TIC 2018-03-26 Item 2B - Contract Amendment #2 - GIS Services for Water, Sanitary Sewer and Surface Water
City ©f Tukwila wild Allan Ekberg, Mayor Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director I BY: Mike Cusick, Senior Program Manager CC: Mayor Ekberg DATE: March 23, 2018 SUBJECT: GIS Services for Water. Sanitary Sewer. and Surface Water Project Nos. 91640104, 80540202, and 80241201 Amendment No. 2 to Contracl ; No.16-063 and No. 17-165 ISSUE Approve Amendment No. 2 to Contract No.16-063 and No. 17-165 with David Evans and Associates, Inc. (DEA) for GIS Services for the Water, Sanitary Sewer, and Surface Water systems. BACKGROUND The 2017-18 budget includes sufficient funding in Water, Sewer, and Surface Water funds for GIS Asset Management System procurement, implementation, and GIS data coordination. This amendment will update the existing GIS databases to address new construction and discrepancies for sanitary sewer, surface water systems, and continue surveying of the water systems in 2018. ANALYSIS & FISCAL IMPACT The City reviewed professional qualifications from DEA, Perteet, Inc. and Gray and Osborne, Inc. that were listed in the Municipal Research Services Consultant Roster. After reviewing the three firms' Statement of Qualifications, DEA was chosen to continue their work and include the 2018 Sanitary Sewer, Surface Water and Water GIS Inventory. DEA has completed other GIS projects for the City and their work has been satisfactory. Consultant Budget for Agreement 2018 2018 Water GIS Inventory $ 99,825.40 $ 100,000.00 2018 Sanitary Sewer GIS Inventory 27,516.00 100,000.00 2018 Surface Water GIS Inventory 97,065.00 100,000.00 Total $ 224,406.40 $ 300,000.00 RECOMMENDATION Council is being asked to approve Amendment No. 2 to Contract No. 16-063 and No. 17-165 with David Evans and Associates, Inc. in the amount of $124,581.00 for the 2018 Sanitary Sewer and Surface Water and $99,825.40 for the Water GIS Survey and consider this item on the Consent Agenda at the April 2, 2018 Regular Meeting. Attachments: Consultant Rating Sheet 2017 CIP pages 70, 86 and 109 Amendment No. 2 to Contract No. 16-063 and No. 17-165 W:\PW Eng \ PROJECTS \A- SW Projects\2016 GIS Services (80540202)\Info Memo 2018 GIS sewer storm and water.docx 31 e� e 2018 GIS Qualification Review (1= Top Choice, 2 = Second Choice, 3 = Third Choice) Ok"- Qetc CP Relevant Project Experience 1 1 1 Similar Size Projects 1 1 1 Ability to Coordinate with City Staff 1 1 2 Ability to keep project on schedule and within Budget 1 2 2 Project Team Availability of Key Team Members 1 1 1 Accuracy of Pasted Project 1 2 2 TOTALS (Lowest Total Score is best) 6 8 9 Firm Rank (1 - 3, Lowest = Best) 1 2 3 DEA is Choosen for the 2018 GIS Projects CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: GIS Inventory of Water System Project No. 91640104 The GIS (Geographic Information System ) will provide current as -built data for the Tukwila water system. DESCRIPTION: The data base will include fire hydrants, valve locations, approximate water line locations, date of installation, and material type. The GIS mapping will provide information on the water system that is easily addressable by City staff JUSTIFICATION: and the public. With GIS data, the City will be able to develop an asset management plan to determine the water assets needed to be upgraded or replaced. STATUS: New project for 2017 - 2022 CIP. Combined Asset Management System scheduled for 2017. MAINT. IMPACT: The survey will provide staff with -up -date information on the location of water line features. COMMENT: FINANCIAL Through Estimated in $000's 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 67 100 100 100 100 100 567 Land (RAN) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 0 0 67 100 100 100 100 100 0 567 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 67 100 100 100 100 100 0 567 TOTAL SOURCES 0 0 67 100 100 100 100 100 0 567 Project Location: Entire System 2017 - 2022 Capital Improvement Program 70 33 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: GIS Inventory of Sewer System Project No. 80540202 DESCRIPTION: GIS (Geographic Information Systems) provides current as -built data for the sanitary sewer system in the Central Business District. This project will expand the as -built database for Tukwila's entire sewer system. GIS mapping of the sewers will provide information