HomeMy WebLinkAboutPermit EL13-1103 - MUSEUM OF FLIGHT - REMODELMUSEUM OF FLIGHT
9404 EAST MARGINAL WY S
EL13-1 103
City ofitukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206-431-3665
Web site: http://www.TukwilaWA.gov
ELECTRICAL PERMIT
Parcel No.: 3324049019
Address: 9404 EAST MARGINAL WY S TUKW
Project Name: MUSEUM OF FLIGHT
Permit Number: EL13-1103
Issue Date: 11/01/2013
Permit Expires On: 04/30/2014
Owner:
Name: MUSEUM OF FLIGHT FOUNDATION
Address: 9404 EAST MARGINAL WAY S , SEATTLE WA 98108
Contact Person:
Name: FENTON KRAFT
Address: 9404 E MARGINAL WAY S , TUKWILA WA, 98108
Phone: (206) 795-5831
Contractor:
Name: OWNER AFFIDAVIT ON FILE Phone:
Address:
Contractor License No: Expiration Date:
DESCRIPTION OF WORK:
REPLACE ONE 9KW ELECTRIC WATER HEATER WITH TWO 3K W HEAT PUMP/ELECTRIC HYBRID
WATER HEATERS. UTILIZE EXISTING 208V 3 PHASE CIRCUIT TO FEED TWO DEDICATED
FUSED DISCONNECTS, AND CONNECT THE LOAD SIDE OF THESE DISCONNECTS TO EACH WATER
HEATER. ALSO CONNECT AN EXISTING FEED TO A REPLACEMENT CIRCULATION PUMP.
Value of Electrical:
NRES: $285.00
RES: $0.00
Type of Fire Protection: UNKNOWN
Electrical service provided by: SEATTLE CITY LIGHT
Permit Center Authorized Signature:
Alf
Fees Collected: $69.30
Washington Cities Electrical Code: 2011
Date: //7/ % 3
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign and obtain this electrical permit.
Signature:
Print Name: t1.1011 VV61 f L
Date: ///i/13
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
doc: EL -7/1 3
EL13-1103 Printed: 11-01-2013
PERMIT CONDITIONS
Permit No. EL 13-1103
**ELECTRICAL**
1: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector
at each work site.
2: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector.
3: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter
296-46B WAC.
4: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the
building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector.
5: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation
of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that
presumes to grant this authority are therefore not valid.
6: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where
approved plans have been issued, revisions to the plans and additional review may be required.
ioc: EL -7/13
EL13-1103 Printed: 11-01-2013
•
CITY OF TUKWILA
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
•
Electrical Permit No. � / 3 —1/D3
Project No.
Date Application Accepted:
Date Application Expires:
(For office use only)
ELECTRICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**Please Print**
SITE LOCATION
Site Address: 9404 East Marginal Way S
King Co Assessor's Tax No.: 3324049019
Suite Number: Floor: Basement
Tenant Name: Museum of Flight
PROPERTY OWNER
Name: Fenton Kraft
Name: Museum of Flight
City: Tukwila State: WA Zip: 98108
Address: 9404 E Marginal Way S
Email: .Fkrgft al
v MU 6e alrnoFfligi+i'.Ovg
City: Tukwila State: WA
Zip: 98108
CONTACT PERSON — person receiving all project
communication
Name: Fenton Kraft
Address: 9404 E Marginal Way S
City: Tukwila State: WA Zip: 98108
Phone: (206) 795-5831 Fax: (206) 764-5707
Email: .Fkrgft al
v MU 6e alrnoFfligi+i'.Ovg
New Tenant: 9 Yes ®..No
ELECTRICAL CONTRACTOR INFORMATION
Company Name:
Address:
City:
State:
Zip:
Phone:
Fax:
Contr Reg No.:
Exp Date:
Tukwila Business License No.;
Valuation of Project (contractor's bid price): $ 285
Scope of Work (please provide detailed information): Replace one 9kW electric water heater with two 3kW
heat pump /electic hybrid water heaters. Utilize existing 208V 3 phase circuit to feed two dedicated fused
disconnects, and connect the load side of these disconnects to each water heater. Also connect an existing
feed to a replacement circulation pump.
