Loading...
HomeMy WebLinkAboutPermit PG13-107 - BOEING #14-02 - BOILER REPLACE - GAS PIPINGBOEING #14-02 BOILER REPLACEMENT 8811 EAST MARGINAL WY S PG13-107 City oi�I'ukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-431-2451 Web site: http://www.TukwilaWA.gov PLUMBING/GAS PIPING PERMIT Parcel No.: 0007400033 Address: 8811 EAST MARGINAL WY S TUKW Project Name: BOEING #14-02 - BOILER REPLACEMENT Permit Number: PG13-107 Issue Date: 08/26/2013 Permit Expires On: 02/22/2014 Owner: Name: BOEING COMPANY THE Address: PROPERTY TAX DEPT , PO BOX 3707 M/C 20-00 98124 Contact Person: Name: CONNIE HARDIN Address: 4600 S 134 PL , TUKVVILA WA 98168 Email: CONNIEH@HOLADAYPARKS.COM Contractor: Name: HOLADAY PARKS, INC. Address: PO BOX 69208 , SEATTLE, WA 98188 Contractor License No: HOLADPI379NO Phone: 206-250-4530 Phone: 206 248-9700 Expiration Date: 09/03/2013 DESCRIPTION OF WORK: GAS PIPING TO (3) BOILERS Value of Plumbing/Gas Piping: Fees Collected: Electrical Service Provided by: $15,000.00 $104.38 Permit Center Authorized Signature: Uniform Plumbing Code Edition: 2009 International Fuel Gas Code Edition: 2009 Date: v -.1-19-4-i3 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the perfor ance of w rk. I am authorized to sign and obtain this plumbing/gas piping permit and agree to the conditions on the back • f this r ermit Signature: Print Name: Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. nn, n 4 n-, Drnnfnrl• fl !)R_')(11 • . PERMIT CONDITIONS Permit No. PG 13-107 1: ***PLUMBING AND GAS PIPING*** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R-3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 guage. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor/ceiling assemblies and fire -resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. doc: UPC -4/10 PG13-107 Printed: 08-26-2013 CITY OF TUKWILA Community Development Department Perini! Center 63(11) Sout/wewer Blvd. Suile 101) 1 irk t'ila. 11;•1 95188 httivIlwww.TukwilaW A.gov Plumbing/Gas Permit No. 76 f 10 7 Project No. Date Application Accepted: Date Application Expires: (For office nue only) PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address:gin 1 624 Mar tit Tenant Name: King Co Assessor's Tax No.:00tnLLnoD33 ec.P ggiog Suite Number: Floor: PROPERTY OWNER Name i‘‘ o a 14 L2O - City: St te. zi Iaf CONTACT PERSON — person receiving all project communication Name: n • WK`'(N 1`a p.f'�, ln{,, Address:q 0 S 13 pi Address; t/lt00 s i3 �{i' pX Phone: MO 2,0 ( Fax.010 Zq6 17000 Cit o . A _ State j ZipeuN (D Phonezsz) b Fax: 6 z r g74o Email: 001114...P1 ' 1 o New Tenant: ❑ Yes Et771Cro PLUMBING CONTRACTOR INFORMATION Company Name: p Address:q 0 S 13 pi City: �[ _ ,ice /t _ State: L0. Zip: n p' �G i Phone: MO 2,0 ( Fax.010 Zq6 17000 Contr Reg No : Exp Date: Npu4berg7g00 9 -13 Tukwila Business License No.: Valuation of Project (contractor's bid price): $ Scope of Work (please provide detailed information): ,�, \042 S Building Use (per Intl Building Code): Occupancy (per Int'I Building Code): Utility Purveyor: Water: Sewer n:\Applications\Forms-Applications On Line\201 I Applications\Plumbing Permit Application Revised 8-9-1 I.docx Revised: August 2011 bh ( 0436 l'age 1 of 2 • Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: Fixture Type Qty Bathtub or combination bath/shower Dishwasher, domestic with independent drain Shower, single head trap Sinks Ram water system — per drain (inside building) Grease interceptor for commercial kitchen (>750 gallon capacity) Each additional medical gas inlets/outlets greater than 5 Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protect ions (1-5) Fixture Type' Qty Bidet Drinking fountain or water cooler (per head) Lavatory Urinal Water heater and/or vent Repair or alteration of water piping and/or water treatment equipment I3ackflow protective device other than atmospheric - type vacuum breakers 2 inch (51 mm) diameter or smaller Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Fixture Type Qty Clothes washer, domestic Food -waste grinder, commercial Wash fountain Water closet Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Repair or alteration of drainage or vent piping Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Gas piping outlets 3 Fixture Type Qty Dental unit, cuspidor Floor drain Receptor, indirect waste Building sewer and each trailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1-5 inlets/outlets for a specific gas Each lawn sprinkler system on any one meter including backflow protection devices Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY TI -IAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY fY OF PERJURY BY THE LAWS OF THF STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUIIAIN O U 1111' IZED AC Signature:ks Print Name: 01 A IL4 11600 S I3t.h+4‘ Mailing Address: ll:\Applications\Forms-Applications On Line\201 1 Applications\Plumbing Permit Application Revised 8-9-1 I.docx Revised: August 2011 hh Day Telephone: City Date: 1-31-t3 State X81(0, Page 2 of 2 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-43 1-3670 Fax: 206-431-3665 Web site: http://www.TukwilaWA.gov RECEIPT Parcel No.: 0007400033 Permit Number: PG13-107 Address: 8811 EAST MARGINAL WY S TUKW Status: PENDING Suite No: Applied Date: 07/31/2013 Applicant: BOEING #14-02 Issue Date: Receipt No.: R13-02253 Payment Amount: $104.38 Initials: WER Payment Date: 07/31/2013 02:41 PM User ID: 1655 Balance: $0.00 Payee: CONNIE HARDIN TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 00652G ACCOUNT ITEM LIST: Description 104.38 Account Code Current Pmts PLAN CHECK - NONRES PLUMBING - NONRES 000.345.830 20.88 000.322.103.00.00 83.50 Total: $104.38 ednr• Roroinr-CIA Printed: 07-31-2013 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. e, CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 P4713.I&'7 Pr ect: nTyp flnspectio : As- Addless: km/6,1J e AL Date Called: 6 Special Instructions: �-- Date Wanted: - 15_,..../3 -a.m- p.m. Requester: Phone 4 2-S - S9 l — Q (3-51 Approved per applicable codes. EJ Corrections required prior to approval. COMMENTS: 6 /2-0‘.10— cr Le 10--Cf)p-r47t(-L. ---- 7.----- 1. ,,.----1 n REINSPECTION FEE REQUIRED( PrPor to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. FSI consulting englr FILE COPY •._......0 ROA. lob# Job Name 14-02 Boiler Replacement Subject Permit Review Response Date 08/13/13 By BAJ/TLA Chkd. Sheet 1 Of 1 -I e as MEI al ■■®■■®■®■■■® asg •ipe a U. sy• - wi N to I b hee -fiche,: ng •. ■ ■■■■■®■■■■®■■■■■ jNejIiIe ■ UsingMir With :.. - IFOMMIAMILIDE ;..'�i ga1121 - ; erin llic pip Man 2 • ■ ze Efi.... ENIM' thille lEf ffeble is 17A) ■Ill C'H. H. he - M ranII�. I 2 o Err ' ' '� meIME 11112 nEIrffEjil1 •' mf •'p�m�- rN - . ax . : ■ _ _C e b.ile T 10,001,010 g ■■■■■■■■■■■■■ 10,001,010 B 1 H ■■■■®■ ■■■■■ Si ce Bot 6' an E MITI.f+ -. II 0 Is ai Th Ern!: -111 ■ — ■■■■■■■■■■■■■ IIII ■■■■■■■■■IINiggi1 Fri III ■■■■■■®■■■ ■■■■■■■ill ■■■■■■■■■1I■mui 1■ i■ t M ■li . . MN Lei Mirill!!. IIIVED I i �� �l I T :7■■ A G 3 201 IL , - .E I • . iiii■ ilig....ma •- ■■ T T 14-02 Boiler Replacement December 21 2012 PARTI GENERAL FILE COPY Permit No. 1.01 WORK INCLUDED Page 1 Section 23 05 29 Hangers and Supports for HVAC Piping and Equipment Pipe hangers and supports. B. Equipment bases and supports. C. Seismic protection of piping and equipment. 