Loading...
HomeMy WebLinkAbout2018-04-10 - Closure Notice - Frank Zepp / South 180th Street Bridge Closure ** Closure Dates Revised to May 11-13 **FRANK ZEPP BRIDGE CLOSURE (South 180th Street) Revised Closure Dates Background: 4/10/18 The City of Tukwila has completed 80% of the repairs to the Frank Zepp (South 180th Street) Bridge over the Green River. This project began in the Summer of 2017 and includes removal and replacement of the bridge deck, seismic upgrades, and painting. One last road closure is needed to raise the bridge deck and for safety reasons, no vehicles will be allowed on the bridge during this time. This is the last anticipated closure of the Frank Zepp Bridge and will complete the bridge repairs. Revi Bridge Closure: The Fran Zepp •ri•ge wi •e completely CLOSED at 7:00 pm on Friday, April 27, 2018 and re- open by 5:00 am on Sunday, April 29, 2018. Contact Steve Carstens at: (206) 431-2446 or steve.carstens@tukwilawa.gov Visit tukwilawa.gov/constructionprojects for more information City of Tukwila Public Works Department 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 City of Tukwila Public Works Department 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188