Loading...
HomeMy WebLinkAboutTIC 2018-01-22 Item 2B - Ordinance - Truck Only Speed Reduction Across 42nd Avenue South Bridge in Allentownwq�s Cit of Tukwila City Allan Ekberg, Mayor Public Works Department - Robin Tischmak, Acting Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Robin Tischmak, Acting Public Works Director BY: Steve Carstens, Senior Program Manager CC: Mayor Ekberg DATE: January 19, 2018 SUBJECT: Ordinance for Truck Only Speed Reduction 42nd Ave S Posting Load Limits on 42nd Ave S in Allentown Bridge Load Rating Review and Update ISSUE Approve an ordinance to reduce the speed limit across the 42nd Avenue South Bridge in Allentown, for trucks only, from 25 mph to 15 mph. The bridge also requires a load restriction posting in accordance with National Bridge Inspection Standards (NBIS), 23 CFR 650c. BACKGROUND A load rating for the 42nd Avenue South Bridge has been performed and the resulting report indicates that a load restriction is required for certain truck weights using the bridge. There are multiple options for implementing a suitable load restriction in this case: 1) reduction in the load limits for two truck categories; 2) the limitation to one - truck -at -a time on the bridge; or 3) a reduction in truck speeds while crossing the bridge. ANALYSIS TranTech Engineering, LLC performed the necessary load ratings for the 42nd Avenue South Bridge. Based on that information, options to provide the legally required load restrictions were discussed. The option to limit truck loads from the BNSF Intermodal yard would not be feasible from a business perspective as this facility is an important supplier to the entire region. It would also not be feasible to expect compliance with the restriction to allow only one truck on the bridge at a time. The least impactful option is to reduce the speed of the trucks crossing the bridge. The speed reduction would be in place until such time as improvements are made to the bridge structure or until the structure is replaced. Either option to repair or replace the bridge are dependent upon funding by the City and/or other grant sources that may be available in the future. FINANCIAL IMPACT The costs related to this change are internal only and are limited to staff time to make and install the new speed signs. RECOMMENDATION Council is being asked to approve an Ordinance for a speed reduction of trucks crossing the 42nd Avenue South Bridge in Allentown and consider this item at the February 12, 2018 Committee of the Whole and subsequent February 20, 2018 Regular Meeting. Attachments: Draft Ordinance TranTech Engineering, LLC August 2017 42"d Avenue South Bridge Structural Assessment Bridge Rating Summary - Low Speed Option Bridge Rating Summary — One Truck at a Time Option W:1PW Eng10THERIBridge101 - NBIS Vehicle Bridges114 - 42nd Ave SlInfo Memo speed change 20171129 SM.docx 5 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ESTABLISHING NEW REGULATIONS TO ACCURATELY DEFINE THE PORTION OF 42ND AVENUE SOUTH BETWEEN 124TH STREET SOUTH AND TUKWILA INTERNATIONAL BOULEVARD WHERE THE SPEED LIMIT IS TO BE REDUCED FROM 25 MPH TO 15 MPH FOR AASHTO TYPE 1, 2, AND 3 TRUCKS ONLY; REPEALING ORDINANCE NO. 1801, AS CODIFIED AT TUKWILA MUNICIPAL CODE SECTION 9.16.060; PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, American Association of State Highway Officials (AASHTO) defines a Type 1 truck as a three -axle truck limited to 25 tons; and WHEREAS, AASHTO defines a Type 2 truck as a three -axle truck with a two -axle single trailer limited to 36 tons; and WHEREAS, AASHTO defines a Type 3 truck as a three -axle truck with two, double - axle trailers limited to 40 tons; and WHEREAS, Title 23 Code of Federal Regulations (CFR) subpart c, National Bridge Inspection Standards (NBIS) Section 650.313 (c) states: "Post or restrict the bridge in accordance with the AASHTO Manual or in accordance with State law, when the maximum unrestricted legal loads or State routine permit loads exceed that allowed under the operating rating or equivalent rating factor"; and WHEREAS, AASHTO Manual for Bridge Evaluation 2nd Edition 2011 — with 2016 Interim Revisions, Section 6A.8.1 and Section 6B.7.2, states, "When the maximum legal load under state law exceeds the safe load capacity of a bridge, restrictive posting shall be required"; and WHEREAS, the bridge crossing the Duwamish River on 42nd Avenue South, also known as Tukwila -14, structure ID 08109700, has been determined to require a restriction to the legal truck loads for AASHTO truck Type 3, which includes a reduction to the speed limit from 25 MPH to 15 MPH for all AASHTO truck types; and W: Word Processing\Ordinances\Speed limit reduction for AASHTO Type 1,2,3 trucks 12-21-17.doc SC:bjs Page 1 of 3 6 WHEREAS, RCW 46.61.415 authorizes the City to alter speed limits on the basis of engineering and traffic investigations; and WHEREAS, an engineering investigation was conducted in the form of a load rating analysis of 42nd Avenue South between South 124th Street and Tukwila International Boulevard; and WHEREAS, based upon the load rating analysis, the City has determined that 15 miles per hour is a reasonable and safe maximum limit for AASHTO Type 1, 2, and 3 trucks traveling on 42nd Avenue South between South 124th Street and Tukwila International Boulevard; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY ORDAINS AS FOLLOWS: Section 1. Repealer. Ordinance No. 1801, as codified at TMC Section 9.16.060, "South 124th Street, 42nd Avenue South, and 50th Place South," is hereby repealed. Section 2. TMC Section 9.16.060 Reenacted. Tukwila Municipal Code Section 9.16.060 is hereby reenacted to read as follows: 9.16.060 South 124th Street, 42nd Avenue South, and 50th Place South A 25 MPH speed limit is established on certain collector arterials as follows: 1 South 124th Street from 42nd Avenue South to 50th Place South. 2. 42nd Avenue South from Interurban Avenue to South 115th Street; except that Type 1. Type 2, and Type 3 trucks, as defined by the American Association of State Highway Officials (AASHTOI, shall be restricted to a maximum weed of 15 MPH. 3. 