HomeMy WebLinkAboutPermit L06-070 - VANLANINGHAM CHARLOTTE - TIEDE BOUNDARY LINE ADJUSTMENTTIEDE BOUNDARY LINE ADJUSTMENT
12600 - 41ST AVE S
L06-070
To: File
From: Rebecca Fox
Subj: Disposition of File #L06-070
Date: January 9, 2007
File #L06-070 has been cancelled, and replaced by #L06-090. It is associated with
P06-144 (D06-0378, M06-224 and PG06-178).
Rf 1
Q:\TiedeB LA L06-070\L06-070Cancel.doc
01/09/2007
•
Department of Community Development
7 Poco r
Dr66
r4 °' r 7/2Lt$
ovo
January 2, 2007
Steven M. Mullet, Mayor
Steve Lancaster, Director
NOTICE OF COMPLETE APPLICATION
Mr. Jonathan M. Harkovich
1201 Monster Rd. SW Ste #320
Renton, WA 98057
Re: Notice of complete application; Lot ConsOLIDATION BOUNDARY LINE ADJUSTMENT
Dear Mr. Behr:
The Department of Community Development received you lot con . .. ' s application on December 20,
2006 and it was deemed to be complete on January 2, 2007.
The application has been routed to other City Departments and I will be in contact with you soon regarding
any comments from the City.
This determination of complete application does not preclude the ability of the City to require that you submit
additional plans or information, if such information is necessary to ensure the project meets the substantive
requirements of the City or to complete the review process.
If you have any questions, you can contact me at (206) 431-3670 or by email at
bmiles@ci.tukwila.wa.us.
Sincerely
\1V
randon J. Miles
Assistant Planner
cc. File (L06-090) —> LorGON$O1,1Q 01/ (3G4
4028 5. (2669:
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206-431-3665
Cizy of Tukwila
Steven M. Mullet, Mayor
Department of Community Development Steve Lancaster, Director
NOTICE OF INCOMPLETE APPLICATION
October 25, 2006
Charlotte VanLaningham
1201 Monster Road. S.W., Suite #320
Renton, WA 98055>
RE: Tiede Boundary Line Adjustment
L06-070
Dear Ms. VanLaningham:
Your application for a Boundary Line Adjustment located at 12600 41st Avenue S., Tukwila„ WA
has been found to be incomplete. In order to be a complete application, the following must be
submitted to the permit center:
a. Recording Document
• Show legal description of all lots before and after the proposed change
b. Civil Plans
• Provide all materials required in the Complete Application Checklist. Please also
include 5' topographic contours and sensitive areas.
Upon receipt of these items, the City will re -review the application for completeness and will mail
you written notification of completeness or incompleteness within 14 days.
Please note that the minimum lot size in Tukwila is 6,500 square feet. The proposed lot that you
have submitted is 4,392 square fee, and therefore could not be a legal lot.
The completeness review has raised several issues that you will need to address once you have
provided a complete application. These issues will need to be addressed and resolved during the
substantive review of your application and before the boundary line adjustment can be approved:
a. How will the new lot be accessed? The drawing shows a masonry wall blocking the
right-of-way on S. 126th Street. This will need to be removed.
b. Please provide documentation from King County that clarifies the status of 4151 Avenue
South.
rf1—
Q:\TiedeBLA L06-070\INCOMPLETE.DOC
1 10/25/2006
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206-431-3665
This application will expire if we do
date of this letter unless an extension
If you have any questions with this
rfox@ci.tulcwila.wa.us.
Sincerreely,
/Ae
Rebecca Fox
Senior Planner
Enc.
not receive the additional information within ninety days of the
is granted pursuant to Section 18.104.070(E).
matter you may contact me at 206-431-3683 or via e-mail at
rf2—
Q:1TiedeBLA L06-0701INCOMPLETE.DOC 2 10/25/2006
COMPLETE APPLICATION CHECKLIST
The materials listed below must be submitted with your application unless specifically waived in writing by the Public
Works Department and the Department of Community Development. Please contact each Department if you feel that
certain items are not applicable to your project and should be waived. Application review will not begin until it is
determined to be complete. ADDITIONAL MATERIALS MAY BE REQUIRED.
The initial application materials alio* project review to begin and vest the applicant's rights. However, the City may
require additional information as needed to establish consistency with development standards.
City staff are available to answer questions about application materials at 206-431-3670 (Department of Community
Development) and 206-433-0179 (Department of Public Works).
.0;4/
Check items
submitted
with
application
Information Required.
May be waived in unusual cases, upon approval of both Public Works and Planning
APPLICATION MATERIALS:
1. Application Checklist (1 copy) indicating items submitted with application.
2. Completed Application Form and drawings (4 copies).
3 One set of all plans reduced to 8 1/2" by 11" or 11x17".
4. Completed and notarized Affidavit of Ownership and Hold Harmless Permission to Enter
Property (1 copy attached).
5. :k`eafice
.h
$T; OttAt $-„ 5; other zones $510
-- Lot Consolidation in LDR $85, other zones $170
PROJECT DESCRIPTION AND ANALYSIS:
iv/R"
Nf�
6. Vicinity Map with site location.
7. Clearly establish status as separate legal lot(s) of record (per TMC Title 17 and RCW Chapter
58.17), showing all known easements and encumbrances.
8. Provide any required maintenance agreements, easements or other documents ready for
recording.
9. Provide King County Health Department approval if there are any septic systems on site.
Items 9 through 11 NOT required for lot consolidations or BLAs without vacant lots
10. Sewer and water availability letters are required from the provider district if the area is not
serviced by the City of Tukwila. Forms are available at the DCD office.
11. Provide two copies of sensitive area studies such as wetland or.Feotechnical report if
needed per Tukwila's Sensitive Areas Ordinance (TMC 18.45). See Geotechnical Report
Guidelines and Sensitive Area Special Study Guidelines (online at
www.ci.tukwila.wa.us/dcd/dcdplan.htm) for additional information.
RECORDING DOCUMENT: Templates are available from the City
12 (a) The recording document must meet the King County Assessor's recording format
requirements (letter, legal or record of survey format). Only documents prepared by a surveyor
may be in record of survey format (18"x24").
(b) Drawing must include a graphic scale, space for the City of Tukwila file number and
north arrow. It shall include the elements listed at TMC 17 08.0030 B. 30d cha �t�e
taIsrofaall;. ,.� • T
v -�must ine lu � � � nges.
.t� , c .P.r_Qvide;l�egal?descnp be�ore�andtaf%rith. �p oho
(d) The recording documentsde signature blocks for the owner(s), Short
Subdivision Committee, Assessor, and Recorder (listed on the template, see TMC 17.04.060).
June 20, 2006
P:tPlanning Forms Applications B A -LC - June 2006.doc
Check items
submitted
with
application
Information Required.
May be waived in unusual cases, upon approval of both Public Works and Planning
(e) Existing and proposed lot lines shall be shown solid with new lines called out and lot
lines to be removed shall be shown dashed.
(f) Show exi� sting and proposed utility easements (water, sewer, septic drainfields, power,
natural gas, telephone, cable).
t,
(g) List total lot area and average width of each proposed residential lot.
(h) Dash in required setback distances from all parcel lot lines.
(i) Show any required fire access lanes and turn-arounds per Fire Department standards.
aaShQwthe
b
ohoatedisJx° i cetorop: o
sdperyns lexisngtires,„ p
•
indicafingShosetobeWiiicvd�-",,Y, .
Arg'-44
SENSITIVEAREAS PLAN: NOT required for lot consolidations or BLAs without vacant lots
13 (a) Location of all sensitive areas (e.g. streams, wetlands, slopes over 20%, coal mine areas
and important geological and archaeological sites). For stream frontage provide existing and
proposed top of stream bank, stream bank toe, stream mean high water mark, and base flood
elevation (i.e., 100 yr. flood). Maximum sheet size 24” x 36".
(b) Location of all required sensitive area buffers, setbacks, tracts and protection measures.
(c) Show all significant trees (4" or more in diameter measured 4.5 feet above grade),
indicating those to be retained and those to be removed. A tree permit will be required for
removal of any significant trees within a sensitive area or its buffer.
(d) Show proposed lot and tract lines.
-eIVITP `NS: NOT required for lot consolidations or BLAs without vacant lots
4 t
14 (a) Include a graphic scale and north arrow. Maximum sheet size 24" x 36".
lki(b)
Vertical datum NAVD 1988 and horizontal datum NAD 83/91. Conversion calculations
to NGVD 1929, if in a flood zone or flood-prone area.
(c) Existing and proposed utility easements and improvements, on site and in street (water,
sewer, power, natural gas, telephone, cable). Schematic designs to be provided regardless of
purveyor (e.g. site line size, location, and size of public main). No capacity calcs, invert depth,
valve locations or the like are needed.
.,-
(d) Storm drainage design at least 90% complete, which meets the King County Surface
Water Design Manual (KCSWDM). Include a Technical Information Report (TIR) including
feasibility analysis if required by the Manual. Call out total existing and proposed impervious
surface in square feet. Include all storm drainage conveyance systems, water quality features,
detention structures, maintenance access and safety features. For additional guidance contact
Public Works or go to www.ci.tukwila.wa.us/ubwks/pwpermit.htm#techinfo.
a
(e) Locate the nearest existing hydrant and all proposed hydrants.
}
(f) Show the 100 yr. flood plain boundary and elevation as shown on FEMA maps.
(g) Plan, profile and cross-section for any right-of-way improvements.
(h) Show planned access to lots, driveways, fire access lanes and turn-arounds.
0. (i) Show the location and distance to proposed property lines of all existing structures,
indicating those to be removed.
(j) Show proposed lot and tract lines.
June 20, 2006
P:IPlanning Fonn&.A p0caOons\BLA-LC - June 2006.doc
MAKE FILE 0 CLOSE FILE 0 COPY
❑ AFFDAVIT 0 MAKE COPIES
❑ MAILING 0 FAX 0 OTHER
0 RETURN ORIGINAL TO PLANNER
\f)( v < < \A\4,1 lk1)1 1(95 *v1 CA)) 1/64
Enntvgi CHER
RECEIVED
CITY Of TUKVIRA
OCT 1 8 2M
PIT CENTER
Cornerstone
Geotechnical, Inc.
Geotechnical Engineering Report
Tiede Property
Tukwila, Washington
For
Majestic Homes
Cornerstone
Geotechnical, Inc.
June 9, 2006
Mr. Mike Davis
Majestic Homes
1201 Monster Road SW, #320
Renton, Washington 98055
Geotechnical Engineering Report
Tiede Property
Tukwila, Washington
CG File No. 2065
Dear Mr. Davis:
17625 -130th Ave. NE, C102, Woodinville, WA 98072
Phone: 425-844-1977
Fax: 425-844-1987
INTRODUCTION
This report presents the results of our geotechnical engineering investigation at your proposed single-
family residential project in Tukwila, Washington. The site is located between the 12600 block of 41s`
Avenue South and State Route 599, as shown on the Vicinity Map in Figure 1.
You have requested that we complete this report to evaluate subsurface conditions and provide
recommendations for site development. We have been provided with a copy of a site plan dated May 25,
2006, by Kenneth R. Anderson and Associates titled "Davis Real Estate Group, Farnum / Tiede", which
shows the existing topography at the site.
PROJECT DESCRIPTION
We have been informed that the planned development consists of one single-family residence. We have
not been provided with a grading plan, but we understand that site grading may include minor cuts and
fills. At this time, we are not aware of the exact location of the building footprint.
SCOPE
The purpose of this study is to explore and characterize the subsurface conditions and present
recommendations for site development. Specifically, our scope of services as outlined in our Services
Agreement, dated March 1, 2006, includes the following:
Geotechnical Engineering Report
Tiede Property
Tukwila, Washington
June 9, 2006
CG File No. 2065
Page 2
1. Review subsurface conditions at the site with backhoe -excavated test pits.
2. Complete a walk -over of the site to observe surface conditions along the slopes at the north
and eastern portions of the property.
3. Provide recommendations for support of the planned foundations, including
recommendations for slope setbacks.
4. Provide recommendations for site preparations and grading.
5. Provide general recommendations for site drainage.
6. Prepare a report summarizing our conclusions and recommendations.
SITE CONDITIONS
Surface Conditions
The irregularly-shaped project site is about 2.5 acres in size and has maximum dimensions of
approximately 200 feet in the east -west direction and 750 feet in the north -south direction. Access to the
site is located east of the intersection of 41' Avenue South and South 126th Street. The site is bordered by
an existing residential development and 41' Avenue South to the west, State Route 599 to the east,
residential property to the south, and undeveloped land to the west and north. A fence currently bisects
the property in the middle of the site from north to south. A layout of the site is shown on the Site Plan in
Figure 2.
The site is generally gently to moderately sloping downward to the south in the western and central
regions of the site and moderate to steeply sloping to the east in the eastern region of the site. Slopes in
the eastern region of the site were observed to be approximately 40 to 55 percent. The site consists of an
unmanicured Lawn and a large deciduous tree in the western region of the site, and deciduous and
evergreen trees, blackberry bushes and ferns in the eastern region of the site.
Geology
Most of the Puget Sound Region was affected by past intrusion of continental glaciation. The last period
of glaciation, the Vashon Stade of the Fraser Glaciation, ended approximately 11,000 years ago. Many of
the geomorphic features seen today are a result of scouring and overriding by glacial ice. During the
Vashon Stade, areas of the Puget Sound region were overridden by over 3,000 feet of ice. Soil layers
overridden by the ice sheet were compacted to a much greater extent than those that were not. Part of a
typical glacial sequence includes advance outwash sand overlain by glacial till. Advance outwash is
Cornerstone Geotechnical, Inc.
