Loading...
HomeMy WebLinkAboutPermit EL13-0822 - COSTCO - OPTICAL - SERVICE CHANGECOSTCO OPTICAL 441 COSTCO DR ELi 3-0822 City o0I'ukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.TukwilaWA.gov Parcel No.: 3623049107 Address: 441 COSTCO DR TUKW Project Name: COSTCO OPTICAL ELECTRICAL PERMIT Permit Number: EL13-0822 Issue Date: 10/03/2013 Permit Expires On: 04/01/2014 Owner: Name: COSTCO WHOLESALE CORP Address: PROPERTY TAX DEPT 190 , 999 LAKE DR 98027 Contact Person: Name: JESSE REYER Address: 15135 NE 92 ST , REDMOND WA, 98052 Contractor: Name: SEQUOYAH ELECTRIC LLC Address: 15135 NE 92ND ST , REDMOND WA 98052 Contractor License No: SEQUOEL977S9 Phone: 425-766-0257 Phone: 425-814-6000 Expiration Date: 01/29/2015 DESCRIPTION OF WORK: PROVIDE AND INSTALL (2) NEW 400 AMP PANEL BOARDS AND ASSOCIATED FEEDERS. Value of Electrical: NRES: $48,464.00 RES: $0.00 Type of Fire Protection: UNKNOWN Electrical service provided by: PUGET SOUND ENERGY Permit Center Authorized Signature: Fees Collected: Washington Cities Electrical Code: $1,202.63 2011 Date: b U 04() I hereby certify that I have read and : xami .- d this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complie • with, hether specified herein or not. The granting of this permit does not pr- u - to give authority to violate or cancel the provisions of any other state or local laws regulating construction o, 1r performance of work. am authorized to sign and obtain this electrical permit. Signature: <Q Q Print Name: t b�l�� 0DG4-'rk This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Date: l©(_// 3 doc: EL -7/13 EL13-0822 Printed: 10-03-2013 PERMIT CONDITIONS Permit No. EL13-0822 **ELECTRICAL** 1: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 2: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 3: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-46B WAC. 4: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 5: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 6: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. doc: EL -7/13 EL13-0822 Printed: 10-03-2013 w CITY OF TUKAID Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov 4111 1 Electrical Permit No. 30 TJ, Project No. Date Application Accepted: 49'--)-0-1 Date Application Expires: X"'` r ( 2J (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: 441 Costco Drive, Tukwila, WA 98188 Tenant Name: Costco Optical PROPERTY OWNER Name: Jesse Reyer Address: 15135 NE 92nd Street Name: Costco Wholesale Phone: (425) 766-0257 Fax: (425) 814-6003 Email: jesse.reyer@sequoyah.com Address: 441 Costco Drive City: Tukwila State: WA Zip: 98188 CONTACT PERSON — person receiving all project communication Name: Jesse Reyer Address: 15135 NE 92nd Street City: Redmond State: WA Zip: 98052 Phone: (425) 766-0257 Fax: (425) 814-6003 Email: jesse.reyer@sequoyah.com King Co Assessor's Tax No.: Suite Number: Floor: New Tenant: ❑ Yes ❑✓ ..No ELECTRICAL CONTRACTOR INFORMATION Company Name: Sequoyah Electric, LLC Address: 15135 NE 92nd Street Cin': Redmond State: WA Zip: 98052 Phone: (425) 814-6000 Fax: (425) 814-6003 Contr Reg No.: SEQUOEL977S9 Exp Date: 12/31/2013 Tukwila Business License No.; BUS -0100327 Valuation of Project (contractor's bid price): $ 48,464 Scope of Work (please provide detailed information): Provide and install (2) new 400A panel boards and associated feeders. Will service be altered? ❑✓ Yes ❑ No Adding more than 50 amps? p✓ Yes ❑ No Type of Use: Commercial Type of work: ❑ New 0 Addition 0 Service Change 0 Remodel ❑✓ Tenant