HomeMy WebLinkAbout2007 - Storm Water Easement and Maintenance Agreement - Singh Hardeep - 20070511000143Return Address:
City Clerk
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188
Storm Water Easement and \Maintenance Agreement
Page I of 9
1111111111 11-111[11E
20070511000143
H S HOMES 8 OE ERS 39.00
PRGE001 OF 008
05/11/2007 09:13
KING COUNTY, UR
Above this line reserved for recording information.
STORM WATER EASEMENT AND MALNTENANCE AGREEMENT
(L04 -070 PW05 -058)
WHEREAS, the PROPERTY OWNER has completed a storm system; and
V
Reference (if applicable): \;_4
Grantor: 1) Hardeep Singh
Grantee:
Legal DescriptionSTR:
Assessor's Tax Parcel iD
City of Tukwila
Lot 23, Sunrise View,
according to the unrecorded
plat thereof; EXCEPT the
North 80 feet lying easterly of
the West 190 feet; AND
EXCEPT State Highway of
Sunrise View, unrecorded
plat.
(SW1 /4, 26- 23 -04)
812520 -0232
Additional on page:
2)
Additional on page:
Additional on page:
EXCISr' T M ,tv'pT'REnt
h y Co. SI& Diviiiko
0
THIS EASEMENT AND AGREEMENT made and entered into this 9 day of May,
2007, by and between the City of Tukwila, a municipal corporation of King County, Washington,
hereinafter referred to as "CITY" and Hardeep Singh, an individual, located at 21625 4 Ave.
South, Normandy Park, WA 98198, hereinafter referred to as "PROPERTY OWNER
WHEREAS, PROPERTY OWNER has applied for certain permits with the CITY for the
construction of facilities at 17038 53 Ave. South, Tukwila, WA, which create impervious
surface; and
WHEREAS, the PROPERTY OWNER and the CITY desire that the storm system be
maintained to provide adequate facilities for controlling both the quantity and quality of storm
drainage; and
WHEREAS, for maintenance of a storm system it is necessary to have appropriate right
of -way to bring in equipment to conduct maintenance functions; and
WHEREAS, maintenance requirement is a covenant running with the land and binding
upon all heirs, successors and assigns of both parties; and
WHEREAS, the parties desire that this Agreement be recorded to advise heirs, successors
and assigns of both parties as to the existence of this easement and agreement; and
WHEREAS, an easement is needed to bring in maintenance equipment; and
WHEREAS, the parties are both desirous of permitting inspection of the storm system to
make certain that it is functioning properly and for purposes of determining the appropriate
repairs.
NOW, THEREFORE, BASED UPON MUTUAL COVENANTS TO BE DERIVED
THE PARTIES AGREE AS FOLLOWS:
Section 1, EASEMENT
PROPERTY OWNER hereby provides an easement over, under and on that portion of the
property as showing on the approved Record Drawings revised pursuant to construction records
for the City of Tukwila under Permit No. PW05 -058, which Record Drawings are hereby
incorporated by reference as if set out in full. This easement shall be a burden to that real estate
which is legally described and attached as Exhibit "A" and incorporated herein by this reference,
and shall be of benefit to the City storm utility system.
Section 2, HEIRS, SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon the heirs, successors and assigns of the parties.
Section 3, MAINTENANCE
The PROPERTY OWNER agrees to maintain the storm system in accordance with the
ordinances and all applicable codes of the CITY and the Stormwater Pollution Prevention
Maintenance and Operation Schedule attached as Exhibit `B" and incorporated herein by this
reference. The PROPERTY OWNER does hereby agree that the CITY may enter onto the
Storm Water Easement and Maintenance Areement
Page 2 of 9
property of the PROPERTY OWNER via the easement described above to inspect and perform
necessary maintenance if, after the PROPERTY OWNER is given notice to maintain, the
PROPERTY OWNER fails to maintain. Further, the PROPERTY OWNER agrees the CITY
may enter onto the property of PROPERTY OWNER via the easement described above to
perform emergency maintenance in the event of the storm system's failure which might result in
adverse impacts(s) on public facilities or private facilities of other property owners. In both
events the PROPERTY OWNER agrees he /she /they /it shall reimburse the CITY for the costs
incurred by the CITY in maintaining the storm system. Should the CITY incur attorney's fees
and/or costs in enforcing the agreement and /or in maintaining or collecting maintenance fees, the
PROPERTY OWNER agrees to pay reasonable attorney's fees and all costs incurred by the
CITY.
Section 4, ACKNOWLEDGMENT OF OTHER ENFORCEMENT ACTIONS
PROPERTY OWNER acknowledges that there may be liability for violations of codes
that could result in additional fines and/or the possibility of incarceration in addition to the fees
for maintenance should violations occur.
Storm Water Easement and Maintenance Agreement
Page 3 of 9
(Mayor
GRANTEE: CITY OF TUKWILA
v ry I \u.QQL\
Attest/Authenticated:
6
CI Clerk
G
day of c
:o aoTAHk m
erne i PUBL \G 2
�N. 5 j 9T.,. 1 2 79.3V
tt '11
Storm Water Easement and Maintenance Agreement
Page4of9
2007.