Geotechnical Engineering Report
Tiede Property
Tukwila, Washington
June 9, 2006
CG File No. 2065
Page 3
described as sand and gravel. Glacial till is an unsorted mixture of sand, silt, and gravel that was
deposited below the glacier, and is commonly referred to as "hardpan." The glacial till has been
consolidated under the weight of the glacier and exhibits both high strength and low permeability.
The geologic units for this area are mapped on the Geology of the Des Moines Quadrangle, Washington,
by Howard H. Waldron, et al (U.S. Geological Survey, 1962). The site is mapped as being underlain by a
glacial till in the western region of the site with advance outwash in the steep slope in the eastern region
of the site. Our site explorations encountered glacial drift. Glacial drift, as defined in this report, is
similar to glacial till, but is typically less dense and exhibits sorting or contains sand seams.
Explorations
Subsurface conditions were explored at the site on March 7, 2006, by excavating a total of three test pits.
The test pits were excavated to depths of 8.7 to 12.8 feet below the ground surface. The explorations
were located in the field by an engineer from this firm who also examined the soils and geologic
conditions encountered, and maintained logs of the test pits. The approximate locations of the test pits are
shown on the Site Plan in Figure 2. The soils were visually classified in general accordance with the
Unified Soil Classification System, a copy of which is presented as Figure 3. The logs of the test pits are
presented in Figure 4.
Subsurface Conditions
A brief description of the conditions encountered in our explorations is included below. For a more
detailed description of the soils encountered, review the test pit logs in Figure 4.
Test Pit 1 encountered a surficial layer of topsoil, 0.7 feet in thickness. The topsoil consisted of loose,
dark brown to black, silty fine sand with roots and organics. Beneath the topsoil layer, weathered,
medium dense silty fine to coarse sand with gravel and roots was observed from 0.7 to 3.3 feet in depth.
Medium dense to dense silty fine to medium sand with gravel was observed beneath the weathered
material from 3.3 feet to the bottom of the excavation at a depth of 12.8 feet. This material is interpreted
as glacial drift.
Test Pits 2 and 3 encountered a layer of fill at the surface that extended to a depth of 1.6 feet. Fill
material consisted of loose, dark brown silty fine to medium sand with gravel. Underneath the fill
Cornerstone Geotechnical, Inc.
Geotechnical Engineering Report
Tiede Property
Tukwila, Washington
June 9, 2006
CG File No. 2065
Page 4
material, buried topsoil was observed to a depth of approximately 2.5 feet. Medium dense, weathered
silty fine to medium sand with gravel and roots was encountered at depths of 2.2 to 4.2 feet in Test Pit 2
and 2.5 to 5.2 feet in depth in Test Pit 3. Test Pits 2 and 3 were completed in medium dense to dense silty
fine to medium sand with gravel at 11.6 and 8.7 feet, respectively. This material is interpreted as glacial
drift.
Hydrologic Conditions
Ground water seepage was not encountered in our test pit explorations. The dense glacial drift is
considered poorly draining. During the wetter times of the year, we expect perched water conditions will
occur as pockets of water on top of the drift layer. Perched water does not represent a regional ground
water "table" within the upper soil horizons. Volumes of perched ground water vary depending upon the
time of year and the upslope recharge conditions.
GEOLOGIC HAZARDS
Landslide Hazards
The core of the site is inferred to be composed of glacially overridden soils. We consider these soils to be
of high strength and considered to be stable with regard to deep-seated slope failures. We did not observe
indications of surficial seepage on the site, nor did we observe indications of shallow or deep-seated slope
failures. A few mature evergreen trees are growing on the steep slope on the eastern side of the site; the
trunks of these trees were straight and did not exhibit curving that would indicate past slope movement.
There is a potential that the surficial soils on the steeper sections of the slope could slough over time.
Any slough events are expected to be surficial, and are affected by surface water and man-made impacts.
The risk of slough events can be minimized if proper drainage is installed, vegetation on the slope is
maintained, and yard waste and other debris are kept off the slopes. We would expect if a slough event
were to occur, it would be small in scale and relatively shallow. We did not observe any indication of
recent sloughing on site.
Erosion Hazard
The erosion hazard criteria used for determination of affected areas include soil type, slope gradient,
vegetation cover, and ground water conditions. The erosion potential is related to vegetative cover and
the specific surface soil types (group classification), which are related to the underlying geologic units.
Cornerstone Geotechnical, Inc.
Geotechnical Engineering Report
Tiede Property
Tukwila, Washington
June 9, 2006
CG File No. 2065
Page 5
Over the majority of the site we consider the erosion hazard to be slight with vegetative cover in place
and moderate when stripped of vegetation. A portion of the site is over 40 percent slope. These areas are
generally considered to have moderate potential for erosion when covered with vegetation and high when
stripped of vegetation. Best management practices (BMPs) and applicable codes should be followed
during site grading to limit potential for erosion. We do not expect this site will require unusual or
extreme erosion management methods. There are no water bodies adjacent to the site.
Seismic Hazard
It is our opinion, based on our subsurface explorations, that the Soil Profile in accordance with Table
1615.1.1 of the 2003 International Building Code (IBC) is Soil Class C. We referenced the 2002 map
from the US Geological Survey (USGS) website to obtain values for SS and S,. The USGS website
includes the most updated published data on seismic conditions. The seismic design parameters are:
SS 148.43% g
S, 51.11% g
Fa 1.0 From Table 1615.1.2(1) of the 2003 IBC
F,, 1.3 From Table 1615.1.2(2) of the 2003 IBC
Site specific coefficients and adjusted maximum considered earthquake spectral response acceleration
parameters apply as shown in Section 1615.1 of the IBC.
Additional seismic considerations include liquefaction potential and amplification of ground motions by
soft soil deposits. The liquefaction potential is highest for loose sand with a high ground water table. The
underlying dense soils are considered to have a very low potential for liquefaction and amplification of
ground motion.
CONCLUSIONS AND RECOMMENDATIONS
General
It is our opinion that the site is compatible with the planned development. The underlying medium dense
to dense glacial deposits are capable of supporting the planned structures and pavements. We recommend
that the foundations for the structures extend through any topsoil, loose, or disturbed soils, and bear on
the underlying medium dense or firmer, native glacial soils, or on structural fill extending to these soils.
Cornerstone Geotechnical, Inc.
Geotechnical Engineering Report
Tiede Property
Tukwila, Washington
June 9, 2006
CG File No. 2065
Page 6
Based on our site explorations, we anticipate these soils will generally be encountered at or near typical
footing depths.
The steep slopes in the eastern region of the site are interpreted to be stable with respect to deep-seated
failures. Some sloughing could occur on the steeper portions of the site. We provide a recommended
setback from the top of the slope, described in the Slope Setback section of the report. It will be
important to not allow concentrated water to flow toward the steep slope areas. This will be critical to
maintaining the stability of the surficial soils on the slopes.
The soils likely to be exposed during construction are highly moisture sensitive and will disturb easily
when wet or during wet conditions. We recommend that construction take place during the drier summer
months, if possible. If construction takes place during the wet season, additional expenses and delays
should be expected due to the wet conditions. Additional expenses could include additional depth of site
stripping, export of on-site soil, the import of clean granular soil for fill, and the need to place a blanket of
rock spalls in the access roads and paved areas prior to placing structural fill.
Slope Setback
Uncertainties related to building along the top of steep slopes are typically addressed by the use of
building setbacks. The purpose of the setback is to establish a "buffer zone" between the structure and
the top of the slope, so that ample room is allowed for normal slope recession during a reasonable life
span of the structure (usually taken to be 100 years). In a general sense, the greater the setback, the lower
the risk. From a geological standpoint, the setback dimension is based on the slope's physical
characteristics, such as slope height, surface angle, material composition, and hydrology. Other factors
such as historical slope activity, rate of regression, and the type and desired life span of the structures are
important considerations as well.
The site is underlain by medium dense or better glacial soils. These soils are considered stable and
indications of instability were not observed. It is our opinion that the glacial drift is stable and indications
of instability on the slope were not observed. It is our opinion that the preliminary structure setback of 25
feet from the top of slope (10 -foot buffer and 15 -foot building setback) will provide an adequate setback
for the design life of the proposed structures. From a geotechnical standpoint, it is possible that these
Cornerstone Geotechnical, Inc.
Geotechnical Engineering Report
Tiede Property
Tukwila, Washington
June 9, 2006
CG File No. 2065
Page 7
structures may be closer to the top of slope, but this should be reviewed and approved by the geotechnical
engineer, and it will depend upon the slope geometry, subsurface conditions, and design.
Site Preparations and Grading
The first step of site preparation should be to strip the vegetation, topsoil, or loose soils to expose medium
dense or firmer native soils in pavement and building areas. The excavated material should be removed
from the site, or stockpiled for later use as landscaping fill. The resulting subgrade should be compacted
to a firm, non -yielding condition. Areas observed to pump or weave should be repaired prior to placing
hard surfaces.
The on-site glacial drift soils likely to be exposed during construction are considered highly moisture
sensitive, and the surface will disturb easily when wet. We expect these soils would be difficult, if not
impossible, to compact to structural fill specifications in wet weather. We recommend that earthwork be
conducted during the drier months. Additional expenses of wet weather or winter construction could
include extra excavation and use of imported fill or rock spalls. During wet weather, alternative site
preparation methods may be necessary. These methods may include utilizing a smooth -bucket trackhoe
to complete site stripping and diverting construction traffic around prepared subgrades. Disturbance to
the prepared subgrade may be minimized by placing a blanket of rock spalls or imported sand and gravel
in traffic and roadway areas. Cutoff drains or ditches can also be helpful in reducing grading costs during
the wet season. These methods can be evaluated at the time of construction.
Structural Fill
General: All fill placed beneath buildings, pavements or other settlement sensitive features should be
placed as structural fill. Structural fill, by definition, is placed in accordance with prescribed methods and
standards, and is monitored by an experienced geotechnical professional or soils technician. Field -
observation procedures would include the performance of a representative number of in-place density
tests to document the attainment of the desired degree of relative compaction.
Materials: Imported structural fill should consist of a good quality, free -draining granular soil, free of
organics and other deleterious material, and be well graded to a maximum size of about 3 inches.
Imported, all-weather structural fill should contain no more than 5 percent fines (soil finer than a Standard
U.S. No. 200 sieve), based on that fraction passing the U.S. 3/4 -inch sieve.
Cornerstone Geotechnical, Inc.
Geotechnical Engineering Report
Tiede Property
Tukwila, Washington
June 9, 2006
CG File No. 2065
Page 8
The use of on-site soil as structural fill will be dependent on moisture content control. Some drying of the
native soils may be necessary in order to achieve compaction. During warm, sunny days this could be
accomplished by spreading the material in thin lifts and compacting. Some aeration and/or addition of
moisture may also be necessary. We expect that compaction of the native soils to structural fill
specifications would be difficult, if not impossible, during wet weather.
Fill Placement: Following subgrade preparation, placement of the structural fill may proceed. Fill
should be placed in 8- to 10 -inch -thick uniform lifts, and each lift should be spread evenly and be
thoroughly compacted prior to placement of subsequent lifts. All structural fill underlying building areas,
and within a depth of 2 feet below pavement and sidewalk subgrade, should be compacted to at least 95
percent of its maximum dry density. Maximum dry density, in this report, refers to that density as
determined by the ASTM D1557 compaction test procedure. Fill more than 2 feet beneath sidewalks and
pavement subgrades should be compacted to at least 90 percent of the maximum dry density. The
moisture content of the soil to be compacted should be within about 2 percent of optimum so that a
readily compactable condition exists. It may be necessary to overexcavate and remove wet surficial soils
in cases where drying to a compactable condition is not feasible. All compaction should be accomplished
by equipment of a type and size sufficient to attain the desired degree of compaction.
Temporary and Permanent Slopes
Temporary cut slope stability is a function of many factors, such as the type and consistency of soils,
depth of the cut, surcharge loads adjacent to the excavation, length of time a cut remains open, and the
presence of surface or ground water. It is exceedingly difficult under these variable conditions to estimate
a stable temporary cut slope geometry. Therefore, it should be the responsibility of the contractor to
maintain safe slope configurations, since the contractor is continuously at the job site, able to observe the
nature and condition of the cut slopes, and able to monitor the subsurface materials and ground water
conditions encountered.
For planning purposes, we recommend that temporary cuts in the near -surface weathered soils be no
steeper than 1.5 Horizontal to 1 Vertical (1.5H:1V). Cuts in the dense glacial drift may stand at a 1H:1V
inclination or possibly steeper. If ground water seepage is encountered, we would expect that flatter
inclinations would be necessary.
Cornerstone Geotechnical, Inc.
Geotechnical Engineering Report
Tiede Property
Tukwila, Washington
June 9, 2006
CG File No. 2065
Page 9
We recommend that cut slopes be protected from erosion. Measures taken may include covering cut
slopes with plastic sheeting and diverting surface runoff away from the top of cut slopes. We do not
recommend vertical slopes for cuts deeper than 4 feet, if worker access is necessary. We recommend that
cut slope heights and inclinations conform to local and WISHA/OSHA standards.
Final slope inclinations for structural fill and the cuts in the native soils should be no steeper than 2H:1 V.
Lightly compacted fills or common fills should be no steeper than 311:1V. Common fills are defined as
fill material with some organics that are "trackrolled" into place. They would not meet the compaction
specification of structural fill. Final slopes should be vegetated and covered with straw or jute netting.
The vegetation should be maintained until it is established.
Foundations
Conventional shallow spread foundations should be founded on undisturbed, medium dense or firmer soil.
If the soil at the planned bottom of footing elevation is not suitable, it should be overexcavated to expose
suitable bearing soil. Footings should extend at least 18 inches below the lowest adjacent finished ground
surface for frost protection and it should also extend at least 1 foot into bearing soils, whichever is deeper.