Improvement 0 Low Voltage 0 Generator 0 Fire Alarm 0 Telecommunication 0 Temporary Service Property Served by: 2 Puget Sound Energy 0 Seattle City Light H:\Applications\Forms-Applications On Line\2013 Applications\Electncal Permit Application Revised 7-1-13.docx Revised: July 2013 bh Page 1 of 2 r RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings $152.85 (including an attached garage) ❑ Garages, pools, spas and outbuildings $81.90 ea ❑ Low voltage systems (alarm, furnace thermostat) $59.85 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration $81.90 (no added/altered circuits) ❑ Service change with added/altered circuits $81.90 number of added circuits $11.55 ea ❑ Circuits added/altered without service change $54.60 (up to 5 circuits) ❑ Circuits added/altered without service change $54.60 (6 or more circuits) $7.65 ea ❑ Meter/mast repair $68.25 ❑ Low voltage systems $59.85 (alarm, furnace thermostat) MULTI -FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) $65.00 ❑ Temporary service (generator) $80.90 ❑ Manufactured/mobile home service $86.25 (excluding garage or outbuilding) ❑ Carnivals $80.60 Number of concessions $10.80 ea Each ride and generator truck $10.80 ea `PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDIN ! ER OR EL " T • AL CONTRACTOR: Sign.ture: Print Name: Jesse Reyer Day Telephone: (425) 766-0257 Date: b " 2 Ec-- 13 Mailing Address: 15135 NE 92nd Street City State Zip Redmond WA 98052 H:\Applications\Fornu-Applications On Line \2013 Applications\Electncal Permit Application Revised 7-1-13.docx Revised: July 2013 bh Page 2 of 2 41111 �J,��I A ►vqs City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite#100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.TukwilaWA.gov Parcel No.: 3623049107 Address: 441 COSTCO DR TUICW Suite No: Applicant: COSTCO OPTICAL RECEIPT Permit Number: EL13-0822 Status: PENDING Applied Date: 08/28/2013 Issue Date: Receipt No.: R13-02493 Payment Amount: $1,202.63 Initials: WER Payment Date: 08/28/2013 12:51 PM User ID: 1655 Balance: $0.00 Payee: SEQUOYAH LLC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 537952 1,202.63 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PERMIT - NONR ELECTRICAL PLAN - NONRES 000.322.101.00.00 962.10 000.345.832.00.00 240.53 Total: $1,202.63 Ann. Onnnins na Printed: 08-28-2013 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. a,t3- (NZ CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit_ Inspection Request Line (206) 431-2451 Project:Co Type of Inspection: 2 too Address: /to Date Called: Special Instru dons: Date Wanted: �Q 0 a. p.m. Requester: Phone No: Approved per applicable codes. IBJ Corrections required prior to approval; OMMENTS: 0 4. Inspector: Date: l0 3 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. "'EMIT COORD COPY. PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: EL13-0822 PROJECT NAME: COSTCO OPTICAL SITE ADDRESS: 441 COSTCO DR X Original Plan Submittal Response to Correction Letter # DATE: 08-28-13 Response to Incomplete Letter # Revision # After Permit Issued DEPAR MENTS: Building Division 3 Public Works ❑ Fire Prevention Structural Planning Division n Permit Coordinator 111 DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete DUE DATE: 08-29-13 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: TUES/THURS ROUTING: Please Route, Structural Review Required ❑ No further Review Required REVIEWER'S INITIALS: DATE: n APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Not Approved (attach