Loading...
HomeMy WebLinkAbout2018-04-24 - Closure Notice - Frank Zepp / South 180th Street Bridge Closure ** Revised Closure Dates - May 11-13 **FRANK ZEPP BRIDGE CLOSURE (South 180th Street) Revised Closure Dates Background: 4/24/18 The City of Tukwila has completed 80% of the repairs to the Frank Zepp (South 180th Street) Bridge over the Green River. This project began in the Summer of 2017 and includes removal and replacement of the bridge deck, seismic upgrades, and painting. One last road closure is needed to raise the bridge deck and for safety reasons, no vehicles will be allowed on the bridge during this time. This is the last anticipated closure of the Frank Zepp Bridge and will complete the bridge repairs. Bridge Closure: The Frank Zepp bridge will be completely CLOSED at 7:00 pm on Friday, May 11, 2018 and reopen by 5:00 am on Sunday, May 13, 2018. Contact Steve Carstens at: (206) 431-2446 or steve.carstens@tukwilawa.gov Visit tukwilawa.gov/constructionprojects for more information