Loading...
HomeMy WebLinkAboutTIC 2018-01-22 Item 2A - Grant Acceptance - Bridge Replacement Advisory Council Grant for Boeing Access Road Bridge Over Airport Way Seismic RetrofitCity of Tukwila Public Works Department - Robin Tischmak, Acting Director Allan Ekberg, Mayor INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Robin Tischmak, Acting Public Works Director BY: Steve Carstens, Senior Program Manager CC: Mayor Ekberg DATE: January 19, 2018 SUBJECT: Boeing Access Road Bridge over Airport Way Seismic Retrofit Project No. 91310407 Acceptance of BRAC Grant Funding ISSUE Accept a federal grant from the Bridge Replacement Advisory Council (BRAC) to provide seismic upgrades for the Boeing Access Road Bridge (BAR) over Airport Way in the amount of $2,981,055.00. BACKGROUND The BAR is the principal arterial connecting I-5 and East Marginal Way South. It is considered regionally significant and is included on the National Highway System (NHS) for access to the Boeing Company and the King County Airport at Boeing Field. The BAR Bridge over Airport Way is the only remaining structure on the BAR corridor that has not been seismically upgraded. This improvement would allow the entire corridor to be seismically resistant during a seismic event. DISCUSSION In 2017 the City applied for BRAC grant funds to construct seismic improvements to the BAR Bridge over Airport Way and was subsequently selected for funding. City policy requires Council acceptance of grant funds. FINANCIAL IMPACT The federal funding letter states that the project requires a 13.5% local match, but if construction is authorized by December 2020, the project is eligible for 100% federal funding. We see no impediment to successfully complete the project by 2020 and receive 100% funding, up to the allowable $3 million. Federal Funds City Funds Total BAR Bridge over Airport Wy $2,981,055.00 $0.00 $2,981,055.00 RECOMMENDATION Council is being asked to accept the federal BRAC grant award in the amount of $2,981,055.00 and consider this item on the Consent Agenda at the February 5, 2018 Regular Meeting. Attachments: BRAC Funding Award Letter Draft CIP Sheet W:IPW Eng1PROJECTSIA- RW & RS Projects\BAR Bridge Airport Wy (91310407)9etters and info memos120171214 info memo TIC accept SM.docx 1 hin t i State a tme t of Trrarrasportatk,r December 6, 2017 Mr. Robin Tischmak Interim Public Works Director City of Tukwila 6300 Southcenter Blvd., Suite 100 Tukwila, Washington 98188-2545 S Bar/Airport Way 2017 Local Bridge Program Federal Funding Dear Mr. Tischmak: Transporcauor, uuiir.+ing 310 Maple Park Avenue S.C. P.O. Box 47300 Olympia, WA 98504-7300 360-705-7000 TTY: 1-800-833-6388 wwwwsdot.wa.yov DECC 21117 T LUIcANIL.O, PUBLIC WORKS WSDOT is pleased to advise you that the above mentioned bridge project was recently selected. The federal funding is limited to the amount shown below: S Bar/Airport Way $2,981,055 Scope: Seismic NOTE: This project requires 13.5 percent local match. If construction is authorized by December 2020, the project is eligible for 100 percent federal funding for eligible costs. Preventative maintenance projects are limited to a maximum $3 million. In order to meet state and federal requirements, the following are required: ■ Project expenditures incurred before receiving notice from Local Programs of federal fund authorization are not eligible for reimbursement. ■ Please refer to the Local Programs webpage for detailed information, including: (htto://www.wsdot.wa.aovilocaluroglams/) ✓ Local Agency Guidelines (LAG) manual for the requirements regarding programming, authorization, reimbursement, etc.; ✓ Projects utilizing federal funds must be included in your current Transportation Improvement Program (TIP) as a complete programmed project. Once your TIP amendment is approved, WSDOT will amend the Statewide Transportation Improvement Program (STIP); ✓ Funding and billing forms; ✓ Quarterly Project Reporting is required to be completed by the end of March, June, September, and December each year. To access the database you will need an account name and password. Your account name is Tukwila and your password is Tukwi785. The password is case sensitive. As a reminder, Local Programs requires all agencies to submit monthly progress billings to ensure timely reimbursement of eligible federal expenditures. For assistance please contact Mehrdad Moini, your Region Local Programs Engineer, at 206.440.4734. Sincerely, Kathleen B. Davis Director Local Programs KBD:st:sas cc: Kelly McGourty, Transportation Director, PSRC Mehrdad Moini, Northwest Region Local Programs Engineer, MS NB82-121 2 PROJECT: DESCRIPTION: JUSTIFICATION: STATUS: CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2019 to 2024 Boeing Access Rd over Airport Way Bridge Seismic Retrofit Project No. 91310407 Provide seismic modifications to the Boeing Access Rd over Airport Way Bridge to allow it to withstand earthquake forces. The Boeing Access Road over Airport Way Bridge is the final bridge from 1-5 to the King County Airport and Boeing facilities that has not been seismically upgraded. This improvement would allow the entire corridor to be seismically resistant during an earthquake. The project is currently in the fund acceptance phase. It is expected to start design in the first quarter of 2018 and have construction bids advertised in late 2018. Construction would be in 2019. MAINT. IMPACT: Maintenance will be reduced. COMMENT: FINANCIAL (in $000's) If construction is not authorized by December 2020 t9,Cit %wor,'d e rec, 'ired to provide a 13.5% match. u If construction is authorized prior to that date ^ ?fe 'Quid I`, ro City '17''?. We believe that the project can obtain the construction author(z0,I s'no r tch is stt. ' ThrougI Est ina „d 2015 X016 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Project Location : 5i 0e � 1ati a5m�.o.,.e.wmo yC. y �mb� i B��cces J'.., s— 5 I> Design j 367 3 a FF S112 St o D y m 370 Land(R/W) i ✓': e sys a 0 Const . Mgmt. DD N as � s a v 122 Str ny 264 4 o 264 Construction b S128 $ 2,347 k\ b 30 St ! / // a. 2,347 TOTAL EXPENSES 0 0 0 367 2,614 0 0 0 0 2,981 FUND SOURCES Awarded Grant 367 2,614 2,981 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 0 0 0 0 0 0 0 0 TOTAL SOURCES 0 0 0 367 2,614 0 0 0 0 2,981 3 2019 - 2024 Capital Improvement Program Project Location : 5i 0e � 1ati a5m�.o.,.e.wmo yC. y �mb� i B��cces J'.., s— 5 I> M ti n j a FF S112 St o D y m i ✓': e sys a 1,• ' Pom DD N as � s a v 122 Str ny 4 o � b S128 $ I H GIS k\ b 30 St ! / // a. 3 2019 - 2024 Capital Improvement Program