comments) n Notation: 11 REVIEWER'S INITIALS: DATE: DUE DATE: 09-26-13 Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: Documents/routing slip.doc 2-28-02 Contractors or Tradespeople Pter Friendly Page • Electrical Contractor A business licensed by L&I to contract electrical work within the scope of its specialty. Electrical Contractors must maintain a surety bond or assignment of savings account. They also must have a designated Electrical Administrator or Master Electrician who is a member of the firm or a full-time supervisory employee. Business and Licensing Information Name Phone Address Suite/Apt. City State Zip County Business Type Parent Company SEQUOYAH ELECTRIC LLC 4258146000 15135 Ne 92Nd St Redmond WA 98052 King Limited Liability Company UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Specialty 1 Specialty 2 602252591 Active SEQUOEL977S9 Electrical Contractor 1/29/2003 1/29/2015 General Unused Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status JAMESEL98ORD JAMESTOWN ELECTRIC LLC Electrical Contractor General Unused 12/4/2002 12/4/2004 Archived SEQUOC"062Q8 SEQUOYAH CORPORATION Electrical Contractor General Unused 11/28/1994 11/28/2004 Archived RAINIEC066MG RAINIER ELECTRICAL CONTRACTORS Electrical Contractor General Unused 7/7/1994 7/7/1996 Archived RAINIEC121'MG RAINIER ELECTRICAL CONTRS INC Electrical Contractor General Unused 7/7/1988 7/7/1994 Archived Master Electrician INFORMATION License NICHODE97406 Name NICHOLS, DAVID E Status Active Business Owner Information Name Role Effective Date Expiration Date NICHOLS, DAVID E Partner/Member 01/29/2003 GHASSEMI, MAHMOOD Partner/Member 01/29/2003 NICHOLS, DAVID E Partner/Member 01 /29/2003 Bond Information Page 1 of 2 Bond 1 Bond Company Name HARTFORD CAS INS CO Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 52BSBAB5541 01/29/2003 Until Cancelled $4,000.00 01/29/2003 Assignment of Savings Information No records found for the previous 6 year period Insurance Information No records found for the previous 6 year period Summons/Complaint Information Summons and Complaints are not filed with the department for this contractor type Warrant Information Warrants are not filed with the department for this contractor type Infractions/Citations Information I I https://fortress.wa.gov/lni/bbip/Print.aspx 10/03/2013 © Sequoyah Electric, LLC: All rights reserved. No part of this document may be reproduced in any form or by any means without permission in writing from Sequoyah Electric, LLC. NEW PANEL '2P1' ELECTRICAL FLOOR PLAN SCALE: 1/8"--l'—o" NEW PANEL '2P2' (2) NEW 400A FEEDERS. SEE ONE LINE DIAGRAM FOR ADDITONAL INFORMATION. ELECTS CAL \OTES 1. PERMIT FOR DISTRIBUTION ONLY. NO EQUIPMENT CONNECITONS ARE MADE UNDER THIS PERMIT. SE7 fA,T r PERMIT F EQU RED FOR: ginmchanical 0,EElectrical L7 P umbing IPLOtas Piping City of Tukwila TM NG DIVISION REVISIONS Ido changes shall be made to the scope Fof work without prior approval of I Tukwila Building Division, € cT.E: Revisions will equire a new plan submittal and. r ay i :i:.da additional plan reriv!..! fees. FILE COPY Permit No. 062-21. Plan review approval is subject to errors and omissions. E;,7 -c,! of construction documents does not auhot e of any adopted code or ordinance. Receipt tyt Lpp:oved Field Copy and conditions is acknowledged: By V( (4 -4A - Date: /C)i-q 3 City Of Tukwila BUILDING DIVISION EXISTING 277/480V, 30, 4W, SERVICE TO REMAIN 1 EXISTING 2,500A 120/208V, 30, 4W, SERVICE TO REMAIN EL\3o Szz REVIEWED FOR COMPLIANCE