Loading...
HomeMy WebLinkAboutPermit EL13-0879 - BOEING - DUWAMISH HABITAT & DREDGING - TENANT IMPROVEMENTBOEING - DUWAMISH HABITAT & DREDGING 8123 EAST MARGINAL wys EL13-0879 City otakukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.TukwilaWA.gov ELECTRICAL PERMIT Parcel No.: 0001600020 Address: 8123 EAST MARGINAL WY S TUKW Project Name: BOEING - DUWAMISH HABITAT & DREDGING Permit Number: Issue Date: Permit Expires On: EL13-0879 10/02/2013 03/31/2014 Owner: Name: BOEING COMPANY THE Address: PROPERTY TAX DEPT , PO BOX 3707 M/C 20-00 98124 Contact Person: Name: ROLANDO MARTIN Address: 15135 NE 92 ST , REDMOND WA, 98052 Contractor: Name: SEQUOYAH ELECTRIC LLC Address: 15135 NE 92ND ST , REDMOND WA 98052 Contractor License No: SEQUOEL977S9 Phone: 425-814-5874 Phone: 425-814-6000 Expiration Date: 01/29/2015 DESCRIPTION OF WORK: PROVIDE PRIMARY DISTRIBUTION TO 1500KVA TRANSFORMER PER PLANS. PROVIDE TEMPORARY DISTRIBUTION ON SECONDARY SIDE FOR JOBSITE PROCESS EQUIPMENT PER PLAN. Value of Electrical: NRES: $227,835.00 RES: $0.00 Type of Fire Protection: UNKNOWN Electrical service provided by: SEATTLE CITY LIGHT Permit Center Authorized Signature: I hereby certify that I have read and e governing this work will be complied The granting of this permit does not pres construction or the performance of work. Signature: Fees Collected: $4,094.19 Washington Cities Electrical Code: 2011 Date: 0 this permit and know the same to be true and correct. All provisions of law and ordinances ether specified herein or not. o give authority to violate or cancel the provisions of any other state or local laws regulating authorized to sign and obtain this electrical permit. Date: Print Name: /2O4-/9 f v /ZIf}-Ie-7/,4l This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: EL -7/13 EL13-0879 Printed: 10-02-2013 • ob PERMIT CONDITIONS Permit No. EL13-0879 **ELECTRICAL** 1: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 2: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 3: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-46B WAC. 4: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 5: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 6: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. doc: EL -7/13 EL13-0879 Printed: 10-02-2013 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Electrical Permit'No. EL\ 0 B7? Project No, Date Application Accepted: Date Application Expires: (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION 911-3 Site Address: inn East Marginal Way So. 98108 King Co Assessor's Tax No.: Suite Number: Floor: New Tenant: ❑ Yes 0..No Tenant Name: Boeing Company PROPERTY OWNER Name: Rolando Martin Name: Boeing Company City: Redmond State: WA Zip: 98052 Address: PO Box 3707 M/C 20-00 Email: rolando.martin@sequoyah.com City: Seattle State: WA Zip: 98124 CONTACT PERSON — person receiving all project communication Name: Rolando Martin Address: 15135 NE 92nd Street City: Redmond State: WA Zip: 98052 Phone: (425) 814-5874 Fax: (425) 814-6003 Email: rolando.martin@sequoyah.com 28240490009 ELECTRICAL CONTRACTOR INFORMATION Company Name: Sequoyah Electric Address: 15135 NE 92nd Street City: Redmond State: WA Zip: 98052 Phone: (425) 814-6000 Fax: (425) 814-6003 Contr Reg No.: SEQUOEL977S9 Exp Date: 01/29/2015 Tukwila Business License No.: BUS -0100327 Valuation of Project (contractor's bid price): $ Scope of Work (please provide detailed information): Provide Primary Distribution to 1500kVA transformer per plans. Provide Temp