GIDE q ABOVE GRADE -�8'-A1000 (U/G) TO NBF � \ 1 8 CL NBF12"-A300 (U/AND G) 2T0 , 8TWT, -85 1-1/2" STM TYP. TRAP ASSEMBLY STEAM SCHEMATIC SCALE: NONE M622 VACUUM BREAKER AR 11-1(1000) 8" U -BOLT r1/2" TOS co 9" —C6x8.2 2" SCH.80 z CC CC 11-1 t,4 DETAIL PIPE SUPPORT M621 M622 SCALE: NONE RELOCATED HEAT EXCHANGER(NOW REMOVED) AIR PIPING BY OTHERS. EL GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES REVIEWED FOR CODE COMPLIANCE APPROVED JUN 21 2013 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA JUN 1 8 2013 PERMIT CENTER REVISION RECORD DRAWING J/982179 80 HCI/HEW APPROVED DATE SYM 80 AP RCAED DATE 1.15.99 CREATE DWG FROM 621 WDB 04.19.10 A STEAM & CONDENSATE 10/7535 WDB 05.13.10 B INSTALL STAHL HEATER ID/19719 WDB 2.8.13 ?1,1__AerArzArc. ACCEPTABIUTY 11110 DESIGN AND/OR SPECIDCARON IS APPROVED APPROVED BY DEPT. DATE 01AwN H. WARDELL O S. SHR S. SHINER THDWEID - S. SHRNER CHECKED R. BERRY APPROVWD R. BERRY 301E 12.22.98 2.08.99 12.12.98 2.08.99 2.08.99 COMPRESSED AIR DETAILS SECTION AND DETAILS CURRENT REVISION 10119719 SYMBOL DATE 2.8.13 APPROVED L COSTELLO 2.08.99 MECHANICAL MASTER 02-080 SHEET M622 JOB N0. 1000673098 COMP N0. PLANT 2 °wG ND. 02-080-M622 •PERMIT COORD COMO PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: PG13-087 DATE: 06/18/13 PROJECT NAME: BOEING #2-80 SITE ADDRESS: 8123 EAST MARGINAL WY S X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter #_ Revision # after Permit Issued DEPARTMENTS: O6 `/eV Building Division Public Works ❑ 3 Fire Prevention Structural Planning Division ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ DUE DATE: 06/20/13 Not Applicable ❑ Comments: Permit Center Use Only ° • INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg 0 Fire 0 Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Pg Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 07/18/13 Not Approved (attach comments) ❑ DATE: Permit Center Use Only. CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping ❑ PW ❑ Staff Initials: Contractors or Tradespeople Per Friendly Page General/Specialty Contractor A business registered as a construction contractor with LW to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name DESIGN AIR LTD UBI No. 600314241 Phone 2538542770 Status Active Address 8657 South 190Th St License No. DESIGL*212DG Suite/Apt. License Type Construction Contractor City Kent Effective Date 3/7/1979 State WA Expiration Date 3/7/2014 Zip 98031 Suspend Date County King Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company ther Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status MRCCOL'981J6 M R C CONSTRUCTION LLC Construction Contractor General Unused 4/2/2002 4/29/2012 Expired Business Owner Information Name Role Effective Date Expiration Date HAGEN, RONALD A President 01/01/1980 Amount PORTO, MARK M Secretary 03/08/2010 GL2095787039 MATZ, RICHARD K Vice President 03/08/2010 Bond Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 8 TRAVELERS CAS & SURETY CO 103742548 03/07/2002 Until Cancelled $12,000.00 02/28/2002 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 32 Continental Cas o GL2095787039 10/01/2012 10/01/2013 $2,000,000.00 10/01/2012 31 Continental Cas GL2095786635 10/01/2011 10/01/2012 $2,000,000.00 09/30/2011 30 CONTINENTAL CAS CO GL2095785243 10/01/2010 10/01/2011 $2,000,000.00 09/27/2010 29 CONTINENTAL CAS CO GL2095786232 10/01/2009 10/01/2010 $2,000,000.00 09/25/2009 28 CONTINENTAL CAS CO GL2095785744 10/01/2008 10/01/2009 $2,000,000.00 09/23/2008 27 CONTINENTAL CAS CO GL2095785744 10/01/2008 10/01/2009 $2,000,000.00 09/23/2008 26 CONTINENTAL CAS CO GL2095783234 10/01/2007 10/01/2008 $2,000,000.00 09/24/2007 25 CONTINENTAL CAS CO HL2079600087 10/01/2006 10/01/2007 $2,000,000.00 10/09/2006 24 CONTINENTAL CAS CO GL2079600087 10/01/2006 10/01/2007 $6,000,000.00 10/05/2006 httns://fortress.wa. aov/lni/bbin/Print.asnx 06/21/2013