Minimum foundation widths should conform to IBC requirements. Standing water should not be allowed
to accumulate in footing trenches. All loose or disturbed soil should be removed from the foundation
excavation prior to placing concrete.
For foundations constructed as outlined above, we recommend an allowable design bearing pressure of
2,000 pounds per square foot (psf) be used for the footing design. An increase of one-third is allowed
when using the alternate load combination in Section 1605.3.2 of the IBC that includes wind or
earthquake loads. Potential foundation settlement using the recommended allowable bearing pressure is
estimated to be less than 1 -inch total and Y2 -inch differential between footings or across a distance of
about 30 feet. Higher soil bearing values may be appropriate for footings founded on the unweathered
drift and with wider footings. These higher values can be determined after a review of a specific design.
Lateral Loads
The lateral earth pressure acting on retaining walls is dependent on the nature and density of the soil
behind the wall, the amount of lateral wall movement, which can occur as backfill is placed, and the
inclination of the backfill. Walls that are free to yield at least one -thousandth of the height of the wall are
Cornerstone Geotechnical, Inc.
Geotechnical Engineering Report
Tiede Property
Tukwila, Washington
June 9, 2006
CG File No. 2065
Page 10
in an "active" condition. Walls restrained from movement by stiffness or bracing are in an "at -rest"
condition. Active earth pressure and at -rest earth pressure can be calculated based on equivalent fluid
density. Equivalent fluid densities for active and at -rest earth pressure of 37 pounds per cubic foot (pcf)
and 57 pcf, respectively, may be used for design for a level backslope. These values assume that the on-
site soils or imported granular fill are used for backfill, and that the wall backfill is drained. The
preceding values do not include the effects of surcharges, such as due to foundation loads or other surface
loads. Surcharge effects should be considered where appropriate. The above drained active and at -rest
values should be increased by a uniform pressure of 8.211 and 25.7H psf, respectively, when considering
seismic conditions. 11 represents the wall height.
The above lateral pressures may be resisted by friction at the base of the wall and passive resistance
against the foundation. A coefficient of friction of 0.45 may be used to determine the base friction in the
native glacial soils. An equivalent fluid density of 225 pcf may be used for passive resistance design. To
achieve this value of passive pressure, the foundations should be poured "neat" against the native dense
soils, or compacted fill should be used as backfill against the front of the footing, and the soil in front of
the wall should extend a horizontal distance at least equal to three times the foundation depth. A factor of
safety of 2.0 has been applied to the passive pressure to account for required movements to generate these
pressures. The friction coefficient does not include a factor of safety.
All wall backfill should be well compacted. Care should be taken to prevent the buildup of excess lateral
soil pressures due to overcompaction of the wall backfill. This can be accomplished by placing wall
backfill in 8 -inch loose lifts and compacting with small, hand -operated compactors.
Slabs -On -Grade
Slab -on -grade areas should be prepared as recommended in the Site Preparation and Grading
subsection. Slabs should be supported on medium dense or firmer native soils, or on structural fill
extending to these soils. Where moisture control is a concern, we recommend that slabs be underlain by 6
inches of free -draining coarse sand or pea gravel for use as a capillary break. A suitable vapor barrier,
such as heavy plastic sheeting, should be placed over the capillary break. An additional 2 -inch -thick
damp sand blanket should be used to cover the vapor barrier to protect the membrane and to aid in curing
the concrete. This will also help prevent cement paste bleeding down into the capillary break through
Cornerstone Geotechnical, Inc.
Geotechnical Engineering Report
Tiede Property
Tukwila, Washington
June 9, 2006
CG File No. 2065
Page 11
joints or tears in the vapor barrier. The capillary break material should be connected to the footing drains
to provide positive drainage.
Drainage
We recommend that runoff from impervious surfaces, such as roofs, driveway and access roadways, be
collected and routed to an appropriate storm water discharge system. We suggest that the finished ground
surface be sloped at a gradient of 3 percent minimum for a distance of at least 10 feet away from the
buildings, as indicated in IBC Section 1803.3. Surface water should be collected by permanent catch
basins and drain lines, and be discharged into an approved drainage area or system.
We recommend that footing drains be used around all of the structures where moisture control is
important. The underlying drift soils may pond water that could accumulates in the crawlspace. It is
good practice to use footing drains installed at least 1 foot below the planned finished floor slab or
crawlspace elevation to provide drainage for the crawlspace. At a minimum, the crawlspace should be
sloped to drain to an outlet tied to the drainage system. If drains are omitted around slab -on -grade floors
where moisture control is important, the slab should be a minimum of 1 foot above surrounding grades.
Where used, footing drains should consist of 4 -inch -diameter, perforated PVC pipe that is surrounded by
free -draining material, such as pea gravel. Footing drains should discharge into tightlines leading to an
appropriate collection and discharge point. Crawlspaces should be sloped to drain, and a positive
connection should be made into the foundation drainage system. For slabs -on -grade, a drainage path
should be provided from the capillary break material to the footing drain system. Roof drains should not
be connected to wall or footing drains.
CONSTRUCTION OBSERVATION
We should be retained to provide observation and consultation services during construction to confirm
that the conditions encountered are consistent with those indicated by the explorations, and to provide
recommendations for design changes, should the conditions revealed during the work differ from those
anticipated. As part of our services, we would also evaluate whether or not earthwork and foundation
installation activities comply with contract plans and specifications.
Cornerstone Geotechnical, Inc.
Geotechnical Engineering Report
Tiede Property
Tukwila, Washington
June 9, 2006
CG File No. 2065
Page 12
USE OF THIS REPORT
We have prepared this report for Majestic Homes and its agents, for use in planning and design of this
project. The data and report should be provided to prospective contractors for their bidding and
estimating purposes, but our report, conclusions and interpretations should not be construed as a warranty
of subsurface conditions.
The scope of our services does not include services related to construction safety precautions, and our
recommendations are not intended to direct the contractors' methods, techniques, sequences or
procedures, except as specifically described in our report, for consideration in design. There are possible
variations in subsurface conditions. We recommend that project planning include contingencies in budget
and schedule, should areas be found with conditions that vary from those described in this report.
Within the limitations of scope, schedule and budget for our services, we have strived to take care that our
services have been completed in accordance with generally accepted practices followed in this area at the
time this report was prepared. No other conditions, expressed or implied, should be understood.
oOo
Cornerstone Geotechnical, Inc.
Geotechnical Engineering Report
Tiede Property
Tukwila, Washington
June 9, 2006
CG File No. 2065
Page 13
We appreciate the opportunity to be of service to you. If there are any questions concerning this report or
if we can provide additional services, please call.
Sincerely,
Cornerstone Geotechnical, Inc.
Jeff Laub, LG
Project Geologist
(EXPIRES 08/16/
1
Rick B. Powell, PE
Principal
JRW:JPL:RBP:nt
Three Copies Submitted
Four Figures
Information about this Geotechnical Engineering Report
Cornerstone Geotechnical, Inc.
Vicinity Map
N
Cornerstone
Geotechnical, Inc.
17625 -130th Ave NE, C-102 • Woodinville, WA • 98072
Phone: (425) 844-1977
Fax: (425) 844-1987
Majestic Homes - Tiede Property
File Number I Figure
2065 1
0
\ ,7
11;1 1
.� 1 11
1
11\
„x.11
\\;\
\ • 11• z
Site Plan
\
40
80
Scale 1" = 40'
LEGEND
TP -1
Number and Approximate
Location of Test Pit
Cornerstone
Geotechnical, Inc.
17625 -130th Ave NE, C-102 • Woodinville, WA • 98072
Phone: (425) 844-1977
Fax: (425) 844-1987
Majestic Homes - Tiede Property
File Number I Figure
2065 2
Unified Soil Classification System
MAJORGROUP
DIVISIONS
SYMBOL
GROUP NAME
COARSE -
GRAINED
SOILS
MORE THAN 50%
RETAINED ON
number 200 SIEVE
GRAVEL
MORE THAN 50% OF
COARSE FRACTION
RETAINED ON NO.4
SIEVE
CLEAN GRAVEL
GW
WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL
GP
POORLY -GRADED GRAVEL
GRAVEL
WITH FINES
GM
SILTY GRAVEL
GC
CLAYEY GRAVEL
SAND
MORE THAN 50% OF
COARSE FRACTION
PASSES NO. 4 SIEVE
CLEAN SAND
SW
WELL -GRADED SAND, FINE TO COARSE SAND
SP
POORLY -GRADED SAND
SAND
WITH FINES
SM
SILTY SAND
SC
CLAYEY SAND
FINE -
GRAINED
SOILS
MORE THAN 50%
PASSES NO. 200 SIEVE
SILT AND CLAY
LIQUID LIMIT
LESS THAN 50%
INORGANIC
ML
SILT
CL
CLAY
ORGANIC
OL
ORGANIC SILT, ORGANIC CLAY
SILT AND CLAY
LIQUID LIMIT
50% OR MORE
INORGANIC
MH
SILT OF HIGH PLASTICITY, ELASTIC SILT
CH
CLAY OF HIGH PLASTICITY, FAT CLAY
ORGANIC
OH
ORGANIC CLAY, ORGANIC SILT
HIGHLY ORGANIC SOILS
PT
PEAT
NOTES:
SOIL MOISTURE MODIFIERS
1) Field classification is based on Dry -Absence of moisture, dusty, dry
visual examination of soil in general to the touch
accordance with ASTM D 2488-83.
2) Soil classification using laboratory Moist- Damp, but no visible water
tests is based on ASTM D 2487-83. Wet- Visible free water or saturated,
3) Descriptions of soil density or usually soil is obtained from
consistency are based on below water table
interpretation of blowcount data,
visual appearance of soils, and/or
test data.
Cornerstone Phone: (425) 844-1977
..:Geotechnical, Inc. Fax: (425) 844-1987
17625 -130th Ave NE, C-102 • Woodinville, WA' 98072
Unified Soil Classification System
Figure 3
DEPTH
LOG OF EXPLORATION
USC SOIL DESCRIPTION
TEST PIT ONE
0.0 - 0.7 SM DARK BROWN TO BLACK SILTY FINE SAND WITH ROOTS AND ORGANICS (LOOSE,
MOIST) (TOPSOIL)
0.7 - 3.3 SM BROWN SILTY FINE TO COARSE SAND WITH GRAVEL AND ROOTS (MEDIUM DENSE,
MOIST) (WEATHERED DRIFT)
3.3 - 8.7 SM GRAYISH BROWN SILTY FINE TO MEDIUM SAND WITH GRAVEL (MEDIUM DENSE TO
DENSE, MOIST)
8.7 -12.8 SM BROWNISH GRAY SILTY FINE TO MEDIUM SAND WITH GRAVEL (DENSE, MOIST)
(GLACIAL DRIFT)
TEST PIT TWO
0.0 - 1.6
1.6 - 2.2
2.2 - 4.2
4.2 - 6.3
6.3 - 11.6
TEST PIT THREE
SM
SM
SM
SM
SM
SAMPLES WERE COLLECTED AT 1.8, 6.8, 9.1 AND 11.8 FEET
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 12.8 FEET ON 3/7/06
DARK BROWN SILTY FINE TO MEDIUM SAND WITH TRACE GRAVEL (LOOSE, MOIST)
(FILL)
DARK BROWN TO BLACK SILTY FINE SAND WITH ROOTS AND ORGANICS (LOOSE,
MOIST) (TOPSOIL)
REDDISH BROWN SILTY FINE TO MEDIUM SAND WITH GRAVEL (MEDIUM DENSE,
MOIST) (WEATHERED DRIFT)
GRAYISH BROWN SILTY FINE TO MEDIUM SAND WITH GRAVEL (MEDIUM DENSE TO
DENSE, MOIST) (GLACIAL DRIFT)
BROWNISH GRAY SILTY FINE TO MEDIUM SAND WITH GRAVEL (DENSE, MOIST)
(GLACIAL DRIFT)
SAMPLES WERE COLLECTED AT 2.6, 5.7, 7.2 AND 11.6 FEET
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 11.6 FEET ON 3/7/06
0.0 -1.6 SM BROWNISH GRAY SILTY FINE TO MEDIUM SAND WITH GRAVEL (LOOSE, MOIST)
(FILL)
1.6 - 2.5 SM DARK BROWN TO BLACK SILTY FINE SAND WITH ROOTS AND ORGANICS (LOOSE,
MOIST) (TOPSOIL)
2.5 - 5.2 SM BROWN SILTY FINE TO MEDIUM SAND WITH GRAVEL AND ROOTS (MEDIUM DENSE,
MOIST) (WEATHERED DRIFT)
5.2 - 8.7 SM GRAYISH BROWN SILTY FINE TO MEDIUM SAND WITH GRAVEL (DENSE, MOIST)
(GLACIAL DRIFT)
SAMPLE WAS COLLECTED AT 8.7 FEET
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 8.7 FEET ON 3/7/06
CORNERSTONE GEOTECHNICAL, INC.
FILE NO 2065
FIGURE 4
Important Intormation About Your
Geotechnical Engineering Report �.
Subsurface problems are a principalcause of construction delays, cost overruns, claims, and disputes.
The!following information is provided to help you manage your risks.
Geotechnical Services Are Performed for
Specific Purposes, Persons, and Projects
Geotechnical engineers structure their services to meet the specific needs of
their clients. A geotechnical engineering study conducted for a civil engi-
neer may not fulfill the needs of a construction contractor or even another
civil engineer. Because each geotechnical engineering study is unique, each
geotechnical engineering report is unique, prepared solelyfor the client. No
one except you should rely on your geotechnical engineering report without
first conferring with the geotechnical engineer who prepared it. And no one
— not even you —should apply the report for any purpose or project
except the one originally contemplated.