50th Place South from South 124th Street to the east City limit. Section 3. Signs to be Posted. The Public Works Department is hereby directed to post appropriate speed limit signs reflecting the speed limits established in Section 2 of this ordinance. Section 4. Corrections by City Clerk or Code Reviser. Upon approval of the City Attorney, the City Clerk and the code reviser are authorized to make necessary corrections to this ordinance, including the correction of clerical errors; references to other local, state or federal laws, codes, rules, or regulations; or ordinance numbering and section/subsection numbering. Section 5. Severability. If any section, subsection, paragraph, sentence, clause or phrase of this ordinance or its application to any person or situation should be held to be invalid or unconstitutional for any reason by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of the remaining portions of this ordinance or its application to any other person or situation. W Word Processing\Ordinances\Speed limit reduction for AASHTO Type 1,2,3 trucks 12-21-17.doc SC.bjs Page 2 of 3 7 Section 6. Effective Date. This ordinance or a summary thereof shall be published in the official newspaper of the City, and shall take effect and be in full force five days after passage and publication as provided by law. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2018. ATTEST/AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk APPROVED AS TO FORM BY: Rachel B. Turpin, City Attorney Allan Ekberg, Mayor Filed with the City Clerk: Passed by the City Council: Published: Effective Date: Ordinance Number: W: Word Processing\Ordinances\Speed limit reduction for AASHTO Type 1,2,3 trucks 12-21-17 doc SC:bjs Page 3 of 3 8 4 � M 4 } y ., 1 4 't tr. 4pr ��. • 1 # The City of Tukwila Public Works August 2017 ■ 42nd Avenue South Bridge Structural Assessment ". TRANTECH 1 Engineering LLC 12011 NE 1st Street, Suite 305 Bellevue, WA 98005 (425) 453-5545 Executive Summary The 42nd Avenue South Bridge is a 3 -span 280 -foot -long bridge built in 1949. The bridge is composed of a 220 -foot -long fracture critical steel thru-truss main span with 30 -foot - long concrete T -beam approach spans at each end. The existing bridge is both Structurally Deficient and Functionally Obsolete. A three-tier structure assessment has revealed that there are critical structural elements within the 42nd Ave bridge structure that have deteriorated into poor conditions. The examples of these are the short plinth columns at the bridge approaches, truss gusset plates, and main span deck structure. The bridge is currently nearing the end of its service life and requires strengthening, repainting, deck work, a seismic retrofit, and scour protection, if it were to remain in service. The cost of this work would be prohibitively expensive and would exceed the cost of a new bridge. The proposed new structure will have the added advantages of being a redundant concrete bridge with very low life cycle maintenance costs to the Bridge Program or to the City of Tukwila. A cost estimate for the proposed replacement bridge is presented in Appendix C. Furthermore, it is recommended that until the bridge can be replaced, the interim inspection frequency remains at a six-month interval with special attention being paid to the critical structural elements identified in the structural analysis presented here. A monitoring plan has been developed and will be implemented by the City of Tukwila until bridge funding can be secured and the bridge can be replaced. 10 Table of Contents Page 1. Introduction 1 2. Structural Assessment 2.1 Tier 1 - Bridge Inspections 2 2.2 Tier 2 - Structural Analysis, Piers 2 and 3 Column Damage 3 2.3 Tier 3 - Updated Load Rating Analysis 4 3. Concluding Remarks 4 APPENDICES A Current Inspection Report B Current Load Rating Summary C Bridge Replacement Estimate 11 1. INTRODUCTION The 42nd Avenue South Bridge is a 3 -span 280 -foot -long bridge built in 1949. The bridge is composed of a 220 -foot -long fracture critical steel thru-truss main span with 30 -foot - long concrete T -beam approach spans at each end. The existing bridge is both Structurally Deficient and Functionally Obsolete. The plans for the existing bridge are available under the "Records/Plans" tab in the WSDOT Bridge Inspection Application. The bridge is located within the City of Tukwila on a sharp bend of the Duwamish River that produces turbulent high velocity flows at the truss abutments. These frequent flows have caused scour damage at the bridge abutments and at the north approach roadway. Because the bridge foundation depths are unknown and there is active scour, the City has implemented a scour Plan of Action (POA) for high flow events. Additionally, existing riprap at Pier 2 is either washing away or is falling into a scour hole developing on the river side of the pier. The bridge is the only access for the BNSF intermodal yard located at the end of South 124th Street as other into the yard prohibit trucks. As a result, the bridge has been subjected to an unusually high percentage of truck traffic constantly crossing the bridge around the clock. routes The City of Tukwila has struggled for years to maintain the bridge. Maintenance projects includ a major paint project in the mid -1990's and a significant project to rebuild the north bridge approach after erosion, caused by scour, threatened the existing roadway. This problem is currently resurfacing even after the City installed a sheet pile wall to protect the approach. A dramatic illustration is the sinking of the north approach guardrail posts with a section of the rail currently at almost ground level. There is also the ongoing problem of keeping the bridge clean enough to perform valid inspections. Cleaning the bridge adds significant cost to the already expensive fracture critical inspections as well as adding equipment scheduling complications. In addition to the substructure problems, the deck and floor system are in distress as evidenced by significant loud floor system creaking and deck panel banging under traffic. These problems have been reported by bridge inspectors and Tukwila 1 12 Maintenance for years. These noises cannot be associated with specific damage at this point but are worrisome in a fracture critical bridge subjected to extreme fatigue stresses by the heavy truck traffic. The bridge is currently nearing the end of its service life and would require strengthening, repainting, deck work, a seismic retrofit, and scour protection, if it were to remain in service. The cost of this work would be prohibitively expensive and would exceed the cost of a new bridge. The proposed new structure will have the added advantage of being a redundant concrete bridge with very low life cycle maintenance costs to the Bridge Program and to the City of Tukwila. 