that is easily addressable by City staff and the public. With the JUSTIFICATION: GIS data, the City will be able to develop an asset management plan to determine the sewer assets that need to be upgraded or replaced. STATUS: In 2007, the Commercial Business District (CBD) was surveyed for GIS mapping. Full data collection should be completed by 2019. Combined Asset Management System in 2017. MAINT. IMPACT: The survey will provide staff with up-to-date information on the location of manholes for the sanitary sewers. COMMENT: FINANCIAL Through Estimated (in $000's 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 105 50 167 100 50 500 972 Land (R/W) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 105 50 167 100 50 0 0 0 500 972 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 105 50 167 100 50 0 0 0 500 972 TOTAL SOURCES 105 50 167 100 50 0 0 0 500 972 Project Location: Entire System 2017 - 2022 Capital Improvement Program 86 34 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Surface Water GIS Inventory Project No. 90241201 80241201 The GIS (Geographic Information Systems) inventory establishes citywide as -built drawings for the public DESCRIPTION: drainage systems. This is an ongoing project as all CIP and development infrastructure improvements will need to be mapped. JUSTIFICATION: State NPDES requirements include provisions for permitted jurisdictions to compile accurate.drainage system maps for all outfalls 24" or greater. STATUS: GIS mapping was completed citywide in 2013. Future contracts will keep maps up to date as projects change the existing system. Combined Asset Management System scheduled for 2017. MAINT. IMPACT: GIS information will allow maintenance to better track storm facility maintenance needs. COMMENT: National Pollution Discharge Elimination System (NPDES). Department of Ecology grants for NPDES permit. FINANCIAL Through Estimated in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 1,421 100 67 100 150 1,838 Land (R/W) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 1,421 100 67 100 0 150 0 0 0 1,838 FUND SOURCES Awarded Grant 218 218 Proposed Grant 0 Mitigation Actual 100 100 Mitigation Expected 0 Utility Revenue 1,103 100 67 100 0 150 0 0 0 1,520 TOTAL SOURCES 1,421 100 67 100 0 150 0 0 0 1,838 Project Location: Entire System 2017 - 2022 Capital Improvement Program 109 35 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: CONTRACT FOR SERVICES Amendment #2 Between the City of Tukwila and David Evans and Associates, Inc. That portion of Contract No. 17-165 between the City of Tukwila and David Evans and Associates, Inc. is hereby amended as follows: . Section II Scope of Work: Additional scope of Work is attached (see Exhibit A) Section IV Payment: Amendment # 2 provides additional payment in the amount of $ 99,825.40 which is for additional GIS Inventory of the Tukwila Water System per David Evans and Associates, Inc Scope of services dated March 12, 2018. The new maximum amount of payment is $159,741.43 (see Exhibit B). All other provisions of the contract shall remain in full force and effect. Dated this day of , 20 CITY OF TUKWILA CONTRACTOR 401 Allan Ekberg, Mayor Printed Name: Doocr Ste-1,4%0c- ATTEST/AUTHENTICATED APPROVED AS TO FORM Christy O'Flaherty, MMC, City Clerk Office of the City Attorney CA Revised December 2016 Page 1 of 1 36 EXHIBIT A CITY OF TUKWILA Water System GIS Inventory Scope of Services Prepared by: David Evans and Associates, Inc. 14432 SE Eastgate Way, Suite 400 Bellevue, WA 98007 March 12, 2018 37 TABLE OF CONTENTS TASK 1.0 PROJECT DESCRIPTION, DELIVERABLES AND ASSUMPTIONS 1 1.1 Project Description 1 1.2 Project Deliverables Furnished by CONSULTANT 1 1.3 Responsibilities and Services Provided by CLIENT 1 1.4 Project Assumptions 1 TASK 2.0 PROJECT MANAGEMENT AND QUALITY CONTROL 2 2.1 Project Management 2 2.2 Monthly Invoices/Progress Reports 2 2.3 Project Kick-off Meeting and Progress Meetings 2 2.4 Quality Assurance /Quality Control Review 2 2.5 Change Management 3 TASK 3.0 WATER SYSTEM GIS INVENTORY 3 3.1 Field Review 3 3.2 Data Collection 3 3.3 Water System As -Built Research 3 3.4 Geodatabase Preparation 3 City of Tukwila Water System GIS Inventory Scope of Services March 12, 2018 38 TASK 1.0 P • OJECT DESCRIPTION, ELIVERA LES AN ip ASSUMPTIONS 1.1 Project Description The City of Tukwila (CLIENT) is requesting professional services from David Evans and