Read the Full Report
Serious problems have occurred because those relying on a geotechnical
engineering report did not read it all. Do not rely on an executive summary.
Do not read selected elements only.
A Geotechnical Engineering Report Is Based on
A Unique Set of Project -Specific Factors
Geotechnical engineers consider a number of unique, project -specific fac-
tors when establishing the scope of a study. Typical factors include: the
client's goals, objectives, and risk management preferences; the general
nature of the structure involved, its size, and configuration; the location of
the structure on the site; and other planned or existing site improvements,
such as access roads, parking lots, and underground utilities. Unless the
geotechnical engineer who conducted the study specifically indicates oth-
erwise, do not rely on a geotechnical engineering report that was:
• not prepared for you,
• not prepared for your project,
• not prepared for the specific site explored, or
• completed before important project changes were made.
Typical changes that can erode the reliability of an existing geotechnical
engineering report include those that affect:
• the function of the proposed structure, as when it's changed from a
parking garage to an office building, or from a light industrial plant
to a refrigerated warehouse,
• elevation, configuration, location, orientation, or weight of the
proposed structure,
• composition of the design team, or
• project ownership.
As a general rule, always inform your geotechnical engineer of project
changes—even minor ones—and request an assessment of their impact.
Geotechnical engineers cannot accept responsibility or liability for problems
that occur because their reports do not consider developments of which
they were not informed.
Subsurface Conditions Can Change
A geotechnical engineering report is based on conditions that existed at
the time the study was performed. Do not rely on a geotechnical engineer-
ing reportwhose adequacy may have been affected by: the passage of
time; by man-made events, such as construction on or adjacent to the site;
or by natural events, such as floods, earthquakes, or groundwater fluctua-
tions. Always contact the geotechnical engineer before applying the report
to determine if it is still reliable. A minor amount of additional testing or
analysis could prevent major problems.
Most Geotechnical Findings Are Professional
Opinions
Site exploration identifies subsurface conditions only at those points where
subsurface tests are conducted or samples are taken. Geotechnical engi-
neers review field and laboratory data and then apply their professional
judgment to render an opinion about subsurface conditions throughout the
site. Actual subsurface conditions may differ—sometimes significantly—
from those indicated in your report. Retaining the geotechnical engineer
who developed your report to provide construction observation is the
most effective method of managing the risks associated with unanticipated
conditions.
A Report's Recommendations Are Not Final
Do not overrely on the construction recommendations included in your
report. Those recommendations are not final, because geotechnical engi-
neers develop them principally from judgment and opinion. Geotechnical
engineers can finalize their recommendations only by observing actual
subsurface conditions revealed during construction: Thegeotechnical
engineer who developed your report cannot assume responsibility or
liability for the report's recommendations if that engineer does not perform
construction observation.
A Geotechnical Engineering Report Is Subject to
Misinterpretation
Other design team members' misinterpretation of geotechnical engineering
reports has resulted in costly problems. Lower that risk by having your geo-
technical engineer confer with appropriate members of the design team after
submitting the report. Also retain your geotechnical engineer to review perti-
nent elements of the design team's plans and specifications. Contractors can
also misinterpret a geotechnical engineering report. Reduce that risk by
having your geotechnical engineer participate in prebid and preconstruction
Conferences, and by providing construction observation.
Do Not Redraw the Engineer's Logs
Geotechnical engineers prepare final boring and testing logs based upon
their interpretation of field logs and laboratory data. To prevent errors or
omissions, the logs included in a geotechnical engineering report should
never be redrawn for inclusion in architectural or other design drawings.
Only photographic or electronic reproduction is acceptable, but recognize
that separating logs from the report can elevate risk.
Give Contractors a Complete Report and
Guidance
Some owners and design professionals mistakenly believe they can make
contractors liable for unanticipated subsurface conditions by limiting what
they provide for bid preparation. To help prevent costly problems, give con-
tractors the complete geotechnical engineering report, but preface it with a
clearly written letter of transmittal. In that letter, advise contractors that the
report was not prepared for purposes of bid development and that the
report's accuracy is limited; encourage them to confer with the geotechnical
engineer who prepared the report (a modest fee may be required) and/or to
conduct additional study to obtain the specific types of information they
need or prefer. A prebid conference can also be valuable. Be sure contrac-
tors have sufficient time to perform additional study. Only then might you
be in a position to give contractors the best information available to you,
while requiring them to at least share some of the financial responsibilities
stemming from unanticipated conditions.
Read Responsibility Provisions Closely
Some clients, design professionals, and contractors do not recognize that
geotechnical engineering is far less exact than other engineering disci-
plines. This lack of understanding has created unrealistic expectations that
have led to disappointments, claims, and disputes= To help "reduce the risk
of such outcomes, geotechnical engineers commonly include a variety of
explanatory provisions in their reports. Sometimes labeled "limitations"
many of these provisions indicate where geotechnical engineers' responsi-
bilities begin and end, to help others recognize their own responsibilities
and risks. Read these provisions closely. Ask questions. Your geotechnical
engineer should respond fully and frankly.
Geoenvironmental Concerns Are Not Covered
The equipment, techniques, and personnel used to perform a geoenviron-
mental study differ significantly from those used to perform a geotechnical
study. For that reason, a geotechnical engineering report does not usually
relate any geoenvironmental findings, conclusions, or recommendations;
e.g., about the likelihood of encountering underground storage tanks or
regulated contaminants. Unanticipated environmental problems have led
to numerous project failures. If you have not yet obtained your own geoen-
vironmental information, ask your geotechnical consultant for risk man-
agement guidance. Do not rely on an environmental report prepared for
someone else.
Obtain Professional Assistance To Deal with Mold
Diverse strategies can be applied during building design, construction,
operation, and maintenance to prevent significant amounts of mold from
growing on indoor surfaces. To be effective, all such strategies should be
devised for the express purpose of mold prevention, integrated into a com-
prehensive plan, and executed with diligent oversight by a professional
mold prevention consultant. Because just a small amount of water or
moisture can lead to the development of severe mold infestations, a num-
ber of mold prevention strategies focus on keeping building surfaces dry.
While groundwater, water infiltration, and similar issues may have been
addressed as part of the geotechnical engineering study whose findings
are conveyed in this report, the geotechnical engineer in charge of this
project is not a mold prevention consultant; none of the services per-
formed in connection with the geotechnical engineer's study
were designed or conducted for the purpose of mold preven-
tion. Proper implementation of the recommendations conveyed
in this report will not of itself be sufficient to prevent mold from
growing in or on the structure involved.
Rely, on Your ASFE-Member Geotechncial
Engineer for Additional Assistance
Membership in ASFE/The Best People on Earth exposes geotechnical
engineers to a wide array of risk management techniques that can be of
genuine benefit for everyone involved with a construction project. Confer
with you ASFE-member geotechnical engineer for more information.
ASFE
The Best People oo Earth
8811 Colesville Road/Suite G106, Silver Spring, MD 20910
Telephone: 301/565-2733 Facsimile: 301/589-2017
e-mail: info@asfe.org www.asfe.org
Copyright 2004 by ASFE, Inc. Duplication, reproduction, or copying of this document, in whole or in part, by any means whatsoever, is strictly prohibited, except with ASFE's
specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express wntten permission of ASFE, and only for
purposes of scholarly research or book review. Only members of ASFE may use this document as a complement to or as an element of a geotechnical engineering report. Any other
firm, individual, or other entity that so uses this document without being an ASFE member could be committing negligent or intentional (fraudulent) misrepresentation.
IIGER06045.0M
Parcel 734060-0485 DAVIS & ROBINSON INC
Tax Roll History
Appraised
Taxable
Tax Yr Omit TaxValue Land Val Imp Val Total Land Val Imp Val Total
Yr Reason
2007 0 104,000 0 104,000 104,000 0 104,000
2006 0 97,000 0 97,000 97,000 0 97,000
2005 0 92,000 0 92,000 92,000 0 92,000
2004 0 96,000 0 96,000 96,000 0 96,000
2003 0 92,000 0 92,000 92,000 0 92,000
2002 0 88,000 0 88,000 88,000 0 88,000
2001 0 84,000 0 84,000 84,000 0 84,000
2000 0 79,000 0 79,000 79,000 0 79,000
1999 0 74,000 0 74,000 74,000 0 74,000
1998 0 64,000 0 64,000
1997 0 64,000 0 64,000
1996 0 64,000 0 64,000
E Number Sale Date
Sales History
Sale Price Instrument Sale Reason
2197912 3/30/2006 99,950 Statutory Warranty Deed None
Review History
Tax Yr Review# Review Type Appeal Val Hearing Dt Settlement Val Hearing Result Status
Number
Permit History
Type Value Issue Date Jurisdiction Review Dt
Home Improvement Exemption
Exempt No Bldg No Date Rec Date Comp Beg Yr Est Cost
Page 2 of 3
King County: Assessor Property Characteristics Report Page 1 of 3
King County
Home'
evirsci
Ser i ces
Comments
Search
By law this information may not be used for commercial purposes.
Assessor Real Property Records:
DAVIS & ROBINSON Parcel Number
Taxpayer INC
Account Number
Tax Year 2006 Levy Code
Tax Status TAXABLE
Taxable Value Reason
7340600485
734060048505
2413
NONE OR
UNKNOWN
Appraised Land Value
$97,000
Taxable Land Value
$97,000
Appraised Improvement
Value
$0
Taxable Improvement Value
$0
Taxpayer DAVIS & ROBINSON
INC
Tax Year 2007
Tax Status TAXABLE
Parcel Number
Account Number
Levy Code
Taxable Value Reason
7340600485
734060048505
2413
NONE OR
UNKNOWN
Appraised Land Value
$104,000
Taxable Land Value
$104,000
Appraised Improvement
Value
$0
Taxable Improvement Value
$0
Assessor Property Sales Records:
Tip: Use the Recorders Office: Excise Tax Affidavits Report
to see more sales records details
Sale Date
3/30/2006
(Sale Price
J$99,950
Seller Name
TIEDE KEITH J+NANCY S
Plat Name
RIVERSIDE INTERURBAN
TRS
Buyer Name
DAVIS & ROBINSON INC
Plat Block
Assessor Parcel Records:
District Name
TUKWILA
Property Name
VACANT LAND
PropertyRESIDENTIAL
Plat Name
RIVERSIDE INTERURBAN
TRS
Present
Use
Vacant
(Single-family)
Plat Block
Water
System
WATER
DISTRICT
Plat Lot
POR
Sewer
System
PUBLIC
Lot Area
100,581 SqFt (2.31 acres)
Access
PUBLIC
Section/Township/Range
SW 10 23 4
Street
Surface
PAVED
http://www5.metrokc.gov/reports/property_report.asp?PIN=7340600485 11/7/2006
King County: Assessor Property Characteristics Report Page 2 of 3
Assessor Legal Description Records:
Account Number
734060048505
Record
Number
01 -13
POR RIVERSIDE INTERUBAN TRACTS POR OF FOLG
TRS 32,33,45, 46 OF SD PLAT & POR OF SQUIRE'S
REPLAT OF POR OF TR 33 RIVERSIDE INTERUBAN TRS
LYING WITHIN FOLG - BAAP OPP HES 68 + 25 ON F 1 LN
SUR OF SR 599 FOSTER INTERCHANGE TO S 118 TH ST
& 110 FT WLY THOF TH S 58-17-25 W 230.32 FT TH S 18-
10-43 E 107.22 FT TAP OPP HES 66 + 20 & 290 FT SWLY
THOF TH SELY TAP OPP HES 63 + 43.5 & 228.2 FT SWLY
THOF TH SELY TAP OPP HES 61+00 & 148.4 FT SWLY
THOF TH NELY TAP OPP SD HES 61+00 & 110 FT SWLY
THOF TH NLY 110 FT WLY OF & CONCENTRIC & PLW SD
F 1 LN TO POB TGW 41 ST AVE S & PORS OF 125 TH ST
& 126 TH ST LESS POR BEG NE COR SD ABOVE PAR TH
S 04-35-53 E ALG E LN OF SD PAR BEING W LN OF HWY
Legal Description
65 FT TH N 63-07-23 W 67.81 FT TO N LN OF SD PAR TH
N 58-19-06 E ALG N LN OF SD PAR 65 FT TO POB LESS
POR BEG NE COR OF SD ABOVE PAR TH S 04-35-53 E
ALG E LN OF SD PAR BEING W LN OF HWY 162.94 FT TO
TPOB TH CONT S 04-35-53 E ALG E LN OF SD PAR 20.66