2. STRUCTURAL ASSESSMENT The structural assessment activities performed as part of this study have a three-tier approach that is described in detail in the following sections: 2.1 Tier 1 - Bridge Inspections The 42nd Avenue South Bridge has been inspected on an increased frequency (a reduced frequency duration) since 2014. The frequency change started at 12 months and is now set at a six-month interval for Interim Inspections. These inspections focused on monitoring the damaged short concrete plinth columns supporting the approach span girder bearings at piers 2 and 3 and bridge gusset plates. Since 2014, the bridge has also undergone several in-depth and routine bridge inspections with the most recent being in spring of 2017. The observations and data obtained from these inspections has been utilized in a new comprehensive load rating per WSDOT and AASHTO recommended Load Factor Rating requirements that includes gusset plate and Emergency Vehicle (EV) ratings. The new load rating is described in further detail in the following sections. The in-depth and interim inspections, some of which were performed with UBIT special access and after bridge cleaning to ensure a valid inspection, indicate that approximately one third of the truss structure is now in BMS Condition State 3 and that the Substructure Overall Condition rating is at a 4 -code because of critical damage to the concrete plinth columns at Piers 2 and 3. Please see Appendix A for the latest Inspection Report. The resulting Sufficiency Rating has dropped in steps as the inspection and analysis has progressed, reaching its current level of 7.56 SD. The new load rating indicates that posting of the bridge for legal loads, single hauling vehicles, and emergency vehicles is necessary. The City is currently implementing the NBIS load posting requirements. 2 13 2.2 Tier 2 - Structural Assessment — Piers 2 and 3 Column Damages The City of Tukwila has initiated a structural evaluation of the short concrete approach span, girder support columns at Piers 2 and 3. The deterioration of these columns was listed as one of the main reasons for the reduction of the Substructure Overall Code to 4 (i.e., Poor Condition) as reported in the 2015 bridge inspection report. This engineering analysis is supporting information to justify the request for bridge replacement funding from the WSDOT administered Local Bridge Program. The results of the structural analyses are summarized below. Eight short plinth columns support the concrete T -beams of approach Spans 1 and 3. The girders sit on a rocker bearing installed on top of each plinth. These bearings are completely frozen by pack rust and deterioration. In addition, the rocker bearings for the truss span at Pier 2 appear have been frozen or locked in the expansion direction for years. Each column has six number seven vertical shear friction bars at their interface with the pier wall. First, the plinth columns were analyzed for temperature and vehicular breaking force induced stresses. These results showed that the demand forces are not large enough to create the observed damage. Next, seismic forces were analyzed and were shown to be large enough to yield the interface of the short columns and the piers wall as the forces are transferred through the semi rigid link caused by the frozen bearings. This condition is accentuated at the obtuse corner (i.e. Column Plinth 3A at northwest corner of the Pier 3). The existing bridge design, which includes an extreme skew of 38°, puts these columns at additional risk from seismic events as well as from normal temperature and traffic forces as torque forces are developed and added to the high shear forces. The interface cracking has been documented since 2001 (upper photo) and the cracks are currently opening and starting to spall. In addition, there has been documented evidence for many years of the deterioration of the reinforcing steel as evidenced by rusty leaching. These problems may have been initiated during the April 29, 1965 South Sound Earthquake and were likely compounded by the February 28, 2001 Nisqually earthquake. However, the damage is aggravated daily by the constant truck traffic and seasonally due to normal temperature 3 14 forces. This constant cyclical bombardment of Column 3A make it a failure risk for Span 3. Since the rocker bearings located on the plinths are all completely frozen, there is a semi-rigid link allowing these high magnitude forces to be transmitted through Span 3 to the North Abutment, Pier 4. Again, due to the bridge's large skew, a concentration of force is toward the northwest side of the abutment as illustrated by the damage at this location. This concentration of force may play a role • in the continued settlement issues of the north bridge approach roadway at the steel sheet pile wall repair mentioned above. 2.3 Tier 3 - Updated Load Rating Analysis A gusset plate load rating update was performed in November 2014 that did not consider the coding changes made during the condition assessments performed in the Spring of 2015. A new comprehensive Load Rating Report was completed in August 2017 as part of the funding analysis as well as to evaluate the bridge for emergency vehicles. The new load rating indicates that the deck and gusset plates have ratings that are below 1.0 with respect to the legal trucks and that the gusset plates control. TranTech has ranked the gusset plates by their criticality and has identified the failure mechanism of each plate. This information will be used to focus the gusset plate inspection during future interim and routine bridge inspections. The rating outcome has further reduced the bridge's capacity and the resulting Sufficiency Rating. A copy of the Summary Sheet from the new load rating is attached in Appendix B. 3. CONCLUDING REMARKS A three-tier structure assessment has revealed that there are critical structural elements of the 42nd Ave bridge structure that have deteriorated to poor conditions. Examples are the short columns at the bridge approaches, truss gusset plates, and main span deck structure. Rehabilitation of this structure would be prohibitively expensive and a bridge replacement is recommended. A cost estimate for this bridge replacement is presented in Appendix C. Furthermore, it is recommended that until the bridge can be replaced, the interim inspection frequency remains at a six-month interval with special attention being paid to the critical structural elements identified in the structural analysis. A monitoring plan has been developed and will be implemented by the City of Tukwila until bridge funding can be secured and the bridge can be replaced. 