WITH NFPA70-NEC SEP 1 7 2013 of TWcwlla BUILDING DIVISION RECEIVED CITY OF TUKWILA AUG 2 8 2013 PERMIT CENTER 8' 16' SCALE: 1/8" = 1'-0" Electrical Construction Electrical Service Lighting & Maintenance Network Services Design -Build T: (425) 814-6000 F: (425) 814-6003 www.sequoyah.com PROJECT NAME COSTCO OPTICAL DISTRIBUTION UPGRADE 441 COSTCO DRIVE TUKWILA, WA 98188 STAMP DESIGN TEAM Designed By: JW Checked By: JR Drawn By: JW Original Issue Date: Job Number: 08.27.2013 35644 ISSUED/REVISIONS No. Description Date CONSTRUCTION SET 08.27.2013 SCALE 1/8" = 1'-0" (Original drawing is 30"x42". Scale entities accordingly if reduced.) SHEET TITLE ELECTRICAL FLOOR PLAN CURRENT ISSUE CONSTRUCTION SET SHEET NUMBER El © Sequoyah Electric, LLC: All rights reserved. No part of this document may be reproduced in any form or by any means without permission in writing from Sequoyah Electric, LLC. Panel: Fed From: Feed To: Name 2P1 MSB 208/120Y Volt 3 Phase,4 Wire 22 kAIC PANEL SCHEDULE Section 1 of 1 400 Amp Copper Bus 400 Amp Feeder/MLO Ckt No Load Type Load Description Rev No. Ckt Bkr Trip I Pol Load kVA LMTR POLISHER #1 20 /3 2.40 3 LMTR 1 1 2.40 0 0 0 • Top Feed Surface Mount Panelboard ❑ Feed-Thru Lugs ❑ Double Lugs ❑ 200% Neutral ❑ Isolated Ground Load kVA Ckt Bkr Load Trip 1 Pol Type Load Description Rev No. Ckt No 5 LMTR 7 MTR 1 2.40 • 2.40 20 /3 MTR POLISHER #2 2 POLISHER #3 20 /3 2.40 9 MTR 1 2.40 • • 2.40 MTR 1 4 2.40 1 MTR 1 6 11 MTR 13 MTR 1 1 2.40 • 2.40 20 /3 MTR POLISHER #4 8 POLISHER #5 20 /3 2.40 15 MTR 1 1 2.40 • • 2.40 1 MTR 10 2.40 1 MTR 1- 12 17 MTR 19 MTR 1 1 2.40 • 2.40 20 /3 MTR POLISHER #6 14 POLISHER #7 20 /3 2.40 21 MTR 1 2.40 23 MTR 25 MTR 1 1 2.40 • • 2.40 1 MTR 1 16 2.40 1 MTR 18 • 2.40 20 /3 MTR POLISHER #8 20 POLISHER #9 20 /3 2.40 27 MTR 1 2.40 • • 2.40 1 MTR 22 2.40 1 MTR 1 24 29 MTR 31 MTR 1 2.40 • 2.40 20 /3 MTR POLISHER #10 26 POLISHER #11 20 /3 2.40 33 MTR 1- 1 2.40 • • 2.40 J. MTR 1 28 2.40 1 MTR 30 35 MTR 37 MTR 1 1 2.40 39 MTR • 2.40 20 /3 MTR POLISHER #12 32 • • 2.40 1 MTR 1 34 2.40 1 MTR 1 36 41 • 38 • 40 42 Load Type LTNG RCPT HEAT MTR LMTR KITN MISC 4A 4B 4C Connected 0.00 0.00 0.00 26.40 2.40 0.00 0.00 Load by Phase 0.00 0.00 0.00 0.00 0.00 0.00 26.40 26.40 2.40 2.40 0.00 0.00 0.00 0.00 Total , Load Factor 0.00 kVA 125% 0.00 kVA 50%>10kVA 0.00 kVA 100% 79.20 kVA 100% 7.20 kVA 125% 0.00 kVA 100% 0.00 kVA 100% Calc Load 0.00 0.00 0.00 79.20 9.00 0.00 0.00 Manufacturer: Other - See Comments Model/Series: Ckt Brkr Type: Notes / Comments: Revision #: I Revision Date: 28.80 28.80 28.80 86.40 Phase kVA 88.20 Total kVA 240.00 240.00 240.00 240.00 Ave Phase Amps 245.00 Ave Amps 60% 60% 60% 60% Panel Loading 61% Calc Panel Load Panel: Fed From: Feed To: Name 2P2 MSB 208/120Y Volt 3 Phase,4 Wire 22 kAIC PANEL SCHEDULE Section 1 of 1 400 Amp Copper Bus 400 Amp Feeder/MLO Ckt No Load Type Load Description Rev No. Ckt Bkr Trip I Pol Load kVA 0 0 0 Top Feed Surface Mount Panelboard gisi)UOYAH ❑ Feed-Thru Lugs ❑ Double Lugs ❑ 200% Neutral ❑ Isolated Ground Load kVA Ckt Bkr Load Trip I Pol Type Load Description Rev No. Ckt No LMTR VFT ORBIT 1 20 /3 2.67 -i 3 LMTR 1 1 2.67 5 LMTR 1 2.67 • 2.67 20 /3 MTR VFT ORBIT 2 2 7 MTR VFT ORBIT 3 20 /3 2.67 • 2.67 1 MTR 1- 4 2.67 1 MTR 1 6 9 MTR 1 1 2.67 2.67 20 /3 MTR VFT ORBIT 4 8 11 MTR 1 1 2.67 13 MTR VFT ORBIT 5 20 /3 2.67 • 2.67 MTR 10 2.67 1 MTR 1- 12 15 MTR 1 1 2.67 17 MTR 1 1 2.67 • 2.67 20 /3 MTR VFT ORBIT 6 14 19 MTR VFT ORBIT 7 20 /3 2.67 21 MTR 1 2.67 • • 2.67 1 MTR 1 16 2.67 1 MTR 