Will service be altered? ❑ Yes m No
Type of Use: Dottie Stit. 14+ Wafev
Adding more than 50 amps? ❑ Yes IJ No
Type of work:
❑ New ❑ Addition ❑ Service Change
❑ Low Voltage ❑ Generator 0 Fire Alarm
Property Served bv:
0 Puget Sound Energy ® Seattle City Light
H \Applications\Forns-Applications On Line\2013 Applications\Electrlcal Permit Application Revised 7-1-13.docx
Revised: July 2013
bh
m Remodel
0 Telecommunication
❑ Tenant Improvement
0 Temporary Service
Page 1 of 2
RESIDENTIAL
NEW RESIDENTIAL SERVICE
❑ New single family dwellings $152.85
(including an attached garage)
❑ Garages, pools, spas and outbuildings $81.90 ea
❑ Low voltage systems
(alarm, furnace thermostat) $59.85 ea
RESIDENTIAL REMODEL AND SERVICE CHANGES
❑ Service change or alteration $81.90
(no added/altered circuits)
❑ Service change with added/altered circuits $81.90
number of added circuits $11.55 ea
❑ Circuits added/altered without service change $54.60
(up to 5 circuits)
❑ Circuits added/altered without service change $54.60
(6 or more circuits) $7.65 ea
❑ Meter/mast repair $68.25
❑ Low voltage systems $59.85
(alarm, furnace thermostat)
MULTI -FAMILY AND COMMERCIAL
Fees are based on the valuation of the electrical contract.
MISCELLANEOUS FEES
O Temporary service (residential) $65.00
❑ Temporary service (generator) $80.90
O Manufactured/mobile home service $86.25
(excluding garage or outbuilding)
❑ Carnivals $80.60
Number of concessions $10.80 ea
Each ride and generator truck $10.80 ea
PERMIT APPLICATION NOTES -
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing
and justifiable cause demonstrated.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER OR ELECTRICAL CONTRACTOR:
Signature: -T Date: 11/01/2013
Print Name: Fenton Kraft Day Telephone: (206) 795-5831
Mailing Address: 9404 East Marginal Way S Tukwila WA 98053
City
1-1 \Applications\Forms-Applications On Line \2013 Applications\Electncal Permit Application Revised 7-1-13 docx
Revised July 2013
bh
State Zip
Page 2 of 2
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206-431-3665
Web site: http://www.TukwilaWA.gov
RECEIPT
Parcel No.: 3324049019 Permit Number: EL13-1103
Address: 9404 EAST MARGINAL WY S TUKW Status: PENDING
Suite No: Applied Date: 11/01/2013
Applicant: MUSEUM OF FLIGHT Issue Date:
Receipt No.: R13-03042
Initials:
User ID:
LAW
1632
Payment Amount: $69.30
Payment Date: 11/01/2013 02:53 PM
Balance: $0.00
Payee: FENTON W KRAFT
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Credit Crd VISA
Authorization No. -8582Z
ACCOUNT ITEM LIST:
Description
69.30
Account Code Current Pmts
ELECTRICAL PERMIT - NONR
000.322.101.00.00 69.30
Total: $69.30
rinr Parcint-(1R
Printed: 11-01-2013
INSPECTION NO.
INSPECTION -RECORD ,�/3 r1r0
Retain a copy with permit c
PERMIT N0.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 431-2451
Project:
J5s6i 1 or vt.ty.vr--
Type of Inspection:
Koa, t4
f
Address:
/0/ f- 444 -tet.
Date Called:
Special Instruction's: t
Date Wanted:
6(1/Requester:e
Phone No:
Approved per applicable codes. El Corrections required prior to approval.
COMMENTS:
begOcriopi5 tAAL
• - 'R(3 -)(o.\
Inspector:
Date:
641411/1
REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT N
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 431-2451
Project:
V 6.1.
4 oppe
of lnspectiogog4 (� /ivit
/
te.Gii
Address:1py
jai
Date Called:
Special Instructions: iii
Date Wanted:
j'
�Q
a
.m.
Requester:
Phone No:
775.-13(
ElApproved per applicable codes. )E Corrections required prior to approval.
COMMENTS:
ar—letpC4 /Ai&ur Fes. t i - 3
Inspector:
rad
Date: DDse.l
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100: Call to; schedule reinspection.
4/1/2014
•
City of Tukwila
•
Department of Community Development
FENTON KRAFT
9404 EAST MARGINAL WY S
TUKWILA, WA 98108
RE: Permit No. EL13-1103
MUSEUM OF FLIGHT
9404 EAST MARGINAL WY S
Dear Permit Holder:
Jim Haggerton, Mayor
Jack Pace, Director
In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National
Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and
become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of
such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun
for a period of 180 days. Your permit will expire on 5/6/2014.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each
inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire.
Address your extension request to the Building Official and state your reason(s) for the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 5/6/2014, your permit will become null and void
and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
84aa
er Marshall
Technician
File No: EL13-1103
6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
•
CITY OF TUKWILA
Department of Community Development
6300 Southcenter Boulevard, Tukwila, WA 98188
Telephone: (206) 431-3670 FAX (206) 431-3665
•
Permit Center/Building Division
206 431-3670
AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION
PERMIT NO: 4f3—//O3
STATE OF WASHINGTON)
) ss.