FT TO BEG OF CRV RAD OF 1578 FT SD PT BEING OPP
HES F1 66+44.31 ON F 1 LN SRV OF SR 599 & 110 FT
WLY THOF TH CONT ALG E LN SD PAR ALG SD CRV TO
LFT THRU AN ANGLE OF 4-11-44 AN ARC DIST 115.55 FT
TH S 81-35-01 W 2.92 FT TO BEG OF NON TAN CRV RAD
OF 2038.60 FT & A CHORD BEARING OF N 07-02-55 W
97.31 FT TH NELY TO RGT ALG SD CRV THRU AN
ANGLE OF 2-44-07 AN ARC DIST OF 97.32 FT TH ON A
TAN LN N 05-40-52 W 39.02 FT TH N 84-19-08 E 3.66 FT
TO TPOB PER SUP COURT #04-2-12329-1SEA
This report was generated: 11/7/2006 9:19:44 AM
Related on-line reports:
Kinig County GIS: Property information FAQ
King County Assessor: Submit a request to correct this information
DDES: Permit Applications Report
King_Coun y: Districts and Development Conditions Report
King County Assessor: eReal Property Report (PDF format requires Acrobat)
King County_ Assessor: Quarter Section Map Report (PDF format requires
Acrobat)
King County Treasury Operations: Property Tax Information
Recorders Office: Excise Tax Affidavits Report
Recorders Office: Scanned images of plats surveys, and other map documents
Enter a 10 digit Parcel Number:
or Enter an address:
Search
http://www5.metrokc.gov/reports/property_report.asp?PIN=7340600485 11/7/2006
Parcel
Name
Site Address
Area Code
Block
734060-0485
DAVIS & ROBINSON INC
024-005
Parcel 734060-0485 DAVIS & ROBINSON INC
Parcel Data
Present Use
Zoning
Jurisdiction
Property Type Code
Lot
Vacant(Single-family)
MIC/L
TUKWILA
R
POR
Legal Description RIVERSIDE INTERUBAN TRACTS POR OF FOLG TRS 32,33,45, 46 OF SD PLAT & POR OF SQUIRE'S REPLAT OF POR OF
TR 33 RIVERSIDE INTERUBAN TRS LYING WITHIN FOLG - BAAP OPP HES 68 + 25 ON F 1 LN SUR OF SR 599 FOSTER INTERCHANGE TO S 118 TH ST &
110 FT WLY THOF TH S 58-17-25 W 230.32 FT TH S 18-10-43 E 107.22 FT TAP OPP HES 66 + 20 & 290 FT SWLY THOF TH SELY TAP OPP HES 63 + 43.5 &
228.2 FT SWLY THOF TH SELY TAP OPP HES 61+00 & 148.4 FT SWLY THOF TH NELY TAP OPP SD HES 61+00 & 110 FT SWLY THOF TH NLY 110 FT
WLY OF & CONCENTRIC & PLW SD F 1 LN TO POB TGW 41 ST AVE S & PORS OF 125 TH ST & 126 TH ST LESS POR BEG NE COR SD ABOVE PAR TH S
04-35-53 E ALG E LN OF SD PAR BEING W LN OF HWY 65 FT TH N 63-07-23 W 67.81 FT TO N LN OF SD PAR TH N 58-19-06 E ALG N LN OF SD PAR 65 FT
TO POB LESS POR BEG NE COR OF SD ABOVE PAR TH S 04-35-53 E ALG E LN OF SD PAR BEING W LN OF HWY 162.94 FT TO TPOB TH CONT S 04-35-53
E ALG E LN OF SD PAR 20.66 FT TO BEG OF CRV RAD OF 1578 FT SD PT BEING OPP HES Fl 66+44.31 ON F 1 LN SRV OF SR 599 & 110 FT WLY THOF TH
CONT ALG E LN SD PAR ALG SD CRV TO LFT THRU AN ANGLE OF 4-11-44 AN ARC DIST 115.55 FT TH S 81-35-01 W 2.92 FT TO BEG OF NON TAN CRV
RAD OF 2038.60 FT & A CHORD BEARING OF N 07-02-55 W 97.31 FT TH NELY TO RGT ALG SD CRV THRU AN ANGLE OF 2-44-07 AN ARC DIST OF 97.32
FT TH ON A TAN LN N 05-40-52 W 39.02 FT TH N 84-19-08 E 3.66 FT TO TPOB PER SUP COURT #04-2-12329-1 SEA
Land SqFt
Acres
Water
Sewer/Septic
Rainier
Olympics
Cascades
Territorial
Seattle
Location
Bank
Tide/Shore
Restricted
100,581
2.31
WATER DISTRICT
PUBLIC
No
No
No
GOOD
No
No
No
No
No
Land Data
Use Exemption
Environmental
Topography
Traffic
Views
Sound
Lk Wash
Lk Samm
Lk/Riv/Crk
Other
Waterfront
Footage
Access Rights
Prox. Influence
Poor Quality
No
YES
EXTREME
No
No
No
No
GOOD
0
No
No
No
Building/Improvement
Page 1 of 3
Parcel 734060-0485 DAVIS & ROBINSON INC
Internet Resources
Summary Report for your area:
http://www. metrokc.gov/Assessor/AreaReports/2006/Residential/024.pdf
Visit Property Tax Information System to access your tax bill:
http://www.metrokc.gov/finance/treasury/kctaxinfo/
Visit Records Office's web site to view Excise Tax Affidavits:
http://146.129.54.93 :8 I 93/localization/menu.asp
Visit GIS Parcel Viewer for the map of the parcel:
http://www5.metrokc.gov/parcelviewer?P1N=7340600485
Glossary of Terms
http •J/www.metrokc.gov/Assessor/eRealProperty/GlossaryTerms.htm I
Page 3 of 3
CITY OF TUk'W ILA
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
Permit Center/Buildr Division:
20631=3679
Public Works Department:
206-433-0179
Planning Division:
206-431-3670
CERTIFICATE OF WATER AVAILABILITY
Required only if outside City of Tukwila water district
PERMIT NO.:
Site address (attach map and.legal description showing hydrant location and size of main):
11600 41st Ave S. Titi&vila INA 92162
7340.GO —
i�y�}�� R�Sp��,111?,q�o�
�pwshltroti@W�}lhllr�SiN,':�h..riR'
±�71aiAt1't��{I it {l�j�aYryFjl�±�y.M 1}'.
Name::pavis $ Robinson, Inc.
Address:I2,01 Mons, +, Rd Sw �trtwn w ws.
Phone: 425 , us -541561
Phone: 42 S_ Z2 • 595,
This certificate is for the purposes of:
Residential Building Permit
❑ Cammercial/Industrial Building Permit ❑ Rezone
❑ Preliminary Piet
❑ Short Subdivision
0 Other
Estimated number of service connections and water meter size(s):
Vehicular distance from nearest hydrant td the closest point of structure is
ft.
Area is served by (Water Utility District):
Owner/Agent Signature
1.
The proposed.project is within k -r471. / fit
2. o Improvements required.
0iId.efa6
Date
3. The improvements required to upgrade the water system to bring It Into compliance with the utilities' comprehensive plan or to
meet the minimum flow` requirements of the project before connection and to meet the State cross connection control
requirements:
01/1-4 C -t -r( co Vl C {-it CS p YZJ'i.ia.ir- % /a -Pt -t l'Ait.O✓G i,�nft-t1
)fr(Q vitt C CP'' vt 0-41 u rA y V; -t /► ti. -5 A-19 1 y t v' 4_ b,. ae.✓e./cr.6-
)vt- re_Lt 5'C A) trc-4.- k-Iet:c. erg 7- 4..i-ty
(Use separate sheet if more room is needed)
4. Based upon the improvements listed above, water can be provided and will be available at the site with a flow of 2-i S - gpm
at 20 psi residual for a duration of 2 hours at a velocity of / .5 fps as documented by the attached calculations.
5. Water availability:
[] Acceptable service can be provided to this project
O Acceptable service cannot be provided to this project unless the improvements in Item B-2 are met.
O System is not capable of providing service to this project.
I hereby certify that the above information Is true and correct,
fV c,,`14-76>;lyoCS( /ZS
Agency/Phone
"Zo—/2 C/ -
By By
This certificate is not valid without Water District No. 125's attachment entitled
"Attachment to Certificate of Water Availability."
Date
f — Z ` c;r "7
P.O. E 69550
Tukwila; WA 98168
Phone: (206) 242-3236
Fax: (206) 242-1527
0 Certificate of Sewer Availability OR ❑ Certificate of Sewer Non -Availability
Part A: (To Be Complete , by Applicant)
Purpose of Certificate:
® Building Permit ❑ Preliminary Plat or PUD ❑ Other
❑ Short Subdivision ❑ Rezone
Proposed Use:
• Residential Single Family ❑ Residential Multi -Family ❑ Commercial ❑ Other
Applicants Name: _PAvi S * .Rf obis sun -Inc, A WA)h;4gtap Phone: 925 -220 -Sq FI (.utte)
Corfora-r,
Property Address or Approximate Location: Tax Lot Number.
,Ia60o 415+ Ave. S 114.1(W;10-1 wA 98168 73'{0609'85
Legal Description(Attach Map and Legal Description if necessary):
See A 1-Izb.cbe d ...
IZITIMMISII:MonipsOld by Sewers Agency)
1. ❑ a. Sewer Service will be provided by side sewer connection only to an existing size sewer
feet frcam the site and the sewer system has the capacity to serve the proposed use.
OR 0 b. Sewer service will require an improvement to the sewer system of:
❑ (1) : feet of sewer trunk or lateral to reach the site; and/or
❑ (2) the construction of a collection system on the site; and/or
21 (3) other (describe): mai rel ✓1 re, n , r; v44 -c %v mr
2. (Must be completed if 1.b at')ove is checked)
® a. The sewer system improvement is in conformance with a County approved sewer comprehensive
plan,
OR 0 b. The sewer system improvement will require a sewer comprehensive plan amendment.
3. 51 a. The proposed project is within the corporate limits of the District, or has been granted Boundary
Review Board apprc val for extension of service outside the District,
OR 0 b. Annexation or BRB ;approval will be necessary to provide service.
4. Service is subject to the following: PERMIT: $ / Do
a. District Connection Charges due prior to connection:
coiiNiN1dN+)
el).-GFC: $ 857 cSFC: $ i Rvecn UNIT: $ TOTAL: $
(Subject to Change on January 1st)
King County/METRO Capacity Charge: Currently, $4250.70/residential equivalent, will be billed
directly by King County after connection to the sewer system. (Subject to change by King Co/Metro
without notice.)
b. Easements: 0 (Required ® May be Required
c. Other. Row A,'�rr►-,1- mar be ra, vc'
I he - by certify that the above sewer agency information is true. This certification shall be valid for one year
fr• u% e date of sic> tune. .
By
Title
'74-cle4
Date
•
ATTACHMENT TO
VAL VUE SEWER DISTRICT s
CERTIFICATE (DF SEWER AVAILABILITY/NON-AVAILABILITY
The following terms and :conditions apply to the attached Val Vue Sewer District :("District")
Certificate of Sewer Availability on -Availability ("Certificate").
1. This Certificate is valid only for the real property referenced herein ("Property"), which is in
the District's service area, for the sole purpose of submission to the King County Department of Development
and Environmental Services, King County Department of Public Health, City of Seattle, City of Tukwila, City
of Burien and/or City of SeaTac. This Certificate is between the District and theapplicant only, and no third
person or party shall have any rights hereunder whether by agency, third -party beneficiary principles or
otherwise.
2. This Certificate crOates no contractual relationship between the District and the applicant and
its successors and assigns, and does not constitute and may not be relied upon as the District's guarantee that
sewer service will be available at fthe time the applicant may apply to the District for such servicer
3. As of the date of a District's signature on this Certificate, the District represents that sewer
service is available to the Property through sewer systems that exist or that may be extended by the applicant.
The District makes no other repre ' ntations, express or implied, including without limitation that the applicant
will be able to obtain the neces permits, approvals and authorizations from King County, City of Seattle,
City of Tukwila, City of Burien, City of SeaTac or any other governmental agency before the applicant can
utilize the sewer service which is the subject of this Certificate.
4. If the District or:the applicant must extend the District's sewer system to provide sewer
service to the Property, the District or applicant may be required to obtain from the appropriate governmental
agency the necessary;: permits, a - .royals and: authorizations. In; addition, the . governmental ::agency may
establish requirements th, .t must be satisfied as a condition of granting any such permits, approvals or
authorizations, which may make impractical or impossible the provision of sewer services to the Property.
5. Application for and possible provision of sewer service to the Property shall be subject to and
conditioned upon availability of sewer service to the Property at the time of such application, and compliance
with federal, state, local and District laws, ordinances, policies, and/or regulations in effect at the time of such
application.
I acknowledge that I have received the Certificate of Sewer Availability/Non-Availability and this Attachment,
and fully understand the terms and conditions herein.
Applicant's Signatur
r/
f HII3N 34311
JegwnN IG3Jed
58b0090tEL
01iao%c
Date
e;ea pue dew
STATE OF WASHINGTON
CITY OF TUKWILA
Department of Community Development
6300 Southcenter Boulevard, Tukwila, WA 98188
Telephone: (206) 431-3670 FAX (206) 431-3665
E-mail: tukplan@ci.tukwila.wa.us
AFFIDAVIT OF OWNERSHIP AND HOLD HARMLESS
PERMISSION TO ENTER PROPERTY
ss
COUNTY OF KING
The undersigned being duly sworn and upon oath states as follows:
I. I am the current owner of the property which is the subject of this application.
2. All statements contained in the applications have been prepared by me or my agents and arc true and correct to the best of my
knowledge.
3. The application is being submitted with my knowledge and consent.
4. Owner grants the City, its emplo es, ag nts smilers, conyactors or of /r resp sentativ s the right to enter upon Owner's real
property, located at /�(p0 — / e 5' / % k ^ W /7� ,vti
for the purpose of application review, or the limited time necessary to complete that purpose.
5. Owner agrees to hold the City harmless for any loss or damage to persons or property occurring on the private property during the
City's entry upon the property, unless the Toss or damage is the result of the sole negligence of the City.
6. The City shall, at its discretion , cancel the application without refund of fees, if the applicant does not respond to specific
requests for items on the "Complete Application Checklist" within ninety (90) days.
EXECUTED at 1.-r2n.�0 Yt
(city), VI( 4 (state), on 1 b Dc4bb er- , 20Q‘
/like DA vcs
/ .;ni fl1 4 - Rd so I , 5 �o
��jjddress
On this day personally appeared before me �'
the foregoing instrument and acknowledged th he signed
mentioned therein.
SUBSCRIBED AND SWORN TO BEFORE
Oil I i ink/
:Q T
sA
•a:4 $0 '�r9�n �'�
EN:*i-oboes. ;,q.