distribution on secondary side for Jobsite Process Equipment per plan. 227,835 Will service be altered? ❑ Yes 1 No Type of Use: Type of work: ❑ New m Addition m Service Change 0 Remodel 0 Tenant Improvement ❑ Low Voltage ❑ Generator 0 Fire Alarm 0 Telecommunication ❑ Temporary Service Adding more than 50 amps? ❑✓ Yes 0 No Property Served by: 0 Puget Sound Energy 21 Seattle City Light H:\Applications\Fors-Applications On Line\2011 Applications \Electrical Permit Application Revised 8-9-11.docc Revised: August 2011 bh Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE O New single family dwellings $152.85 (including an attached garage) ❑ Garages, pools, spas and outbuildings $81.90 ea O Low voltage systems (alarm, furnace thermostat) $59.85 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration $81.90 (no added/altered circuits) ❑ Service change with added/altered circuits $81.90 number of added circuits $11.55 ea ❑ Circuits added/altered without service change $54.60 (up to 5 circuits) O Circuits added/altered without service change $54.60 (6 or more circuits) $7.65 ea ❑ Meter/mast repair $68.25 ❑ Low voltage systems $59.85 (alarm, furnace thermostat) MULTI -FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES O Temporary service (residential) $63.00 ❑ Temporary service (generator) $78.75 ❑ Manufactured/mobile home service $84.00 (excluding garage or outbuilding) O Carnivals $78.75 Number of concessions $10.50 ea Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Signature: Print Name: Rolando Martin Date: 09/10/2013 Day Telephone: (425) 814-5874 Mailing Address: 15153 NE 92nd St. Redmond WA 98052 City State Zip H:\Applications\Forms-Applications On Line \2011 Applications\Electncal Permit Application Revised 8-9-11.doat Revised: August 2011 bh Page 2 of 2 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.TukwilaWA.gov RECEIPT Parcel No.: 0001600020 Permit Number: EL13-0879 Address: 8123 EAST MARGINAL WY S TUKW Status: PENDING Suite No: Applied Date: 09/11/2013 Applicant: BOEING COMPANY Issue Date: Receipt No.: R13-02605 Initials: User ID: WER 1655 Payment Amount: $4,094.19 Payment Date: 09/11/2013 03:36 PM Balance: $0.00 Payee: SEQUOYAH LLC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 538125 4,094.19 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PERMIT - NONR 000.322.101.00.00 ELECTRICAL PLAN - NONRES 000.345.832.00.00 Total: $4,094.19 3,275.35 818.84 rinr Rcroinf_(1R Printed• 09-11-2013 INSPECTION RECORD Retain a copy with permit (1,(3-0Y11 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter 8(vd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project: t64 1c1-DiftALY1(54- Type of Inspection: Ocr • Address: 2-3 ( / 11-1kk - Date Called: Special Instructions: Date Wanted: /' i2 3 p.m. Requester: (( Tiok Phone No:/ ©tob Approved per applicable codes. Corrections required prior to approval. ,COMMENTS: - ?(P1 c As a \lb likoqpitati /6060) Inspector:izt Date: "413 n REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION.. RECORD Retain a copy with permit 66'077 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project: EAik_D � J (SO Type of Inspection:7!