1.02 REQUIRED SUBMITTAL DATA A. Equipment bases and supports 1.03 CODES AND STANDARDS REVIEWED FOR CODE COMPLIANCE APPROVED AUG 232013 City of Tukwila BUILDING DIVISION A. SMACNA publication "Seismic Restraint Manual - Guidelines for Mechanical Systems" for seismic protection of piping. B. The International Building Code for seismic protection of equipment. 1.04 RELATED WORK A. All portions of specification Division 1 apply to this work. B. All portions of specification section 23 05 00 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications index. C7PART II PRODUCT 2.01 ACCEPTABLE MANUFACTURERS A. Guides and Anchors: 1. Adsco, Advance Thermal Systems, ITT -Grinnell, Keflex, Elcen, Aeroquip- Barco, or approved equal. B. Pipe hangers and supports: 1. Anvil, Erico, Grabler, Fee & Mason, Unistrut, Superstrut or equal. 2.02 STRUCTURAL ATTACHMENTS A. Steel Structural Clamps: 1. Beam clamps, brackets, channel clamps and bar joist clips select to suit structural system and meet loading recommendations of manufacturer. B. Attachment into existing concrete or masonry wall: Self -drill type Red Head, Phillips Anchors or equal. Do not use powder driven inserts. 2.03 INTERMEDIATE ATTACHMENTS A. Hanger Rods: 1. Continuous threaded steel rod, do not use chain, wire or perforated REiP.EIVED 2. Maximum hanger rod loading as follows: CITY OF TUKWILA Rod Size, Maximum Load, CORRECTION AUG 1 3 2013 23 05 29-1 FSi consulting engineers PERMIT CENTER DC,17/N- Ia7 14-02 Boiler Replacement December 21 2012 Page 2 Section 23 05 29 Hangers and Supports for HVAC Piping and Equipment Diameter in Inches Pounds 3/8 610 1/2 1130 5/8 1810, 3/4 2710 7/8 3770 1 4960 3. Trapeze Pine Racks: Fabricate from structural anales or channels or Unis1 rut channels to suit weight of piping to be supported. Size for a minimum safety factor of 5. C. Hanger Straps: 'Galvanized bar steel; 3/4 -inch wide by 18 gauge for 2 -1/2 -inch and smaller pipe; 7/8 -inch wide by 16 gauge for 3 -inch to 4 -inch pipe; 1 -1/8 -inch wide by 12 gauge for 6 -inch pipe size. 2.04 PIPE ATTACHMENTS A. Pipe Rings: 1. Steel pipe and cast iron soil pipe: 2 -inch and smaller, adjustable ring Anvil #69. 2 -1/2 -inch and larger, adjustable clevis Anvil #260. 2. Copper Pipe: 2 -inch and smaller, adjustable ring Anvil #CT -269. 2 -1/2 -inch and larger, adjustable clevis Anvil #CT -65. 3. Finish: Copper plated where ring comes in contact with copper pipe; galvanized for contact with galvanized steel pipe; black for all other applications. 4. Application: Use only on piping systems where axial movement from thermal expansion is less than 1/2 -inch. 5. For Hanger Straps: Elcen Figure 94 or Anvil Figure 97 with flattened -end bolt through cast iron socket; or hinged type, Modern Hanger Corporation No. 20, Elcen Figure 104, or Anvil Figure 108. Pipe rings shall be electro- galvanized, prime painted or cadmium -plated. B. Pipe Clamps: 1. Vertical piping: Unistrut P-1332 shelf bracket, Unistrut P-1100 channel and Unistrut P-1100 series pipe clamps. Copper pipe clamps for copper pipe. 2. Horizontal racked piping: Unistrut P-1109 series or Unistrut P -2024C series clamps for Unistrut channel pipe racks. 3. Application: Use on piping systems without any thermal expansion. 2.05 EQUIPMENT BASES AND SUPPORTS A. Concrete pads shall be 3-1/2" high. Pads shall extend 6 -inches beyond machine base in all directions with 3/4 -inch top edge chamfered. Structural steel frame supports shall have all joints welded. Galvanize after fabrication. '32.06 GAS PIPING A. Gas piping shall conform to the IFGC Section 407 and Section 415.. PART III EXECUTION 23 05 29-2 FSi consulting engineers 14-02 Boiler Replacement December 21 2012 Page 3 Section 23 05 29 Hangers and Supports for HVAC Piping and Equipment 3.01 HANGER SPACING FOR PIPING A. Horizontal Steel Pipe: Maximum hanger spacing and minimum hanger rod diameters as follows: 1/2 and 3/4 -inch. pipe.. 5 -foot span . 318 -inch rod 1 and 1 -1/4 -inch pipe 7 -foot span 3/8 -inch rod 1 -1/2 -inch pipe 9 -foot span 3/8 -inch rod 2 -inch pipe 10 -foot span _:.. 3/8 -inch rod 2-1/2 and 3 -inch pipe '12 -foot span 1/2 -inch rod 4 -inch pipe 14 -foot span 5/8 -inch rod 6 -inch pipe 17 -foot span 3/4 -inch rod B. Horizontal Copper Pipe: Maximum hanger spacing and minimum hanger rod diameters as follows; C. D. 3.02 INSTALLATION OF PIPE HANGERS AND SUPPORTS 1/2 -inch pipe 5 -foot span 3/8 -inch rod 1 -inch pipe 6 -foot span 3/8 -inch rod 1-1/4 and 1 -1/2 -inch 6 -foot span 3/8 -inch rod 2 and 2 -1/2 -inch pipe ' 9 -foot span 1/2 -inch rod 3 and 4 -inch pipe 10 -foot span 1/2 -inch rod Provide additional hangers or supports at concentrated loads such as valves, to maintain alignment and prevent sagging. Provide a minimum of 2 hangers per pipe section for grooved joint pipe. C. Size pipe rings and clamps to pass around the pipe, except on piping with a vapor barrier on the insulation, then size rings and clamps to pass around the outside of the insulation utilizing insulation protection shields Anvil Fig. 167. Provide rigid inserts as required to prevent crushing of insulation. D. Install vertical piping supports to allow for pipe movement due to thermal expansion and contraction. E. Do not support any pipe from any other pipe. F. Provide special hangers and supports for vibration control in critical areas. See Vibration Isolation Section. G. Provide bored, drilled or reamed holes for all bolting to miscellaneous structural metals, frames or for mounts or supports. Flame cut, punched or hand sawn holes will not be accepted. H. Install anchor bolts for all mechanical equipment and piping as required. Tightly fit and clamp base -supported equipment anchor bolts at all equipment support points. Provide locknuts where equipment is hung. 3.03 EQUIPMENT BASES AND SUPPORTS A. Provide supports, pads, bases and their attachments for mechanical work to be furnished or installed. B. Provide concrete pads for pumps, compressors, other rotating mechanical machinery, boilers, and for equipment where indicated on the drawings. Insert #4 6 - inch -long steel dowel rods into floors to anchor pads. 3.04 SEISMIC PROTECTION OF PIPING 23 05 29-3 FSi consulting engineers 14-02 Boiler Replacement December 21 2012 Page 4 Section 23 05 29 Hangers and Supports for HVAC Piping and Equipment A. Seismic Restraints: 1. Provide seismic protection for all piping in accordance with the most current edition of the SMACNA publication "Seismic Restraint Manual - Guidelines for Mechanical Systems", Hazard Level B. 3.05 SEISMIC PROTECTION OF EQUIPMENT A. Provide seismic protection for all equipment in accordance with the international Building Code, and all local amendments, most recently adopted by the authority having jurisdiction. B. Overturning force calculations for equipment shall be prepared and shall be used to determine anchor bolt size and locations. END OF SECTION 23 05 29 23 05 29-4 FSi consulting engineers J��N1LA wq • City of Tukwila August 2, 2013 Connie Hardin Holaday Parks Inc 4600 S 134 PI Tukwila, WA 98168 Jim Haggerton, Mayor Department of Community Development Jack Pace, Director RE: Correction Letter #1 Plumbing/Gas Piping Permit Application Number PG13-107 Boeing #14-02 — 8811 East Marginal Wy S Dear Ms. Hardin, This letter is to inform you of corrections that must be addressed before your plumbing/gas piping permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. At this time the Public Works Department has no comments. Building Department: Dave Larson at 206-431-3678 if you have any questions regarding the attached memo. Please address the attached comments in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 431-3670. Sincerely, CR)c.. Bill Rambo Permit Technician encl File: PG13-107 W::Permit CenterlCorrection Letters12013IPG13-107 Correction Letter #I.docx 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 Tukwila Building Division Dave Larson, Senior Plan Examiner Building Division Review Memo Date: August 2, 2013 Project Name: Boeing #14-02 Boiler Replacement Permit # PG13-107 Plan Review: Dave Larson, Senior Plans Examiner The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and/or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36. Please submit all plans on the same size paper. Revised plans need to be the same size as originally submitted). (If applicable) Structural Drawings and structural calculation sheets shall be stamped and signed. 