HomeMy WebLinkAboutTIC 2018-04-23 Item 2A - Discussion - Flagging Expenses for Boeing Access Road Over Burlington Northern Santa Fe Bridge Rehabilitation111211,55 101 City of Tukwila Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation Committee FROM: Henry Hash, Public Works Director tip/ BY: Steve Carstens, Senior Program Manager CC: Mayor Ekberg DATE: April 20, 2016 SUBJECT: Boeing Access Road over BNRR Bridge Rehabilitation Project Project No. 99410408 BNSF Flagging expenses Allan Ekberg, Mayor ISSUE Approve Burlington Northern Santa Fe's (BNSF) flagging and inspection cost increases. BACKGROUND In October 2013, the City contracted with Jacobs Engineering, Inc. to provide the design for the rehabilitation of the Boeing Access Road over BNRR Bridge. The BNSF Overpass Agreement allows the City and its contractor to work in the BNSF right-of-way and pays for required railroad flagging and inspection services performed by BNSF. ANALYSIS BNSF's Overpass Agreement is for required construction and maintenance costs related to the work over the railroad's right-of-way and covers inspection services and flagging required by the BNSF. Average charges from the previous six months were used to forecast the additional flagging costs of $300,000.00. FISCAL IMPACT The Overpass Agreement is within the approved construction management budget which includes a contingency for unanticipated work. Jacobs CM Contracts BNSF Original Flagging and Inspection New BNSF Flagging and Inspection Construction Contingency Total Contract CM Budget $1,785,249.83 $1,224,000.00 149,428.00 149,428.00 300,000.00 $2.234,677.83 1,584,668.00 $2.958.096.00 RECOMMENDATION Council is being asked to approve the increased flagging and railroad costs with BNSF for the Boeing Access Rd over BNRR Rehabilitation Project in the amount of $300,000.00 and consider this item on the Consent Agenda at the May 7, 2018 Regular Meeting. attachments Page 10, 2017 CIP W:1PW Eng1PROJECTSIA- RW & RS Projects\Boeing Access Rd Bridge Rehab (99410408)105 ROW Esmt Permits\BNSF CM Agreementllnfo Memo BNSF Flagging 042018.docx 1 PROJECT: DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 Boeing Access Rd over BNRR Bridge Rehabilitation Project No. 99410408 Rehabilitate the existing bridge with a 340' long concrete or steel bridge structure. It will be 6 lanes and have a sidewalk on one side. The existing bridge is structurally and seismically deficient. Several pedestals are leaning, have concrete spalls, exposed rusty anchor bolts and reinforcements and some cracks. The existing railings do not meet current bridge standards. Type, size, and location draft report (specifically required for bridges) was completed in 2005. Federal grant applications were submitted in 2008 and 2010 and the bridge rehabilitation was successful for funding in 2012 for federal bridge funds. A Public Works Trust Fund (PWTF) loan was rescinded in 2013. Maintenance will be reduced. Bridge will be rehabilitated in phases to allow continued traffic use. Federal bridge grant of $9,745,600 requires a 20% local match. A bond issue for the City match was issued in 2015 with the Interurban Ave S. FINANCIAL (in $000's) Through Estimated 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 1,249 104 1,353 Land (R/VV) 100 100 Const. Mgmt. 1,124 1,124 Construction 9,745 9,745 TOTAL EXPENSES 1,249 204 10,869 0 0 0 0 0 0 12,322 FUND SOURCES Awarded Grant 905 163 8,677 9,745 Proposed Grant 0 Fund Balance -Bond 344 41 2,192 2,577 Mitigation 0 City Oper. Revenue 0 0 0 0 0 0 0 0 0 0 TOTAL SOURCES 1,249 204 10,869 0 0 0 0 0 0 12,322 2017 - 2022 Capital Improvement Program 10 2