/7_3 aj Address:Date Frz � ` �, Called: Special Instructions: au- f Itik- PkkoN .Y. Date Wanted: af.rrr. Requester: Phone No: ❑ Approved per applicable codes. Corrections required prior to approval. COMMENTS: tr 0 -x ths/Wkti&ovii19 CDAID41 r5 so -14191 *1L13 F (413 H -I) - Apitint,D Amil) 3/0 Date: 0(4? REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. %MIT COORD COPY • PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: EL13-0879 DATE: 09-11-13 PROJECT NAME: BOEING - DUWAMISH HABITAT & DREDGING SITE ADDRESS: 8123 EAST MARGINAL WY S X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: 43-1) Building Division Public Works Fire Prevention Structural ❑ Planning Division Permit Coordinator n 1 DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete n DUE DATE: 09-12-13 Not Applicable n Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required No further Review Required n REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10-10-13 Approved ❑ Approved with Conditions17j Not Approved (attach comments) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: Documents/routing slip.doc 2-28-02 Contractors or Tradespeople Prr Friendly Page • Electrical Contractor A business licensed by L&I to contract electrical work within the scope of its specialty. Electrical Contractors must maintain a surety bond or assignment of savings account. They also must have a designated Electrical Administrator or Master Electrician who is a member of the firm or a full-time supervisory employee. Business and Licensing Information Name Phone Address Suite/Apt. City State Zip County Business Type Parent Company SEQUOYAH ELECTRIC LLC 4258146000 15135 Ne 92Nd St Redmond WA 98052 King Limited Liability Company UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Specialty 1 Specialty 2 602252591 Active SEQUOEL977S9 Electrical Contractor 1/29/2003 1/29/2015 General Unused Icbv\S 01h Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status JAMESEL98ORD JAMESTOWN ELECTRIC LLC Electrical Contractor General Unused 12/4/2002 12/4/2004 Archived SEQUOC'062Q8 SEQUOYAH CORPORATION Electrical Contractor General Unused 11/28/1994 11/28/2004 Archived RAINIEC066MG RAINIER ELECTRICAL CONTRACTORS Electrical Contractor General Unused 7/7/1994 7/7/1996 Archived RAINIEC121MG RAINIER ELECTRICAL CONTRS INC Electrical Contractor General Unused 7/7/1988 7/7/1994 Archived Master Electrician INFORMATION License NICHODE97406 Name NICHOLS, DAVID E Status Active Business Owner Information Name Role Effective Date Expiration Date NICHOLS, DAVID E Partner/Member 01/29/2003 GHASSEMI, MAHMOOD Partner/Member 01/29/2003 NICHOLS, DAVID E Partner/Member 01/29/2003 Bond Information Page 1 of 2 Bond 1 Bond Company Name HARTFORD CAS INS CO Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 52BSBAB5541 01/29/2003 Until Cancelled $4,000.00 01/29/2003 Assignment of Savings Information No records found for the previous 6 year period Insurance Information No records found for the previous 6 year period Summons/Complaint Information Summons and Complaints are not filed with the department for this contractor type Warrant Information Warrants are not filed with the department for this contractor type Infractions/Citations Information I I httbs://fortress.wa. I;ov/1ni/bbip/Print. aspx 1 10/02/2013 1 1 © Sequoyah Electric, LLC: All rights reserved. No part of this document may be reproduced in any form or by any means without permission in writing from Sequoyah Electric, LLC. w c C-1 0 c 0 0 c W u w 0 a rn C▪ U c 0 N 0 0 0 N 1-1 cu rn 0 L fa c 0 MD1 MAIN SERVICE 1600A -480V 2"C. - 4#3/0,#4 GND —10 — 20 — 20 n — 30 1-1/4" C. 3#2, #8 GND 75KVA XFMR 100AMP PANEL H1 200A -277/480V 30 2"C. - 4#3/0,#4 GND (ooA P SPARE OOA (400A 0 SPARE OOA (400A 0 VAULT I13(NEW) 1500KVA XFMR VAULT H13(NEW) 504PL 600A 15KV 75A FUSED SWITCH VAULT G13(NEW) 712LA WITH 