4 15 APPENDIX A I Current Inspection Report s= TRANTECH 4 'Engineering LLC 16 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 Agency: TUKWILA CD Date: 7/27/2017 Program Mgr: Roman G. Peralta Page 1 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post Inspector's Signature GDG Cert # G0014 Cert Exp Date 5/12/2021 Co -Inspector's Signature BMS Elements Element Element Description Inspections Performed: Freq Hrs Date Rep Type 12 6.0 4/26/2017 Routine 24 6.0 4/26/2017 Fract Crit UW Special 24 1.0 2/26/2016 Interim UWI Damage Safety Short Span In Depth Geometric 2 State 1 Structural Eval (1657) 27 23 Operating Tons (1552) 2 6,816 No Utilities (2675) 1 0 Bridge Rails (1684) 2 35 Deck Geometry (1658) 0.77 SF 0.65 Op RF (1553) 16 14 Inventory Tons (1555) 0 256 Transition (1685) 9 0 Underclearance (1659) 0 113 Guardrails (1686) 8 LF (1661) 0.46 0.39 IInv RF (1556) 5 3 Operating Level (1660) 0 LF Terminals (1687) 6 —Alignment 5 Deck Overall (1663) 0.00 Truss Gusset Plates Asphalt Depth (2610) 5 — Superstructure (1671) A 0 Open/Closed (1293) 4 332 Substructure (1676) 8 U E Waterway (1662) Scour (1680) Soundings Flag (2693) 6.00 205 Design Curb Ht (2611) 9 EA Culvert (1678) 40.0 8 Bridge Rail Ht (2612) 5 — Chan/Protection (1677) 1949 71 Year Built (1332) N 0 Pier/Abut/Prot (1679) N 76 Revise Rating (2688) 0 0 Year Rebuilt (1336) 4 234 Drain Cond (7664) 149 LF Photos Flag (2691) Y 0 Subj to NBIS (2614) Alpha Span Type: 1 1,100 Drain Status (7665) 1,100 0 Measure Clrnc (2694) M 311 Deck Scaling (7666) 6 EA Sdwk Cond (7673) 0 STrus 8 10 Fixed Bearing Scaling Pct (7667) 5 2 Paint Cond (7674) 0 7 Deck Rutting (7669) 6 Approach Cond (7681) 7 Exposed Rebar (7670) 7 Retaining Wall (7682) Sufficiency Rating 7.56 SD 6 Curb Cond (7672) 9 Pier Prot (7683) High Risk BMS Elements Element Element Description Total Units State 1 State 2 State 3 State 4 12 Concrete Deck 6,816 SF 6,811 0 5 0 35 Concrete Deck Soffit 6,816 SF 6,812 0 4 0 110 Concrete Girder 256 LF 256 0 0 0 113 Steel Stringer 1,100 LF 1,050 0 50 0 126 Steel Thru Truss 440 LF 286 0 154 0 133 Truss Gusset Plates 40 EA 20 0 20 0 152 Steel Floor Beam 332 LF 282 50 0 0 205 Concrete Pile/Column 18 EA 10 0 8 0 212 Concrete Submerged Pier Wall 74 LF 71 3 0 0 215 Concrete Abutment 76 LF 66 0 10 0 234 Concrete Pier Cap/Crossbeam 149 LF 149 0 0 0 266 Concrete Sidewalk & Supports 1,100 SF 1,100 0 0 0 311 Moveable Bearing (roller, sliding, etc) 10 EA 2 0 0 8 313 Fixed Bearing 2 EA 2 0 0 17 0 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 Agency: TUKWILA CD Date: 7/27/2017 Program Mgr: Roman G. Peralta Page 2 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post BMS Elements (Continued) Element Element Description Total Units State 1 State 2 State 3 State 4 330 Metal Bridge Railing 568 LF 456 100 12 0 340 Metal Pedestrian Railing 284 LF 284 0 0 0 357 Pack Rust 50 EA 46 4 0 0 361 Scour 4 EA 2 2 0 0 362 (Discontinued) Impact Damage 1 EA 1 0 0 0 402 Open Concrete Joint 216 LF 0 0 216 0 408 Steel Sliding Plate 48 LF 0 0 48 0 901 Red Lead Alkyd Paint System 17,000 SF 11,800 4,000 1,000 200 18 Notes 0 ORIENTATION Beginning of bridge at south abutment (nearest traffic signal at Interurban Ave). 1 FRACTURE CRITICAL INSPECTION This includes visual inspection of truss tension members, bottom chords, floor beams, diagonal and vertical members. See Fracture Critical Report in Files Tab. 3 UBIT 60 UBIT can deploy through both sides of truss. However, the bridge deck is narrow with low portals and sways. Suggest closing the bridge for next UBIT inspection due to the bouncing motion of the UBIT caused by the high volume of truck traffic on the bridge. Also added congestion to main arterial Interurban Ave S from the in inadequate approach distance on 42nd Ave S to south portal of the bridge. TRANSIENTS Activity under Span 3. Garbage accumulated, litter and needles on top of cap 3. 11 EV2 RF = 0.62 EV3 RF = 0.42 LOAD RATING Gusset Plate at L2U1-East controls. A new load rating has been performed (August 2017) and the bridge requires load posting for AASHTO 2 and 3, SHV 5,6,&7, and EV 2 and 3. The City is in the process of implementing the posting requirements. 12 CONCRETE DECK (SURFACE) Open joints at floorbeam. Exposed aggregate in wheel lines and slight rutting. Moderate scaling, pop -outs and mudball voids scattered throughout surface. Longitudinal cracks concentrated near ends of bridge, some porosity. North bound lane: 4"-6" pavement spall. South bound lane: 6" loose pavement near double yellow line. 35 CONCRETE DECK SOFFIT Diagonal hairline leaching cracks near steel stringers. Deck fillets are spelled in several locations along top flanges of floorbeams. Many short exposed rebar in edge overhangs due to lack of cover and poor consolidation of concrete. Scattered hairline transverse rusty leaching cracks in soffit. Moderate sized pockets of poor consolidation - spans 2-4 thru 2-7. 110 CONCRETE GIRDER Four lines of CIP concrete T -beams in Spans 1 and 3. Webs have hairline vertical and diagonal cracks. 1A - Vertical crack near Pier 2 End diaphragm @ Pier 3 - hairline vertical leaching cracks Span 3 griders are coverd with soot 113 STEEL STRINGER Five lines of stringers (5x220=1100 LF). Square cope at connection to floorbeams, no cracks observed. Rusty top flanges. Mud staining on outside stringers. Rust blisters on a few copes. 18 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 Agency: TUKWILA CD Date: 7/27/2017 Program Mgr: Roman G. Peralta Page 3 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post 19 Notes (Continued) 126 STEEL THRU TRUSS GENERAL: See 2017 FCR for detail on fracture critical members. Lower panel points were dry cleaned prior to inspection. Upper panel points and those connecting members are covered in guano droppings, active nests in upper chords and owls nest at L4E. Debris building up in bottom chord. See note #133 Gusset Plates PACK RUST: Pack rust is starting to develop in all built-up members but hasn't reached the point of popping rivet heads. - Up to 1/8" pack rust in seams of tension and compression diagonals. - Pack rust between bottom lateral gusset plates and bottom chord has caused bulging up to 3/8" at most chord joints. - Pack rust between interior cover plates and bottom chord channel has caused warping of cover plate up to 1/4". - Bottom laterals have seam rust and pack rust up to 3/8" along tops of members. - Bottom chords two channel beams from L2 to L8 E&W addition plates riveted to webs, pack rust forming between channel webs and plates distorting up to 1/8" between rivets. - Upper chords seam rust along channel/plate seams throughout. PORTALS & SWAYS: SOUTH PORTAL, U1W-U2E: High load traffic damage to south portal and sway frame. North flange of south portal is bent north 3" over 2 ft length. Bottom flange of sway is pushed up 2" over 8" length. Top flange of sway has a sine -wave shaped crimp, 1" over 7" length. Center of sway is bent 1'-0" to north. -SWAY M1W-M2E: Impact damage to sway, pushed 5" to north with flanges buckled. SWAY M2W-M3E: Minor impact damage. U5W: Paint blister and minor pack rust along edge of top chord. L7W: 2 rusty rivet heads on bottom plate. L7-U7E: Paint failure at SW. L7-L8W: Pack rust on lower chord. L8W: Pack rust 1/8" on bottom plate. L9W-U9W: Pitting up to 1/8" near top of bottom gusset plate. L9W: Gusset plate 7/16" thick. Pack rust 1/8" on bottom plate and 1/4" V.P. 133 STEEL GUSSET PLATES 20 gusset plates per truss line. High bird activity. Bottom lateral gusset plates at bottom chord have pack rust causing bulging up to 3/8" at most chord joints. Interior cover plates at bottom chord channel have pack rust causing warping of cover plate up to 1/4". Interior rivet heads have blistered paint or lack paint, many are heavily rusted. 