Associates, Inc. (CONSULTANT) to inventory the water system and convert it into a Geographic Information System (GIS). The major features of the project include: Water System • Water Lines • Water Valves • Water Meters • Water Manholes • Fire Hydrants • Water Vaults • Water Risers • Post Indicator Valves • Fire Department Connections • Air Relief Valves 1.2 Project Deliverables Furnished by CONSULTANT CONSULTANT shall deliver the following documents and products to CLIENT as part of this agreement: • Electronic copy of the GIS Geodatabase. CLIENT will have the opportunity to review each of the deliverables. CLIENT review documents will be returned with subsequent revision, illustrating that each review comment has been addressed as stated, or how/why it was not addressed. 1.3 Responsibilities and Services Provided by CLIE; T CLIENT will: • Provide existing water system maps, GIS maps and data, and other available mapping information. • Review all submittals made to the CLIENT within 15 working days, or as agreed, and return them to CONSULTANT with consolidated written comments regarding changes or revisions needed. • CLIENT will provide staff to aid with locating water features. 1.4 Project Assumptions • Mapping accuracy requirement for object locations is "mapping grade" (+1- 3 feet). Objects will be mapped to "survey grade" accuracy (+/- 0.10 feet) throughout the project unless dense vegetation or forested areas prevent the use of survey grade GPS equipment. • Water System mapping will be limited to area within public Right of Way. • Horizontal datum will be NAD 83/91. • Vertical datum will be NAVD 88. • The project duration is assumed to be four (8) months. City of Tukwila Water System GIS Inventory Scope of Services March 12, 2018 39 TASK 2M PROJECT MANAGEMENT AN iI QUALITY CONTROL 2.1 Project Management CONSULTANT will provide direction for staff and review of their work over the course of the project. This work element includes preparing monthly progress reports, to accompany monthly invoicing, that include the status of individual work elements, number of meetings attended, outstanding information required, and work items planned for the following month. CONSULTANT will monitor the project budget weekly throughout the course of the project. This work element is intended to help monitor costs and budgets, and to propose corrective actions, if needed. These actions may include formal requests for increases, modifications, or reductions in scope. Drawings and documents received and generated over the course of the project require review, coordination, and file management. The status of requested information will also be maintained. 2.2 Monthly Invoices/Progress Reports Monthly invoices will be prepared by CONSULTANT per CLIENT requirements for work activities for the prior month. These invoices will include SUBCONSULTANT work and will be accompanied by monthly progress reports, back-up materials for expenses, and show approved budget and amount expended to date. Deliverables: Monthly Invoices and Progress Reports (6 total). 2.3 Project Kick-off Meeting and Progress Meetings After receiving notice to proceed, CONSULTANT will conduct a project team kick-off meeting with staff expected to be involved in the project and key CLIENT staff. The meeting will be used to discuss critical elements of the Scope of Work, the project schedule, document control, and QA/QC procedures; and to clearly define the roles and responsibilities of the project team members. This work element provides for the preparation, attendance, follow-up, and documentation of meetings during the length of the project. These meetings will be the forums for CLIENT to provide input and guidance for the direction of the project. They will also be used to discuss project issues, approve submittals, and develop potential solutions. CONSULTANT will prepare for, attend, and document up to six (6) meetings with CLIENT staff. The CONSULTANT will attend one meeting every month with the CLIENT's project manager for the duration of the project. The meetings will be held in a location acceptable to CLIENT and CONSULTANT. Deliverables: Meeting Minutes (6 total). 