Loading...
HomeMy WebLinkAboutPlanning 2018-01-25 Item 4 - TMC 18.54 Tree Regulations Update - Attachment H: Significant Tree Comparison ChartZ 0 N_N a 2 0 W N W W CC 1- 1- z LL z PERMIT REQUIRED? (outside environmentally sensitive areas) Land Clearing permit during development process. No No, if < 2,000 sq. ft. is being cleared & other exemption criteria are met. 0 Z Yes, type of permit depends of number of trees removed v } 0 Z Yes No if 4 trees or less are removed in 36 month period. # TREES PERMITTED TO BE REMOVED (outside of environmentally sensitive areas) 10% of significant trees to be retained — applies to all new development. Must keep 30% of trees on SF site at time of development Up to 2,000 sq. ft. may be cleared w/out a permit if area is outside a sensitive area. Retention of trees is regulated at the platting stage with required tree density required per acre and subsequent retention. No restrictions on number of trees that can be removed on a single family lot that was not developed under the current regulations. 2 in 12 month period provided: a. There is no active application to develop the site; b. The trees were not required to be retained as part of a previous development of the site; c. Two trees remain on the site. In some cases, tree replacement is required. 2 in 36 -month period Sliding scale depending on size of lot: • Up to 10,000 sq. ft: 2/12 months -max of 4/60 months; • 10,001-20,000 sq. ft. 3/12 months -max of 6/60 month; • Lots > 20,000 sq. ft.: 6/12 months -max of 12/60 month Tree retention applies only to platting proposals 3 in 12 -month period 4 in 36 month period SIZE OF SIGNIFICANT TREE (in inches) 00 8 -evergreen 12 -deciduous LO d' JURISDICTION 0 Burien Des Moines a-+ C L Lake Forest Park Renton coi6 v v = Attachment 1/2/2018 5:48 PM