1 18 23 MTR 1 1 2.67 • 2.67 20 /3 MTR VFT ORBIT 8 20 25 MTR MANUAL BLOCKER 1 20 /1 1.10 27 MTR MANUAL BLOCKER 3 20 /1 1.10 • • 2.67 1 MTR 22 2.67 1 MTR 1 24 29 MTR MANUAL BLOCKER 5 20 /1 1.10 • 1.10 20 /1 MTR MANUAL BLOCKER 2 26 31 MTR MANUAL BLOCKER 7 20 /1 1.10 33 MTR LASER ENGRAVER 1 20 /1 1.10 • • 1.10 20 /1 MTR MANUAL BLOCKER 4 28 1.10 20 /1 MTR MANUAL BLOCKER 6 30 35 MTR LASER ENGRAVER 3 20 /1 1.10 • 1.10 20 11 MTR MANUAL BLOCKER 8 32 37 39 • • 1.10 20 /1 MTR LASER ENGRAVER 2 34 1.10 20 /1 MTR LASER ENGRAVER 4 36 41 • 38 • 40 42 Load Type LTNG RCPT HEAT MTR LMTR KITN MISC Connected Load by Phase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.09 23.09 23.09 2.67 2.67 2.67 0.00 0.00 0.00 0.00 0.00 0.00 Total Load Factor I 0.00 kVA 125% 0.00 kVA 50%>10kVA 0.00 kVA 100% 69.27 kVA 100% 8.01 kVA 125% 0.00 kVA 100% 0.00 kVA 100% Calc Load 0.00 0.00 0.00 69.27 10.01 0.00 0.00 Manufacturer: Other - See Comments Model/Series: Ckt Brkr Type: Notes / Comments: I Revision #: 1 Revision Date: 25.76 25.76 25.76 77.28 Phase kVA 79.28 Total kVA 214.67 214.67 214.67 214.67 Ave Phase Amps 220.23 Ave Amps 54% 54% 54% 54% Panel Loading 55% Calc Panel Load 30 -DAY PEAK DEMAND CALCULATION WORKSHEET FOR 2,500 AMP 120/208V SERVICE PER NEC 220-87 AND WAC 296-46B-900On A. Recorded Peak Demand on Date: Several Days (See Note 1 Below) 491.40 KW Study Dates: From 4/8/2013 To 5/8/2013 Power Factor (See Note 2 Below) 0.86 (P.F.) Apparent Peak Demand 571.40 KVA C. NEC 220-87 Adjustment Factor Adjusted Peak Demand D. Seasonal Adjustment Factor (See Note 3 Be ow) Seasonally Adjusted Peak Demand E. Occupancy Adjustment Factor (See Note 4 Below) Occupancy Adjusted Peak Demand F. Other Adjustment Factor (See Note 4 Below) Total Peak Demand X 1.25 714.24 KVA 1.00 714.24 KVA 1.00 714.24 KVA Loci 714.24 KVA G. New Calculated (Demand) Load Added (See Note 5 Below) 167.48 KVA NOTES: 1. 2. 3. 4. 5. Metered Demand Based Calculated Load at 120/208V-3PH: Metered Demand Based Calculated Load at 120/208V-3PH: 881.72 KVA 2449.23 AMPS Peak demand is 1,365.54 amps on Phase B for (30) days. Based on Sqeuoyah Electric demand metering dated 5/8/2013. Power factor is the lowest value for the past (12) months based on utility information. No seasonal factor taken. No other adjustment required. Planned future loads to be connected to new panelboards. (N) PANEL '2P1' 120/208 30,4W 400A 22KAIC (N) PANEL '2P2' 120/208 30,4W 400A 22KAIC ONE -LINE DIAGRAM SCALE: NONE 400AF 400AF 400AT 400AT ELECTRICAL NOTES 1. PERMIT FOR DISTRIBUTION ONLY. NO EQUIPMENT CONNECITONS ARE MADE UNDER THIS PERMIT. FLAG NOTES PROVIDE 400A FEEDER (4)600KCMIL CU, +(1)#3CU IN 4" C. PANEL AND BREAKERS ONLY INSTALLED AT THIS TIME. INSTALLATION OF AND ACTUAL CONNECTIONS TO EQUIPMENT WILL BE FUTURE WORK UNDER A SEPARATE PERMIT. EL rb-- o B 2 2, REVIEWED FOR COMPLIANCE WITH NFPA 70 • NEC SEP i 7 2013 City o Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA AUG 2 a 2013 PERMIT CENTER Electrical Service Lighting & Maintenance Network Services Design -Build T: (425) 814-6000 F: (425) 814-6003 www.sequoyah.com PROJECT NAME COSTCO OPTICAL DISTRIBUTION UPGRADE 441 COSTCO DRIVE TUKWILA, WA 98188 STAMP DESIGN TEAM Designed By: JW Checked By: JR Drawn By: JW Original Issue Date: Job Number: 08.27.2013 35644 ISSUED/REVISIONS No. Description Date CONSTRUCTION SET 08.27.2013 SCALE NONE (Original drawing is 30"x42". Scale entities accordingly if reduced.) SHEET TITLE ONE LINE DIAGRAM AND SCHEDULES CURRENT ISSUE CONSTRUCTION SET SHEET NUMBER E2