2.4 Quality Assurance /Quality Control Review This work element is for the QA/QC review of CONSULTANT deliverables by a designated QA/QC staff member of the CONSULTANT team. CONSULTANT will assign a Quality Manager to the project that will be responsible for ensuring that quality reviews are performed at stages throughout the project and on all deliverables. The review will cover field and office work on an on-going basis. QA/QC documentation will be maintained and filed with project records. City of Tukwila Water System GIS Inventory Scope of Services March 12, 2018 40 2.5 Change Management Project Managers from CLIENT and CONSULTANT are responsible for managing changes to the scope and schedule. CLIENT is responsible for the authorization of any changes to the scope, budget, and/or schedule. Team members must ensure that work within their areas remains within the defined project scope, schedule, and budget. When issues, actions, or circumstances occur that could cause a change in scope, personnel, cost, or schedule, team members must communicate potential changes to the Project Manager as early as possible. Project Managers will determine whether the potential change issue will lead to a change in scope, cost, or schedule. CONSULTANT shall obtain written authorization from CLIENT before implementing any change to this Scope of Services, schedule, or budget. All changes will be documented using the Project Change Form. TASK 3M WATER SYSTEM GIS INVENT®i' Y 3.1 Field Review CONSULTANT will conduct an existing water system maps/GIS review at the outset of the project to identify key field conditions that may impact the field mapping including safety, traffic and access issues. The procedures required to complete the field survey will be determined and safety risks will be analyzed. 3.2 Data Collection CONSULTANT will field survey the location of water system point features and water system utility paint locates outside of the City of Tukwila retail water service area that was completed as part of a previous scope of services. Field notes will be collected to support project deliverables. Pipe connections will be completed in the field where practical. CONSULTANT will use CLIENT agreed upon GIS database structure. 3.3 Water System As -Built Research CONSULTANT will review research on existing utility information, provided by CLIENT, for inclusion in the mapping. Where possible CONSULTANT will use provided as -built records to prepare and pre -enter system information to be field verified. This will make the field effort more efficient. 3.4 Geodatabase Update CONSULTANT will utilize its field surveyed information, and the as -built research to create the Geodatabase GIS files. CONSULTANT will include metadata for the Geodatabase updates. Deliverables: Electronic copy of the updated Geodatabase City of Tukwila Water System GIS Inventory Scope of Services March 12, 2018 41 Exhibit B City of Tukwila Water System GIS Inventory David Evans and Associates, Inc. Negotiated Classification Hrs. x Rate = Cost 1 Project Manager (PMGR/PLSU) 112 $ 140.14 15,695.68 2 Quality Control Manager (PICH) 12 $ 203.28 2,439.36 3 GIS Manager (GISM) 20 $ 141.68 2,833.60 4 Survey Manager (SVYM) 16 $ 203.28 3,252.48 5 GIS Technician (GIST) 344 $ 83.16 28,607.04 6 Survey Technician (SVTE) 292 $ 67.76 19,785.92 7 Party Chief (PCHF) 252 $ 92.40 23,284.80 8 Administrative Assistant (ADMA) 12 $ 83.16 997.92 9 Project Administrator (PADM) 12 $ 107.80 1,293.60 Total Hrs. 1072 Total Salary Cost $ 98,190.40 Direct Expenses Mileage - Water System GIS Inventory No. Unit Each Cost 3,000 miles @ $0.545 /mill $ 1,635.00 Subtotal 1,635.00 David Evans and Associates Total Page 1 of 1 $ 99,825.40 \\BLVFS1\share\SURVVAgreements\2018\2018-03-12 Tukwila H2O GIS add-on12018-03-12 Tukwila H2O GIS Fee Sheet V1 (dev).xlsx 3/12/2018 42 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: CONTRACT FOR SERVICES Amendment #2 Between the City of Tukwila and David Evans and Associates, Inc. That portion of Contract No. 16-063 between the City of Tukwila and David Evans and Associates, Inc. is hereby amended as follows: Section II Scope of Work: Additional scope of Work is attached (see Exhibit A) . Section III Duration of Agreement: Contract duration is extended through 12/31/2019 Section IV Payment: Amendment # 2 provides additional payment in the amount of $ 124,581.00 which is for additional GIS surveying of the Sanitary Sewer and Surface Water systems per David Evans and Associates, Inc Scope of services dated March 12, 2018. The new maximum amount of payment is $437,527.00 (see Exhibit B). All other