• . 'ANA •
WIN ig 0144)4:
(Phone Number)
(Signatur
4
li9
b ,���
,6.'/" 'PAI
ding at ..,. 1
c same a
• HIS
to me known to be the individual who executed
er voluntary act and deed for the uses and purposes
DAY OF
,20�p
n for the St. e . ashington
My Commission expires on
P:\Ptanning FormsApplications lB ..LC - June 2006.doc
G?tp \ \c, -2_005
June 20. 2006
RECEIVED
CITY OF TUKWILA
CITY OF TUKWILA OC l 1 8 2880BOUNDARY LINE
Department of Community Development
6300 Southcenter Boulevard, Tukwila, WAT c ADJUSTMENT/LOT
Telephone: (206) 431-3670 FAX (206) 431-3665CONSOLIDATION
E-mail: tukplan(c)ci.tukwila.wa.us
NAME OF PROJECT/DEVELOPMENT: ie Q' � o ccna� 1r
/-dj us4merlf
LOCATION OF PROJECT/DEVELOPMENT: Give street address or, if vacant, indicate lot(s),
block and subdivision, access street, and nearest intersection.
/0266)0 — y 151- A -v' S. , J4 Divi/a, t1 /4 1g10
LIST ALL TAX LOT NUMBERS (this information may be found on your tax statement).
731714. 49C-
DEVELOPMENT COORDINATOR :
The individual who:
• has decision making authority on behalf of the owner/applicant in meetings with City staff,
• has full responsibility for identifying and satisfying all relevant and sometimes overlapping
development standards, and
• is the primary contact with the City, to whom all notices and reports will be sent.
Name: 4jf4 e l!Q/l-017/;OM
Address: /24 / /TO 11,SX'/ s e% S a 3,2_0 >A y8OS S'
Phone: -2 0 - 95 - .0.611 FAX: -44C-„126-92-27
E-mail: it -If eVA Qi/4/ re4 . C7. + m
Signature: ,%L l//�:.�' /Date: /D 4'46
P:\Planning Forms\Appllcatlons\BLA-LC - June 2006.doc
June 20, 2006
—
FOR STAFF USE ONLY Permits Plus Type: P-BLA/LC
— _ _ – \---)
Planner:
File Number:
(0' X70
Application Complete
(Date:
)
Project File Nu er:
�
�_
Application Incomplete
(Date:
)
Other File Numbers:
NAME OF PROJECT/DEVELOPMENT: ie Q' � o ccna� 1r
/-dj us4merlf
LOCATION OF PROJECT/DEVELOPMENT: Give street address or, if vacant, indicate lot(s),
block and subdivision, access street, and nearest intersection.
/0266)0 — y 151- A -v' S. , J4 Divi/a, t1 /4 1g10
LIST ALL TAX LOT NUMBERS (this information may be found on your tax statement).
731714. 49C-
DEVELOPMENT COORDINATOR :
The individual who:
• has decision making authority on behalf of the owner/applicant in meetings with City staff,
• has full responsibility for identifying and satisfying all relevant and sometimes overlapping
development standards, and
• is the primary contact with the City, to whom all notices and reports will be sent.
Name: 4jf4 e l!Q/l-017/;OM
Address: /24 / /TO 11,SX'/ s e% S a 3,2_0 >A y8OS S'
Phone: -2 0 - 95 - .0.611 FAX: -44C-„126-92-27
E-mail: it -If eVA Qi/4/ re4 . C7. + m
Signature: ,%L l//�:.�' /Date: /D 4'46
P:\Planning Forms\Appllcatlons\BLA-LC - June 2006.doc
June 20, 2006
Lob -o-7
C.O.1V113 TE Al E
Lis ATi(1)..N CRIi.(;K.LiSI'
The materials listed below must be submitted with your application unless specifically waived in writing by the Public
Works Department and the Department of Community Development. Please contact each Department if you feel that
certain items are not applicable to your project and should be waived. Application review will not begin until it is
determined to be complete. ADDITIONAL MATERIALS MAY BE REQUIRED.
The initial application materials alio* project review to begin and vest the applicant's rights. However, the City may
require additional information as needed to establish consistency with development standards.
City staff are available to answer questions about application materials at 206-431-3670 (Department of Community
Development) and 206-433-0179 (Department of Public Works).
Check items
submitted
with
application
Information Required.
May be waived in unusual cases, upon approval of both Public Works and Planning
APPLICATION
MATERIALS:
✓/
1. Application Checklist (1 copy) indicating items submitted with application.
1/
2. Completed Application Form and drawings (4 copies).
3. One set of all plans reduced to 8 1/2" by 11" or 11x17".
4. Completed and notarized Affidavit of Ownership and Hold Harmless Permission to Enter
Property (1 copy attached).
5.;+Application FE LA' e TI '`$285rother zones $510
-- Lot Consolidation in LDR $85, other zones $170
PROJECT DESCRIPTION AND ANALYSIS:
7
6. Vicinity Map with site location.
17.--
7. Clearly establish status as separate legal lot(s) of record (per TMC Title 17 and RCW Chapter
58.17), showing all known easements and encumbrances.
N/A
8. Provide any required maintenance agreements, easements or other documents ready for
recording.
Ai/A
9. Provide King County Health Department approval if there are any septic systems on site.
Items 9 through 11 NOT required for lot consolidations or BLAs without vacant lots
10. Sewer and water availability letters are required from the provider district if the area is not
serviced by the City of Tukwila. Forms are available at the DCD office.
sensitive area studies such as wetland or geotechnical re cP if
11. Provide two copies of
needed per Tukwila's Sensitive Areas Ordinance (TMC 18.45). See Geotechnical Report
Guidelines and Sensitive Area Special Study Guidelines (online at
www.ci.tukwila.wa.us/dcd/dcdplan.htm) for additional information.
RECORDING
DOCUMENT: Templates are available from the City
12 (a) The recording document must meet the King County Assessor's recording format
requirements (letter, legal or record of survey format). Only documents prepared by a surveyor
may be in record of survey format (18"x24").
(b) Drawing must include a graphic scale, space
north arrow. It shall include the elements listed at
for the City of Tukwila file number and
, "=" i , i 30 B.
X
(c) Provide legal descriptions of all lots before :
d after A proposed changes.
(d) The recording documents must include signature b ocks for the owner(s), Short
.,A D.nnrrinr rlictprl nn the template, see TMC 17.04.060).
ubdivision Committee, Assc��u1,
PAPlanning FormsWPPllcaUonsU6LA-LC - June 2006.doc
June 20, 2006
Check items
submitted
with
application
Information Required.
May be waived in unusual cases, upon approval of both Public Works and Planning
-
(e) Existing and proposed lot lines shall be shown solid with new lines called out and lot
lines to be removed shall be shown dashed.
(f) Show existing and proposed utility easements (water, sewer, septic drainfields, power,
natural gas, telephone, cable).
't-
(g) List total lot area and average width of each proposed residential lot.
t/
(h) Dash in required setback distances from all parcel lot lines.
(i) Show any required fire access lanes and turn-arounds per Fire Department standards.
(j) Show the location and distance to proposed property lines of all existing structures,
indicating those to be removed.
SENSITIVE AREAS PLAN: NOT required for lot consolidations or BLAs without vacant lots
13 (a) Location of all sensitive areas (e.g. streams, wetlands, slopes over 20%, coal mine areas
and important geological and archaeological sitg,$). For stream frontage provide existing and
proposed top of stream bank, stream bank toe, stream mean high water mark, and base flood
elevation (i.e., 100 yr. flood). Maximum sheet size 24" x 36".
(b) Location of all required sensitive area buffers, setbacks, tracts and protection measures.
(c) Show all significant trees (4" or more in diameter measured 4.5 feet above grade),
indicating those to be retained and those to be removed. A tree permit will be required for
removal of any significant trees within a sensitive area or its buffer.
(d) Show proposed lot and tract lines.
CIVIL PLANS: - required for lot consolidations or BLAs it t vacant to
14 (a) Include a graphic scale and north arrow. Maximum s eet size 24" x 36".
(b) Vertical datum NAVD 1988 and horizontal datum NAD 83/91. Conversion calculations
to NGVD 1929, if in a flood zone or flood-prone area.
(c) Existing and proposed utility easements and improvements, on site and in street (water,
sewer, power, natural gas, telephone, cable). Schematic designs to be provided regardless of
purveyor (e.g. site line size, location, and size of public main). No capacity calcs, invert depth,
valve locations or the like are needed.
(d) Storm drainage design at least 90% complete, which meets the King County Surface
Water Design Manual (KCSWDM). Include a Technical Information Report (TIR) including
feasibility analysis if required by the Manual. Call out total existing and proposed impervious
surface in square feet. Include all storm drainage conveyance systems, water quality features,
detention structures, maintenance access and safety features. For additional guidance contact
Public Works orgo to www.ci.tukwila.wa.us/pubwks/pwpermit.htm#techinfo.
(e) Locate the nearest existing hydrant and all proposed hydrants.
(f) Show the 100 yr. flood plain boundary and elevation as shown on FEMA maps.
(g) Plan, profile and cross-section for any right-of-way improvements.
(h) Show planned access to lots, driveways, fire access lanes and turn-arounds.
(i) Show the location and distance to proposed property lines of all existing structures,
indicating those to be removed.
(j) Show proposed lot and tract lines.
June 20, 2006
P:\Planning Fonns\Appllca6ons\BLA-LC - June 2006.doc
Page 1 of 1
4 I 1150ft
N CityGIS 6.0
Copyright 02006 All Rights Reserved. The information contained herein is the proprietary property of the
contributor supplied under license and may not be approved except as licensed by Digital Map Products.
http://maps.digitalmapcentral.com/production/CoreGIS/ver1_76f/index.html 11/20/2006
City of Tukwl(o
Department of Communl , Development
6300 Southoenter Boulewd, Tukwila. WA 96168
Telephone (206) 431-38E0 FAX (206) 431-3665
E-motl: 3ykolanOtukw0a.va.ue
BOUNDARY LINE ADJUSTMENT NUMBER
DEq.ARATIDN:
IONOW ALL YEN BY THESE PRESENT THAT ITE THE UNDERSIGNED, 0111�q(0) IN FEE SIMPLE OF
THE LAND ISBN DESCRIBED p0 HEREBY MANE A BOUNDARY 181E SNOB. THE
(60ED0,7ED FURTHER DE0ARE 7X15 601D0ARY UNE ADJJSIMENT 1D BE THE 08.1100
REPRESENTATION CE SAID BOUNDARY UNE ADJUSTMENT AND THE SAME 6 MADE MTX THE
FREE CONSENT AND 04 ACCORDANCE NTH THE DENTE CE THE O04iR(S).
IN WTNESS %HEREOF WE HAVE SET OUR HANDS Am SEALS
NAMES NNE:
NAME NAIL
STATE OF WASHINGTON
COUNTY OF LONG
ON THIS DAY PERSOEIALL7 APPEARED BEFORE ME
TO ME IO101w TO RE THE DIDIVIDUAL NID EIEOtUED THE MINN AND FOEGODND INSTRUMENT
AND A0GIONEDCED THAT HE SIGNED THE SNE AS MS/HER VOLUNTARY ACT AND DEED
FOR THE USES MID THEREIN 1@NTIENE4
GIVEN MER MY XAND AND °ERDAL SEAL THIS__DAY a• 20
SIGNATURE:
NAME AS CaA0590NED
TITLE
MY APPOINTMENT E7o1RES
STATE OF WAS/11401O!
COUNTY OF KING
ON THIS DAY PERSONALLY APPEARED BEFORE MF
TO 6E MOM 10 BE THE DIDIYOUAL MRO REEVED THE NNW AND FOREGOING INSTRUMENT
AND AOW08IDGED MAT K -/SHE BI91FD THE SNE AS 111S/RER VOLLMTARY ACT AND
OEED, FM THE USES AND RIRPOSES THERON 6837 10110.
GIVEN UNDER MY HAND M0 OFFICIAL SEAL THIS --DAT OF 20_
9GNATIIR@
NAME A5 COtlY59WEID
1111.6
MY MPOWNIENT 061682
LAND SURVEYOR'S CERTIFICATE:
1 KENNETH K ANDERSEN. REGISTERED A5 A LAND S RVEYCR BY TE STATE OF WANINGION.
CERTIFY TAT THIS RAT 6 BASTED ON AN ACTUAL SURVEY OF THE LAND DESCRIBED HEREIN,
CONDUCTED BY LIS OR INNER II0 SUPERVISION TAT THE DISTANCES. GORSES AND ANGLES
ARE SHOWN HEREIN CORRECTLY• A10 THAT MONUMENTS OTE.1 MAN NOSE MONUMENTS
APPROVED FOR SETTING AT A LATER DATE, HAVE SED! SET AND LOT LIMNERS STARED ON
TE maw A5 DEPICTED ON THE RAT.
)ENNERH K AIOESOI P.L.S. CEAIFICATE Na 211287
100 COUNTY ASSESSOR'S APPROVAL
MOND AND ABROAD BY 1)E WARDENS CF ASSESSIE4S 1H5
DAT 0' 2D
IOD COATS ASSESSOR
DEPUTY ASSESSOR
PMOL MADEg5)
ITACULA SHORT SUMMON COMMITTEE APPROTAL;
REWORD DD APPROVED 8Y THE BORT 9.881 11 COMM AND HEREBY OiED FOR ND
TES DAY DF SO_
OIMPOECL SHORT 511®1%88 COMM
SURVEY IN THE
SE 1/4 OF THE SW 1/4
SEC. 10, T23N.. RO4E., W.111.,
04 KING COUNTY,
WASHINGTON
RECORD 40 CERTIFICATE:
RED F8 RCM AT THE MOM CF DE 00 CF 111108A 116
ODYN 20_, AT_ MIMES PAST
.JS. AFD SEOFDED N VOLAE --CF SURVEYS
8 PAIN , RECROS CF 16410 CONTY, WASHINGTON
181 CORTYMANACEA SUPT. CF RECO DS AND FLEC106
FOUND 1CNIAENT
6' BRASS USK IN CONCRETE.
