HomeMy WebLinkAboutPermit EL13-0899 - ANTEZANA INVESTMENTS - LOW VOLTAGEANTEZANA INVEST'MENTS
15215 52 AVE S
EXPIRED 03/17/14
EL1 3-0899
City oftukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206-431-3665
Web site: http://www.TukwilaWA.gov
Parcel No.: 1157200017
Address: 15215 52 AV S TUKW
Project Name: ANTEZANA INVESTMENTS
ELECTRICAL PERMIT
Permit Number: EL13-0899
Issue Date: 09/18/2013
Permit Expires On: 03/17/2014
Owner:
Name: ANTEZANA INVESTMENTS LLC
Address: 15215 52ND AVE S , TUKWILA WA 98188
Contact Person:
Name: MARK MCILWAIN
Address: 2030 AIRPORT WY S , SEATTLE WA, 98134
Contractor:
Name: WASHINGTON ALARM INC
Address: 1253 S JACKSON , SEATTLE WA 98144
Contractor License No: WASHIAI282C3
Phone: 206-328-3788
Phone: 206 328-1800
Expiration Date: 12/05/2013
DESCRIPTION OF WORK:
RUN WIRE FOR FIRE ALARM SYSTEM
Value of Electrical:
NRES: $781.00
RES: $0.00
Type of Fire Protection: UNKNOWN
Electrical service provided by: SEATTLE CITY LIGHT
Permit Center Authorized Signature:
Fees Collected:
$90.80
Washington Cities Electrical Code: 2011
Date:
cic--(g-H3
I hereby certify that I have read and examined this permit and know the sa e to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit
construction or the per
Signature:
� 1
Print Name: X/
This permit shall become nul and voi • if ork is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
oes not presume to give authority to violate or c
nce • am authorized to sign and obtain s electrical permit.
cel the provisions of any other state or local laws regulatin
Date:
doc: EL -7/13
EL13-0899 Printed: 09-18-2013
1
PERMIT CONDITIONS
Permit No. EL13-0899
**ELECTRICAL**
1: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector
at each work site.
2: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector.
3: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter
296-46B WAC.
4: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the
building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector.
5: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation
of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that
presumes to grant this authority are therefore not valid.
6: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where
approved plans have been issued, revisions to the plans and additional review may be required.
doc: EL -7/13
EL13-0899 Printed: 09-18-2013
CITY OF TUK�A
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
Electrical Permit No. t L,'�"3-0 Sq
Project No. f
Date Application Accepted:
Date Application Expires:
(For office use only)
ELECTRICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**Please Print**
SITE LOCATION
Site Address:
Tenant Name:
_ King Co Assessor's Tax No.: 115.72O by )
52.1' 52.1 Aon Suite Number:
41+e CirL �'nni nk
PROPERTY OWNER
Name:
Mart< 1 ` e -T-1 ,4- o
Name: - n a weskmen rs LLC
Ai
City: C,(�C,k1e,
State: vir4 Zip: qt, -514
J'"1
Address: 15 f•is S2,F Age G. # 1 bV
Email:
City: 74614\1 c.,, State: ` '� Zipq &0
/
CONTACT PERSON — person receiving all project
communication
Name:
Mart< 1 ` e -T-1 ,4- o
Address: 1 _aj
l� i1 `t�I I Vial
Z030. 5 .
T
City: C,(�C,k1e,
State: vir4 Zip: qt, -514
J'"1
Phone: r �LD'�� Fax: 20t' 32 Z ' 7?t
Email:
Floor:
New Tenant: ❑ Yes
ELECTRICAL CONTRACTOR INFORMATION
Company Name: Vk6b' =-
Ai„ , -n.„...
`
Address: 2030 /�1r M Vic,
�`t `�
I
City: 1 I- „ State: , _ /n Zip: u
`I'71f' IM G� i 3-7
Phone: (21.3N, ,3N, Fax: 2)1;1632 a,^ r-y� i
32,155
1
Contr Reg No.: WAlIt 2(3Exp Date:12466.13
I
Tukwila Business License No.; , DTI 74507
Valuation of Project (contractor's bid price): $
Scope of Work (please provide detailed information):
C<<ccm 5.(5�em
Will service be altered? ❑ Yes No
Adding more than 50 amps? ❑ Yes DNo
Type of Use:
Type of work:
1:1111,i‘ ❑ Addition 0 ice Change 0 Remodel 0 Tenant Improvement
Low Voltage 0 Generator Fire Alarm 0 Telecommunication 0 Temporary Service
Property Served by:
0 Puget Sound Energy 0 Seattle City Light
H:\Applicattons\Forms-Applications On Line \2013 Apphcattons\Electrical Permit Application Revised 7-I-13.docx
Revised: July 2013
bh
cep,
Pave 1 nf2
RESIDENTIAL
NEW RESIDENTIAL SERVICE
❑ New single family dwellings $152.85
(including an attached garage)
❑ Garages, pools, spas and outbuildings $81.90 ea
❑ Low voltage systems
(alarm, furnace thermostat) $59.85 ea
RESIDENTIAL REMODEL AND SERVICE CHANGES
❑ Service change or alteration $81.90
(no added/altered circuits)
❑ Service change with added/altered circuits $81.90
number of added circuits $11.55 ea
❑ Circuits added/altered without service change $54.60
(up to 5 circuits)
❑ Circuits added/altered without service change $54.60
(6 or more circuits) $7.65 ea
❑ Meter/mast repair $68.25
❑ Low voltage systems $59.85
(alarm, furnace thermostat)
MULTI -FAMILY AND COMMERCIAL
Fees are based on the valuation of the electrical contract.