provisions of the contract shall remain in full force and effect. Dated this day of , 20 CITY OF TUKWILA CONTRACTOR , (k5,&„t Allan Ekberg, Mayor Printed Name:1Decr `)o` -c / e ,A -. ATTEST/AUTHENTICATED APPROVED AS TO FORM Christy O'Flaherty, MMC, City Clerk Office of the City Attorney CA Revised December 2016 Page 1 of 1 43 EXHIBIT A CITY OF TUKWILA Sanitary Sewer and Surface Water GIS Inventory and Update Scope of Services Prepared by: David Evans and Associates, Inc. 14432 SE Eastgate Way #400 Bellevue, WA 98007 March 12, 2018 44 TABLE OF CONTENTS TASK 1.0 PROJECT DESCRIPTION, DELIVERABLES AND ASSUMPTIONS 1 1.1 Project Description 1 1.2 Project Deliverables Furnished by CONSULTANT 1 1.3 Responsibilities and Services Provided by CLIENT 1 1.4 Project Assumptions 1 TASK 2.0 PROJECT MANAGEMENT AND QUALITY CONTROL 2 2.1 Project Management 2 2.2 Monthly Invoices/Progress Reports 2 2.3 Project Kick-off Meeting and Progress Meetings 2 2.4 Quality Assurance /Quality Control Review 2 2.5 Change Management 3 TASK 3.0 SANITARY SEWER GIS INVENTORY 3 3.1 Field Review 3 3.2 Data Collection 3 3.3 Sanitary Sewer As -Built Research 3 3.4 Geodatabase Update 3 TASK 4.0 STORM WATER GIS INVENTORY 4 4.1 Field Review 4 4.2 Data Collection 4 4.3 Storm Water As -Built Research 4 4.4 Geodatabase Preparation 4 City of Tukwila Sanitary Sewer and Surface Water GIS Inventory and Update Scope of Services May 3, 2016 45 TASK 11.0 OJECT DESC IPTION, DELUVLRA LES AND ASSUMPTJ �F NS 1.1 Project Description The City of Tukwila (CLIENT) is requesting professional services from David Evans and Associates, Inc. (CONSULTANT) to inventory and update the Sanitary Sewer and Surface Water Geographic Information System (GIS). The major features of the project include: Sanitary Sewer • Sewer Manholes • Sewer Pipes • Sewer Pump Stations Surface Water • Catch Basin • Pipes and Ditches • Stormwater Pump Stations • Stormwater Detention Ponds • Drain Points 1,2 Project Deliverables Furnished by CONSULTANT CONSULTANT shall deliver the following documents and products to CLIENT as part of this agreement: • Electronic copy of the updated GIS Geodatabase. • Structure and Site Photos. • Structure Data Sheets. CLIENT will have the opportunity to review each of the deliverables. CLIENT review documents will be returned with subsequent revision, illustrating that each review comment has been addressed as stated, or how/why it was not addressed. 1.3 Responsibilities and Services Provided by CLIENT CLIENT will: • Provide electronic copy of the existing GIS Geodatabase that is to be updated. • Provide existing as -built plans, horizontal and vertical monument information, GIS maps and data, and other available mapping information. • Review all submittals made to the CLIENT within 15 working days, or as agreed, and return them to CONSULTANT with consolidated written comments regarding changes or revisions needed. 1.4 Project Assumptions • Mapping accuracy requirement for object locations is "mapping grade" (+/- 3 feet). Objects will be mapped to "survey grade" accuracy (+/- 0.10 feet) throughout the project unless dense vegetation or forested areas prevent the use of survey grade GPS equipment. • Horizontal datum will be NAD 83/91. • Vertical datum will be NAVD 88. • The project duration is assumed to be six (6) months. City of Tukwila Sanitary Sewer and Surface Water GIS Inventory and Update Scope of Services March 12, 2018 46 TASK 2M i'ROJECT MANAGEMENT AND QUALITY CONT1' OL 2.1 Project Management CONSULTANT will provide direction for staff and review of their work over the course of the project. This work element includes preparing monthly progress reports, to accompany monthly invoicing, that include the status of individual work elements, number of meetings attended, outstanding information required, and work items planned for the following month. CONSULTANT will monitor the project budget weekly throughout the course of the project. This work element is intended to help monitor costs and budgets, and to propose corrective actions, if needed. These actions may include formal requests for increases, modifications, or reductions in scope. Drawings and documents received and generated over the course of the project require review, coordination, and file management. The status of requested information will also be maintained. 