COUNTY OF KING )
F-evktow Vve f+
[please print name]
, states as follows:
1. I have made application for a permit from the City of Tukwila, Washington.
2. I understand that state law requires that all construction contractors be registered with the State of
Washington. The exceptions to this requirement are stated under Section 18.27.090 as well Section
19.28.091 of the Revised Code of Washington. I have read or am familiar RCW 19.28.091, a copy of
which is printed on the reverse side of this Affidavit.
3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the
City of Tukwila must verify either that the contractor is registered by the State of Washington, or that
one of the exemptions stated under RCW 18.27.090 or RCW 19.28.091 applies.
4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby
attest that after reading the exemptions from the registration requirement of RCW 19.28.091, I
consider the work authorized under this permit to be exempt under number 7, where an
appropriately certified electrician will be doing the work without compensation for a non-profit
organization on a project valued under $30,000.
I understand that I may be waiving certain rights that I might otherwise have under state law in any decision
to engage an unregistered contractor to perform construction work.
[Printed Name and Title]
1\114S,euiv/ 0f Ft,1 t
[Company]
Signed and sworn tto//,OV Pbefore m//e,_,this
1 d of %Vh'►ber , 20 /3.
-i° J'6<
TAY PUBLIC in and for the State of Washington
/49
Residing at
, County
Name as commissioned: / n' ,`T v'(
My commission expires: U -5--,..---– / v
19.28.091 — Licensing Exemptions. The registration provisions of this chapter do not apply to:
(1) No license under the provision of this chapter
shall be required from any utility or any person, firm,
partnership, corporation, or other entity employed by
a utility because of work in connection with the
installation, repair, or maintenance of lines, wires,
apparatus, or equipment owned by or under the
control of a utility and used for transmission or
distribution of electricity from the source of supply to
the point of contact at the premises and/or property to
be supplied and service connections and meters and
other apparatus or appliances used in the
measurement of the consumption of electricity by the
customer.
(2) No license under the provisions of this chapter
shall be required from any utility because of work in
connection with the installation, repair, or
maintenance of the following:
(a) Lines, wires, apparatus, or equipment used in
the lighting of streets, alleys, ways, or public areas or
squares;
(b) Lines, wires, apparatus, or equipment owned
by a commercial, industrial, or public institution
customer that are an integral part of a transmission or
distribution system, either overhead or underground,
providing service to such customer and located
outside the building or structure: PROVIDED, That a
utility does not initiate the sale of services to perform
such work;
(c) Lines and wires, together with ancillary
apparatus, and equipment, owned by a customer that
is an independent power producer who has entered
into an agreement for the sale of electricity to a utility
and that are used in transmitting electricity from an
electrical generating unit located on premises used
by such customer to the point of interconnection with
the utility's system.
(3) Any person, firm, partnership, corporation, or
other entity licensed under RCW 19.28.041 may
enter into a contract with a utility for the performance
of work under subsection (2) of this section.
(4) No license under the provisions of this chapter
shall be required from any person, firm, partnership,
corporation, or other entity because of the work of
installing and repairing ignition or lighting systems for
motor vehicles.
(5) No license under the provisions of this chapter
shall be required from any person, firm, partnership,
corporation, or other entity because of work in
connection with the installation, repair, or
maintenance of wires and equipment, and
installations thereof, exempted in RCW 19.28.010.
(6) The department may by rule exempt from
licensing requirements under this chapter work
performed on premanufactured electric power
generation equipment assemblies and control gear
involving the testing, repair, modification,
maintenance, or installation of components internal to
the power generation equipment, the control gear, or
the transfer switch.
(7) This chapter does not require an electrical
contractor license if: (a) An appropriately certified
electrician or a properly supervised certified electrical
trainee is performing the installation, repair, or
maintenance of wires and equipment for a nonprofit
corporation that holds a current tax exempt status as
provided under 26 U.S.C. Sec. 501(c)(3) or a
nonprofit religious organization; (b) the certified
electrician or certified electrical trainee is not
compensated for the electrical work; and (c) the value
of the electrical work does not exceed thirty thousand
dollars.
(8) An entity that currently holds a valid specialty
or general plumbing contractor's registration under
chapter 18.27 RCW may employ a certified plumber,
a certified residential plumber, or a plumber trainee
meeting the requirements of chapter 18.106 RCW to
perform electrical work that is incidentally, directly,
and immediately appropriate to the like -in-kind
replacement of a household appliance or other small
household utilization equipment that requires limited
electric power and limited waste and/or water
connections. A plumber trainee must be supervised
by a certified plumber or a certified residential
plumber while performing electrical work. The
electrical work is subject to the permitting and
inspection requirements of this chapter.
[2003 c 399 § 301; 2003 c 242 § 1; 2001 c 211 § 6; 1998 c 98 § 1;
1992 c 240 §1; 1980 c 30 §15; 1935 c 169 § 11; RRS § 8307-11.
Formerly RCW 19.28.200.]