42" STEEL ROUND LID LOAD BREAKS VAULT F (EXISTING) VAULT E (EXISTING) EXISTING 13.8KVA BOEING SUBSTATION #21 T NEW (4)4"C. - 4#500KCMIL (1200A 3/0 GROUND TO GROUND ROD NEW 4"C. - 3#1/0 3/0 GROUND TO GROUND ROD NEW 4"C. - 3#500KCMIL MEDIUM VOLTAGE CABLE 13.8KV 3/0 GROUND TO GROUND ROD NEW 4"C. - 3#500KCMIL MEDIUM VOLTAGE CABLE 13.8KV 3/0 GROUND — 20 — 20 — 20 10/3 S.O. CORD (2)20A -480V 10, (1)30A -480V 10 CIRCUITS T #2 GROUND 3" C. 4#250,#2 GND (200A MCB 20 C"\ 20 20 1/2" C. 2#12, #12 GND COMPRESSOR 3HP-120V 10 1/2" C. 2#12, #12 GND YARD LIGHT 20A -120V 10 n 50 1/2" C. 2#12, #12 GND YARD LIGHT 20A -120V 10 SPIDER BOX 50A -120/240V MCB PANEL Ll 200A -120/208V 30 J -BOX WITH FUSE BLOCKS PANEL H2 200A -277/480V 30 (3)2-1/2"C. - 3#3/0,#4GND BOUNDARY OF TEMPORARY WORK INSTALLATON NEW 4"C. - 3#500KCMIL MEDIUM VOLTAGE CABLE 13.8KV 10/3 S.Q. CORD (3)20A -480V 10 CIRCUITS TAP BOX 600A -480V TRIFLOW FUSED DISCONNECT 400AS/AF-480V 30 jJ 10A 10A 10A 10A 10A 10A 10A 10A 10A 30A (3)3/4"C. 3#10, #10 GND (3)3/4"C. 3#10, #10 GND MOTOR RELAYS 7.1A EACH °44 4 Q T QQc 3/4"C. 3#10, #10 GND TRIFLOW DISCONNECT 400A -480V 30 EC FUSED DISCONNECT 200AS/AF-480V 30 r (2)2-1/2"C. - 4#3/0,#4 GND P DISCHARGE PUMP 30A -480V 30 17.3FLA 3/4" C. 3#8, #8 GND 3/4"C. 3#8, #8 GND (2)3/4"C. 3#10, #10 GND TRIFLOW CONTROLLER DISCONNECT 15A 10 TC -1 PANEL 400A -480V 30 J DISCONNECT LIGHTING XFMR 30A -120/240V 20A T ❑ ❑ DISCONNECT 30A 10 J XFMR T TC -2 PANEL 50A -120/240V ELECTRICAL NOTES ALL WORK FOR 'TRIFLOW CONTROLLER' PRE -MANUFACTURED AND PRE -WIRED BY OTHERS. CONNECTED BY ELECTRICAL CONTRACTOR. PANEL SCHEDULES ARE PROVIDED FOR LOAD CALCULATION PURPOSES ONLY. ALL WORK FOR 'ELECTRICAL COAGULATOR' PRE -MANUFACTURED AND PRE -WIRED BY OTHERS. CONNECTED BY ELECTRICAL CONTRACTOR. PANEL SCHEDULES ARE PROVIDED FOR LOAD CALCULATION PURPOSES ONLY. FILE COPY Permit 1 . �l• �`' Q�iff Plan review approval Is and missions. ssions. Approval of =Motion documents does not authorize tic v:3Iation of any adopted code or ordnance. Receipt of approved Field Copy and *. ,'" , + = ac I'eoledged: BY Date AA/1 7 City Ofl kw,a BUILDING DIVISION REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Div n. NOTE: Revisions will require a new plan sitaniNal and may include acklitional plan review fees. PUMP 15A CRA 20A L_ M1 M2 M3 M4 75HP-480V 75HP-480V 75HP-480V 11A -480V 30 30 30 30 M5 M6 M7 11A -480V 5A -480V 4A -480V 30 30 30 GENERATOR POINT OF CONNECTION MANUAL TRANSFER SWITCH 200A -480V 30 0 EC FUSED DISCONNECT 200AS/AF-480V 30 F� MOTOR MOTOR SPARE MOTOR 30A -480V 40A-480 20A -480V 30A -480V EC -1 PANEL 30 30 30 30 200A -277/480V L 2 1/2"C. - 4#3/0,#4 GND L T 60A-15KVA XFMR M8 16A -480V 30 LIGHT LIGHT RECPT RECPT EC -2 PANEL 15A -120V 15A -120V 20A -120V 20A -120V 125A -120/240V 10 10 10 10 M9 M10 M11 4A -480V 7A -480V 5A -480V 30 30 30 60A -480V XFMR 7 LIGHTING 15A 60A -480V XFMR 60A -480V XFMR ELECTRICAL COAGULATOR 200A -480V 30 AIC 200,000 EC CONTROL PANEL SEPARATE PPM' REQUIRED R; Ditlechimbu D macula* Wring Piping City of Tukwila BUILDING DIVISION REVIEWED FOR COMPLIANCE WITH NEPA 70 - NEC SEP 2 6 2013 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 1 1 2013 PERMIT CENTER �L13-0879 //ALJOYAH Electrical Construction Electrical Service Lighting & Maintenance Network Services Design -Build 15135 NE 92nd St Redmond, WA 98052 425.814.6000 MAIN 425.814.6003 FAX www.sequoyah.com PROJECT DUWAMISH HABITAT AND DREDGING BOEING PLANT 2 REVISIONS mm/dd/yy STAMP EXPIRES: 101081 eats DESIGN Design By: Drawn By: Checked By: Issue Date: Date Plotted: Job Number: JH M.ERSFELD-_ JH 09/11/2013 September 11, 2013 (Original drawing is 24'x36". Scale accordingly if reduced.) CURRENT ISSUE REVIEW TITLE ONE -LINE SHEET NUMBER E1.1 EXPIRES: .10108/ 2.015 I © Sequoyah Electric, LLC: All rights reserved. No pari of this document may be reproduced in any form or by any means without permission in writing from Sequoyah Electric, LLC. Panel: Fed From: Feed To: Name MD1 SERVICE 480/277Y Volt 3 Phase,4 Wire 22 kAIC PANEL SCHEDULE Section 1 of 1 1600 Amp Copper Bus 1600 Amp Main Breaker Top Feed Surface Mount Panelboard Ckt No Load Type Load Description No. Ckt Bkr Trip IPol Load kVA 0 0 0 Load Ckt Bkr kVA Load Trip IPot Type SEQUOYAH D Feed-Thru Lugs D 200% Neutral Double Lugs a Isolated Ground Load Description No. Ckt No MISC PANEL 'H1' 200 /3 3 MISC 1- 1 • 5 MISC 1 1 • 600 /3 MISC DREDGE WATER RETURN 2 7 MISC PANEL 'HZ 200 /3 9 MISC 1 1 • • 1 MISC 1 4 1 MISC 1 6 11 MISC 1 1 • 400 /3 MISC SPARE 8 13 MISC SPARE 400 /3 15 MISC 1 1 • • 1 MISC 1 10 1 MISC 1 12 17 MISC 1 1 • SPACE 14 19 SPACE 21 SPACE • • SPACE 16 SPACE 18 23 SPACE • SPACE 20 25 SPACE 27 SPACE • • SPACE 22 SPACE 24 29 SPACE • SPACE 26 31 SPACE 33 SPACE • • SPACE 28 SPACE 30 35 SPACE • SPACE 32 37 SPACE 39 SPACE • • SPACE 34 SPACE 36 41 SPACE • SPACE 38 • SPACE 40 SPACE 42 Load Type CONT RCPT HEAT MTR LMTR KITN MISC �A 1B 41C Connected Load by Phase 9.60 6.00 0.00 3.60 3.60 0.00 0.00 0.00 0.00 110.19 106.59 114.75 26.59 26.59 26.59 0.00 0.00 0.00 0.00 3.60 0.00 Total Load Factor Calc Load 15.60 kVA 125% 19.50 7.20 kVA 50%>10kVA 7.20 0.00 kVA 100% 0.00 331.54 kVA 100% 331.54 79.78 kVA 125% 99.72 0.00 kVA 100% 0.00 3.60 kVA 100% 3.60 Manufacturer: Other - See Comments Model/Series: Ckt Brkr Type: Notes / Comments: 1 Revision #: 1 Revision Date: 149.99 146.39 141.35 437.72 Phase kVA 461.56 Total kVA 541.21 528.22 510.04 526.49 Ave Phase Amps 555.17 Ave Amps 34% 33% 32% 33% Panel Loading 35% Calc Panel Load NOTES ENVIROCON 08/29/2013 Panel MD1 Panel: Fed From: Feed To: Name H1 MD1 480/277Y Volt 3 Phase,4 Wire 18 kAIC PANEL SCHEDULE Section 1 of 1 200 Amp Copper Bus 200 Amp Feeder/MLO Top Feed Surface Mount Panelboard Ckt No Load Type Load Description No. Ckt Bkr Trip I Pol Load kVA 0 0 0 Load Ckt Bkr Load kVA Trip IPol Type ffSCEUOYAH D Feed-Thru Lugs D 200% Neutral a Double Lugs 101 Isolated Ground Load Description No. Ckt No MTR MOTOR 7.1A 20 /3 1.97 3 MTR 1 1 1.97 • 5 MTR 1 1 1.97 • 100 /3 MISC 75KVA TRANSFORMER'PNL L1' 2 7 MTR MOTOR 7.1A 20 /3 1.97 9 MTR 1 1 1.97 • • 1 MISC 1 4 1 MISC 1 6 11 MTR 1 1 1.97 • SPACE 8 13 MTR DISCHARGE PUMP 30 /3 4.79 15 MTR 1 1 4.79 • • SPACE 10 SPACE 12 17 MTR 1 1 4.79 • SPACE 14 19 SPACE 21 SPACE • • SPACE 16 SPACE 18 23 SPACE • SPACE 20 25 SPACE 27 SPACE • • SPACE 22 SPACE 24 29 SPACE • SPACE 26 31 SPACE 33 SPACE • • SPACE 28 SPACE 30 35 SPACE • SPACE 32 37 SPACE 39 SPACE • • SPACE 34 SPACE 36 41 SPACE • SPACE 38 • SPACE 40 SPACE 42 Load Type CONT RCPT HEAT MTR LMTR KITN MISC 4)A 4)B 4)C Connected Load by Phase Total Load Factor Calc Load 1.20 1.20 0.00 2.40 kVA 125% 3.00 0.00 0.00 0.00 0.00 kVA 50%>10kVA 0.00 0.00 0.00 0.00 0.00 kVA 100% 0.00 8.73 8.73 12.81 30.26 kVA 100% 30.26 0.00 0.00 0.00 0.00 kVA 125% 0.00 0.00 0.00 0.00 0.00 kVA 100% 0.00 0.00 0.00 0.00 0.00 kVA 100% 0.00 Manufacturer: Other - See Comments ModeVSeries: Ckt Brkr Type: Notes / Comments: 1 Revision #: 1 Revision Date: 9.93 9.93 12.81 32.66 Phase kVA 33.26 Total kVA 35.82 35.82 46.21 39.28 Ave Phase Amps 