2.2 Monthly invoices/Progress Reports Monthly invoices will be prepared by CONSULTANT per CLIENT requirements for work activities for the prior month. These invoices will include SUBCONSULTANT work and will be accompanied by monthly progress reports, back-up materials for expenses, and show approved budget and amount expended to date. Deliverables: Monthly Invoices and Progress Reports (6 total). 2,3 Project Kick-off Meeting and Progress Meetings After receiving notice to proceed, CONSULTANT will conduct a project team kick-off meeting with staff expected to be involved in the project and key CLIENT staff. The meeting will be used to discuss critical elements of the Scope of Work, the project schedule, document control, and QA/QC procedures; and to clearly define the roles and responsibilities of the project team members. This work element provides for the preparation, attendance, follow-up, and documentation of meetings during the length of the project. These meetings will be the forums for CLIENT to provide input and guidance for the direction of the project. They will also be used to discuss project issues, approve submittals, and develop potential solutions. CONSULTANT will prepare for, attend, and document up to three (3) meetings with CLIENT staff. The CONSULTANT will attend one meeting every month with the CLIENT's project manager for the duration of the project. The meetings will be held in a location acceptable to CLIENT and CONSULTANT. Deliverables: Meeting Minutes (3 total). 2.4 Quality Assurance /Quality Control Review This work element is for the QA/QC review of CONSULTANT deliverables by a designated QA/QC staff member of the CONSULTANT team. CONSULTANT will assign a Quality Manager to the project that will be responsible for ensuring that quality reviews are performed at stages throughout the project and on all deliverables. The review will cover field and office work on an on-going basis. QA/QC documentation will be maintained and filed with project records. City of Tukwila Sanitary Sewer and Surface Water GIS Inventory and Update Scope of Services March 12, 2018 47 2.5 Change Management Project Managers from CLIENT and CONSULTANT are responsible for managing changes to the scope and schedule. CLIENT is responsible for the authorization of any changes to the scope, budget, and/or schedule. Team members must ensure that work within their areas remains within the defined project scope, schedule, and budget. When issues, actions, or circumstances occur that could cause a change in scope, personnel, cost, or schedule, team members must communicate potential changes to the Project Manager as early as possible. Project Managers will determine whether the potential change issue will lead to a change in scope, cost, or schedule. CONSULTANT shall obtain written authorization from CLIENT before implementing any change to this Scope of Services, schedule, or budget. All changes will be documented using the Project Change Form. TASK 300 SANITAI"Y SE\'m El!' GIS INVENT° pr Y 3.1 Field Review CONSULTANT will conduct an existing as-built/GIS review at the outset of the project to identify key field conditions that may impact the field mapping including safety, traffic and access issues. The procedures required to complete the field survey will be determined and safety risks will be analyzed. Structures requiring subconsultant assistance for traffic control to survey will be identified and will be scheduled to be completed with other structures requiring traffic control. Coordinate with traffic control subconsultant. Prepare traffic control plans when needed. 3.2 Data Collection CONSULTANT will field survey the location and collect attributes for up to 50 Sanitary Sewer Manholes and there accompanying pipes. Photographs and supplemental measurement data sheets will be collected to support project deliverables. Structure sizes and depths, pipe sizes and invert elevations, etc. will be measured in the field so that necessary database attribute information can be completed. Field measurement data will be collected electronically in the field, which will update the GIS database electronically from the field. Additionally, hard copy structure cards will be completed in the field with the same measurements so that a quality control check of the information collected electronically in the field can be performed. CONSULTANT will use CLIENT provided GIS database structure. 