1. Please provide the method of sizing the gas piping sections including calculations if applicable. 2. Plan pages relative to the new gas piping should be stamped by a Mechanical Engineer licensed in the state of Washington. 3. Provide gas piping support details and spacing of supports, assuming gas piping is above ground. 4. Welded gas pipe joints will need special inspection by an inspector certified in gas pipe welding. Please add this requirement to the plan notes if applicable. Should there be questions concerning the above information please contact the Building Division at 206-431-3670. Page 2 of 2 "ERMIT COORD COPY o PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: PG13-107 DATE: 08-13-13 PROJECT NAME: BOEING #14-02 SITE ADDRESS: 8811 EAST MARGINAL WY S Original Plan Submittal Response to Incomplete Letter # X Response to Correction Letter # 1 Revision # After Permit Issued DEPARTMENTS:D 11.1111ding D• `C Division Public Works n Fire Prevention Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete n DUE DATE: 08-15-13 Not Applicable n Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping 0 PW 0 Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required n No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 09-12-13 Approved I I Approved with Conditions — Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: Documents/routing slip.doc 2-28-02 PLAN )EVIEW/ROUTING SLIP ACTIVITY NUMBER: PG13-107 DATE: 07-31-13 PROJECT NAME: BOEING #14-02 - BOILER REPLACEMENT SITE ADDRESS: 8811 EAST MARGINAL WY S X Original Plan Submittal Response to Incomplete Letter # _ Response to Correction Letter # Revision # After Permit Issued DEPARTME S: uilding Division 4_1, 5 Public Works ❑ Fire Prevention Structural Planning Division ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete DUE DATE: 08-01-13 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire 0 Ping 0 PW 0 Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required ❑ No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 08-29-13 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) NI" Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: 13-)--.A Departments issued corrections: Bldg Fire 0 Ping 0 PW 0 Staff Initials: Documents/routing slip.doc 2-28-02 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http•//www.ci.tukwila.wa.us REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: l3 Response t Incomplete Letter # Plan Cheek/Permit Number: PG 13 -1.07 E. Response to Correction Letter # 1 C Revision # after Permit is Issued n Revision requested by a City Building Inspector or Plans Examiner Project Name: Boeing #14-02 Project Address: 8811 East Marginal Wy S Contact .Person:1� ekI Phone Number: 110 to 7-5-6 L4531) Summary of Revision: VED CITY OC TFvw u' 'AUG 1.4.2013 PERMIT CENTER Permit Review Comment #1: Gas pipe sizing summary is attached. Comment #2: ME stamped sheets provided with this Permit revision. Comment #3: Note added to 1 M60, referencing specifications for gas piping hangers, supports, & seismic bracing. Project specification excerpts for gas piping hangers, supports, & seismic bracing are attached. Comment #4: Added note to plan per comment. Sheet Number(s). All sheets stamped, 1 M60 revised and clouded. "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: Entered in Permits Plus on \applications\forms-applications on line\revision submittal Created: 8-13-2004 Contractors or Tradespeople Prer Friendly Page • i General/Specialty Contractor A business registered as a construction contractor with L&I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name HOLADAY PARKS INC UBI No. 578004089 Phone 2062489700 Status Active Address 4600 S 134Th Pl License No. HOLADPI379N0 Suite/Apt. License Type Construction Contractor City Seattle Effective Date 1/21/1983 State WA Expiration Date 9/3/2015 Zip 98168 Suspend Date County King Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status HOLADI'00105 HOLADAY PARKS INC Electrical Contractor Hvac/Rfrg Ltd Energy Unused 9/25/2000 4/29/2015 Active HOLADPF376NO HOLADAY PARKS FABRCTRS INC Construction Contractor General Unused 8/20/1963 1/1/1983 Archived Business Owner Information Name Role Effective Date Expiration Date PARKS, GERALD T JR President 01/21/1983 Amount O'CONNOR, BONNY K Secretary 01/21/1983 A1CG96431203 BECK, DAVID CLARENCE Treasurer 01/21/1983 NAILON, JUNE ANNETTE Vice President 01/21/1983 Old Republic Ins Co VAN DER VEEN, JULIE ELIZABETH Member 08/26/2011 08/14/2013 CONNELL, DANIEL AARON Member 08/26/2011 08/14/2013 GIRI, BUIT Member 08/26/2011 08/14/2013 KIEL, RINALD HOWARD Member 08/26/2011 08/14/2013 WHITMYRE, CHRISTIAN Member 08/26/2011 08/14/2013 VAN DER VEEN, ERIC M Vice President 11/04/2010 08/14/2013 PIZZEY, GRACE KATHERINE Vice President 08/26/2011 08/14/2013 NELSON, MICHAEL Secretary 01/01/1980 11/04/2010 PARKS, DAVID L Treasurer 01/01/1980 11/04/2010 TALBOT, PAUL Treasurer 01/01/1980 11/04/2010 Bond Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 7 LIBERTY MUTUAL INS CO 23000452 09/01/2002 Until Cancelled $12,000.00 08/23/2002 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 26 Old Republic Ins Co A1CG96431203 11/01/2012 11/01/2013 $1,000,000.00 10/30/2012 25 Old Republic Ins Co A1CG96431102 11/01/2011 11/01/2012 $1,000,000.00 10/28/2011 24 Old Republic Ins Co A1CG96431102 11/01/2011 11/01/2012 $1,000,000.00 10/28/2011 https://fortress.wa.gov/lni/bbip/Print.aspx 08/26/2013 BOEING SHARED SERVICE GROUP BUILDING 14-02 THOMPSON SITE VICI\ ITY NAP 8811 EAST MARGINAL WAY SOUTH TUKWILA, WASHINGTON 98108 AREA VAP 3UILD1\G ADDRESS: 8811 EAST NARGINAL WAY SOUTH TI,KWILA, WASHI\GTO\ 14-07 11111111111111111111111111111111111111111111111111 (1111111""""1 111111111111111111111 RHONE POULENC dao THO VPSO \ SITE SEPARATE PERMIT REQUIRED FOR: 14-02 3UILDI\G LOCATIO ,C� echanical t� Electrical elumbing 0 Gas Piping C 5,, of Tukwila E; ,s ar`ING DIVISION REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. Ni" 7: fovisions will require a new plan submittal cnd may include additional plan review fern. FNWi,COPY Permit No. VIP t3'- l Ol RFT r'aricw approval is subject to errors and omissions. 