Loading...
HomeMy WebLinkAboutPermit S10-071 - PRO GOLFPRO GOLF 17305 SOUTHCENTER PKWY SI 0-071 BUILDING MOUNTED SIGN File No. Name of Tenant: Sign Address: Date Photo Taken: SITE INSPECTION (PLANNING) S10-071 Pro Golf 17305 Southcenter Pkwy 1/10/2011 x Sign appears to conform to permit application Sign appears different from permit application Sign not installed as of XX/XX/200X Make new site visit and take photo by XX/XX/200X Comments: Sign inspected and final approval granted. JMW 01-14-2011 J��11LA h�q City of 4u kwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-431-2451 Web site: http://www.ci.tukwila.wa. us PERMANENT SIGN PERMIT Wall or Awning Face Sign Parcel No.: 2623049024 Permit Number: S10-071 Address: 17305 SOUTHCENTER PY TUKW Issue Date: 12/13/2010 Suite No: Permit Expires On: 06/11/2011 Business: TRACIE SKILES Property Owner: Name: TR5 LLC Address: 117 E LOUISA ST #230 , SEATTLE WA 98102 Contact Person: Name: Address: Phone: Contractor: Name: BERRY NEON Phone: 425-776-8835 Address: 7400 HARDESON RD , EVERETT WA 98203 DESCRIPTION OF WORK: ONE FLUSH MOUNTED BUILDING SIGN. SIGN IS 57.7 SQUARE FEET, "PRO GOLF". FEE FOR PERMIT WAS TAKEN IN UNDER S10-069. Fees Collected: $0.00 WALL SIGN: Total exposed building face: Permitted sign area: Area of sign: AWNING FACE SIGN: Area of awning: Sign area: Type of lighting: Type of material of awning: Type of material of sign: INCENTIVE WALL SIGNAGE: Location of Entrance: Total Exposed Building Face: Area of Wall: Method of Lighting: Zoning: TUC Sign Type: Wall Sign #1 1628 square feet 68.84 square feet 51.7 square feet Awning Sign #1 0 square feet 0 square feet Planning Division Authorized Signature: /1 Wall Sign #2 0 square feet 0 square feet 0 square feet Awning Sign #2 0 square feet Awning Sign #3 0 square feet Date: todig I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. THIS PERMIT SHALL BECOME NULL AND VOID IF THE WORK IS NOT COMMENCED WITHIN 180 DAYS FROM THE DATE OF ISSUANCE, OR IF THE WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS FROM THE LAST INSPECTION. ToSchedule ;a,finaliin's"pectionafor:your!_sign, pleasegcall,the inspection'requeit'l ne at 206 431 2451. •EiiterInspection Code '1510 for,:sign*final; iiispection.:'Please_:allow:up to`5`business days for youririspection: FINAL INSPECTION APPROVAL: DATE: .1..... \AIA I 1 AIA/AI Printed: 12-13-2010