5LE bottom plate has two deformed rivet heads. 152 STEEL FLOOR BEAM Two skewed end floorbeams and ten transverse floorbeams (2x33.6+10x26.5=332 LF). Dirt and mud at connections to truss. Laminar rust along top flange with minor section loss (<2%). 205 CONCRETE PILE Five concrete piles each at Piers 1 and 4, with cap and backwall. Rough concrete and a few hairline cracks at cap interface. 10: 10" spall with exposed rebar. 4A, 4B, 4C: Hairline horizontal cracks at about 1 ft. spacing. CONCRETE COLUMNS: 28" tall concrete columns support the sliding plate bearings at Piers 2 & 3. 2A: Horizontal crack at cap interface, exposed rusty rebar, corners are spalled off, NW corner of bearing is unsupported. 2B: Horizontal crack at cap interface, exposed rusty rebar, large spalls in NW corner of bearing is unsupported. 2C: Horizontal crack at cap interface, exposed 4" section of rusty rebar 2D: Hairline crack at cap interface, SE corner is spalled off (18" high by 4" deep) 3A: Horizontal cracks at cap interface 3B: Horizontal cracks at cap interface 3C: 12" of horizontal rebar exposed on south side 3D: Hairline crack at cap interface 212 CONCRETE SUBMERGED PIER WALL Hairline vertical cracks in pier walls. Many 1-1/2" shallow form tie holes in both walls. Pier 2: water abrasion along north face. Pier 3: Three 12" x 12" x 1" deep areas of abrasion in south face. 215 CONCRETE ABUTMENT Both backwalls have a few hairline vertical cracks throughout. Graffiti at face of abutment. Pier 4: gap under backwall from pile 4A through 4D, minor erosion/sloughing. NW wingwall: open diagonal crack above top of cap to ground line (1.75" gap at top) with 2 ft x 8" x 6" deep spall with 5" exposed rebar. NE wingwall: 8" x 6" x 3" deep spall. Two steel plates attached on the east side of north abutment wall at the NE corner bridge rail. MONITOR NOTES 2/25/2016 Pier 2 concrete columns - no change noted. Pier 3 concrete columns - Heavy graffiti on north face of column of all columns and pier cap. Change noted in column 3A; north face - cracks at base along interface with pier cap, full width. Cracks are narrow to open, some new chips and small spalls along crack line. Column is tilted to the north 1.5 degrees. Abutment 4 - west corner at wingwall interface. 2016: Gap is 1.75" at top horizontal face. Concrete piles with transverse cracks - no change 19 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 Agency: TUKWILA CD Date: 7/27/2017 Program Mgr: Roman G. Peralta Page 4 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post 20 Notes (Continued) 234 CONCRETE PIER CAP Hairline vertical cracks in perimeter, tops are covered with mud, moss and transient debris. Pier 2 - spall with exposed rebar NW, north & SE face. Pier -3. Caps have open form tie holes. Pier 4 : 4A, 4B & 4C top of beam cap spall across width of stringer. 266 CONCRETE SIDEWALK & SUPPORTS Surface: Transverse cracks at panel points, open up to 1/8", small spalls starting to form. ACP at south approach to sidewalk is steep (Repair #12316). Vegetation growing along edge next to east truss line. Soffit: Many hairline transverse cracks leaching on underside. Form anchors still in place on soffit along channel web. Supports: Steel knee braces support sidewalk in Span 2. Top clips at truss are separating due to pack rust. 311 MOVEABLE BEARING Rocker Bearings- Truss: Both bearings 2-1A & 2-1B are tipped 5° expanded, temperature was 44° F. Rocker Bearings - approach spans. Eight skewed steel bearings, each bearing has two hing bars. Bearings are mounted on concrete plinths at Piers 2 and 3. Pack rust between sole plates and hing bars on all bearings. Hing bars at 2A, 2D, 3-1A and 3-1D, are bulging up to 1/8" from pack rust, all eight bearings are frozen. SEE NOTE 1676 SUBSTRUCTURE - for details on the concrete plinths. 313 FIXED BEARING Two pinned shoe bearings at Pier 3, minor rust on edges. 330 METAL BRIDGE RAILING Retrofitted thrie beam has minor traffic scrapes throughout. Rail has loose connection at U5L5 in east truss and rattles under traffic. Curbs cracked open 1/8" over truss floorbeams. Tack welds broken on west rail, widespread. 340 METAL PEDESTRIAN RAILING Rail panel section loose at bottom tube connection to post, east sidewalk north of centerline of the river, between L4 & L5. 357 PACK RUST Seam rust and pack rust - most 1/4" or less on built-up members throughout truss. 361 SCOUR, FIELD Pier 2 is located on the outside of a sharp meander bend in the Duwamish River. Riprap along Pier 2 has a scour scallop, about 8 to 10 feet in diameter at the center of pier, two relic piles are exposed in the scalloped area. During inspection flow increased velocity with the changing tide. The main thalweg flow is near the left bank at Pier 2; back eddies were noted along the center and downstream face of Pier 2. Riprap is scattered and missing along the downstream face of Pier 3. Gravel bar visible upstream of pier 3, right bank to mid channel. Riprap has scatted areas upstream and downstream along both banks. 2015 soundings show 2.5' deepening near Pier 2. Little change to gravel bar forming near Pier 3. SOUNDINGS: are taken from upstream rail at truss panel points: Year LO L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 2015 18.5 30.5 41.5 44.5 40.5 36.0 29.7 28.5 26.5 23.5 16.0 2014 19.0 30.5 39.0 42.0 39.5 34.0 28.5 28.0 26.5 23.5 15.0 2013 18.8 30.2 41.0 42.0 42.0 35.0 30.0 27.5 26.0 23.8 16.0 2007 18.5 30.5 40.0 43.5 43.0 37.5 31.0 28.5 27.0 25.5 15.0 Update soundings every two years or more often if lateral migration is suspected. Monitor riprap at low tide and low flow periods. 362 IMPACT DAMAGE Traffic impact damage to truss south portal and sway members. 402 JOINT FILLER Open joints over floorbeams; most of fabric fill is worn away, allowing mud and water to pump through onto floorbeam top flanges (Repair #12306). 