1,7%. -,:1' of construction documents does not authorize ti, . i;ion of any adopted code or ordinance. Receipt AI iiti ro . �/ } andh ! t j I !' is ��� Reed: BY y Of 'Tukwila BUILDING DIVISION CODE SU VINERY TYPE OF APPLICATION: NEW ❑ ALTERATION ❑ ADDITION ❑ TENANT IMPROVEMENT II PROJECT DESCRIPTION: THE PRIMARY OBJECTIVE OF THIS PROJECT IS TO PROVIDE DESIGN SERVICES TO REMOVE EXISTING BOILERS FROM THE 14-02 FACILITY AND PLACE NEW BOILERS ON THE EXISTING PADS AND RECONNECT ALL PIPING AND CONTROLS AS DETAILED IN DRAWINGS AND SPECIFICATIONS. WORK INCLUDES PROVIDING ADDITIONAL LOUVER AREA FOR BOILER COMBUSTION AIR, AND REPLACING A PAIR OF DAMAGED DOORS. CODES: 2009 INTERNATIONAL BUILDING CODE & WAC 51-50 2009 INTERNATIONAL MECHANICAL CODE & WAC 51-52 2009 INTERNATIONAL FIRE CODE & WAC 51-54 2009 UNIFORM PLUMBING CODE & WAC 51-56 2009 UNIFORM PLUMBING CODE AMENDMENTS A, B & I & WAC 51-57 2008 NATIONAL ELECTRIC CODE, AMENDMENTS A, B & C & WAC 296-46B-010 2009 WASHINGTON STATE ENERGY CODE WAC 51-11 CURRENT CITY OF TUKWILA ZONING ORDINANCES CONTRACTOR & STATE NUMBER: THE BOEING CO. BOEINC *294ML(OV2009) BOEING PROJECT ENGINEER. TOM ANDERSON, FSI ENGINEERS 206-622-3321 BOEING CONTACT: JOHN MURDOCH PHONE. 253-657-0868 FAX NUMBER. 253-657-0858 E-MAIL. ZONING: john.s.murdoch@boeinq.com OCCUPANCY GROUP. GROUP FI FACTORY CONSTRUCTION TYPE. TYPE II -B ALLOWABLE AREA INCREASE. SPRINKLERED & 60' SET -BACK (NO CHANGES) OCCUPANT LOAD: (ALLOWABLE) NO CHANGE FLOOR AREA: (ACTUAL) NO CHANGE (TABLE 10-A) OFFICES OCC STORAGE OCC. LABORATORY OCC. CANOPY OCC. OTHER OCC BLDG GROSS TUNNEL FIRST FLOOR 3,080 SF 1ST FLR MEZZ 2ND FLOOR 2ND FLOOR ME77 PROJECT AREA 3,080 SF BUILDING HEIGHT: (ACTUAL) 24 FT STORIES: 1 3,080 SF SQ FT SQ FT SQ FT SQ FT SQ FT SQ FT SQ FT MEZZANINE ? ❑ (YES) • (No) SQ FT FIRE PROTECTION: SPRINKLERED THROUGHOUT PER NFPA 13 ? 111 (YES) ❑ (NO) SEPARATION EXTERIOR WALL (NON-BEARING) HOUR RATING EXTTERIOR WALL (BEARING) HOUR RATING INTERIOR WALL (NON-BEARING) HOUR RATING INTERIOR WALL (BEARING) HOUR RATING DEMOUNTABLE PARTITIONS HOUR RATING STRUCTURAL FRAME HOUR RATING FLOOR/CEILINGS HOUR RATING ROOF CONSTRUCTION HOUR RATING SEISMIC DESIGN: ZONE ff D Pi DESIGN LOADS: (CHAPTER 16) ROOF: LIVE (SNOW) FLOOR: OFFICE MECH/STOR STAIRS (PSF) (PSF) (PSF) (PSF) CONCENTRATED. CODES A\D PER V ITS PROJECT TITLE: 14-02 BOILER REPLACEMENT QUANTITY SUBMITTED: ❑ 5 SETS: GENERAL PERMIT (SHELL & CORE) OR STRUCTURAL TENANT IMPROVEMENT 4: SETS: TENANT IMPROVEMENT (NON-STRUCTURAL) ❑ 3 SETS: FIRE PROTECTION/SPRINKLERS ❑ 2 SETS: TENANT IMPROVEMENT (REVISION) SUBMITTED FOR PERMIT & REVIEW: • BUILDING ❑ GRADING El PLUMBING ❑ LANDSCAPE ❑ MECHANICAL* ❑ DEMOLITION ❑ STRUCTURAL ❑ - JOB NUMBER: #15796 * TO BE REVIEWED UNDER SEPARATE PERMIT WASHINGTON STATE NON-RESIDENTIAL ENERGY CODE -APPROACHES COMPLIANCE OPTION ❑ PRESCRIPTIVE ❑ LPA ❑ ANALYSIS ■ N/A SPECIAL INSPECTIONS REQUIRED: • WELD REBAR ❑ STRUCTURAL BOLTING ❑ OTHER CALCULATIONS TYPE: N/A ❑ ELECTRICAL* ❑ FIRE PROTECTION* ❑ CANTILEVER RACKS ❑- ❑ CONCRETE ❑ ANCHOR BOLTS ❑ STRUCTURAL OBSERVATION ATTACHED (YES) (NO) DAWI\G IN DEX SHEET DRAWING SHEET TITLE N0. NO. GO 14 -02 -GO TITLE SHEET 1 Al OR 14-02-1 Al OR FIRST FLOOR PLAN RFA160R 14-02—RFA160R ROOF PLAN 1A10 14-02-1A10 FIRST FLOOR PLAN 1A350 14-02-1A350 DOOR SCHEDULE AND DOOR TYPE RFA160 14-02—RFA160 ROOF PLAN RFA500 14-02—RFA500 ROOF DETAIL S501 14-02—S501 DETAILS M1 14=02—M 1 LEGEND AND ABBREVIATIONS 1M6OR 14-02-1 M6OR HVAC PIPING PLAN — REMOVAL 1 M60 14-02-1M60 HVAC PIPING PLAN REVIEWED FOP CODE COMPLIANj M501 14-02—M501 HEATING WATER DIAGRAM AND SCHEDULES APPROVED i M502 14-02—M502 DETAILS AUG 232013 bL tite City of Tukwila 1 E11 OR 14-02-1 E11 OR 277/480 VOLT POWER PLAN — REMOVAL BUILDING DI'VI$K 1E21OR 14-02-1E21OR CMCS PLAN — REMOVAL E502R 14-02-E502R MCC #5 ELEV & EQUIP LIST DETAIL — BOILER HOUSE — REMOVAL 1E60 14-02-1E60 120/208 VOLT POWER PLAN 1E110 14-02-1E110 277/480 VOLT POWER PLAN 1E210 14-02-1E210 CMCS PLAN E502 14-02—E502 MCC #5 ELEV & EQUIP LIST DETAIL — BOILER HOUSE GE\E RAL \CIES CONSTRUCTION SET OF DOCUMENTS, REVIEWED AND STAMPED BY CITY OF TUKWILA MUST BE ON SITE DURING CONSTRUCTION. DO NOT PROCEED WITH CONSTRUCTION WITHOUT ABOVE MENTIONED SET OF DOCUMENTS. )N 1. VERIFY ALL DIMENSIONS AND CONNECTIONS BEFORE ANY WORK. RECEI1(ED 2. NOTIFY FACILITY ENGINEERS SHOULD EXISTING CONDITIONS REQUIRE DESIGN REVISIONS. CITY OF TUKWILA 3. COORDINATE WORK WITH OTHER CRAFTS. 4. RETURN THIS SAME SET TO THE CONSTRUCTION MANAGER AFTER COMPLETION. PG(slo7 ISSUED FOR CONSTRUCTION1 JUL3 1 2013 PERMIT CENTER • FSi consulting engineers Seattle, Washington Solutions & Service SYM A B REVISION 14-02 BOILER REPLACEMENT 15796 PERMIT REVISIONS 15796 BY FSi FSi APPROVED DATE SYM REVISION BY APPROVED DATE 12.21.12 06.03.13 0,)LAwSETEVE,WAfEIDNIER4a 12.21.12 MOND ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN DATE CHECKED SUBTITLE TITLE SHEET CURRENT REVISION 15796 SYMBOL 3 DATE 06.3.13 APPROVED BY DEPT. DATE ENCINEER CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER BUILDING 14-02 THOMPSON, WA SHEET GO JOB NO. COMP NO. DWG NO. 14-02—GO GENERAL LEGEND NORTH ARROW DETAIL, DRAWING REFERENCE SECTION REFERENCE CONSTRUCTION NOTE REVISION SYMBOL POINT OF CONNECTION BOLD LINE WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT INDICATES EXISTING SLASHED LINE INDICATES EXISTING WORK TO BE DEMOLISHED VENTILATION LEGEND SINGLE LINE DUCTWORK INDICATES VIEW DIMENSION LESS THAN 12 INCHES I DQ I �x1 . I L/I 4 I L-1 I (A) t p SD■ MD SD MD FVD i FD TV�tj 7 F-1 SUPPLY OR EXHAUST TAKEOFF SUPPLY DUCT TURNING TOWARD SUPPLY DUCT TURNING AWAY EXHAUST DUCT TURNING TOWARD EXHAUST DUCT TURNING AWAY ROUND DUCT TURNING TOWARD ROUND DUCT TURNING AWAY TRANSITION SMOKE DAMPER MOTORIZED DAMPER VOLUME DAMPER FIRE DAMPER HUMIDIFIER PLUMBING LEGEND XX DOMESTIC COLD WATER (CW) DOMESTIC HOT WATER (HW) DOMESTIC HOT WATER CIRCULATING (HWC) SOIL, WASTE (S,W) VENT (V) PIPING IDENTIFIER, SEE ABBREVIATIONS ELBOW DOWN o ELBOW UP TEE D4 ACCESS DOOR, ACCESS PANEL FLEXIBLE CONNECTION TURNING VANES FLEXIBLE DUCT 2'x2' SUPPLY DIFFUSER 2' DIAMETER SUPPLY DIFFUSER 1'x2' EXHAUST GRILLE 2'x2' EXHAUST GRILLE 2'x4' EXHAUST GRILLE HUMIDISTAT THERMOSTAT EQUIPMENT TAG TEE DN TEE UP ANGLE VALVE ISOLATION OR SHUT—OFF VALVE (NO), TYPE AS ISOLATION OR SHUT—OFF VALVE (NC), TYPE AS THROTTLING VALVE, TYPE AS SPECIFIED BALANCING VALVE METERING BALANCING VALVE CHECK VALVE CONTROL VALVE 3—WAY CONTROL VALVE ISOLATION OR SHUT—OFF VALVE (NO), TYPE AS ISOLATION OR SHUT—OFF VALVE (NC), TYPE AS THROTTLING VALVE (NO), TYPE AS SPECIFIED THROTTLING VALVE (NC), TYPE AS SPECIFIED PLUG VALVE PRESSURE REDUCING VALVE SOLENOID VALVE ANGLE VALVE(PLAN VIEW) CAP BLIND FLANGE EXPANSION JOINT REDUCER PRESSURE GAUGE STRAINER UNION AIR VENT, TYPE AS SPECIFIED PRESSURE/TEMPERATURE TAP TEMPERATURE GAUGE GENERAL NOTES SPECIFIED SPECIFIED SPECIFIED SPECIFIED PROVIDE POST CONSTRUCTION COMMISSIONING AND COMPLETION REQUIREMENTS IN ACCORDANCE WITH THE WASHINGTON STATE ENERGY CODE, SECTION 1416 AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. SEE SPECIFICATION SECTIONS 23 05 00, 23 09 00 AND ALL OTHER APPLICABLE SPECIFICATION SECTIONS. BALANCE ALL HVAC SYSTEMS IN ACCORDANCE WITH THE WASHINGTON STATE ENERGY CODE, GENERALLY ACCEPTED ENGINEERING STANDARDS AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. SEE SPECIFICATION SECTION 23 05 93 AND ALL OTHER APPLICABLE SPECIFICATION SECTIONS. PROVIDE CONTROLS IN ACCORDANCE WITH THE WASHINGTON STATE ENERGY CODE, SECTION 1412 AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. SEE TEMPERATURE