40.00 Ave Amps 18% 18% 23% 20% Panel Loading 20% Calc Panel Load NOTES ENVIROCON 08/29/2013 Panel H1 Panel: Fed From: Feed To: Name L1 P1 480/277Y Volt 3 Phase,4 Wire 18kAIC PANEL SCHEDULE Section 1 of 1 200 Amp Copper Bus 200 Amp Main Breaker Top Feed Surface Mount Panelboard Ckt No Load Type Load Description No. Ckt Bkr Trip IPol Load kVA 0 0 0 { CONT YARD LIGHTS 20 /1 1.20 3 CONT YARD LIGHTS 20 /1 1.20 • 5 MTR COMPRESSOR 3HP 20 /1 4.08 • Load Ckt Bkr Load kVA Trip IPol 4.50 50 /2 Type %SEQUOYAH D Feed-Thru Lugs 13 200% Neutral Double Lugs 13 Isolated Ground Load Description SPIDER BOX No. Ckt No 2 7 SPACE 9 SPACE • • 4.50 1 1 4 SPACE 6 11 SPACE • SPACE 8 13 SPACE 15 SPACE • • SPACE 10 SPACE 12 17 SPACE • SPACE 14 19 SPACE 21 SPACE • • SPACE 16 SPACE 18 23 SPACE • SPACE 20 25 SPACE 27 SPACE • • SPACE 22 SPACE 24 29 SPACE • SPACE 26 31 SPACE 33 SPACE • • SPACE 28 SPACE 30 35 SPACE • SPACE 32 37 SPACE 39 SPACE • • SPACE 34 SPACE 36 41 SPACE • SPACE 38 • SPACE 40 SPACE 42 Load Type CONT RCPT HEAT MTR LMTR KITN MISC Connected Load by Phase 1.20 1.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Load Factor 2.40 kVA 125% 0.00 kVA 50%>10kVA 0.00 kVA 100% 4.08 kVA 100% 0.00 kVA 125% 0.00 kVA 100% 0.00 kVA 100% Calc Load 3.00 0.00 0.00 4.08 0.00 0.00 0.00 Manufacturer: Other - See Comments Ckt Brkr Type: Notes / Comments: 1 Revision #:1 1 Revision Date:I 1.20 1.20 4.08 6.48 Phase kVA 7.08 Total kVA 4.33 4.33 14.72 7.79 Ave Phase Amps 8.52 Ave Arnps 2% 2% 7% 4% Panel Loading 4% Cale Panel Load NOTES ENVIROCON 08/29/2013 Panel Li Panel: Fed From: Feed To: Name H2 480/277Y Volt 3 Phase,4 Wire 18 kAIC PANEL SCHEDULE Section 1 of 1 200 Amp Copper Bus 200 Amp Feeder/MLO Ckt No Load Type Load Description No. Ckt Bkr Trip 'Poi Load kVA 0 0 0 Top Feed Surface Mount Panelboard Load Ckt Bkr kVA Load Trip 1Pol Type ,Si\OUOYAH Feed-Thru Lugs D 200% Neutral Isolated Ground I:1 Double Lugs Load Description No. Ckt No MTR MOTOR 7.1A 1.97 3 MTR 1 1 1.97 • 5 MTR 1 1 1.97 • SPACE 2 7 MTR MOTOR 7.1A 20 /3 1.97 MTR 1 1 1.97 • • SPACE 4 SPACE 6 11 MTR 1 1 1.97 • SPACE 13 MTR MOTOR 7.1A 1.97 15 MTR 1 1 1.97 • • SPACE 10 SPACE 12 17 MTR 1 1.97 • SPACE 14 19 SPACE 21 SPACE • • SPACE 16 SPACE 18 23 SPACE • SPACE 20 SPACE 22 25 SPACE SPACE 24 27 SPACE 29 SPACE • SPACE 26 31 SPACE 33 SPACE • • SPACE 29 SPACE 30 35 SPACE • SPACE 32 37 SPACE 39 SPACE • • SPACE 34 SPACE 36 41 SPACE • SPACE 38 SPACE 40 SPACE 42 Load Type CONT RCPT HEAT MTR LMTR KITN MISC OA 013 Connected Load by Phase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.90 5.90 5.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Load Factor Cale Load 0.00 kVA 125% 0.00 0.00 kVA 50%>10kVA 0.00 0.00 kVA 100% 0.00 17.70 kVA 100% 17.70 0.00 kVA 125% 0.00 0.00 kVA 100% 0.00 0.00 kVA 100% 0.00 Manufacturer: Other - See Comments Model/Series: Ckt Brkr Type: Notes / Comments: 1 Revision #: 1 Revision Date: 5.90 5.90 5.90 17.70 Phase kVA 17.70 Total kVA 21.29 21.29 21.29 21.29 Ave Phase Amps 21.29 Ave Amps 11% 11% 11% Panel Loading 11% Calc Panel Load NOTES ENVIROCON 08/29/2013 Panel H2 Panel: Fed From: Feed To: Name EC -1 480/277Y Volt 3 Phase,4 Wire 14 kAIC PANEL SCHEDULE Section 1 of 1 200 Amp Copper Bus 200 Amp Feeder/MLO Top Feed Surface Mount Panelboard Ckt No Load Type Load Description No. Ckt Bkr Trip IPol Load kVA 0 0 0 MTR MOTOR 30 /3 6.00 3 MTR 1 1 6.00 • 5 MTR 1 1 6.00 • Load Ckt Bkr Load kVA Trip IPol Type MISC UOYAH Feed-Thru Lugs C3 200% Neutral a Double Lugs ell Isolated Ground SPARE Load Description