20 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 Agency: TUKWILA CD Date: 7/27/2017 Program Mgr: Roman G. Peralta Page 5 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post 21 Notes (Continued) 408 STEEL SLIDING PLATE Joints are full of dirt. D -spalls and delaminations along edges of both joints. Water leaks through joint onto truss main piers. MEASUREMENTS: are taken at center line of each joint. YEAR TEMP TIME PIER 2 (WEST) PIER 3 (EAST) 2016 62° 09:00 1-0" 1-1/2" 2015 48° 09:20 7/8" 1-1/2" 2013 48° 11:00 15/16" 1-3/8" 2011 50° 15:30 15/16" 1-3/8" 2009 65° 10:00 1-0" 1-5/8" 2007 50° 08:00 1-1/2" 1-5/8" 2005 65° 10:00 1-0" 1-3/8" 901 RED LEAD ALKYD PAINT SYSTEM Top coat of paint on top chord has flaked off in many areas. There are a few rust spots where failed paint has exposed bare metal. Seam rust is bleeding through along edges of built-up members. Moss growth on some diagonal/vertical members. 1663 The Deck Overall code was downgraded based on deck and floor system deterioration. The deck panels are non -composite and are loose and banging on the floor system under traffic. In addition, the floor system is creaking and groaning under load. These problems are not revealing themselves in recordable damage but the loose deck panels and lack of continuity was taken into account in a new load rating update. 1676 SUBSTRUCTURE Code reduced to 4 due to condition of concrete plinths under rocker bearings at piers 2 and 3. Pier 2 plinth 2A, and 2B have open cracks at interface with pier cap. All plinths have large spalls with exposed rebar along edges, several are spalled under bearing plates. Pier 3 plinth 3A and 3B have open cracks at interface with pier cap. Several plinths have spalls with exposed rebar. Unknown pile tip elevation of piles supporting Piers 2 & 3. Channel thalweg is near pier 2, riprap is scattered. 1680 SCOUR , OFFICE Scour analysis done in 2014. Since pile tip elevations are not available, the scour code = "U". The channel is centered under L3 -East and is slightly aggradating at piers 1, 2 and 3. Calculated contraction scour is 0.6 feet, local pier scour ranges between 6 feet and 13 feet depending on angle of attack. Plans indicate bottom of footing at -7.0, top of rail is estimated per plans at 28.0. 1685 TRANSITION Bridge rail transition at Pier 1 west side is missing approach guard rail. 1686 GUARDRAILS SE Traffic impact damage to approach rail flex beam. NW Approach rail is below standard height at settlement area, 18in to top of rail. 1687 TERMINAL Terminals not slotted. Attenuator is located at NE corner. 2675 NO. OF UTILITIES Two utilities are suspended from east edge under sidewalk: One 12" diameter steel waterline with mechanically restrained joints. One 6" diameter gas pipe. 2694 CLEARANCE Vertical clearance at portals and sway braces 3" from curb: East truss: E -M0 - W -M0 = 15'-3 1/8" E -M2 - W -M1 = 15'- 0 1/4" E -M3 - W -M2 = 15'-0" E -M4 - W -M3 = 15'-0" E -M5 - W -M4 = 15'-0 7/16" E -M6 - W -M5 = 15'-0 3/8" E -M7 - W -M6 = 15'-1 3/8" E -M8 - W -M7 = 15'-0 1/8" E -M9 - W -M8 = 15'-0 1/8" 7664 DRAINS Drains are plugged throughout. 21 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 Agency: TUKWILA CD Date: 7/27/2017 Program Mgr: Roman G. Peralta Page 6 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post Notes (Continued) 7681 APPROACH ROADWAY Longitudinal and transverse cracking in ACP in both approaches. South approach - slight settlement. North approach - settlement at sheet pile wall and in southbound lane for 50 ft north of approach, longitudinal cracks and fault cracks around settled area, approximately 1" settlement. 7682 RETAINING WALL Sheet pile wall to retain NW approach fill, no defects noted. Repairs Repair No Pr R Repair Descriptions Noted Maint Verified 12306 1 B JOINTS SPAN 2: (MAH Revised 4/10/2015) Open Joints: Clean out open joints over floor beams thoroughly and fill with a flexible sealant, priority 1 due to corrosion at top flanges of floorbeams from leaking joints. 3/25/1998 12316 1 B SIDEWALK: North approach - rework the sliding plate expansion joint so it is smooth with sidewalk. Deck - patch spalls near panel points, seal open cracks. 4/12/2007 13469 1 B RAIL: SW transition is missing approach guard rail and terminal. SE guardrail is bent and deformed. NW guardrail has sunk down below acceptable standards. REPAIR - replace missing guard rail and terminal at SW corner, replace damaged rail at SE corner, reset NW rail and posts to bring rail up to standard height. 4/8/2013 13471 1 B PAINT: Paint has failed in many locations on top of top chords of truss. Pack rust is forming in seams of all built-up members. Moist dirt and pigeon guano are trapped in truss panel points and will cause premature paint failure. Algae growing on many members. REPAIR - Thoroughly pressure wash clean truss of all dirUalgae/guano, prepare surface, paint bridge to encapsulate pack rust and protect truss members. Add bird deterrent at all panel points, upper and lower chords. 4/8/2013 13473 1 B EXPANSION JOINT: Steel sliding plate expansion joints allows water and dirt to fall onto top of caps at Piers 2 and 3. The edges around the joints are chipped and spalled. REPAIR - Replace steel sliding plate expansion joints with either a strip seal with steel header or modular joint. 4/8/2013 13474 S S SCOUR: Current scour code is coded "5" which means that foundation is stable for calculated scour depths. Need copy of pile tip elevations from city for bridge file. 4/16/2013 22 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 Agency: TUKWILA CD Date: 7/27/2017 Program Mgr: Roman G. Peralta Page 7 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post Repairs (Continued) Repair No Pr R Repair Descriptions Noted Maint Verified 13475 2 B STRUCTURAL SUBSTRUCTURE: (RPH Revised 4/8/13) Concrete columns supporting sliding bearings at Piers 2 and 3 have horizontal cracks at cap interface, exposed rusty rebar, spalls and delaminations. Pier 2 - Cap has spall, with rusted rebar and open cracks up to .05mm. Pier 3 - heavily abraded at waterline. Pier 4 - columns 4A -C have horizontal cracks. Abutment backwall is undermining along west half. West wing wall has large open crack and spalls. REPAIRS: P2 and P3 bearing columns - recommend design seismic retrofit steel collar and construct around bearing columns, anchored to cap, then fill tight with epoxy. Pier 2 - cap clean exposed rebar and patch spalls, epoxy inject cracks. Pier 3 - clean and patch abraded areas of pier wall Pier 4 - FRP wrap columns 4 A -C. Reinforce west wingwall. Add quarryspall along abutment 4 and under span 3 to retain fill and discourage transient activity. 4/16/2013 13476 2 B SCOUR: (RPH Revised 7/22/2014) Small scour scallops in left bank armor in front of Pier 2. Riprap is sparse and scattered through mudbar in front of Pier 3. Monitor the downstream inside face of Pier 3 at low water. REPAIR - Replace missing riprap along banks and in front of piers. 