CONTROL SPECIFICATION SECTIONS AND ALL OTHER APPLICABLE SPECIFICATION SECTIONS. ABV AD ADDN AFF ALT AP APPROX ARCH AUX BAL BLDG BSMT BTU BTU H CAP CL CLG CMU COND COL CONC CONN CONST CONT CONTR COORD D DEG DIA DIAL DIFF DIM DISCH DIV DN DP DR DWG EA EFF ELEC ELEV EMCS ENT EQ EQUIP ET EWT EX, (E) EXP EXPL F FIO FIN FLEX FLR FDIC FP FT GA GAL GC GEN GPM GWB H HOA HOR HP HR HZ IBC ID IFC IMC IN INFO INSUL KW KWH L LAB LAV LB GENERAL ABBREVIATIONS ABOVE ACCESS DOOR ADDITION, ADDITIONAL ABOVE FINISHED FLOOR ALTERNATE ACCESS PANEL APPROXIMATELY ARCHITECT; ARCHITECTURAL AUXILIARY BALANCING BUILDING BASEMENT BRITISH THERMAL UNIT BRITISH THERMAL UNITS PER HOUR CAPACITY CENTERLINE CEILING CONCRETE MASONRY UNIT CONDENSATE COLUMN CONCRETE CONNECT; CONNECTION CONSTRUCTION CONTINUOUS; CONTINUATION CONTRACTOR COORDINATE DEEP (DIM) DEGREE DIAMETER DIAGONAL; DIAGRAM DIFFERENTIAL DIMENSION DISCHARGE DIVISION DOWN DIFFERENTIAL PRESSURE DRAIN DRAWING EACH EFFICIENCY ELECTRICAL ELEVATION; ELEVATOR ENERGY MANAGEMENT CONTROL SYSTEM ENTERING EQUAL EQUIPMENT EXPANSION TANK ENTERING WATER TEMPERATURE EXISTING EXPOSED EXPLOSION FAHRENHEIT FURNISHED & INSTALLED BY OWNER FINISHED FLEXIBLE FLOOR FURNISHED BY OWNER, INSTALLED BY CONTRACTOR FIRE PROTECTION; FREEZE PROTECTION FEET; FOOT; FEET OF WATER(PRESS) GAGE; GAUGE GALLON GENERAL CONTRACTOR GENERAL GALLONS PER MINUTE GYPSUM WALLBOARD HEIGHT; HIGH HAND OFF AUTOMATIC HORIZONTAL HORSE POWER HOUR HERTZ INTERNATIONAL BUILDING CODE INSIDE DIAMETER INTERNATIONAL FIRE CODE INTERNATIONAL MECHANICAL CODE INCH INFORMATION INSULATE; INSULATION KILOWATT KILOWATT HOUR LENGTH; LONG (DIM) LABORATORY LAVATORY POUND LBS/HR LF LO LTG LVG LWT MAT MAX MBH MCC MECH MED MFG MFR MIN MISC MTD MTG MTL N NA NC NIC NO NOM NTS OC OD OPP PD PERF PERP PH POC PRELIM PRESS PROP PS PSI PSIG PT QTY QUANTITY POUNDS PER HOUR LINEAL FEET LOW LIGHTING LEAVING LEAVING WATER TEMPERATURE MATERIAL MAXIMUM THOUSAND BRITISH THERMAL UNITS PER HOUR MOTOR CONTROL CENTER MECHANICAL; MECHANICAL CONTRACTOR MEDIUM MANUFACTURING MANUFACTURER MINIMUM; MINUTE MISCELLANEOUS MOUNTED MOUNTING METAL NORTH NOT APPLICABLE NORMALLY CLOSED NOT IN CONTRACT NORMALLY OPEN; NUMBER NOMINAL NOT TO SCALE ON CENTER OUTSIDE DIAMETER; OVERALL DIMENSION OPPOSITE PRESSURE DROP PERFORATED PERPENDICULAR PHASE POINT OF CONNECTION PRELIMINARY PRESSURE PROPERTY; PROPOSAL PRESSURE SWITCH POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH GAGE PRESSURE/TEMPERATURE TAP R RAD REF REFR REQD RET RM RPM S SCHED SECT SF SHT SIM SOL SPEC SPECD SQ STD STRUCT TBD TD TEMP TH THRU TYP UBC UL UTIL V VAR VEL VERT VOL W W/ W/0 WT YD YR RADIUS; RETURN; RISER RADIATOR REFERENCE REFRIGERATION REQUIRED RETURN ROOM REVOLUTIONS PER MINUTE SOUTH SCHEDULE SECTION SQUARE FEET SHEET SIMILAR SOLENOID SPECIFICATION SPECIFIED SQUARE STANDARD STRUCTURAL TO BE DETERMINED TEMPERATURE DIFFERENTIAL TEMPERATURE TOTAL HEAD THROUGH TYPICAL UNIFORM BUILDING CODE UNDERWRITER'S LABORATORY UTILITY VOLT VARIABLE VELOCITY VERTICAL VOLUME WATER; WIDE(DIM); WATT WITH WITHOUT WEIGHT YARD YEAR ISSUED FOR CONSTRUCTION AL AC AD AF AHU BDD BHP BI BOD C CC CFM CG CLG CLWR CLWS COND CT CV CWR CWS DDC DMPR DB EA EAT EF EG EXH FA FC FCU FD FF FPM FS FV GALV GR H HC HPC HPS HTG HV HWR HWS HX IMC AW A BOP CI CF CIRC CW CO CA DI DW DOM DR DF ES FCO FD FOR FOS FOV FPHB G GPH HB HW HWC IPC IW JAN HVAC ABBREVIATIONS ACOUSTIC LINED; ALUMINUM AIR CONDITIONING AUTOMATIC DAMPER AIR FOIL AIR HANDLING UNIT BACKDRAFT DAMPER BRAKE HORSEPOWER BACKWARD INCLINED BOTTOM OF DUCT CONDENSATE; COMMON COOLING COIL CUBIC FEET PER MINUTE CEILING GRILLE COOLING COOLING WATER RETURN COOLING WATER SUPPLY CONDENSATE COOLING TOWER CONSTANT VOLUME CHILLED WATER RETURN CHILLED WATER SUPPLY DIRECT DIGITAL CONTROLS DAMPER DRY BULB TEMPERATURE(°F) EXHAUST AIR ENTERING AIR TEMPERATURE EXHAUST FAN EXHAUST GRILLE EXHAUST FACE AREA FAN COIL; FORWARD CURVED FAN COIL UNIT FIRE DAMPER FINAL FILTER FEET PER MINUTE FLOW SWITCH FACE VELOCITY GALVANIZED GRILLE HUMIDIFIER, HUMIDISTAT HEATING COIL HIGH PRESSURE CONDENSATE HIGH PRESSURE STEAM HEATING HEAT AND VENT UNIT HEATING WATER RETURN HEATING WATER SUPPLY HEAT EXCHANGER INTERNATIONAL MECHANICAL CODE LAT LPC LPS MA MPC MPS LEAVING AIR TEMPERATURE LOW PRESSURE CONDENSATE LOW PRESSURE STEAM MIXED AIR MEDIUM PRESSURE CONDENSATE MEDIUM PRESSURE STEAM NPSH NET POSITIVE SUCTION HEAD OA OAT ODP OSA OV OUTSIDE AIR OUTSIDE AIR TEMPERATURE OPEN DRIPPROOF OUTSIDE AIR OUTLET VELOCITY PF PREFILTER PHC PREHEAT COIL RL RS RHC RH RA RF RG S SFD SP SD SA SF SG SR STM REFRIGERANT LIQUID REFRIGERANT SUCTION (GAS) REHEAT COIL RELATIVE HUMIDITY RETURN AIR RETURN FAN RETURN GRILLE SUPPLY SMOKE/FIRE DAMPER STATIC PRESSURE SMOKE DAMPER; SUPPLY DIFFUSER SUPPLY AIR; SOUND ATTENUATOR SUPPLY FAN SUPPLY GRILLE SUPPLY REGISTER STEAM T, TSTAT THERMOSTAT TEFC TOTALLY ENCLOSED, FAN COOLED TG TRANSFER GRILLE UMC UH UV UNIFORM MECHANICAL CODE UNIT HEATER UNIT VENTILATOR VAV VARIABLE AIR VOLUME VSD VARIABLE SPEED DRIVE VENT VENTILATE; VENTILATION VD VOLUME DAMPER WG WALL GRILLE; WATER GAGE WSEC WASHINGTON STATE ENERGY CODE WSNEC WASHINGTON STATE NON—RESIDENTIAL ENERGY CODE WB WET BULB TEMPERATURE(T) PLUMBING ABBREVIATIONS ACID WASTE AIR, COMPRESSED AIR BOTTOM OF PIPE CAST IRON CHEMICAL FEED CIRCULATING CITY WATER; DOMESTIC COLD WATER CLEAN OUT COMPRESSED AIR DEIONIZED WATER DISTILLED WATER DOMESTIC DOOR; DRAIN DRINKING FOUNTAIN EMERGENCY SHOWER FLOOR CLEAN OUT FLOOR DRAIN FUEL OIL RETURN FUEL OIL SUPPLY FUEL OIL VENT FREEZE PROOF HOSE BIBB GAS GALLONS PER HOUR HOSE BIBB DOMESTIC HOT WATER DOMESTIC HOT WATER CIRCULATING INTERNATIONAL PLUMBING CODE INDIRECT WASTE JANITOR G 3 L MV NPW NO N 0 PC PLBG PNEU PRV RWL RECIRC RD S SS SD UPC V VA VAC VB VTR W WC WFS Y ion LAVATORY MEDICAL VACUUM NON—POTABLE WATER NITROUS OXIDE; NUMBER NITROGEN OXYGEN PUMPED CONDENSATE PLUMBING PNEUMATIC PRESSURE REDUCING VALV RAIN WATER LEADER RECIRCULATING ROOF DRAIN ..1•1.10=f11•131•01100._ REVIEWED FOR CODE COMPLIANCE APPROVED AUG 232013 City of Tukwila BUILDING DIVISION SOIL SANITARY SEWER; SERVICE SINK; STAINLESS STEEL STORM DRAIN UNIFORM PLUMBING CODE VENT VALVE VACUUM VACUUM BREAKER VENT THRU ROOF WASTE; WATER; WIDE(DIM) WATER CLOSET WATER FLOW SWITCH WYE RECEIVED CITY OF TUKWILA JUL 31 2013 PERMIT CENTER • FSi consulting engineers Seattle, Washington Solutions 8c Service SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE A 14-02 BOILER REPLACEMENT 15796 FSi 12.14.12 Q�BOE/NG' �Y- ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN DATE CHECKED SUBTITLE LEGEND AND ABBREVIATIONS CURRENT REVISION 15796 SYMBOL DATE A 12.14.12 APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER BUILDING 14-02 THOMPSON, WA SHEET M1 JOB NO. COMP NO. DWG NO. 14-02—M1 &I— 1, 3x3x316 _i..Y,.. 1 GAS CONN. TO-NAIURAL GAS M- El2IF )SYSTEM TIRE HOSE CONN. 3'-0" ABOVE GROUND HOSE BIBB 3'-0" OFF GROUND 3/4"CW -3/4"CA r W 8 iYP 1"CW H.W. SYSTEM MAKE–UP, UNIT P-1 COMBUSTION CUT–OFF FLOW STITCH –McDONNEL MODEL : –2 2" REUE OMBUSTION FLOW SWITCH MODEL E-2 UT– MCD PRESSURE EGU STRAINER PLUG VALVI 4" NAT. GA FF . EL 8" ALV Ailk& –150 HW. ON •N 10" 150' NN. N H ER OMBUSTION FLOW SWITCH MODEL E-2 UT– MCD PRESSURE EGU STRAINER PLUG VALVI 4" NAT. GA FF . EL 8" "GV ER • 4".:.T < 1 " _ T RCVEf 2"FUNNEL DRAIN 1 1/2" COOLER DRAIN 1/2" CONDENSATE DRAIN 2"CW VALVE 1'-6"CA (NEW) rAIR COMPRESSOR AD -1 (NEW) 6"CA (NEW) 2"IFCR (NEW) 2"IFCS (NErf) 3/4"DW IN III 3/4"DW OUT rg 1/2" TO FLOOR DRAIN (NEW) TIE IIV #3 TI I # r' ... 