No. Ckt No 2 7 MTR MOTOR 8.50 MTR 1 1 8.50 11 MTR 1 1 8.50 • • 1 MISC 1 4 1 MISC 1 6 • 13 MISC XFMR EC -2 15 MISC 1 1 • • 6.00 30 /3 MTR MOTOR 8 6.00 1 MTR 1 10 6.00 1 MTR 1 12 17 MISC XFMR 60 /2 • SPACE 14 19 MISC 1 1 21 MISC 60 /2 • • SPACE 16 SPACE 18 23 MISC 1 1 • SPACE 20 25 MISC XFMR 60 /2 27 MISC 1 • • SPACE 22 29 SPACE • SPACE SPACE 24 26 31 SPACE 33 SPACE • • SPACE 28 SPACE 30 35 SPACE • SPACE 32 SPACE 34 37 SPACE 39 SPACE • SPACE 36 41 SPACE • SPACE 38 SPACE 40 SPACE 42 Load Type CONT RCPT HEAT MTR LMTR KITN MISC Connected Load by Phase Total Load Factor Calc Load 1.80 1.80 0.00 3.60 kVA 125% 4.50 20.50 20.50 20.50 61.50 kVA 100% 61.50 0.00 0.00 0.00 0.00 kVA 125% 0.00 0.00 0.00 0.00 0.00 kVA 100% 0.00 0.00 0.00 0.00 0.00 kVA 100% 0.00 Manufacturer: Other - See Comments Ckt Brkr Type: Notes / Comments: I Revision MI_ 1 Revision Date: 24.10 24.10 20.50 68.70 Phase kVA 69.60 Total kVA 86.96 86.96 73.97 82.63 Ave Phase Amps 83.72 Ave Arnps 43% 43% 37% 41% Panel Loading 42% Calc Panel Load NOTES PANEL IS PART OF PRE -ASSEMBLED EQUIPMENT SUPPLIED BY OTHERS, CONNECTED BY ELECTRICAL CONTRACTOR. PANEL SCHEDULE IS SHOWN FOR LOAD CALCULATION PURPOSES ONLY. ENVIROCON 08/29/2013 Panel EC -1 Panel: Fed From: Feed To: Name EC -2 EC -1 240/120 Volt 10 kAIC PANEL SCHEDULE 125 Amp Copper Bus lAUOYAH Section 1 of 1 125 Amp Main Breaker Top Feed D Feed-Thru Lugs 01 200% Neutral Surface Mount Panelboard Ckt No Load Type Load Description No. Ckt Bkr Trip IPol Load kVA CONT LIGHTS 20 /1 1.80 3 CONT LIGHTS 20 /1 1.80 0 0 • Load Ckt Bkr Load kVA Trip 1Pol 1.80 20 /1 5 SPACE 7 SPACE • 1.80 20 /1 Type RCPT RCPT a Double Lugs el Isolated Ground Ckt No. No Load Description RECEPTACLES 2 RECEPTACLES 4 9 SPACE 11 SPACE • • SPACE 6 SPACE 8 13 SPACE 15 SPACE • • SPACE 10 SPACE 12 17 SPACE 19 SPACE • • SPACE 14 SPACE 16 21 SPACE 23 SPACE • • SPACE 18 SPACE 20 25 SPACE • SPACE 22 SPACE 24 27 SPACE 29 SPACE 31 SPACE • • SPACE 26 SPACE 28 33 SPACE • SPACE 30 SPACE 32 35 SPACE 37 SPACE 39 SPACE • • SPACE 34 SPACE 36 41 SPACE • • SPACE 38 SPACE 40 SPACE 42 Load Type CONT RCPT HEAT MTR LMTR KITN MISC Connected Load by Phase Total Load Factor Calc Load 1.80 1.80 0.00 3.60 kVA 125% 4.50 0.00 0.00 0.00 0.00 kVA 100% 0.00 0.00 0.00 0.00 0.00 kVA 100% 0.00 0.00 0.00 0.00 0.00 kVA 125% 0.00 0.00 0.00 0.00 0.00 kVA 100% 0.00 0.00 0.00 0.00 0.00 kVA 100% 0.00 Manufacturer: Other - See Comments Ckt Brkr Type: Notes / Comments: I Revision #: 1 Revision Date: 3.60 3.60 0.00 7.20 Phase kVA 8.10 Total kVA 30.00 30.00 0.00 30.00 Ave Phase Amps 33.75 Ave Amps 24% 24% 24% Panel Loading 27% Cale Panel Load NOTES PANEL IS PART OF PRE -ASSEMBLED EQUIPMENT SUPPLIED BY OTHERS, CONNECTED BY ELECTRICAL CONTRACTOR. PANEL SCHEDULE IS SHOWN FOR LOAD CALCULATION PURPOSES ONLY. ENVIROCON 08/29/2013 Panel EC -2 Panel: Fed From: Feed To: Name TC -1 480/277Y Volt 3 Phase,4 Wire 14 kAIC PANEL SCHEDULE Section 1 of 1 400 Amp Copper Bus 400 Amp Feeder/MLO Ckt No Load Type Load Description No. Ckt Bkr TripiPol Load kVA /AICEQUOYAH Top Feed Feed-Thru Lugs 0 200% Neutral Surface Mount Panelboard Load Ckt Bkr Load kVA Trip 1P01 Type Double Lugs Isolated Ground Ckt Load Description No. No MTR M11 5A 20 /3 1.39 3 MTR 1 1 1.39 5 MTR 1 1 1.39 • 3.05 20 /3 MTR M4 11A 2 7 MTR M10 7A 20 /3 1.94 9 MTR 1 1.94 • • 3.05 1 MTR 4 3.05' 1 MTR 1 11 MTR 1 1 1.94 • 26.59 125 /3 LMTR M3 75HP 8 26.59 1 LMTR 1- 10 13 MTR M9 4A 20 /3 1.11 15 MTR 1 1 • 26.591 1 LMTR 1 12 17 MTR 1 • 26.59 125 /3 MTR M2 75HP 14 19 MTR M8 16A 20 /3 4.43 21 MTR 1 1 4.43 • • 26.59 1 MTR 1 16 26.59 1 MTR 1 18 23 MTR 1 1 4.43 • 26.59 125 /3 MTR M1 75HP 20 25 MTR M7 4A 20 /3 1.94 • 26 59 1 MTR 1 22 26.59 1 MTR 1 24 27 MTR 1 1.94 29 MTR 1 1 1.94 • MISC XFMR 26 31 MTR M6 5A 1.39 33 MTR 1 1.39 • • 1 MISC 1 28 30 /2 MISC XFMR 12KVA 30 35 MTR 1 1 1.39 • 1 MISC 1 32 37 MTR M5 11A 20 /3 3.05 39 MTR 1 1 3.05 • • SPACE 34 SPACE 36 41 MTR 1 1 3.05 • SPACE 38 • SPACE 40 SPACE 42 Load Type CONT RCPT HEAT MTR LMTR KITN MISC Connected Load by Phase 1.