HomeMy WebLinkAbout2011-08-15 Transportation MinutesCitv of Tukwila
Transportation Committee
TRANSPORTATION COMMITTEE Meeting Minutes
August 15, 2011 5: 00 p. m. Conference Room I
PRESENT
Councilmembers: Joan Hernandez, Chair; Joe Duffle and Verna Seal
Staff: Bob Giberson, Frank Iriarte, Robin Tischmak, Cyndy Knighton, Peter Lau, Jack Pace, Derek
Speck, Shawn Hunstock, Gail Labanara and Kimberly Matej
CALL TO ORDER: The meeting was called to order at 5:02 p.m.
I. PRESENTATIONS
No presentations.
II. BUSINESS AGENDA
A. Grant Applications: 2011 Transportation Improvement Board Funding Programs
Staff is seeking Committee approval to submit two projects /grant applications to the Washington State
Transportation Improvement Board (TIB) 2011 Funding Program.
Upon approval, staff will submit applications for the Capital Improvement Projects (CIP) listed below:
Andover Park West Tukwila Parkway to Strander Boulevard
Interurban Avenue South South 143` Street to Fort Dent Way
If awarded, funding will require a minimum 20% match. Fund recipients are expected to be announced in
November. UNANIMOUS APPROVAL. SUBMIT GRANT APPLICATIONS.
B. 2011 Overlav and Repair Program Construction Management: Consultant Selection and Agreement
Staff is seeking full Council approval to enter into a contract with Anchor QEA, LLC in the amount of
$104,708 for construction management services for the 2011 Overlay Program.
Anchor QEA was identified as the best selection of five firms considered from the Municipal Research and
Services Center (MRSC) consultant roster. The 2011 Program will provide roadway and overlay repairs at
four locations, including one additive item (see Transportation Committee minutes dated June 20, 2011).
The City has $150,000 budgeted for construction management services for the 2011 Overlay Program.
Current construction management contracts total $149,554.52 UNANIMOUS APPROVAL. FORWARD
TO AUGUST 22 COW FOR DISCUSSION.
C. Tukwila Urban Center (TUC) Pedestrian/Bicvcle Bridge: Type. Size and Location Studv
As an information only item, staff reviewed the processes to date that have resulted in the draft Type, Size
and Location (TSL) Report for the TUC Pedestrian/Bicycle Bridge. This project is being reintroduced to the
Committee and Council due to two recently received grants totaling over $1.2 million that will fund
completion of the bridge design.
Staff highlighted the project history which initially began with the 1995 Comprehensive Plan Urban
Center Goals, and a preview of the draft Type, Size and Location Report (see staff distributed PowerPoint
attached to Committee minutes). Staff will distribute the TSL Report to Committee members next week, and
will return to the Committee on September 6 to discuss this project further. In addition to seeking
Committee direction on next steps after reviewing the TSL Report, staff will ask the Committee if they
would like this item to go forward to a COW.
Transportation Committee Minutes
Auaust 15.2011- Paae 2
III. SCATBd
The Committee reviewed and briefly discussed the July 19 SCATBd meeting summary and the August 16
meeting agenda. INFORMATION ONLY.
IV. MISCELLANEOUS
Meeting adjourned at 5: 48 p.m.
Next meeting: Tuesday, September 6, 2011 5:00 p.m. Conference Room 1 "Tuesday meeting due to holiday
Committee Chair Approval
Minutes by KAM. Reviewed by GL.
08/12/2011
Tu;Kwila Urban
s, L' ;try. i c �;fif
I CA
e a h, c uvE;r':oyw
r
f p �!v
k;e >t+:
_OC
1995 Comprehensive Plan Urban Center Goals
o Encourage a broader mix of uses Intensifying uses relies on auto
access, not auto dominance
o Establish specific pedestrian oriented
areas
Q ,Linkopen spaces, amenities ancl:�ctivity
6
R
:v congesti'�,
�'fn �a�inenities future hbox�o�d�� t� PraVide
ancivity a yl j
j
4,.. al', ?tA.�.k�,.J'- 3
i(}
Q Vr
t
4, l.x ra
�h4 ie
k
"t4
38 P„79
�t`.:
a
o a eve",
%=a°s< 4'a
o Protect"
economic' 1
-i rcu lat i o n,, real uc e
rated access
t� x altern tfves
1
08/12/2011
Jr•an Center Redevelopment Strategy:
Implement the Comprehensive Plan
o Achieve local regional goals of,..-,..
irAt ,broadening uses
a Center Is a V1
0 te.start a bush
ire a real, recognizable, and
tional urban center
)me a residential paradise
intra- and inter-connected
in
TOD Master Plan at Longacres Commuter Rail/Amtrak Station
Design of a permanent Sounder/Amtrak station at Longacre
N�
2
08/12/2011
Tukwila Urban Center
Vision
o Identifiable districts with clear market focus
c High-amenity, pedestrian-oriented "TUC
f0 4 R Core" as a catalyst for transformation 1.1'� rov Neighborhoor,
t Regional Retail I
Mall tostation District stop "1"
v alues
410�4" step
A
le vel of r
4 IhtOdst i
h t o e o erings of TUC to meet
t mporary spending patterns.