10"-150' HWS CONN ON HW GEN ROLDITROL AIR RELEAS FITTING f– 6" BOILER RELIEF DR 10" PLUG VALV ANCHOR 1" SOL. VALVE (N.O.) 120V 60HZ 1 1/2"CW (IN ) CRANE #998 1/2 'Y' STRAINER 2" AIR INTAKE, UP THRU EXIST. ROOF ER COOT FR (FXIST) EMERGENCY GENERATOR DIESEL ENGINE EXHAUST 5" SCHED 40 EXHAUST UP THRU EXIST. ROO PENETRATION (3) NO. COM (EXIT.) 30" STACK T 'U ROOF 4" : FILER RELIEF DRAIN PLUG VALVE AIR RECEIVER WITH VALVES & GAGE FURNISHED BY I.R. 30" STACK THRU ROOF 1 1 /2"CA 10 GAL. DAY TANK t._ 2 -SEPARABLE SOCKETS FOR RESISTANCE BULBS THERMOMETERS (FURNISHED WITH BTU METER INSTRUMENATION)2"HWR TRERICE, 9t, NO. 1325403 1/2 THERMOMETER W/ SEPERABLE I SOCKET RANGE 30' 300T IN RISER "HWS 2 1/2"CA 1 SEPARAE THERMOME INSTRUMEN LE SOCKET FOR RESISTANCE BULB ER (FURNISHED WITH BTU METER ATION) 2"CW 6"CA (NEW) CONN. 6" AIR TO EXIST. 6" PLANT AIR AT FLANGE 2"IFCR (NEW) 2"IFCS (NEW) REMOVAL REVIEWED FO •C'ODE COMPLIA E APPROVED AUG 232013 City of Tukwila BUILDING DIVISION LEGE \D GE \E AL \OTES EFERE\CE D�AWI \GS SEE TIF FILE 114-002-4001 M3 FOR MYLAR DRAWING ENOVAL \CTES REMOVE BOILER 1 AND BOILER 2. BOILER JACKET WILL BE ABATED BY BOEING EH&S PRIOR TO REMOVAL COORDINATE WITH BOEING CONSTRUCTION MANAGER. REMOVE EXISTING HWS PIPING AND VALVES FROM BOILERS BACK TO INDICATED DROP. REMOVE ALL ABOVE GROUND FUEL OIL PIPING. DRAIN AND CAP FOR ABANDONMENT OF UNDERGROUND FUEL PIPING. REMOVE PUMP 1 AND 2, AND ASSOCIATED SUCTION AND DISCHARGE PIPING TO LOCATIONS SHOWN. RETAIN PUMPS AND RETURN TO BOEING. CONTACT BOEING CM FOR DIRECTIONS. REMOVE COMPRESSION TANK AND ASSOCIATED NITROGEN PIPING. REMOVE NITROGEN TANKS AND RETURN TO BOEING. REMOVE HWR PIPING BACK TO INDICATED POINT. REMOVE 6" BOILER RELIEF DRAIN PIPING BACK TO TEE. CAP UNUSED BRANCH. REMOVE 4" NATURAL GAS PIPING TO TEE AND CAP UNUSED BRANCH REMOVE 4" NATURAL GAS PIPING, STRAINER AND PLUG VALVE BACK TO ELBOW. 10 REMOVE PIPING FROM COMPRESSION TANK TO AIR SEPARATOR, CAP AT TEE ABOVE AIR SEPARATOR. AIR RELEASE VALVE TO REMAIN. REMOVE PIPING FROM COMPRESSION TANK TO HW SYSTEM MAKE UP UNIT. REMOVE 30" EXHAUST STACK AND CAP CURB OPENING AT ROOF. SEE ARCH FOR CURB CAP ABOVE. REMOVE SEAL WATER PIPING FROM PUMP BACK TO MAKEUP WATER LIVE MAIN AND CAP TEE. DISCONNECT AND RETAIN POT FEEDER FOR REINSTALLATION. REMOVE LADDER, PLATFORM AND ASSOCIATED STRUCTURAL COMPONENTS. LOCATED ABOVE BOILERS. REMOVE FUEL OIL PUMP CONCRETE PADS & PATCH FLOOR. REMOVE CONCRETE PUMP PADS FOR HHW PUMP 1 AND 2 & PATCH FLOOR REMOVE FUEL OIL TRENCH COVER PLATES WITH UN—USED CUTOUTS FOR FUEL OIL REMOVE STACK AND RETAIN PENETRATION FOR REUSE RECEIVED CITY OF TUKWILA JUL 3 1 2013 PE T PGI3 (07 ISSUED FOR CONSTRUCTION II• FSI consulting engineers Seattle, Washington Solutions & Service SYMBOL DATE A 12.21.12 REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE CAD CONVERSION CADDNW 09.04.98 14-02 BOILER REPLACE 15796 FSi 12.21.12 pirAFE,AW ® ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN DATE APPROVED BY DEPT. DATE CHECKED ENGINEER SUBTITLE HVAC PIPING PLAN CURRENT REVISION 15796 CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER BUILDING 14-02 COL. A—E/1-4 THOMPSON, WA SHEET IM6OR JOB NO. COMP NO. DWG NO. 14-002-1M6OR • I rI---Iz FREEZE PROTECTION UNIT HEATER. ON SETPOINT SET FOR 40T. SEE 3/M502 FOR COIL CONNECTION DETAIL 48" FIXE 53% SEE ASPHALT RAM P Wx90" ALUMINU FREE AR ARCH FO 0 LOUVER 4" FRAME MIN. " R LOUVER ARCH c- c—I 1 6" SEISMIC SHUTOFF VALVE GAS METERS CONN. TO NATURAL GAS METERING SYSTEM TS 3x3x3/1 6 TYP 5 TIRE HOSE CONN. 3'-0" ABOVE GROUND HOSE BIBB 3'-0" OFF GROUND 3/4"CW 3/4"CA t .f FOR HEATING WATER A BOILER DIAGRAM SEE 1M60 M501 W8x20 TYP. EMERG: CY BOILER CONNE ION (E) OUTSIDE AIR LOUVERS, 144" * 10", TYP 6. VFD PLACEMENT BOILER CONTROL PAN 1"CW— CONC RETE CURB W/STEEL PLATE 1M60 M50 3/4" HWS&R 1M60 M50 EXPANSION TANK ET -1 1" H.W. PUMP P-1 1M60 M502 1/2" NPW 4" .D. 6" NAT. GAS -2"FUNNEL DRAIN 1 1/2" COOLER DRAIN 1/2" CONDENSATE DRAIN 2"CW VALVE 1'-6"CA (NEW) AIR COMPRESSOR AD -1 (NEW) 1/2" TO FLOOR DRAIN (NEW) 6"CA (NEW' 2"IFCR (NEW) 2"IFCS (NEW) 3/4"DW IN 3/4"DW OUT 1M60 M502 PARATOR LEASE 6" BOILER < RELIEF DRAIN r 8" 1" SOL. VALVE (N.O.) 120V 60HZ 1 1/2"CW (IN CRANE #998 1/2 'Y' STRAINER 2" AIR INTAKE, UP THRU EXIST. ROOF AFTER CO0I FR (FXIST) EMERGENCY GENERATOR DIESEL ENGINE EXHAUST 5" SCHED 40 EXHAUST UP THRU EXIST. RO PENETRATION HWS - - HWR i` - - 3"CW 28" STACK THRU ROOF NO. (EX T.) 6" RELI AIR RECEIVER WITH VALVES & GAGE FURNISHED BY I.R. IS " 1 1/2"CA +ri? nom O II II 10 GAL. DAY TANK 2 -SEPARABLE SOCKETS RESISTANCE BULBS THERMOM MAKE-UP WATER METER PRESSURE REDUCING VAVLE SET SET AT 40 PSI. \-21"HWS 2"CW Id TRERICE, 9", NO. 1325403 1/2 THERMOMETER W/ SEPERABLE SOCKET RANGE - 30' - 300'F IN RISER 1 SEPARABLE SOCKET FOR RESISTANCE BULB THERMOMETER 6 C FREEZE PROTECTION UNIT HEATER. ON SETPOINT SET FOR 40T. SEE 3/M502 FOR COIL CONNECTION DETAIL 2 1/2"CA CONN. 6" AIR TO EXIST. 6" PLANT AIR AT FLANGE CORRECTION )16t3•- 167 2"IFCR (NEW) 2"IFCS (NEW) c4) F;E./IEWED FOR CODE COMPLIANCE APPROVED AUG 2S 2013 City of Tukwila BUILDING DIVISION GENERAL \OTES SEE 2/S501 FOR EQUIPMENT ANCHORING DETAIL. REFERE\CE DRAWINGS SEE TIF FILE 114-002-4001 M3 FOR MYLAR DRAWING RECEIVED CITY OF TUKWILA AUG 1 3 2013 PERMIT CENTER FOR PIPE SUPPORTS REFER TO SPEC 23 05 29 (TYP). CONSTRUCTIO\ NOTES PROVIDE AND INSTALL BOILERS ON THE EQUIPMENT PADS. MAINTAIN MFR'S RECOMMENDED ACCESS CLEARANCES AS INDICATED ON BOILER 1. PROVIDE BOILER HOT WATER PIPING, VALVES AND COMBUSTION CUT OFF FLOW SWITCHES ROUTED FROM EXISTING HOT WATER LINE TO BOILERS. SEE FOR NATURAL GAS PIPE WELDING AND INSPECTION REFER TO SPEC 23 11 00 (TYP). OV H G IT i ER M'.FRG! DE4; BETWEEN PUMPS AND VFDs. SEE 1/M502 FOR DETAIL. FOR VFDS SEE DRAWING 1E110. PROVIDE NATURAL GAS LINE WITH VALVE TRAIN TO THE THREE BOILERS, SEE BOILER CONNECTION DETAIL 2/M502. PROVIDE EXPANSION TANK, PIPING TO PUMP INLET LINE AND APPROPRIATE FITTINGS. PROVIDE SUCTION DIFFUSERS FOR THE PUMP INLETS, CHECK VALVES, SHUT OFF VALVES AND APPROPRIATE CONNECTIONS. SEE 1/M502 FOR PUMP CONNECTION DETAIL. PROVIDE FLUE AND CONNECT TO EACH BOILER, ROUTE FLUE UP THROUGH EXISTING 30" ROOF PENETRATION. SEE A/M502. PROVIDE, MOUNT BOILER CONTROL PANELS ON STRUT SUPPORT AT END OF EQUIPMENT PAD. CONNECT 2" BOILER RELIEF DRAIN TO BOILER RELIEF VALVE OUTLET & ROUTE TO EXISTING DRAIN PIPING. SLOPE HORIZONTAL PIPING DN TO DRAIN. PROVIDE PIPE CONNECTION FROM H.W. SYSTEM MAKE—UP UNIT TO EXPANSION TANK PROVIDE EMERGENCY BOILER CONNECTION, VALVE AND 10" FLANGE, AND BLIND FLANGE. PROVIDE SIMILAR TO EXISTING STEEL PLATE TRENCH COVER. MOUNT RELOCATED POT FEEDER. PROVIDE NEW GAS REGULATORS. VENTING THROUGH EXISTING ROOF PENETRATIONS. PROVIDE PUMP PADS, SEE DETAIL 1/M502 PROVIDE VERTICALLY MOUNTED SEISMIC SHUTOFF VALVE PER MANUFACTURER INSTALLATION INSTRUCTIONS. PROVIDE FLUE TEMPERATURE GAGE AT EACH BOILER FLUE. PROVIDE UNIT HEATER, ROUTE HEATING WATER PIPING AS SHOWN, CONNECT TO EXISTING HWS/R. PROVIDE J.L.WINGERT CO. COUPON RACK CSCR -5-007, WITH ASSOCIATED CONNECTION PIPE AND VALVES. PROVIDE UNISTRUT MOUNTING. PROVIDE J.L.WINGERT CO SAMPLE COOLER SC-2—B—COP, AND ASSOCIATED CONNECTION PIPE AND ISOLATION VALVES. CONNECT WITH i" PIPING. PROVIDE UNISTRUT MOUNTING. MODIFY 30" STACK PENETRATION FOR 28" FLUE. SEE S501 FOR