4/17/2013 13478 1 B SWAY BRACES: Heat straighten south portal and sway E-M3/W-M2. Sway bracing measures 15'-0" three inches from curb. Vertical clearance signs are required for measured clearances less than or equal to 15'-3" Install warning signs at both portals with posted height 3" less than lowest measured clearance. Recommend raising portals and sways due to the high volume of truck traffic and existing damage to sway members. 4/10/2015 13479 2 B BEARINGS: Main span rocker bearings at pier 2 are frozen in expanded position, fixed bearing at pier 3 are offset. Clean and reset main span bearings. Approach span bearings - slide bearing at pier 2 and 3 are corroded - possibly frozen. Replace sliding plates with elastomeric dynamic isolation bearings. 4/10/2015 13480 2 B DECK SOFFIT - widespread honeycombed areas, spalls with exposed rebar east side of soffit. SURFACE - worn to aggregate, spalling along joints. Patches of light scaling. REPAIR: Chip any delamintaed concrete from exposed rebar, clean and seal exposed bar and patch spalls. Sack honeycombed areas throughout soffit. Shotblast deck surface, patch spalled areas and apply epoxy overlay. 4/10/2015 Inspections Performed and Resources Required Report Type Routine Fracture Critical Date 4/26/2017 4/26/2017 Freq 12 24 Hrs Insp 6.0 ZZ 6.0 ZZ CertNo G1414 G1414 Resources Hours Min Pref Max Freq Date UBIT 6.00 Coinsp TTT TTT Need Date Override Notes Note SDOT UBIT 60 USED 23 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 Agency: TUKWILA CD Date: 7/27/2017 Program Mgr: Roman G. Peralta Page 8 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post Inspections Performed and Resources Required (Continued) Report Type Flagging Date Freq Hrs Insp CertNo Coinsp Note 6.00 LOCAL AGENCY Flagging provided by City of Tukwila - contact Steve Carstens at 206-431-2446 Interim 2/26/2016 24 1.0 MAH G1103 BLR Inspect short concrete columns supporting bearings at piers 2 and 3. See Monitor Note 695 for details Resources Hours Min Pref Max Freq Date Need Date Override Notes Special Bring ladder to reach columns and bearings. Equipment Equipment 4/26/2017 24 6.0 ZZ G1414 TTT Resources Hours Min Pref Max Freq Date Need Date Override Notes UBIT 4.00 SDOT UBIT-60 USED Flagging 4.00 Flagging provided by City of Tukwila - contact Steve Carstens 206-431-2446. Informational 7/27/2017 GDG G0014 Updated load rating information with 2017 rating results. Downgraded Deck Overall to account for loose deck panels and floor system noise under traffic. These issues have were noted in inspections since 2014 were not noted. This change was made with the concurrance of the previous bridge inspector. 24 A1111111k Washington State war Department of Transportation Bridge ID Facilities Layout Crossing Design Load Rating Inspection Report Types 1001 2009 2132 1019 1286 1021 WSBIS Local Agency Inventory Report 2023 1156 2181 2183 2185 1188 1196 Structure ID Bridge Number Bridge Name rwner c County City Location Section N Range Latitude Longitude 08109700 TUKWILA-14 42ND AVENUE SOUTH BR 04 4 17 1320 .03 MI N OF INTERURBAN AV 10 23 04E 47° 29' 23.10" 122° 16' 49.00" 284 Speed Limit! 220 2 24.0 30.0 0.0 3.5 38 N 15' 00" 00' 00" N 1232 1256 1274 7281 7283 1276 1285 1288 1289 1293 1292 2295 7296 Feature Intersected Facilities Carried Region Leg1 r ca N FIPS Toll n7 N Temp OPC NRHP HAER LRHP DUWAMISH RIVER 42ND AVE SO NW 11 0 72625 3 N Lift Clear A 4 1949 0 284 Speed Limit! 220 2 24.0 30.0 0.0 3.5 38 N 15' 00" 00' 00" N 1332 1336 1340 2346 1348 1352 1356 1360 1364 1367 1310 1312 1370 1374 1378 1379 1382 Printed Date 8/17/2017 1383 1386 1387 Sufficiency Rating: 7.56 SD High Risk 1390 1394 Item 2710 SR Item 2711 SD/FO 1291 1397 Yer Built Yearw Rebuilt LLennrigth NBIS Length SpanlLe Length L Ons to Curb CDeaneurbck Width Out to OutSidLeft Deck Width Ik ewadewalk Si g Flared Min Vert Over Deck MUndein rt Code Min Lat Under Right Lat Code UVert nnder Left in Lat Nav Ctl Code N Clear av N Clearv 1Z Lift Clear Median Rdwy 1949 0 284 Speed Limit! 220 2 24.0 30.0 0.0 3.5 38 N 15' 00" 00' 00" N 0.0 N 0.0 0 0 0 0 0 36 N 2 0 24'00" 15'00" 2 25 23 0.65 14 0.39 1432 1433 1434 1435 2440 1445 1451 1453 1457 1463 1467 1477 1469 2410 7479 1483 1484 1485 1486 1487 1489 1490 1354 1491 1495 1499 1413 2441 On Under n m F',7 i NADT Service Level Route Number Milepost ADT Truck % Year of ADT Future ADT Future Year Linear Referencing System LRS Sub LRS Milepost NBI Bridge Fed Aid Route # Z = cn BHS cn D = FLH Funct. Class NTN Lane Use Direction Lanes Under Horizontal Clearance Route Dir Horizontal Clearance Reverse Dir Max Vert Clearance Route Detour Speed Limit! 1 5 1 01037 1.04 10000 20 2014 11000 2034 01037 0.77 6 Y 1037 0 0 0 0 17 N 2 0 24'00" 15'00" 2 25 23 0.65 14 0.39 1532 1533 1535 1536 1538 1541 1544 1545 1546 1547 1548 1549 1550 1551 1552 1553 1554 1555 1556 1585 1588 1590 7565 7557 Main Span Material Main Span Design Appr Span Material Appr Span Design Number Main Spans Number Appr Spans Service On Service Under Deck Type Wearing Surface Membrane Deck Protect Design Load Code Oper Rating Method Oper Rating Tons Oper Rating Factor Inv Rating Method Inv Rating Tons Inv Rating Factor Border State Cd Border Pct Border Structure ID Fed Aid Project No Design Exemption 3 10 1 04 1 2 5 5 1 1 0 0 4 6 27 0.77 6 16 0.46 23 0.65 14 0.39 2587 2588 2589 2590 2591 2592 2593 2594 2595 2596 7832 7833 7834 7835 7836 7837 7838 7839 7840 7841 1844 1846 Type 3 c` -0 caa 2J .i al o 1 �i OL1 OL2 N N ca N r- < < < < Engr Cost Total Cost Estmt Year Prop Imp Cost Calc. B ANH 2 3 N AN 1.21 0.90 0.84 0.73 1.11 0.98 0.88 0.81 0.65 0.34 2920 Inspection 1990 Date 2646 Inspector 2649 Cert No 2654 Co -Inspector Routine Fracture Critical Special Feature Underwater Waterway/ Prop Imp 1847 2853 2860 1867 1873 2870 1861 1879 2883 Water Type Flood Pln Int Flood Control Scour Hist Strmbd Matrl Substr Stablty o* q Strmbd Stablty Strmbd Anabrn Piers In Watr Type Work * m o g- . Stru Imp Length Roadway Width Cost Per SF Struct Cost Rdwy Cost Engr Cost Total Cost Estmt Year Prop Imp Cost Calc. B ANH 2 3 N AN 2 31 1 294 38 800 4469 894 3575 8938 2014 Y Inspection Date Inspector Cert No Co -Inspector UW Interim Interim In Depth Damage Inspection Date Inspector Cert No Co -Inspector Safety Short Span Geometric Info 7/27/2017 GDG G0014 Inventory 25 APPENDIX B 1Current Load Rating Summary s= TRANTECH 4 'Engineering LLC 26 BRIDGE RATING SUMMARY Bridge Name: 42ND AVENUE SOUTH BR Bridge Number: TUKWILA-14 Span Types: Steel Through Truss Bridge & Approach Slabs Bridge Length: 280' (220' Truss + 2x30' Approach Slab) Design Load: HS20-44 Rated By: VP Checked By: KN Date: 8/1/2017 EXPIRES 5- IQ Inspection Report Date 4/26/2017 Substructure Condition 4 Rating Method LFR Deck Condition 6 Overlay Thickness 0"/Truss & 2"/Approach Superstructure Condition 5 Truck RF (INV) RF (OPR) Controlling Point AASHTO-1 AASHTO-2 AASHTO-3 NRL OL -1 OL -2 0.72 0.54 0.50 0.44 0.39 0.20 NBI