MISCELLANEOUS FEES
❑ Temporary service (residential) $65.00
❑ Temporary service (generator) $80.90
❑ Manufactured/mobile home service $86.25
(excluding garage or outbuilding)
❑ Carnivals $80.60
Number of concessions $10.80 ea
Each ride and generator truck $10.80 ea
PERMIT APPLICATION NOTES -
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing
and justifiable cause demonstrated.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER OR ELECTRICAL CONTRACTOR:
Signature:
Print Name:
Mailing Address:
H:\Applications\Fors-Applications On Lme\2013 Applications\Electncal Permit Application Revised 7-I-13.docx
Revised: July 2013
bh
:&70-7L E7LY
SY
City State Zip
Day Telephon
Date
Pu,, % of 1
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206-431-3665
Web site: http://www.Tukwila WA.gov
Parcel No.: 1157200017
Address: 15215 52 AV S TUKW
Suite No:
Applicant: ANTEZANA INVESTMENTS
RECEIPT
Permit Number: EL13-0899
Status: PENDING
Applied Date: 09/18/2013
Issue Date:
Receipt No.: R13-02663
Payment Amount: $90.80
Initials: WER Payment Date: 09/18/2013 11:59 AM
User ID: 1655 Balance: $0.00
Payee: KY NGUYEN
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Credit Crd MC
Authorization No. 024610
ACCOUNT ITEM LIST:
Description
90.80
Account Code Current Pmts
ELECTRICAL PERMIT - NONR
000.322.101.00.00 90.80
Total: $90.80
,1„n• Derninl_l1A
Printpri• nQ-1R-9M3
2/3/2014
•
City of Tukwila
Department of Community Development
MARK MCILWAIN
2030 AIRPORT WY S
SEATTLE, WA 98134
RE: Permit No. EL13-0899
ANTEZANA INVESTMENTS
15215 52 AV S
Dear Permit Holder:
Jim Haggerton, Mayor
Jack Pace, Director
In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National
Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and
become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of
such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun
for a period of 180 days. Your permit will expire on 3/17/2014.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206-431-2451 to schedule for the next or final inspection. Each
inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire.
Address your extension request to the Building Official and state your reason(s) for the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 3/17/2014, your permit will become null and void
and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
er Marshall
t Technician
File No: EL13-0899
6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
Contractors or Tradespeople Per Friendly Page
Electrical Contractor
A business licensed by L&I to contract electrical work within the scope of its specialty. Electrical
Contractors must maintain a surety bond or assignment of savings account. They also must have a
designated Electrical Administrator or Master Electrician who is a member of the firm or a full-time
supervisory employee.
Business and Licensing Information
Name
Phone
Address
Suite/Apt.
City
State
Zip
County
Business Type
Parent Company
WASHINGTON ALARM INC
2063281800
2030 Airport Way S
Seattle
WA
98134
King
Corporation
UBI No. •
Status
License No.
License Type
Effective Date
Expiration Date
Suspend Date
Specialty 1
Specialty 2
578043086
Active
WASHIAI282C3
Electrical Contractor
1/1/1984
12/5/2013
General
Unused
Other Associated Licenses
License
Name
Type
Specialty
1
Specialty
2
Effective
Date
Expiration
DateWASHINGT
Status
WASHIEC282C3
EQUIPMENT CONElectrical
EQUIPMENT CINC
Contractor
General
Unused
2/23/1972
12/31/1984
Archived
Electrical Administrator INFORMATION
License W00DMJH241QD
Name WOODMAN, JOHN H
Status Active
Business Owner Information
Name
Role
Effective Date
Expiration Date
HANER, RON
--01/01/1980
ERADW00251
4/12/2012
WOODMAN, JOHN H
Agent
01/01/1980
$1,000.00
WOODMAN, JOHN H
President
01/01/1980
ELECTRICAL CITATION
ESTERBERG, KELLY
Secretary
10/29/2001
ADAMS, MEGHAN R W
Treasurer
10/29/2001
WOODMAN, BARBARA K
Vice President
01/01/1980
Bond Information
Page 1 of 2
Bond
2
Bond Company Name
AMERICAN STATES INS
CO
Bond Account Number
Effective Date
Expiration Date
Cancel Date
Impaired Date
Bond Amount
Received Date
EX753984
09/25/1989
Until Cancelled
$4,000.00
09/25/1989
Assignment of Savings Information No records found for the previous 6 year period
Insurance Information No records found for the previous 6 year period
Summons/Complaint Information Summons and Complaints are not filed with the department for this contractor type
Warrant Information Warrants are not filed with the department for this contractor type
Infractions/Citations Information
Infraction / Citation
Date
RCW Code
Type
Status
Violation Amount
ERADW00251
4/12/2012
19.28.101 RCW
ELECTRICAL CITATION
Satisfied
$1,000.00
EOWET00235
7/26/2012
19.28.101 RCW
ELECTRICAL CITATION
Satisfied
$2,000.00
https: //fortress. wa. gov/lni/bbip/Print. aspx
09/18/2013