LOUVER WALL OPENING AND REINFORCING. PROVIDE FLANGES FOR FUTURE 48" PIPE SPOOL FOR CROSSOVER CONNECTION, PROVIDE BLIND FLANGES, TYP 2. PROVIDE 36" X 14" DUCT FROM TOP OF EXISTING LOUVERS AT A MAXIMUM OF 45.0° ANGLE TO WITHIN 8" OF CEILING, REFER TO SECTION M5 MOUNT RELOCATED METER AND PANEL ON WALL NEAR EXISTING RPBP AND ELECTRICAL OUTLET. MOUNT PRV ON WALL IN ACCESSIBLE LOCATION. FSi consulting engineers Seattle, Washington ISSUED FOR CONSTRUCTION Solutions & Service SYM REVISION CAD CONVERSION A 14-02 BOILER REPLACEMENT 15796 B PERMIT REVISIONS 15796 C D 14-02 BOILER REPLACEMENT REVISION 15796 GAS PIPING PERMIT REVISION 15796 BY CADDNW FSi FSi FSi FSi APPROVED DATE SYM REVISION BY APPROVED DATE 09.04.98 12.21.12 06.03.13 07.12.13 08.13.13 QtBOE/NG' 12.21.12 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN DATE CHECKED SUBTITLE HVAC PIPING PLAN CURRENT REVISION 15796 SYMBOL D DATE 08.13.13 APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER BUILDING 14-02 COL. A—E/1-4 SHEET 1 M60 JOB NO. COMP NO. THOMPSON, WA DWG No. 14-002-1M60 A( \'''' BOILER EMERGENCY _ CONNECTION 1-�EUCE-i - 4' -- 8" 78" NAT. GAS 3 TYP (2� M502 1M60 , -a -0 4"GV D PLUG VALVE L. 1 1/2" AIR TO RCVR - STRAINER -2"FUNNEL DRAIN 1 1/2" COOLER DRAIN 1/2" CONDENSATE DRAIN 2"CW VALVE 1'-6"CA (NEW) AIR COMPRESSOR AD -1 (NEW) 1/2" TO FLOOR DRAIN (NEW) 6"CA (NEW' 2"IFCR (NEW) 2"IFCS (NEW) 3/4"DW IN 3/4"DW OUT 1M60 M502 PARATOR LEASE 6" BOILER < RELIEF DRAIN r 8" 1" SOL. VALVE (N.O.) 120V 60HZ 1 1/2"CW (IN CRANE #998 1/2 'Y' STRAINER 2" AIR INTAKE, UP THRU EXIST. ROOF AFTER CO0I FR (FXIST) EMERGENCY GENERATOR DIESEL ENGINE EXHAUST 5" SCHED 40 EXHAUST UP THRU EXIST. RO PENETRATION HWS - - HWR i` - - 3"CW 28" STACK THRU ROOF NO. (EX T.) 6" RELI AIR RECEIVER WITH VALVES & GAGE FURNISHED BY I.R. IS " 1 1/2"CA +ri? nom O II II 10 GAL. DAY TANK 2 -SEPARABLE SOCKETS RESISTANCE BULBS THERMOM MAKE-UP WATER METER PRESSURE REDUCING VAVLE SET SET AT 40 PSI. \-21"HWS 2"CW Id TRERICE, 9", NO. 1325403 1/2 THERMOMETER W/ SEPERABLE SOCKET RANGE - 30' - 300'F IN RISER 1 SEPARABLE SOCKET FOR RESISTANCE BULB THERMOMETER 6 C FREEZE PROTECTION UNIT HEATER. ON SETPOINT SET FOR 40T. SEE 3/M502 FOR COIL CONNECTION DETAIL 2 1/2"CA CONN. 6" AIR TO EXIST. 6" PLANT AIR AT FLANGE CORRECTION )16t3•- 167 2"IFCR (NEW) 2"IFCS (NEW) c4) F;E./IEWED FOR CODE COMPLIANCE APPROVED AUG 2S 2013 City of Tukwila BUILDING DIVISION GENERAL \OTES SEE 2/S501 FOR EQUIPMENT ANCHORING DETAIL. REFERE\CE DRAWINGS SEE TIF FILE 114-002-4001 M3 FOR MYLAR DRAWING RECEIVED CITY OF TUKWILA AUG 1 3 2013 PERMIT CENTER FOR PIPE SUPPORTS REFER TO SPEC 23 05 29 (TYP). CONSTRUCTIO\ NOTES PROVIDE AND INSTALL BOILERS ON THE EQUIPMENT PADS. MAINTAIN MFR'S RECOMMENDED ACCESS CLEARANCES AS INDICATED ON BOILER 1. PROVIDE BOILER HOT WATER PIPING, VALVES AND COMBUSTION CUT OFF FLOW SWITCHES ROUTED FROM EXISTING HOT WATER LINE TO BOILERS. SEE FOR NATURAL GAS PIPE WELDING AND INSPECTION REFER TO SPEC 23 11 00 (TYP). OV H G IT i ER M'.FRG! DE4; BETWEEN PUMPS AND VFDs. SEE 1/M502 FOR DETAIL. FOR VFDS SEE DRAWING 1E110. PROVIDE NATURAL GAS LINE WITH VALVE TRAIN TO THE THREE BOILERS, SEE BOILER CONNECTION DETAIL 2/M502. PROVIDE EXPANSION TANK, PIPING TO PUMP INLET LINE AND APPROPRIATE FITTINGS. PROVIDE SUCTION DIFFUSERS FOR THE PUMP INLETS, CHECK VALVES, SHUT OFF VALVES AND APPROPRIATE CONNECTIONS. SEE 1/M502 FOR PUMP CONNECTION DETAIL. PROVIDE FLUE AND CONNECT TO EACH BOILER, ROUTE FLUE UP THROUGH EXISTING 30" ROOF PENETRATION. SEE A/M502. PROVIDE, MOUNT BOILER CONTROL PANELS ON STRUT SUPPORT AT END OF EQUIPMENT PAD. CONNECT 2" BOILER RELIEF DRAIN TO BOILER RELIEF VALVE OUTLET & ROUTE TO EXISTING DRAIN PIPING. SLOPE HORIZONTAL PIPING DN TO DRAIN. PROVIDE PIPE CONNECTION FROM H.W. SYSTEM MAKE—UP UNIT TO EXPANSION TANK PROVIDE EMERGENCY BOILER CONNECTION, VALVE AND 10" FLANGE, AND BLIND FLANGE. PROVIDE SIMILAR TO EXISTING STEEL PLATE TRENCH COVER. MOUNT RELOCATED POT FEEDER. PROVIDE NEW GAS REGULATORS. VENTING THROUGH EXISTING ROOF PENETRATIONS. PROVIDE PUMP PADS, SEE DETAIL 1/M502 PROVIDE VERTICALLY MOUNTED SEISMIC SHUTOFF VALVE PER MANUFACTURER INSTALLATION INSTRUCTIONS. PROVIDE FLUE TEMPERATURE GAGE AT EACH BOILER FLUE. PROVIDE UNIT HEATER, ROUTE HEATING WATER PIPING AS SHOWN, CONNECT TO EXISTING HWS/R. PROVIDE J.L.WINGERT CO. COUPON RACK CSCR -5-007, WITH ASSOCIATED CONNECTION PIPE AND VALVES. PROVIDE UNISTRUT MOUNTING. PROVIDE J.L.WINGERT CO SAMPLE COOLER SC-2—B—COP, AND ASSOCIATED CONNECTION PIPE AND ISOLATION VALVES. CONNECT WITH i" PIPING. PROVIDE UNISTRUT MOUNTING. MODIFY 30" STACK PENETRATION FOR 28" FLUE. SEE S501 FOR LOUVER WALL OPENING AND REINFORCING. PROVIDE FLANGES FOR FUTURE 48" PIPE SPOOL FOR CROSSOVER CONNECTION, PROVIDE BLIND FLANGES, TYP 2. PROVIDE 36" X 14" DUCT FROM TOP OF EXISTING LOUVERS AT A MAXIMUM OF 45.0° ANGLE TO WITHIN 8" OF CEILING, REFER TO SECTION M5 MOUNT RELOCATED METER AND PANEL ON WALL NEAR EXISTING RPBP AND ELECTRICAL OUTLET. MOUNT PRV ON WALL IN ACCESSIBLE LOCATION. FSi consulting engineers Seattle, Washington ISSUED FOR CONSTRUCTION Solutions & Service SYM REVISION CAD CONVERSION A 14-02 BOILER REPLACEMENT 15796 B PERMIT REVISIONS 15796 C D 14-02 BOILER REPLACEMENT REVISION 15796 GAS PIPING PERMIT REVISION 15796 BY CADDNW FSi FSi FSi FSi APPROVED DATE SYM REVISION BY APPROVED DATE 09.04.98 12.21.12 06.03.13 07.12.13 08.13.13 QtBOE/NG' 12.21.12 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN DATE CHECKED SUBTITLE HVAC PIPING PLAN CURRENT REVISION 15796 SYMBOL D DATE 08.13.13 APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER BUILDING 14-02 COL. A—E/1-4 SHEET 1 M60 JOB NO. COMP NO. THOMPSON, WA DWG No. 14-002-1M60 BOILER E -STOP PUSHBUTTON TYP 2. SEE ELECTRICAL FUTURE BOILER PUMP FOR VARIABLE FLOW, TYP. 3 ATER TREAT CHEM FEEDER rA HEAMIG WATER 301LE M501 SCALE: NONE DIAGAv BOILER CONTROL 1. BOILER OPERATION AND SEQUENCEING SHALL BE CONTROLLED BY THE BOILER CONTROL PANEL, INCLUDING SAFETIES AND INTERLOCKS. 2. EMCS SHALL ENABLE BOILERS ON SCHEDULE. 3. ONE SET BOILER ISOLATION VALVES SHALL OPEN WHEN SYSTEM ENABLED. 4. SECOND SET BOILER ISOLATION VALVES SHALL OPEN WHEN CALL FOR SECOND BOILER ON. 5. BOILER CONTROL SHALL PROVE BOILER WATER FLOW PRIOR TO FIRING BOILER. 6. BOILERS SHALL BE CONTROLLED TO MAINTAIN HEATING WATER SUPPLY TEMPERATURE SETPOINT (INITIALLY 180°F), WITH AN ADJUSTABLE DEADBAND (INITIALLY 4°F). 7. STAGE BOILERS ACOORDING TO MANUFACTURER'S RECOMMENDATIONS AND BOILER CONTROL PANEL ON -BOARD SEQUENCES. 8. THE BOILER CONTROL PANEL SHALL DESIGNATE ONE BOILER AS THE LEAD, WITH THE NEXT AS LAG. THE THIRD BOILER IS STANDBY/BACKUP. WHEN THE LEAD BOILER HAS 300 RUN HOURS TIME LOGGED, THE BOILER CONTROL PANEL SHALL DESIGNATE THE NEXT BOILER AS LEAD. ALL THREE UNITS SHALL BE ROTATED EQUALLY THROUGH THE LEAD DESIGNATION. SAFETIES 1. WHEN A LEAD OR LAG BOILER FAILS TO OPERATE, START STANDBY BOILER AND PROVIDE BOILER FAILURE SIGNAL TO EMCS. 2. EMERGENCY PUSHBUTTONS SHALL BE HARDWIRED TO DISABLE BOILERS BY CUTTING POWER TO BURNER CONTROLS. NOTES 1. DESIGN IS FOR DUAL FLOW SYSTEM AND CONSTANT TEMP SETPOINT. 2. SYSTEM HAS PROVISIONS FOR FUTURE VARIABLE FLOW OPERATION, VARIABLE FLOW OPERATION OF THESE BOILERS WILL REQUIRE ADDITION OF BOILER CIRCULATION PUMPS, AND PIPING AND CONTROLS MODIFICATIONS. 3. BOILER CONTROL PANEL SHALL HAVE PROVISION FOR FUTURE HWST RESET. HEATING WATER PUMPS CONTROL 1. ONE SET BOILER ISOLATION VALVES SHALL OPEN WHEN SYSTEM ENABLED. 