Approved As to Form:
City Attomey
STATE OF WASHINGTON
ss.
County of King
On this
day of -iff _e/ 2007, before me, the undersigted, a
Notary Public in and for the State of Washingttn, duly commissioned and sworn, personally
appeared 54cNItn YV\ YYI tA.A 1 .c known to me to be the
Mayor of CITY OF TUKWILA, the municipal corporation that executed the foregoing
instrument, and acknowledged it to be the free and voluntary act of said municipal corporation,
for the uses and purposes mentioned in this instrument, and on oath stated that he /she was
authorized to execute said instrument.
WITNESS my hand and official seal hereto affixed the day and year above written.
t cu
\a A. A 1 al lae
print t na q r^' o y
Notary Public in and for the State of
Washington, residing at Lc -4<k3t I&
My appointment expires 1 a t 9 07
STATE OF WASIiNGTON)
)ss.
County of King
Storm Water Easement and _Maintenance Aereement
Page 5 of 9
;i/
Property 0m4er
Property Owner
Date
I certify that I know or have satisfactory evidence that /Iarcle e n h
and
is /are the person(s) who appeared before me, and said individual(s} acknowledged that
he. /she/they signed this instrument and acknowledged it to be histhe heir free and voluntary act
for the uses and purposes mentioned in this instrument.
Dated /pr// 27 2607
C-Cith. CG. fJ
Aiiee A. Deacy
Notary Public, in and for the State of Washington
residing_ at /i enton
My appointment expires 6 -/h -08
Site Address
Exhibit "B"
Stormwater Pollution Prevention Plan
for
PIEPER (a.k.a.) SINGH— 9 LOT SHORT PLAT
SHORT PLAT L04 -070
PW05 -058
The project is located in the SW1 /4 NW1 /4, of the SW1 /4 of Section 26,
Township 23 North, Range 4 East, W.M., adjacent to 53 Ave. South; and within
a private street named South 172 Lane, in the City of Tukwila. The site
address is 17083 53` Ave. South, Tukwila, WA 98188. The Tax Parcel
Number is 812520 -0232.
Introduction
This project proposes to develop approximately 3.13 acres of existing, tall
grasses and a few small deciduous trees. The underlying soils vary from sand
silt, sandy silt, and medium to dense sand. Catch basins and storm drainage
pipes will be installed within the private street and adjacent areas to convey
runoff to a Private Underground Detention/Water Quality Vault located in the
eastem portion of the site. Roof downspouts will be individually tightlined to the
catch basins, which is tightlined to a public storm conveyance system, located
South of the Paved 53` Ave. South end of road. The off-site area is not
considered as part of the private detention vault sizing. After development,
approximately 1.09 acres of the site is impervious, with the remaining 2.04
pervious acres consisting of lawns, landscaping, etc.
Plan Goal
The goal of the plan is to treat all on -site runoff for water quality by directing flows
to a Detention Water Quality facility. The detention vault is designed to retain
runoff volumes up to the 2 year, and 10 -year storm events; with 7 inches of
freeboard.
Preventative BMP's
The catch basins shall have stenciled next to them "DUMP NO WASTE DRAINS
TO STREAM Activity that involves pollutants shall be done under a covered
area. The private street shall be cleaned and swept as necessary to remove
debris.
Page 7 of 9
Treatment BMP's
Interceptor swales were constructed intercepting silt -laden runoff from the site
during clearing and directed the runoff to temporary traps for treatment of water
before releasing down stream from-the site. These facilities were design for 2/3
of 2 -year storm event.
Inspection
Inspect the storm detention /water quality vault, at least twice a year, especially
after periods of heavy runoff. Maintenance records must be kept for five (5)
years and available for City Inspector review.
Maintenance
To ensure proper water quality treatment, the wet vault designed to allow for a
minimum of 6 -inch sediment at the bottom of the vault, which will be removed at
a regular schedule. In the addition for the bottom 6 -inch of sediment, the vault is
designed with a minimum dead storage of three feet to allow silt -laden runoff to
settle at the bottom of the vault.
Person of Responsibility
Name Hardeep Singh
Address 21625 4 Ave. South, Normandy Park, WA 98198
Emergency Contact, Phone 206 261 -7657
Person of Responsibility, Date: Mr. Hardeep (Harry) Singh. April 27, 2007.
Engineer Preparing Plan
Name Jaeger Engineering
Address 9419 South 204 Place, Kent, WA 98031
The City of Tukwila, Public Works Department, Engineering Division, Storm
Drainage Section; is to review and approve any changes to this Stormwater
Pollution Prevention Plan prior to changes in its implementation. Additionally,
any changes in ownership or person of responsibility are to be reported to the
City of Tukwila, Public Works.
Plan and/or Information Updates
Page 8 of 9
Structure
Date of Inspection Maintenance
CB 1 Type 2
Insp. Results
Maint. Done
CB 2 Type 1
Insp. Results
Maint. Done
CB 3 Type 1
Insp. Results
Maint. Done
CB 4 Type 1
Insp. Results
Maint. Done
CB 5 Type 1
Insp. Results
Maint. Done
Storm
Vault
Insp. Results
Page 9 of 9
INSPECTION MAINTENANCE CHECKLIST