Loading...
HomeMy WebLinkAboutTIC 2018-02-26 Item 2D - Bid Award - Michels Corporation for Central Business District Sanitary Sewer RehabilitationCity of Tukwila Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director //// • BY: Mike Cusick, Senior Program Manager CC: Mayor Ekberg DATE: February 23, 2018 SUBJECT: CBD Sanitary Sewer Rehabilitation Project No. 91140203 Bid Award Allan Ekberg, Mayor ISSUE Award the contract to Michels Corporation for the 2018 Central Business District (CBD) Sanitary Sewer Rehabilitation Project. BACKGROUND The 2018 CBD Sanitary Sewer Rehabilitation Project will address deterioration of the approximately 50 - year old sanitary sewer pipes by relining the pipe with little impact to roadways and no excavation. DISCUSSION Michels Corporation submitted the only bid received on February 14, 2018 for the 2018 Sanitary Sewer Rehabilitation Project for $311,826.35 for the Base Bid and $137,806.90 for Bid Alternate Number 1. The bid was reviewed and tabulated (see attached sheet) and no errors were found. Michels Corporation has previously performed work for the City that was found to be satisfactory. BUDGET AND BID SUMMARY Michels Corporation Contingency 20% Engineers Estimate Bid Amount Budget $440,158.00 $ 449,633.25 $ 550,000.00 89,926.65 $ 539.559.90 With the awarding contract to the Michels Corporation with a of the bid of $449,633.25 we also have a 20% contingency on the project. The contingency amount of $89,926.65 is the allowable expense that the Mayor will be able to approve for any change orders to the construction contracts. If at any time the project overruns the contingency amount, staff will return to Committee and Council for approval. RECOMMENDATION Council is being asked to award the construction of the 2018 CBD Sanitary Sewer Rehabilitation Project to the Michels Corporation in the amount of $449,633.25 Council is being asked to consider this item on the Consent Agenda at the March 5, 2018 Regular Meeting. Attachments: Page 81, 2017 CIP Map Bid Tabulation W\PW Eng PROJECTS \A- SW Projects \CBD Sewer Rehabilitation (91140203)\ Info memo award to Michels Feb 14, 2018 sm.docx 13 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: CBD Sanitary Sewer Rehabilitation Project No. 91140203 DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: The asbestos concrete pipe in the CBD (commercial business district) is approximately 45 years old and becoming soft. Slip lining the pipe will reinforce the strength with little impact to roadways and minimal excavation. If the pipe collapses, the street will have to be excavated and the cost of the repairs will be significant. In the last five years we have had four major pipe failures on Andover Park West and Andover Park East. In 2014 and 2015, over 10,500 feet of asbestos sanitary sewer pipe were relined. In 2016 through 2018, 20,000 feet of asbestos sewer is scheduled to be relined. Reduced maintenance and repair costs. A Public Works Trust Fund loan was successfully obtained in 2012 for $750k. FINANCIAL Through Estimated in 000's 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 323 37 45 45 45 495 Land (RNV) 1 1 Const. Mgmt. 112 85 120 120 120 557 Construction 736 1,540 1,100 1,100 1,049 5,525 TOTAL EXPENSES 1,172 1,662 1,265 1,265 1,214 0 0 0 0 6,578 FUND SOURCES • Awarded Grant 0 PW Trust Fund 750 750 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 422 1,662 1,265 1,265 1,214 0 0 0 0 5,828 TOTAL SOURCES 1,172 1,662 1,265 1,265 1,214 0 0 0 0 6,578 2017 - 2022 Capital Improvement Program 81 14 PROJECT LOCATION EXISTING SEWER MAIN TO BE LINED WITH CIPP, TYP. EXISTING SEWER MAIN TO BE LINED WITH CIPP, TYP. EXISTING SEWER MAIN TC BE LINED WITH CIPP, TYP. EXISTING SEWER MAIN TO BE LINED WITH CIPP, TYP. 15 16 w 2 e•I CC Amount 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 oo.000c0000c000tnoocoo . . . . . . . . . N 0 c‘r m < to <- 00 0 CV N U:i N: 0. 