2.ONE PUMP SHALL START WHEN SYSTEM IS ENABLED. 3. WHEN THERE IS A CALL FOR A SECOND BOILER, SECOND PUMP SHALL START. 4. THE EMCS CONTROL PANEL SHALL DESIGNATE ONE PUMP AS THE LEAD, WITH THE NEXT AS LAG. THE THIRD PUMP IS STANDBY/BACKUP. WHEN THE LEAD PUMP HAS 300 RUN HOURS TIME LOGGED, THE EMCS CONTROL PANEL SHALL DESIGNATE THE NEXT PUMP AS LEAD. ALL THREE PUMPS SHALL BE ROTATED EQUALLY THROUGH THE LEAD DESIGNATION. SAFETIES 5. WHEN A LEAD OR LAG PUMP FAILS TO PROVE OPERATION, START STANDBY PUMP AND PROVIDE PUMP FAILURE SIGNAL TO EMCS. NOTES 1. VFD SPEED SETTING FOR ALL THREE PUMPS SHALL BE BALANCED TO THE DESIGN PUMP FLOW. 2. DESIGN IS FOR A DUAL FLOW SYSTEM WITH ONE PUMP ON PROVIDING 400 GPM AND TWO PUMPS ON PROVIDING 800 GPM. 3. SYSTEM HAS PROVISIONS FOR FUTURE VARIABLE FLOW OPERATION. VARIABLE FLOW OPERATION WILL REQUIRE PIPING AND CONTROL SEQUENCE MODIFICATIONS. EMCS CONTROL 1. SYSTEM ENABLE/DISABLE 2. SUPPLY WATER TEMPERATURE SETPOINT 3. BOILER ON/OFF DEADBAND MONITORING 1. BOILER FAULTS 2. PUMP FAILURE 3. SUPPLY WATER TEMPERATURE 4. RETURN WATER TEMPERATURE NOTES 1. SEE POINT LIST HEATI\G WATER SEQUE\CES OF OPHATIO\ SCALE: NONE P N 301LE PLA\T CvCS P01\T SUvvAY SYSTEM NAME: HW HEATING SYSTEM DESCRIPTION: PRESSURE ANALOG INPUTS ANALOG OUTPUTS DIGITAL INPUTS DIGITAL OUTPUTS ALARMS REMARKS REMARKS HYDRONIC BOILER ENABLE 180 50 400 1 PROVIDE VFD (SEE ELECTRICAL), SUCTION DIFFUSER P-2 BOILER STATUS 180 50 1 10 1 P-3 HW PUMP 1 START/STOP 180 50 400 1 PROVIDE VFD (SEE ELLECTRICAL), SUCTION DIFFUSER HW PUMP 1 STATUS 4000 WT 1 160 1 CURRENT SENSING RELAY HW PUMP 2 START/STOP 160 GAS 5,000 1 2 CLEAVER BROOKS FLX 500 HW PUMP 2 STATUS 1 B3 1 CURRENT SENSING RELAY HW BOILER PUMP 3 START/STOP 160 180 85% ET 1 160 GAS HW BOILER PUMP 3 STATUS 18 2 1 1 CURRENT SENSING RELAY BOILER SUPPLY TEMP 1 1 BOILER RETURN TEMP 1 1 TOTALS: 2 0 4 4 6 BOILER CONTROL 1. BOILER OPERATION AND SEQUENCEING SHALL BE CONTROLLED BY THE BOILER CONTROL PANEL, INCLUDING SAFETIES AND INTERLOCKS. 2. EMCS SHALL ENABLE BOILERS ON SCHEDULE. 3. ONE SET BOILER ISOLATION VALVES SHALL OPEN WHEN SYSTEM ENABLED. 4. SECOND SET BOILER ISOLATION VALVES SHALL OPEN WHEN CALL FOR SECOND BOILER ON. 5. BOILER CONTROL SHALL PROVE BOILER WATER FLOW PRIOR TO FIRING BOILER. 6. BOILERS SHALL BE CONTROLLED TO MAINTAIN HEATING WATER SUPPLY TEMPERATURE SETPOINT (INITIALLY 180°F), WITH AN ADJUSTABLE DEADBAND (INITIALLY 4°F). 7. STAGE BOILERS ACOORDING TO MANUFACTURER'S RECOMMENDATIONS AND BOILER CONTROL PANEL ON -BOARD SEQUENCES. 8. THE BOILER CONTROL PANEL SHALL DESIGNATE ONE BOILER AS THE LEAD, WITH THE NEXT AS LAG. THE THIRD BOILER IS STANDBY/BACKUP. WHEN THE LEAD BOILER HAS 300 RUN HOURS TIME LOGGED, THE BOILER CONTROL PANEL SHALL DESIGNATE THE NEXT BOILER AS LEAD. ALL THREE UNITS SHALL BE ROTATED EQUALLY THROUGH THE LEAD DESIGNATION. SAFETIES 1. WHEN A LEAD OR LAG BOILER FAILS TO OPERATE, START STANDBY BOILER AND PROVIDE BOILER FAILURE SIGNAL TO EMCS. 2. EMERGENCY PUSHBUTTONS SHALL BE HARDWIRED TO DISABLE BOILERS BY CUTTING POWER TO BURNER CONTROLS. NOTES 1. DESIGN IS FOR DUAL FLOW SYSTEM AND CONSTANT TEMP SETPOINT. 2. SYSTEM HAS PROVISIONS FOR FUTURE VARIABLE FLOW OPERATION, VARIABLE FLOW OPERATION OF THESE BOILERS WILL REQUIRE ADDITION OF BOILER CIRCULATION PUMPS, AND PIPING AND CONTROLS MODIFICATIONS. 3. BOILER CONTROL PANEL SHALL HAVE PROVISION FOR FUTURE HWST RESET. HEATING WATER PUMPS CONTROL 1. ONE SET BOILER ISOLATION VALVES SHALL OPEN WHEN SYSTEM ENABLED. 2.ONE PUMP SHALL START WHEN SYSTEM IS ENABLED. 3. WHEN THERE IS A CALL FOR A SECOND BOILER, SECOND PUMP SHALL START. 4. THE EMCS CONTROL PANEL SHALL DESIGNATE ONE PUMP AS THE LEAD, WITH THE NEXT AS LAG. THE THIRD PUMP IS STANDBY/BACKUP. WHEN THE LEAD PUMP HAS 300 RUN HOURS TIME LOGGED, THE EMCS CONTROL PANEL SHALL DESIGNATE THE NEXT PUMP AS LEAD. ALL THREE PUMPS SHALL BE ROTATED EQUALLY THROUGH THE LEAD DESIGNATION. SAFETIES 5. WHEN A LEAD OR LAG PUMP FAILS TO PROVE OPERATION, START STANDBY PUMP AND PROVIDE PUMP FAILURE SIGNAL TO EMCS. NOTES 1. VFD SPEED SETTING FOR ALL THREE PUMPS SHALL BE BALANCED TO THE DESIGN PUMP FLOW. 2. DESIGN IS FOR A DUAL FLOW SYSTEM WITH ONE PUMP ON PROVIDING 400 GPM AND TWO PUMPS ON PROVIDING 800 GPM. 3. SYSTEM HAS PROVISIONS FOR FUTURE VARIABLE FLOW OPERATION. VARIABLE FLOW OPERATION WILL REQUIRE PIPING AND CONTROL SEQUENCE MODIFICATIONS. EMCS CONTROL 1. SYSTEM ENABLE/DISABLE 2. SUPPLY WATER TEMPERATURE SETPOINT 3. BOILER ON/OFF DEADBAND MONITORING 1. BOILER FAULTS 2. PUMP FAILURE 3. SUPPLY WATER TEMPERATURE 4. RETURN WATER TEMPERATURE NOTES 1. SEE POINT LIST HEATI\G WATER SEQUE\CES OF OPHATIO\ SCALE: NONE P N D C-I-� SERVICE L= SIZE PRESSURE MARK NO. SERVICE LIQUID TEMP °F HEAD (FT. H20) GPM HP REMARKS P-1 PRIMARY HEATING WATER CIRCULATION 180 50 400 10 PROVIDE VFD (SEE ELECTRICAL), SUCTION DIFFUSER P-2 PRIMARY HEATING WATER CIRCULATION 180 50 400 10 PROVIDE VFD (SEE ELECTRICAL), SUCTION DIFFUSER P-3 PRIMARY HEATING WATER CIRCULATION 180 50 400 10 PROVIDE VFD (SEE ELLECTRICAL), SUCTION DIFFUSER B2 4000 WT 406 160 180 85% ET 2.03 160 GAS 5,000 18 2 TANK SCHEDULE MARK NO. SERVICE GALLONS SIZE PRESSURE REMARKS T-1 FUEL OIL STORAGE 20,000 REMARKS ATMOSPHERE BOILER ROOM FREEZE PROTECTION w w w - w w - T-2 HOT WATER SYSTEM EXPANSION TANK 317 98"x36" MAX. 125 PSI MINIMUM ACCEPTANCE: 0.50 BASIS OF DESIGN: BELL & GOSSETT WTA-457 _ -; ADJACENT BUILDING —\ 1 28" STACK RAIN CAP CO\ ST UCTION OYES PROVIDE FLUE STACK TERMINATION 2' ABOVE ADJACENT BUILDING. PROVIDE BAND WITH CABLE EYES. PROVIDE GUY WIRE, SIMILAR TO EXISTING, CONNECT TO EXISTING BRACKETS ON ROOF, 3 PLACES. SEE ARCH FOR CURB CAP/FLASHING TO EXISTING CURB. 28" (E) CURB ROOF 1" FLUE DRAIN BOILER ROOM ,/-28" 16" DN BOILER 3 MAX 10° 16" 16" BOILER 2 16" BOILER 1 BOILER FLUE SECTION SCALE: 1/4" = rA� iM601M502 GAGE COCK, TYP 1/4", TYP COUPLING MOTOR HOUSEKEEPING PAD FULL LINE SIZE, TYP 3/4" TO FD TO FILL CAPPED DRAIN VALVE & HOSE CONN, 2 TYP PUMP & EXPANCION TANK CONNECTION DETAILn 1M60IM502 SCALE: NONE EMCS STACK TEMP SENSOR I x BOILER N TO FD BURNER VENT GAS TRAIN DEVICES REQUIRING VENTING REGULATOR, PRESSURE SWITCH & ALL OTHER BY . G -� COORDINATEASMECSD-1SIZE & NUMBER W/BOILER MFR. VENT THROUGH EXISTING GAS VENT OR PENETRATIONS. BOILER HOLD-DOWN BOLTS, 4 TYP TO FD DRAIN 1 1/2" * ASTERISK INDICATES ITEMS FURNISHED WITH BOILER, INSTALLED BY CONTRACTOR BOILER CONNECTION DETAIL SCALE: NONE PRESSURE & TEMP TEST PORT, TYP MANUAL VENT 1 M60 M502 VERIFY COIL INLET AND OUTLET CONN. LOCATIONS PRIOR TO PIPING FABRICATION AND INSTALLATION. CONNECT INLET AND OUTLET PER MANUFACTURER'S INSTRUCTIONS. 2—WAY MODULATING CONTROL VALVE MANUAL DRAIN WITH HOSE—END CONNECTION UH COIL CONNECTION SCALE: NONE DETAIL�3� IMO M502 �Gt3� IGS ISSUED FOR CONSTRUCTION REVIEWED FOR CODE COMPLIANCE APPROVED AUG 2 3 2013 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA JUL 3 1 2013 PERMIT CENTER • FSi consulting engineers Seattle, Washington Solutions & Service SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ORIG 14-02 BOILER REPLACEMENT 15796 FSi 12.21.12 i___..ensw,Aria ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN CHECKED DATE SUBTITLE DETAILS CURRENT REVISION SYMBOL DATE 15796 Q G 12.21.12 APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER BUILDING 14-02 THOMPSON, WA SHEET M502 JOB NO. COMP NO. DWG NO. 14-02—M502