811)4 '+' 3 STAMPED '1978
KC', MARKED Mw SEO KIN
TOM196P ! RANGE DEFORMATION
*SHED 4/16/06 4 J
Fount YCBAISNT
(KCCS ODD p340)
r BRASS DISK IN CONCRETE.
FB1H Pa40H PARK 3 'DAVID
EVANS h ASSOC.' '1890'
FLUSH(
VISITED 4/17/06
9 10
71:
=now coma %SHED
5CDDN CORNEA 8AL0RATED P0SI110N
SEMEN OUMIER CORIA TASTED
I SECDOI OUMEA =MATED P09118
O FOUND IDIAAE111 AS DLSO®ED
O CALCU DIED MOAAENI MINN
e SET 5/8' MAR k CAP. U.S 211787
ICINESS 01IE011SE HOMED
O) IMMURED
(C) CALCULATED
(P1) PUT IP RIVERSIDE MERMAN TRACTS VOL. 10, PC 74
(RI) RECORD CC 0RWY, TOL 0. PG 171
(=CS) RING CONN CONTROL SMMS
WA9pGI4N STATE OPT. OF 1RAMPORTA11ON RINM-CE-01T
(0E000 YAP EOR SR SRS, FOSTER INTERCHANGE TO SEM 1181)1 FE.
APPROVED SVR 4. 11161. ERASER 54 5700.1080 20
VOLUME _ PAGE
VICINITY MAP
SCALE: 1'-1/4 LCE
CONTROL DIAGRAM 5
SCALE: 1'-207
aY.{YlOAOr
5
13/01
086411101 STA% RRNE. PERTH mE
PFR W19e1170N men Of Cann sum -ruts a lID
CONST 081110 SURVEY
10
If
n�
L-
"1614.4310 1614.90'0'1)
S8916'04'E 213593'
g
377.201PhXC)
FOND YONRRIENT IN CASE
NONOME OF
PERMANENT MARKINGS, IS
RLID MTH CONCRETE.
USED APPARENT
INDENTATION.
USED 4/16/06
CRL.CAAIED
PER )E1)
144.30'
`
S 125111
7))
5891139'E I
1774.59'(C)
FOLRID MONUMENT M CASE
r BRASS DESK MOH
PUNCH MARK t ICING CO.'
IN CONCRETE, 0.5' DOM
MED 4/16/06
^250.70'
S 1261H ST.
FOUND MORARNT IN CASE
3' BRASS DISK NTH '2' Ni 10NG
ca' IN COEa1t1E. 0.r wow
WSI1ED 4/18/88
189134'39'W 2838.51
C MI AHED S 1/4 cm:KR
PM KOS COO 11443
CALCULATED
PER (NSD01)
KENNETH R. ANDERSON
AND. ASSOCIATES. INC.
a MN: Mapping and lane Memdn11
MO kinddV Om NANO=X04
0.. Ildeai (7504601-1181
T....5([32(1304 01-S020
E1�S UA.E511C BUILDERS
• 01 MONSTERROAD, SUITE 330
ATE/71P: RENTON. WA 98055
ONE: (425) 235-8600
DRAIN BY
MEL
CHEMED BY
KRA
DAZE
SCALE
9/14/06
NJA
15
JIB NIRIER
08-022
BEET 1 af 4
City of Tukwila
Department of Community Development
6300 Scut/venter Boulevard, Tukwila, WA 98188
Telephone (206) 431-3670 FAX (206) 431-3665
E -mall: 89921Q3083819.80.0.
BOUNDARY LINE ADJUSTMENT NUMBER
ORIGINAL LEGAL DESCRIPTIONS:
(PER SIEWART TILE SUEIDASTN GUARANIES N0. SG -2631-12009, ORDER NO. 206138305, DATED 8/29/06)
PARCEL 'A' - NO. 7340600485
PARCEL A
AU. THAT PORTION OF TRACT 32, RIVERSIDE INTERURBAN TRACTS, ACCORDING TO THE PLAT NERDY
RECORDED IN VO JME 10 OF PLATS, PAGE(S) 74, RECORDS OF KING COUNTY, WASHINGTON, LYING SOUTHERLY
AND EASTERLY OF A LINE BEDNNING AT A PONT OPPOSITE HIGHWAY ENGINEER'S STATION 68+25 ON THE F1
UNE SURVEY Cf SR 599, FOSTER INTERCHANGE TO SOUTH 118111 5T. AND 110 FEET WESTERLY THEREFROM;
THENCE SOUTH 561725 WEST 230.32 FEET;
THENCE SOUTH 1810'43 EAST 100 FEET TO A PONT AND THE END OF THIS UNE DESORPTION;
AND LYING WESTERLY OF A UNE DRAWN PARALLEL Wim AND 110 FEET WESTERLY, MIDI MEASURED AT RIGHT
ANGLES AND/OR RADIALLY FROM SAID F1 LINE SURVEY;
ALSO,
PARCEL B:
ALL THAT PORTION OF THE EAST HALF OF LOT 1, BLOCK 1. SQUIRE'S REPLAT OF PART OF TRACT 33,
FIVERSIDE INTERURBAN TRACTS, ACCORDNG TO THE PLAT THEREOF RECORDED IN VT UAAE 20 CC PLATS,
PAC (S) 109. RECORDS OF KONG COUNTY, WASHINGTON. LYING NORTHEASTERLY OF A UNE BEQNNG AT A PONT
OPPOSITE HIGHWAY EI GINEERS STATION (HEREAFTER REFERRED TO AS Iffy) 63+43.5 04 THE F1 UNE SURVEY
OF SR 599, FOSTER INTERCHANGE TO SOUTH 118TH ST.. AND 228.2 FEET SOUTHWESTERLY, WHEN MEASURED
RADIALLY THEREFROM;
THENCE NOR1HWESTIMLY TO A POINT OPPOSITE HES 66+20 OV SAID FT LINE SURVEY AND 290 FEET
WESTERLY, Y6HDN MEASURED AT RIGHT ANGLES AND/0R RADIALLY THEREFRO9
THOME NORTHWESTERLY TO A PONT OPPOSITE HES 67+20 ON SND FI UNE SURVEY AND 315 FEET WESTERLY
THEREFROM AND THE END OF THIS UNE DESCRIPTION:
ALSO.
PARCEL G
ALL THAT POR1101 OF LOTS 10, 11. 12 AND 13, BLOCK 1. SQUIRES REPEAT OF PART OF TRACT 33, RIVERSDE
INTERURBAN TRACTS, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 20 OF PLATS` PAGE(S) 100
RECORDS OF KING COUNTY. WASHINGTON. DING NORTHEASTERLY OF A UNE BEGINNING AT A PONT OPPOSITE
HIGHWAY ENGINEERS STATION 63+10 ON THE F1 UNE SURVEY OF SR 599, FOSTER INTERCHANGE TO SOUTH
118111 ST AND 225 FEET
SOUTHWESTERLY, WHEN MEASURED RADIALLY THEREFROM;
THENCE NORTH 2172'52 WEST 369.40 FEET TO A POINT AND THE END OF THIS UNE DESCRIPTION;
PARCEL D:
AU. THAT PORTION OF THE HEREINAFTER DESCRMED TRACT 'X' LYING WESTERLY OF A UNE BEGINNING AT A
POINT OPPOSITE HIGHWAY ENGINEER'S STATOR (HEREINAFTER REFERRED TO AS HES) 61+00 ON THE Ft UNE
SURVEY OF SR 599, FOSTER INTERCHANGE TO SOUTH 118TH ST., AND 110 FEET SOUTHWESTERLY, WHEN
MEASURED AT RIGHT ANGLE ANDOR RADIALLY 1HERREFROEt
THENCE NORTHERLY PARALLEL +1TH SAID 61 LINE SURVEY TO A PONT OPPOSITE HES 68+25 AND THE END OF
THIS UNE DESCRIPTION:
TRACT X:
THAT PORTION OF TRACT 33, RIVERSIDE INTERURBAN TRACTS, ACCORDING TO THE PLAT 1HERECF RECORDED IN
VULUME 10 GF PLATS, PAGE(S) 74, RECORDS OF KING COUNTY, WASHINGTON, DESCRIBED AS ROLOWS:
BEGINNING AT A PONT ON THE SOUTH UNE OF SAID TRACT 325.7 FEET EAST OF THE SOUTHWEST CORNER
THEREOF;
THENCE EAST ALONG THE CENTER UNE OF ALDER SUNttt IN SAID PLAT 100.4 FEET;
THENCE NORTH 433.7 FEET TO THE NORTH UNE OF SAID TRACT;
THENCE WEST ALONG SAID NORTH LINE 100.4 FEET;
THENCE SOUTH 433.7 FEET TO THE PINT GF BFSINNING
EXCEPT PORTION FOR ALDER STREET.
PARCEL E:
ALL THAT PORTION OF THE NORTH 333.3 FEET OF TRACT 46, AS MEASURED ALONG THE WEST UNE THEREOF,
AND THE NORTH 132.5 FEET OF TRACT 45, RIVERSIDE INTERURBAN TRACTS, ACCORDING TO THE PLAT THEREOF
RECORDED IN VOLUME 10 OF PLATS. PAGE(S) 74, REGARDS OF KING COUNTY, WASHINGTON;
EXCEPT THE WEST Z00 FEET OF SND 71RACTT 45, LANG BETWEEN THE FOLLOWING DESCRM O LINES 1 AND 2
LINE 1:
BEGINNING AT A PONT OPPOSITE HIGHWAY ENGNEER'S STATON (HEREAFTER REFERRED TO AS HES) 81+00 ON
THE F1 UNE SURVEY OF SR 599, FOSTER INTERCHANGE TO SOUTH 118TH STS AND 148.4 FEET SOUTHWESTERLY,
vne1 MEASURED READULLY T EREFROIt
THENCE NORTHEASTERLY TO A POOR OPPOSITE SAID HES AND 110 FEET SOUTHWESTERLY, WHEN MEASURED
RADIALLY THEREFROM;
THENCE NORTHERLY PARALLEL NTH SAID 61 UNE SURVEY TO A PONT OPPOSITE HES 63+43.5 AND THE END
OF THIS LINE DESORPTION.
LANE 2:
BEGINNING AT POINT 'A' OPPOSITE HES 61+00 CON THE 61 UNE SURVEY OF SR 599 FOSTER INTE ROIANGE TO
SOUTH 118111 ST.;
THENCE WESTERLY TO A PONT OPPOSITE HES 61+25 ON SAID F1 LINE SURVEY AND 196 FEET SOUTHWESTERLY
THEREFROM AND DESIGNATED HERON AS POINT' B';
THENCE NORTHWESTERLY ALONG TIE SOUNWESIERLY FIGHT OF WAY UNE OF REARRANGED COUNTY ROAD. TO
A PONT OPP09TE HES 63+10 ON SAID F1 UNE SURVEY AND 245 FEET SOUTHWESTERLY THEREFROM;
THENCE NORTHEASTERLY ALONG A UNE, THE PRODUCOON OF WHICH EXTENDS TO SAID HES 63+10, TO
INTERSECT A LINE DRAWN PARALLEL WITH AND 30 FEET NORTHEASTERLY, WHEN MEASURED AT FIGHT ANGLES,
FROM SAID SOUTHWESTERLY RIGHT OF WAY LINE AND THE TRUE POINT OF BEGINNING GIF THE UNE HERON
DESCRIBED,
THENCE SOUTHEASTERLY ALONG SAID PARALLEL UNE TO INTERSECT THAT LINE DRAWN BETWEEN SAID PONT
'A' AND POINT If AND THE END OF THIS UNE DESCRIPTION.
EXCEPT THAT P0R110 4 OF PARCELS A THROUGH E DESCRIBED AS FOLLOWS:
BEGINNING AT A POINT HAVING SOUND TRANSIT SOUTH ZONE COORDINATES OF N282674.04, 81382164.04, SAID
PONT BEING BY SOUND TRANSIT SURVEY THE NORTHEAST CORNER OF SND PARCELS;
THENCE SOUTH 0415'53' EAST ALONG THE EAST UNE SAID PARCELS. THE SAYE BEING THE WEST UNE OF
STATE ROUTE 599. A DISTANCE OF 65.00 FEET;
NOME NORTH 630723' WEST A DISTANCE OF 67.81 FEET TO THE NORTH UNE OF SAID PARCELS;
THENCE NORTH 5810'06' EAST ALONG THE NORTH UNE OF SAID PARCELS, A DISTANCE OF 65.00 FEET TO THE
PONT OF BEGaOA19.