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 73.27 71.47 71.47 26.59 26.59 26.59 0.00 0.00 0.00 0.00 1.80 0.00 Total Load Factor Calc Load 1.80 kVA 125% 2.25 0.00 kVA 50%>10kVA 0.00 0.00 kVA 100% 0.00 216.20 kVA 100% 216.20 79.78 kVA 125% 99.72 0.00 kVA 100% 0.00 1.80 kVA 100% 1.80 CAUTION - Panel is Near Capacity Manufacturer: Other - See Comments Ckt Brkr Type: Notes / Comments: 1 Revision #: 1 Revision Date: 101.66 99.86 98.06 299.57 Phase kVA 319.97 Total kVA 366.83 360.33 353.84 360.33 Ave Phase Amps 384.86 Ave Amps 92% 90% 88% 90% Panel Loading 96% Calc Panel Load NOTES PANEL IS PART OF PRE -ASSEMBLED EQUIPMENT SUPPLIED BY OTHERS, CONNECTED BY ELECTRICAL CONTRACTOR. PANEL SCHEDULE IS SHOWN FOR LOAD CALCULATION PURPOSES ONLY. ENVIROCON 08/29/2013 Panel TC -1 Panel: Fed From: Feed To: Name TC -2 TC -1 240/120 Volt 1 Phase,3 Wire 10 kAIC PANEL SCHEDULE Section 1 of 1 100 Amp Copper Bus 100 Amp Main Breaker Top Feed Surface Mount Panelboard Ckt No Load Type Load Description No. Ckt Bkr Trip 1Pol Load kVA 0 0 Load Ckt Bkr Load kVA -Trip !Poi Type Feed-Thru Lugs 1:11 200% Neutral El Double Lugs a Isolated Ground Load Description No. Ckt No MTR PUMP 20 /1 1.80 3 MISC CRZ 20 /1 1.80 • 5 CONT LIGHTING 20 /1 1.80 7 SPACE • • SPACE 2 SPACE 4 9 SPACE 11 SPACE • • SPACE 6 SPACE 8 13 SPACE 15 SPACE • • SPACE 10 SPACE 12 17 SPACE • SPACE 14 SPACE 16 19 SPACE 21 SPACE • SPACE 18 SPACE 20 23 SPACE 25 SPACE 27 SPACE • • SPACE 22 SPACE 24 29 SPACE 31 SPACE • • SPACE 26 SPACE 28 33 SPACE 35 SPACE • • SPACE 30 SPACE 32 37 SPACE 39 SPACE • • SPACE 34 SPACE 36 41 SPACE • • SPACE 38 SPACE 40 SPACE 42 Load Type CONT RCPT HEAT MTR LMTR KITN MISC 4)13 OC Connected Load by Phase Total Load Factor Calc Load 1.80 0.00 0.00 1.80 kVA 125% 2.25 0.00 0.00 0.00 0.00 kVA 100% 0.00 1.80 0.00 0.00 1.80 kVA 100% 1.80 0.00 0.00 0.00 0.00 kVA 125% 0.00 0.00 0.00 0.00 0.00 kVA 100% 0.00 0.00 1.80 0.00 1.80 kVA 100% 1.80 Manufacturer: Other - See Comments Ckt Brkr Type: Notes / Comments: 1 Revision #: 1 Revision Date: 3.60 1.80 0.00 5.40 Phase kVA 5.85 Total kVA 30.00 15.00 0.00 22.50 Ave Phase Amps 24.38 Ave Amps 30% 15% 23% Panel Loading 24% Calc Panel Load NOTES PANEL IS PART OF PRE -ASSEMBLED EQUIPMENT SUPPLIED BY OTHERS, CONNECTED BY ELECTRICAL CONTRACTOR. PANEL SCHEDULE IS SHOWN FOR LOAD CALCULATION PURPOSES ONLY. ENVIROCON 08/29/2013 Panel TC -2 0 87 REVIEWED FOR COMPLIANCE WITH NFPA 70 - NEC SEP 2 6 2013 CliaTukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 1 1 2013 PERMIT CENTER gilUOYAH Electrical Construction Electrical Service Lighting & Maintenance Network Services 15135 NE 92nd St Redmond, WA 98052 425.814.6000 MAIN 425.814.6003 FAX www.sequoyah.com PROJECT DUWAMISH HABITAT AND DREDGING BOEING PLANT 2 REVISIONS mm/dd/yy STAMP DESIGN Design By: Drawn By: Checked By: Issue Date: Date Plotted: Job Number: JH M. ERSFELD JH 09/11/2013 SEPTEMBER 11, 2013 (Original drawing is 24"x36". Scale accordingly if reduced) CURRENT ISSUE REVIEW TITLE PANEL SCHEDULES SHEET NUMBER El .2