Rating RF 1.21 0.90 0.84 0.73 0.65 0.34 Yielding in member L2U 1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Controlling Point Inventory (HS -20) Operating (HS -20) 0.39 Yielding in member L2U1 0.65 Yielding in member L2U1 Remarks: Bridge requires posting. The single unit and FAST Act vehicles rating factors are: Operating Rating SU4 (GVW = 54 K) SU5 (GVW = 62 K) SU6 (GVW = 69.5 K) SU7 (GVW = 77.5 K) EV2 (GVW = 57.5 K) EV3 (GVW = 86.0 K) RF 1.11 0.98 0.88 0.81 0.62 0.42 Ton 29.97 30.38 30.58 31.39 17.83 18.06 Controlling Point Yielding in member L2U1 Yielding in member L2U 1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U 1 27 APPENDIX C 1 Bridge Replacement Estimate s= TRANTECH 4'Engineering LLC 28 City of Tukwila -Tukwila 14 -42nd Avenue Bridge Replacement Cost Estimate August 1, 2017 285 foot simple span with angled bearings. STD. ITEM ITEM DESCRIPTION MEAS. UNIT QUANTITY UNIT PRICE COST 130 REMOVING ASPHALT CONCRETE SIDEWALK SY 10 $ 150 $ 1,500 170 REMOVING GUARDRAIL LF 40 $ 25 $ 1,000 1085 QUARRY SPALLS CY 500 $ 40 $ 20,000 4006 STRUCTURE EXCAVATION CLASS A INCL. HAUL CY 200 $ 150 $ 30,000 4010 SPECIAL EXCAVATION CY 100 $ 200 $ 20,000 4013 SHORING OR EXTRA EXCAVATION CLASS A - SHAFT LS 1 $ 25,000 $ 25,000 4007 SOIL EXCAVATION FOR SHAFT INCL HAUL CY 450 $ 450 $ 202,500 4008 FURNISH AND PLACE TEMP CASING FOR 60" DIAM SHAFT LF 600 $ 200 $ 120,000 FURNISH PERM CASING FOR 60" DIAM SHAFT LF 600 $ 450 $ 270,000 PLACING PERM CASING FOR 60" DIAM SHAFT EA 6 $ 3,000 $ 18,000 CONC CL 4000P FOR SHAFT CY 450 $ 300 $ 135,000 ST REINF BAR FOR SHAFT LBS 540,000 $ 1.70 $ 918,000 CSL ACCESS TUBES LF 600 $ 15 $ 9,000 REMOVING SHAFT OBSTRUCTIONS LS 1 $ 100,000 $ 100,000 REMOVING EXISTING BRIDGE SUPERSTRUCTURE LS 1 $ 300,000 $ 300,000 REMOVING EXISTING BRIDGE FOUNDATION LS 1 $ 300,000 $ 300,000 REMOVING EXISTING BRIDGE APPROACHES LS 1 $ 100,000 $ 100,000 TEMPORARY DETOUR BRIDGE LS 1 $ 1,250,000 $ 1,250,000 PRESTRESSED CONCRETE GIRDERS, WATER XING WITH PILING LF 1,750 $ 300 $ 525,000 BRIDGE APPROACH SLAB SY 280 $ 250 $ 70,000 REINFORCED CONC RETAINING WALL SF 2,000 $ 90 $ 180,000 CONC CL 4000 FOR BRIDGE CY 550 $ 575 $ 316,250 STRUCTURAL SURVEYING LS 1 $ 30,000 $ 30,000 4438 EXPANSION JOINT SYSTEM COMPRESSION SEAL - SUPERSTRUCT. LF 160 100 $ 16,000 4339 EXPANSION JOINT SYSTEM STRIP SEAL LF 160 800 $ 128,000 4410 BRIDGE RAILING LF 600 120 $ 72,000 6403 ESA LEAD DAYS 280 120 $ 33,600 6416 SEEDING, FERTILIZING, AND MULCHING LS 1 3,000 $ 3,000 6455 BIODEGRADABLE EROSION CONTROL BLANKET SY 250 4 $ 1,000 6470 STREET CLEANING HR 120 200 $ 24,000 6471 INLET PROTECTION EA 6 100 $ 600 6488 EROSION CONTROL AND WATER POLLUTION PREVENTION LS 1 2,000 $ 2,000 6630 HIGH VISIBILITY FENCE LF 300 4 $ 1,200 6806 PAINT LINE LF - 5 $ - 6869 PEDESTRIAN TRAFFIC CONTROL LS 1 10,000 $ 10,000 6899 BRIDGE MOUNTED SIGN EA 2 1,000 $ 2,000 6903 TEMPORARY ILLUMINATION SYSTEM LS 1 10,000 $ 10,000 6913 PORTABLE TEMPORARY TRAFFIC CONTROL SIGNAL LS 1 30,000 $ 30,000 6971 PROJECT TEMPORARY TRAFFIC CONTROL LS 1 100,000 $ 100,000 6974 TRAFFIC CONTROL SUPERVISOR LS 1 10,000 $ 10,000 6982 CONSTRUCTION SIGNS CLASS A SF 200 20 $ 4,000 7003 TYPE B PROGRESS SCHEDULE LS 1 5,000 $ 5,000 7052 BRIDGE END SIDEWALK RAMP EA 2 1,000 $ 2,000 7400 TRAINING HR 500 20 $ 10,000 7480 ROADSIDE CLEANUP EST 1 10,000 $ 10,000 7500 FIELD OFFICE BUILDING LS 1 20,000 $ 20,000 7570 HEALTH AND SAFETY PLAN LS 1 10,000 $ 10,000 7736 SPCC PLAN LS 1 2,000 $ 2,000 APPROACH @15% OF BRIDGE COST LS 1 817,148 $ 817,148 WILDLIFE MANAGEMENT LS 1 5,000 $ 5,000 SUBTOTAL $ 6,269,798 CONTINGENCY (15%) $ 940,470 MOBILIZATION $ 626,980 $ 626,980 RIGHT OF WAY COSTS $ 500,000 PRELIMINARY ENGINEERING (25% CONSTRUCTION COST) $ 1,567,449 CONSTRUCTION MANAGEMENT (18% CONSTRUCTION COST) $ 1,128,564 INFLATION FACTOR (5%/YEAR BASED ON PROJECTED AD DATE) $ 1,351,181 TOTAL $ 12,384,440 PE Costs (approximately 25% of Total) (Soils, Environmental, Desig Docuemnts, Plan Preparation, etc.) Right of Way Costs (Purchases, Reoloation and Construction Easement) Construction Costs (Environmental mitigation, approach costs (15%), structure costs, etc) Construction engineering (18%) contingency (15%) Mobilization (10%) Inflation Factor (5% per year based on project Ad Date below) Total Rehabilitation/Replacement/Preventative Maitnenance Project Costs $ 1,567,449 $ 500,000 $ 6,269,798 $ 1,128,564 $ 940,470 $ 626,980 $ 1,351,181 $ 12,384,440 29 www.trantecheng.com ■ TRANTECH 1111Engineering LLC 30 BRIDGE RATING SUMMARY Bridge Name: 42ND AVENUE SOUTH BR Bridge Number: TUKWILA-14 Span Types: Steel Through Truss Bridge & Approach Slabs Bridge Length: 280' (220' Truss + 2x30' Approach Slab) Design Load: HS20-44 Rated By: VP Checked By: KN Date: 8/1/2017 EXPIRES 5/18/ Inspection Report Date 4/26/2017 Substructure Condition 4 Rating Method LFR Deck Condition 6 Overlay Thickness 0"/Truss & 2"/Approach Superstructure Condition 5 Truck RF (INV) RF (OPR) Controlling Point AASHTO-1 AASHTO-2 AASHTO-3 NRL OL -1 OL -2 0.81 0.60 0.56 0.49 0.42 0.22 NBI Rating RF 1.35 1.00 0.94 0.82 0.70 0.37 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Controlling Point Inventory (HS -20) Operating (HS -20) 0.44 Yielding in member L2U1 0.73 Yielding in member L2U1 Remarks: Bridge requires load posting. This rating scenario requires lowering the speed limit over the bridge to 10 MPH. Operating Rating SU4 (GVW = 54 K) SU5 (GVW = 62 K) SU6 (GVW = 69.5 K) SU7 (GVW = 77.5 K) EV2 (GVW = 57.5 K) EV3 (GVW = 86.0 K) RF 1.24 1.09 0.99 0.90 1.14 0.78 Ton 33.48 33.79 34.40 34.88 32.78 33.54 Controlling Point Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 31 BRIDGE RATING SUMMARY Bridge Name: 42ND AVENUE SOUTH BR Bridge Number: TUKWILA-14 Span Types: Steel Through Truss Bridge & Approach Slabs Bridge Length: 280' (220' Truss + 2x30' Approach Slab) Design Load: HS20-44 Rated By: VP Checked By: KN Date: 8/1/2017 EXPIRES 5/18/ Inspection Report Date 4/26/2017 Substructure Condition 4 Rating Method LFR Deck Condition 6 Overlay Thickness 0"/Truss & 2"/Approach Superstructure Condition 5 Truck RF (INV) RF (OPR) Controlling Point AASHTO-1 AASHTO-2 AASHTO-3 NRL OL -1 OL -2 0.80 0.60 0.56 0.49 0.45 0.24 NBI Rating RF 1.34 1.00 0.94 0.82 0.75 0.40 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Controlling Point Inventory (HS -20) Operating (HS -20) 0.47 Yielding in member L2U1 0.79 Yielding in member L2U1 Remarks: Bridge requires load posting. This rating scenario requires posting the bridge for one truck at a time. Operating Rating SU4 (GVW = 54 K) SUS (GVW = 62 K) SU6 (GVW = 69.5 K) SU7 (GVW = 77.5 K) EV2 (GVW = 57.5 K) EV3 (GVW = 86.0 K) RF 1.23 1.08 0.98 0.90 1.08 0.88 Ton 33.21 33.48 34.06 34.88 31.05 37.84 Controlling Point Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 32