ALSO THAT PORTON OF SAID PARCELS DESCRIBED AS F0IOWSG
ORIGINAL LEGAL DESCRIPTIONS; (CONTNUFD)
CIMMENONG AT A POINT HAYING SOUTH TRANSIT SOUTH ZONE COORDINATES OF 11282674.8, 61382164.04, SAD)
PONT BONG BY SOUND TRANSIT SURVEY, THE NORTHEAST CORNER OF SAID PARCELS
THENCE SOUTH 047553' EAST ALONG THE SAID PARCES (THE SAME BEING THE WEST UNE CF STATE ROUTE
599) A DISTANCE OF 162.94 FEET TO THE TRUE POINT OF BEGINNING
THENCE CONTNUE SOUTH 043553' EAST ALONG THE EAST LINE OF SAID PARCEL A DISTANCE OF 20.66 FEET
10 THE BEGINNING OF A CURVE HAVING A RADIUS OF 1578.00 FEET, SAID PONT BEING OPPOSITE HIGHWAY
ENGINEERS STATION F1 66+44.31 ON THE F1 UNE SURVEY OF SR 599 AND 110 FEET WESTERLY 1HFREFROIk
THENCE CONTINUE HANG THE EAST UNE OF SAID PARCEL ALONG SAID CURVE TO THE UFT THROUGH AN
ANGLE OF 411'44' AN ARC DSTANE OF 115.55 FEET:
THENCE SOUTH 81750' WEST A DISTANCE OF 292 FEET TO 1116 BEGINNING OF A NON -TANGENT CURVE
HAVING A RADIUS OF 2038.60 FEET AND A CHORD BEARING OF NORTH 0702'55' VEST 97.31 FEET;
THENCE NORTHEASTERLY TO THE RIGHT ALONG SAID CURVE THROUGH AN ANGLE OF 744'07' AN ARC DISTANCE
OF 97.32 FEET;
THENCE ON A TANGENT UNE NORM 05'40'52 WEST A DISTANCE OF 39.02 FEET;
THENCE NORTH 8419'08' EAST A DISTANCE OF 166 FEET TO THE TRUE PONT OF BEGINNING.
PARCEL 'B' - NO. 7945200045
PARCEL F:
LOT 10, BLOCK 1, SQUIRES REPLAT OF PART OF TRACT 33, RIVERSIDE INTERURBAN TRACTS, ACCORDING TO
THE PLAT THEREOF RECORDED IN VOLUME 20 OF PLATS, PAGE(S) 100, RECORDS OF KING COUNTY,
WASHINGTON:
EXCEPT THAT PORTION OF SAID LOT 10 CONDEMNED FOR THE STATE HIGHWAY UNDER KING COUNTY SUPERIOR
COURT CAUSE N0. 646939
REVISED LEGAL DESCRIPTIONS
PARCEL 'A'
PARCEL 'A' GIF BOUNDARY UNE ADJUSTMENT NUMBER N THE OTT OF TUKWILA. STATE OF
WASHINGTON,
118CORDET) IN KONG COUNTY UNDER RECORDING NUMBER N KING COUNTY, WASHINGTON.
PARCEL 'B' OF BOUNDARY UNE ADJUSTMENT NUMBER IN THE OTY OF 1UKWILA, STATE OF
WASHINGTON,
RECORDED IN KING COUNTY UNDER RECORDING NUMBER IN KING COUNTY, WASHINGTON.
KENNETH R. ANDERSON
AND ASSOCIATES. INC.
Surveying, Mapping and Land Planning
1720 South 341.4 Plata ante C-4
e Moines
Washington98CO3
Des 99
Tacoma (253) 272-9858
FAX 253) 838-8164
CAI& inalOcriderstesurvelcresorn
9/24/07
DRAWN BY
C BUILDERS
ONSTER ROAD, SUITE 330
P: RENTON, WA 98055
(425) 235-6600
NEL
OLEO® BY
KRA
DATE
SCALE
9/14/06
N/A
VOLUME PAGE
JOB NUMBER
SHEET
06-022
2 GF 4
A
BOUNDARY LINE ADJUSTMENT
NUMBER
5
-MATCHLI E- SEE SHEET 4 OF 4
RENSED N
UIT UNEW
4•
DECLARED ;o i
TO STATE�� �
Y ROUTE 599 o a
WSDOT LETTER . v`�
2/22/1978. -
pass RIGHT OF 1 '
. 1.75 ACRES) I i
1'I
rz.E. LINE, W. 100.4'
TRACT 33
0
•
2 STORY
WORD
FRAMED
HOUSE
6' W000 FENCE
WAAT110E TOP
HEDGE ROW
MASONRY REP,/
S. 126TH—S EET
899
57'39•E 250.70' - • (ALS STREE1)
220.00'
PARCEL Na
734360 0661
STAUDACIER ROBERT 6
TALEVIC
734060 0664
1
45b0', �'-
�o
113
Nu ;p473o s
v,
as
0
7 .
45.00' 23.35'
99.05'
N
CENTERLINE. 40' EASEMENT
FOR ELECTRIC TRANSMISSION
AND DISTRISUBON FOR CITY
OF SEATTLE REC. NO.
7905111015
oy
STATIONING
PER WSDOT
PAGE
City of Tuk.9a
Department of Ccmmurlty Development
6300 SautAeenter Badenad, Tattled, WA 98188
e (206) (206) 431-3685
E
SCALE IN FEET
30 15 0 30
1=30'
60
NAD83/91
WASHDIGTON STATE PLANE. NORTH ZONE
PER WASHINGTON COUNCIL OF COUNTY SURVEYORS & XNG
COUNTY CONTROL SURVEY
BASIS OF BEARINGS:
BASED UPON THE MONUIIENTED VESTURE OF THE
NORTHWEST QUARTER OF SECTION 10-23N-040.
BEARING: N01'44'34 t
PARCEL NO.
734360
3662
HDOIVAY MI6
734060 0663
i
,ON ttr%
SECTION CORNER VISITED
SECTION CORNER CALCULATED POSITION
SECTION QUARTER CORNER VOTE,
SECTION QUARTER CALCULATED P091094
FOUND MONUMENT AS DESCRBE0
CALOU AIED MONUMENT P09110N
MEASURED
CALCULATED
PUT OF RIVERSIDE INTERURBAN TRACTS, VOL 10, PG. 74
RECORD OF SURVEY, VOR.. 5, PG. 171
KING COUNTY CONTROL SURVEY
WASHINGTON STATE DEPT. OF TRAN9'ORTA1IOI RIGHT -OF -WA
MAP FOR SR 599, FOSTER INTERCHANGE TO SW1H 118114 ST.
APPROVED SPT 4, 1963, DRAWER 56, SEQUENCE 20
‘0.
IEI4t1VAY PI4LIP
1 734060 0665
1 I "NDIVAY II NIEL41
5844
34969. Mel
KENNETH R. ANDERSON
AND ASSOCIATES. INC.
Surveying, Mapping and Land Planning
1720 Seth 341st Roca Sate C-4
FedscalWogWa � 1�3
Dr Mahn (
Tamer (253) 272-9858
FAX (2,53) 838-8164
E mdgndesmsrreyorawn
C BUILDERS
ONSTER ROAD. SUITE 330
P: RENTON, WA 98055
(425) 235-6600
DATE
944/06
1•=60'
JOB NUMBER
06-022
0'
City of Tukwila
Department of Community Devdapmed
6300 Sautheeiter Boulevard, Tukwila WA 98188
Tdephone (206) 431-3670 FAX (208) 431-3665
E-mail: t anOtukw6a.wa.uq
VOLUME - PAGE
BOUNDARY LINE ADJUSTMENT NUMBER
SCALE IN FEET
30 15 0 30
1'=30'
60
PL1D83/91
WASN1NGfCN STATE PLANE. NORTH ZONE
PER WASim1GTON COUNCIL CF COUNTY SURVEYORS & KING
OOlMTY CONTROL SURVEY
BASIS OF BEARINGS:
BASED UPON TME UONUKENTED WEST UNE OF THE
NORTHWEST QUARTER OF SECTION 10-236-04E.
BEARING: N01'44'34'E
SEC1 M CORNER MED
SECTION CORNER CALCULATED POSITION
SECTION QUARTER COMER VISITED
SECTION QUARTER CALCULATED POSITION
FOUND MONUMENT AS DESCRIBED
CALCULATED MONUMENT POSITION
SET 5/6' IREBAR & CAP, LS. 29267
UNLESS OTHERWISE NOTED
MEASURED
CALCULATED
PLAT OF RIVERSIDE INTERURBAN TRACTS, VOL 1q PG 74
RECORD CF SURVEY, VOL 5, PG. 171
KING COUNTY CONTROL SURVEY
WASI9NGTON STATE DEPT. OF 1RMNSPCRTA110N RIGHT -OF -WAN
WAP FOR SR 599. FOSTER INTERCHANGE TO SOUTH 1181H ST.
APPROVED SEPT 4, 1963, DRAWER 56, SEQUENCE 20
S18'08121
36.85'(C) 36.80'(RI)
(AIDER STREET
76+05.29
CALCULATED PER (Rt)
g
g-1-STATIONING PER MOOT
110.00'
SA'
S8419'08'W
3.67
110.00'
S. 126TH STREET
F.
T
' ;= '
NOTE
LAND DECLARED SURPLUS TO STATE
HIGHWAY ROUTE 599 PER WSDOT
LETTER DATED 2/22/1978. (AKA
EXCESS RIGHT OF WAY. 1.75 ACRES)
O3in
i(73"P
� n^
lDl,
C13 A Ch
Z
o ° W
o C121 -4 9N
110.00'
66+41.30
MONUMENT PER (R1) ...
13
a
oa
LINE. W. 100.4' IS
TRACT 33
LO
KENNETH R. ANDERSON
AND ASSOCIATES. INC.
Sur/eying, Mapping and Land Planning
1720 South 341st Roca Suite C-4
Federal WaK WmAAptoe 98003
De Moines (253) 836-1199
Town (253) 272-9858
FAX (253) 838-8184
8-1a6 rnallesidirsanourayaresese
f
}► 04I
___�
-MATCHLINE- SEE SHEET 3 OF 4
C BUILDERS
01 MONSTER ROAD, SUITE 330
�P: RENTON. WA 98055
235-6600
EXPIRES: 9/24/07
e
w I (I revua- sk-e-/,,J Col S9 O w1 1 t c/ �e . -
PARCEL C:
ASSESSOR'S PARCEL ND
794520 0045
TOPOGRAPHY INFORMATION -
TOPOGRAPHY ASE IS USING GEODATUM INC GIS MAPPING.
FIELD VERIFICATION REQUIRED.
IMPERVIOUS SURFACE (RESIDENCE): 1564 S.F.
IMPERVIOUS SURFACE (PORCH): 40 S.F.
IMPERVIOUS SURFACE (DRIVEWAY): 400 S.F.
IMPERVIOUS SURFACE (PATIO DECK): 135 S.F.
TOTAL IMPERVIOUS SURFACE (ON SITE): 2139 S.F.
OVERALL LOT SURFACE ±4400 S.F.
RIGHT OF WAY UTILITY WORK & H00K-UP WILL
BE UNDER SEPARATE PERMIT BY THE RESPECTED
UTILITY PROVIDERS.
LEGALJESIETEM
ZONING:
LDR - UGHT DENSITY RESIDENTIAL
LOT 10, BLOCK 1, SQUIRE'S REPLAT OF PART OF TRACT 33, RNERSIDE INTERURBAN TRACTS, ACCORDING
TO THE PLAT THEREOF RECORDED IN VOLUME 20 OF PLATS, PAGE 100, RECORDS OF KING COUNTY,
WASHINGTON;
EXCEPT THAT PORTION OF SAID LOT 10 CONDEMNED FOR STATE HIGHWAY UNDER KING COUNTY
SUPERIOR COURT CAUSE NO. 646939.
SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON.
SUBJECT TO JUDGMENT AND/OR ORDER FOR CONDEMNATION OF ACCESS OF STATE HIGHWAY AND OF
UGHT, VIEW AND NR IN FAVOR OF THE STATE OF WASHINGTON, KING COUNTY SUPERIOR COURT CAUSE
NO. 647372.
LEGEND:
OFOUND REBAR (AS NOTED)
— CATV— OVERHEAD CABLE TV UNES
— OHE — OVERHEAD ELECTRIC UNES
— UGE — UNDERGROUND ELECTRIC UNES
- GAS UNES
— SS —
— TELE-
- W —
-0-
SANITARY SEWER UNES
OVERHEAD TELEPHONE UNES
WATER UNES
FENCE (AS NOTED)
GUY ANCHOR
PAD MOUNTED TRANSFORMER
UTILITY POLE
UTIIIRY POU: W/LUMINAIRE
SS SANITARY SEWER MANHOLE
SANITARY SEWER STUB
FIRE HYDRANT
• WATER METER
!XI WATER VALVE
MB MAIL BOX
—� SIGN (AS NOTED)
DRILL HOLE/TEST PIT
•XX`- CONIFEROUS TREE
DECIDUOUS TREE
Do(9— Sig
e
--7
---
- s\\
\
/--OHE/0- T -/TE
nllr
to/ 012
40.00'
5
//
9
2 STORY
WOOD FRAMED
HOUSE
40xx S. 126th ST.
SINGLE FAMILY
RESIDENCE
(#2536/2A)
6' WOOD FENCE
W/LATTICE TOP
HEDGE ROW
S. 126TH ST
4=W-
/
STREET SIGN
0
– ---@HE /CA TV/TEEE-
1 1— — —� 94.79—;
— --OH
OHEf CA
GRAPHIC SCALE
Iff
SITE PLAN
SCALE 1' 20'-0•
D
C
B
MAJESTIC BUILDERS
1201 MONSTER ROAD SW
SUITE 1 330
RENTON, WA 98057
Jonathan M. Harkovich
Davis Real Estate Group
1201 Monster Road SW, Suite 1320
Renton, WA 98057
(o) (425) 228-5959
(e) (253) 315-3170
TUKWILA / FARNUM-TIEDE
TAX # 794520 0045
40XX SOUTH 126TH ST
TUKWILA, VA 98168
TUKWILA / FARNUM-TIEDE
1
09-26-06
PREUMINARY
PHD
JMH
PHD
NO.
DATE
REVISIONS
BY
CHK
APP'D
REV
SCALE: AS SHOWN I DESIGNED BY: PHD
DRAWN BY: PHD
6
5
4
3
2
1
0
A