3.3 Sanitary Sewer As -Built Research CONSULTANT will review research on existing utility information, provided by CLIENT, for inclusion in the mapping. Where possible CONSULTANT will use provided as -built records to prepare and pre -enter attribute information to be field verified. This will make the field effort more efficient. 3.4 Geodatabase Update CONSULTANT will utilize its field surveyed information, and the as -built research to update the CLIENT's existing Geodatabase GIS files. CONSULTANT will include metadata for the Geodatabase updates. Deliverables: Electronic copy of the updated Geodatabase City of Tukwila Sanitary Sewer and Surface Water GIS Inventory and Update Scope of Services March 12, 2018 48 TASK 4.0 STa! i' Ail WATER GLS INVENT°?' Y 4.1 Field Review CONSULTANT will conduct an existing as-built/GIS review at the outset of the project to identify key field conditions that may impact the field mapping including safety, traffic and access issues. The procedures required to complete the field survey will be determined and safety risks will be analyzed. Structures requiring subconsultant assistance for traffic control to survey will be identified and will be scheduled to be completed with other structures requiring traffic control. Coordinate with traffic control subconsultant. Prepare traffic control plans when needed. 42 Data Collection CONSULTANT will field survey the location and collect attributes for up to 350 Storm Drain Features and their accompanying pipes. Structure sizes and depths, pipe sizes and invert elevations, etc. will be measured in the field so that necessary database attribute information can be completed. Field measurement data will be collected electronically in the field, which will update the GIS database electronically from the field. Additionally, hard copy structure cards will be completed in the field with the same measurements so that a quality control check of the information collected electronically in the field can be performed. CONSULTANT estimates that the miscellaneous GIS updates that thus far have been requested by CLIENT can be completed within the allocated budget. In addition, as budget allows CLIENT will provide CONSULTANT additional CIP project plan sets to be need to be incorporated in to the GIS database. The CONSULTANT will use CLIENT provided GIS database structure. 4.3 Storm Water As -Built Research CONSULTANT will review research on existing utility information, provided by CLIENT, for inclusion in the mapping. Where possible CONSULTANT will use provided as -built records to prepare and pre -enter attribute information to be field verified. This will make the field effort more efficient. 4.4 Geodatabase Preparation CONSULTANT will utilize its field surveyed information, and the as -built research to update the CLIENT's existing Geodatabase GIS files. The CONSULTANT will include metadata for the Geodatabase updates. Deliverables: Electronic copy of the updated Geodatabase City of Tukwila Sanitary Sewer and Surface Water GIS Inventory and Update Scope of Services March 12, 2018 49 Exhibit B City of Tukwila Sanitary Sewer and Surface Water GIS Inventory David Evans and Associates, Inc. Negotiated Classification Hrs. x Rate = Cost 1 Project Manager (PMGR/PLSU) 138 $ 138.32 $19,088 2 Quality Control Manager (PICH) 10 $ 200.64 $2,006 3 GIS Manager (GISM) 51 $ 139.84 $7,132 4 Survey Manager (SVYM) 14 $ 200.64 $2,809 5 GIS Technician (GIST) 292 $ 82.08 $23,967 6 Survey Technician (SVTE) 436 $ 66.88 $29,160 7 Party Chief (PCHF) 336 $ 91.20 $30,643 8 Administrative Assistant (ADMA) 24 $ 82.08 $1,970 9 Project Administrator (PADM) 15 $ 106.40 $1,596 Total Hrs. 1316 Salary Cost $ 118,372 Salary Escalation Cost (estimated) Escalation - % of Labor Cost per year @ 0 year(s) $0 Total Salary Cost $ 118,372 Direct Expenses No. Unit Each Cost National Barricade - Sanitary Sewer GIS Inventory 1 days @ $1,350 $ 1,350.00 National Barricade - Storm Water GIS Inventory 1 days @ $1,350 $ 1,350.00 Mileage - Sanitary Sewer GIS Inventory 2,000 miles @ $0.540 /mil' $ 1,080.00 Mileage - Storm Water GIS Inventory 4,500 miles @ $0.540 /mils $ 2,430.00 Subtotal $ 6,210 Sanitary Sewer GIS Inventory Totals $ 27,516 Storm Water GIS Inventory Totals $ 97,065 David Evans and Associates Total $ 124,582 Page 1 of 1 \\BLVFS1\share\SURV Agreements\2018‘2018-03-12 Tukwila SD SS GIS add-on \2018-03-12 Tukwila SD SS GIS Fee Sheet V2 (dev).xlsx 3/12/2018 50