0 oi ci 0 a m Ln Ln m P... 00 cr m <-1 iN N N 0 0 0 CO it 0 Cr <-4 r-4 m C,I (V 0 vi <-1 Ln IN 01 C1) 0 - 00 N . N ri ri (-4 <-1 0 If) <-1 id). PRICE UJ ix -- Z 0 0 . co CV tri N . Lo 0 0 . N 0 0 0 0 0 0 . . . on Ln m Csl re -i 0 0 . N CO 0 0 . 00 (NI 0 0 . .o- 0 0 . N. 0 0 . co 0 <-1 . 1.11 N . 0 <-1 . 0 0 . szr r... 0 0 . 0 m 0 0 . a a 00 Amount 0 CD 0 m 0 N (NI M Cr/ 0 if). if} 0 0 0 CD CD 0 0 0 0 <-1 I.O. V). CD 0 0 .0. 0 0 < ill. 0 LI) 0 ,L -I 0 Lb 00 00 0 ID m '0 0 00 <-1 0 Ln 0 1./1, 0 0 01 0 0 0 4.0- 0 0 0 0 Ln 0 'J) -c0.. .1/- lnit---i Price 0 0 1..0 C".4 CO 0 to r, ' LO if)- N N. if). 00000000ml-00000 0 0 0 0 0 to LO 1-1 i.r). -Lf). <-1 0 0 0 0 0 0 0 •71" if). if). <-1 if). 0 Ln 0 CY Ol LC/ CO 00 if). ' ci if). -Cf). in. if). ifl. if1- (4) --1 :I' E Ln -J cc 1 cc 1 (t) cel Lr) J. -1 J. Ln -J (t) --I L.L. -J u_ -I u_ J u_ J u_ _I u_ --I < W LU --1 ri ›. '''' cp Cf 0 Ul LO If) 0 n4 r-1 co <-1 'Cr E (6 s -r N (5) to <-1 .-I Item Description Mobilization Traffic Control — Flagger Labor (Minimum Bid of $38.36) Traffic Control - Off -Duty Uniformed Police Officer Project Temporary Traffic Control Pre -Cleaning Video Inspection Clean and Prep Sewer Prior to Construction Video Inspection Prior to Construction Provide, Install, and Manage Wastewater Bypasses 8 -inch Main Line Cured -in -Place -Pipe (CIPP) 12 -inch Main Line Cured -in -Place -Pipe (CIPP) 16 -inch Main Line Cured -in -Place -Pipe (CIPP) '8 -inch Main Line Cured -in -Place -Pipe (CIPP) Pre -liner 12 -inch Main Line Cured -in -Place -Pipe (CIPP) Pre -liner 16 -inch Main Line Cured -in -Place -Pipe (CIPP) Pre -liner Trenchless Lateral Reinstatement and Packer Injection Grouting Trenchless Outside Manhole Drop Connection Reinstatement Force Account aar Z "1 m al. Lr' 283,478.50 Lfl co r -Z m 00N m (-4 00 m I4 00 rJ LC) 1t) N 00 Lri tr). N N 0 00 10.0% Sales Tax Base Bid w/ Sales Tax U.1 u 2 DISTRICT SEWER REHABILITATION (44 Col 00 Oe z w u 00 CD r4 ci w w 0 00 1 Amount 0 0 0 0 0 0 0 0 co 0 o o co co co c c00000000000000 ‘...-1 6 r4 N. 4 m vi m cS a u5 (21 r-: 0 0 N- o to to to N <- .o- o CO LO Ln ‘0- N CD rn (-4 <-4 0 uo 00 ul ‘...4 Ln 0 .o- 00 m 0 - - - - - " - PRICE 0 U") or-- . . t -i 00 r-- M n4 V)- .I.O• 0 CD 0 0 0 0 0 0 If) If) 0 0 ooc0000cootoc000 . . . . . . . . . . N r-. .o. m u-1 m .o- (--1 (-4 (NI N. 0 h". 'CY l- LO ‘I'L Cl- C40 0 tO 00 LO r.1 CO M en m CV 00 ri 1-1 <-1 1.4- .4.O. "LO- -V} ii} .1.4 ir.O. if). 4f in in 0 . co 0 cf in. Amount 0 0 al Ns. 0 LO 1-1 NJ" N tr.) r -i s -i' 0 0 0 a <.-t 0 0 N N'a in. 0 0 cl',.. ct it). 0 co N r'sl' in. 0 0 <-I US in. 0 o 0 d N 0 0 Lt( ct." r.... 0 N (-1 '-4 0 LO CD 4-11• 0 co 0 <-1' 0 0 0 co Iil 0 tn. 4* Unit Price 0 0 al r‘i <-1 0 Ln • N. La IA- r,1 N tri. 0 0 0 0 0 N 0' N A-1 -V). 0 0 a 0 "I'N i" .(11- if). 0 0 -1 <- . 6. 1..O. 0 oo IA 0 u-) if). rn m in. in. co 0 0 41)- 0 0 0 0 r I) 0 if). '''' Eco _ ...4 -J co 1 co I to --I (4) --1 cc) -J to J (4) --i 14... -J LL --I LL --I u_ --I < w < (A LLJ -J Quantity I ri N CO UP r-1 ri ,- r -I ri r -I 0 Ul 0 01 .zt <-4 0 ci' 0 n4 r-1 Item Description Mobilization Traffic Control — Flagger Labor (Minimum Bid of $38.36) Traffic Control - Off -Duty Uniformed Police Officer Project Temporary Traffic Control Pre -Cleaning Video Inspection Clean and Prep Sewer Prior to Construction Video Inspection Prior to Construction Provide, Install, and Manage Wastewater Bypasses 6 -inch Main Line Cured -in -Place -Pipe (CIPP) 8 -inch Main Line Cured -in -Place -Pipe (CIPP) 6 -inch Main Line Cured -in -Place -Pipe (CIPP) Pre -liner 8 -inch Main Line Cured -in -Place -Pipe (CIPP) Pre -liner Trenchless Lateral Reinstatement and Packer Injection Grouting Trenchless Outside Manhole Drop Connection Reinstatement Force Account E (6 s -r c...4 nr) ,ci- to to N 00 Cl ° ` "1 m al. Lr' CD C) CO N triN 0 0") 0 0 00 m <-4 (14 01 CO 00 •LO. 0 0 111 10.0% Sales Tax Bid Alternate No. 1 w/ Sales Tax LU u m 0 uJ z w 17 CAUsers\ michael-c\ Documents\ MICHELS BID TAB 2 14 2018[Cost Est - 2017.12.11] 2/15/2018, 7:05 AM