Workplace District
plement the Mall Expansion to create Retail sorWcs rorridor
tFi attractive destination
Use the new town center its amenities stop 2, V,f N
along with the upgraded transit center to
s imulate demand for the housing, lodging 0
d office development that will ultimately
reate the TOD.
zS
Development Alternatives
o Do Nothing
.,no i,nvestn
I,P,nt to Ul C,
��t .35..,. x� t�,iu`� r.. ��6��J �tt ���'ti✓� €W1['�� -Si_'� 3.��'a..:- d �k4.��X.4.�`r,�l'
WINM
Transform the TUC with
Various options for location,
type of development
3
08/12/2011
0
Primary Objectives
o Bolster Tukwila Urban Center's market position as a,regiQnal retail center
kty creating an attractive central destinatltt In the
to r
in TVC
chi addliva %,"vibrant,
ir6lo l��eSO4�rect;aj 1144:,eiihanced
0_1 T", qlt
access�b�l��rtd 'k
dJ)&'W 61
lifestyle retail center
a and recreation values
f or g-
Create a town center environment r Tukai"460 S6
Make it pleasing to walk, sit, meet :li
Widen the variety of auto -oriented retail to inclu
o' and retail environments for people who want to,,,
Vision lor 'I AwilP f ril Cenic' I 'ielt� frost .k !all to Station
W
Long Range Vision
08/12/2011
Investment in a TUC Core
o City amenities
08/12/2011
Priorities and Tim
o Priority: the Regional Shopping and
Entertainment District
a concentrate investfiment and, staff rgabr
ari:rA fn3 4 e �t d l
AV IC
AJ �'y
4 t
cr�s in
trader
1
s Y al
o JRi w a A 2 4
TUC Investment Strategies
w
Both Place- Making
Transportation Emphasis:
q Pase 1 improvements incld I
h t
.0d3".✓.tr't.
tF'�s�f �f i..�Li_..r IL, T a �3M1 h wY ,,��w•
t't .�t�$ r ni t
ed6strian way &bridge (mill t
z station) a
Key Andover Park W. streetsc
improvements
o Phase 2 improvements include: :x:r
n
nk'` Tukwila Pond Park improvements 4
Pedestrian underpass to station
C:1
08/12/2011
Private Component
o Creation of City Core will need public/private
partnership
4
Private devel =of reta retail
J% `1 j,
mss.
g
m, opm ent
M
cueTrc
eft p
I
to their own, new inve'fo"
1"" obsolete to today's consumer,:
Public investment must occur
The Catalyst
A Klickitat
A Transit Center/Andover Park W
A Pedestrian /Bicycle Bridge
and office'.
2005 Transportation Element Update
Goal 13.4 Public Transportation, Transit, Rideshare
Efficient transit capacity that will reduce single-occupancy-vehicle trips to, from, and
through Tukwila and provide p u lalk nsportad6njor.Tq,*q4nt w e s who depe
sou M W
licre
pw -,eisewnere, zneo,.
geltransit nuos,
M w
(A"Pursue amenities and funding in'syp of fr(ii
g Westfield Mall at Southcenter to the q-0 :brnrriu ei
ion.
1.13 Encourage transit-oriented uses, developm
estrian amenities in the vicinity of high capacity
7
08/12/2011
Goal 13.5 Non- motorized Transportation
Bicycle and walking capacity for regional Category I and local Category II trips.
z 5 4 Continu�t�alr#�n�`� fo c�ansxrut pedssti'sabtyizYrhitidr�xd
q
a non motorized transportation
V: Y
elan for the City °q}
Pursue connections between existing ry,'
p pedestrian and bicycle facilities
Pursue additional pedestrian and r 4
bicycle amenities
M a k ing t Tr
Suburb to Urba
i
08/12/2011
mm MI,
Making the Transition:
Suburban to Urban
08/12/2011
RM.— UNTO.-
Ped/Bike
Station Ac
Bridge Parlori Lol,r
Wa
Sm
94$ f m49ai/ Relocated
S,
Station
Building CR.
pl.z.
I
,am
an Vim U4
V Transit Cente APW i
pjpt�jgj
Tvc Car. R O.W, L!, Vndcrpuss A—ss
10
71
v
RM.— UNTO.-
Ped/Bike
Station Ac
Bridge Parlori Lol,r
Wa
Sm
94$ f m49ai/ Relocated
S,
Station
Building CR.
pl.z.
I
,am
an Vim U4
V Transit Cente APW i
pjpt�jgj
Tvc Car. R O.W, L!, Vndcrpuss A—ss
10
08/12/2011
Grant Funding
Type, Size Location to Full Design
Council Direction:
Design Signature Bridge to Connect Transit "Bookends"
Set Standard for Redevelopment of Ped-Oriented Core
11
08/12/2011
12
08/12/2011
URTAT
A
Twin Tied Arch
P
V
11"IT
13
08/12/2011
Curvilinear Alignment:
HZ2
Curvilinear Alignment
Inclined Arch
14
2
Zr
14
08/12/2011
Curvilinear Alignment
Tied Arch
Landings Clearances:
Complicating Factors
15
08/12/2011
1�= W
Final Draft TAL distributed
9
il getyp
id es et
.e r
u pplement to completqi�:�- ""iii
Final design complete by eRd
Pedestrian-Bicycle Bridge Over Green River
Type, Size, and Location Report
ek
r I n itte" e f
i�
m
N
ilt
4
16