Loading...
HomeMy WebLinkAboutPermit D07-121 - SCHWALD RESIDENCE - GARAGESCHWALD GARAGE 14931 62 AV S D07-121 Citf Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.ci.tukwila.wa.us Parcel No.: 3597000100 Address: 14931 62 AV S TUKW Suite No: DEVELOPMENT PERMIT Permit Number: D07-121 Issue Date: 06/07/2007 Permit Expires On: 12/04/2007 Tenant: Name: SCHWALD RESIDENCE Address: 14931 62 AVS , TUKWILA WA Owner: Name: GROHS HARLAN C+IDA M TTEES Address: 27614 MILITARY RDS , AUBURN WA 98001 Phone: Contact Person: Name: THEO VERVILLES Address: 17500 WEST VALLEY HY , TUKWILA WA 98188 Phone: 206 391-2020 Contractor: Name: TUFF SHED INC Address: 8939 SOUTH 190TH STREET, #D , KENT, WA 98031 Phone: Contractor License No: TUFFSI*038RZ Expiration Date: 07/02/2007 DESCRIPTION OF WORK: CONSTRUCT 960 SF DETACHED GARAGE Value of Construction: $35,433.60 Fees Collected: $1,031.96 Type of Fire Protection: NONE International Building Code Edition: 2003 Type of Construction: VB Occupancy per IBC: 26 **continued on next page** doc: IBC -10/06 D07-121 Printed: 06-07-2007 City o -Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.ci.tukwila.wa.us Permit Number: D07-121 Issue Date: 06/07/2007 Permit Expires On: 12/04/2007 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: Hauling: N Start Time: End 'rime: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non -Profit: N Water Main Extension: Private: Public: Water Meter: N Permit Center Authorized Signature:Date: I hereby certify that I have read and x ed this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complie wi , whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the pert ce o rk. I ant authorized to sign and obtain this development permit. Signature: I � Date: (' —Q-7 Print Name: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IBC -10/06 D07-121 Printed: 06-07-2007 Parcel No.: 3597000100 Address: Suite No: Tenant: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.ci.tukwila.wa.us 14931 62 AV S TUICW SCBtWALD RESIDENCE PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: D07-121 ISSUED 04/03/2007 06/07/2007 1: ***BIDING DEPARTMENT CONDITIONS*** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: Truss shop drawings shall be provided with the shipment of trusses delivered to the job site. Truss shop drawings shall bear the seal and signature of a Washington State Professional Engineer. Shop drawings shall be maintained on the site and available to the building inspector for inspection purposes. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: All wood to remain in placed concrete shall be treated wood. 7: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception. 8: All construction noise to be in compliance with Chapter 8.22 of the City of Tukwila Municipal Code. A copy can be obtained at City Hall in the office of the City Clerk. 9: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. **continued on next page** doc: Cond-10/06 D07-121 Printed: 06-07-2007 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Signature: 1 -/�./ C_..., ''''....-a Print Name: 1 ..12-"(2-(- l bQ.'P L L— Date: - 0-7 doc: Cond-10/06 007-121 Printed: 06-07-2007 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 hp: //ivww. c i. iulctvila. wa. us Building Permit No. POI-- t2 -L Mechanical Permit No. kreieri Plumbing/Gas Permit No. Public Works Permit No. Project No. (For office use only) Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION -y King Co Assessor's Tax No.: 7 597D /PO �y Site Address:/y // LZ II2 %it% S' /c« -l'" Suite Number: Floor: �� Tenant Name: !.✓N Sl�7za,I/f New Tenant: ❑ Yes al..No Property Owners Name: 5.,9 /41 i Mailing Address: �h' '1 ¢ City State Zip CONTACT PERSON - who do we contact when your permit is ready to be issued Name: 71e7.0 Vitt! JJrS Day Telephone: �" za 2- me) Mailing Address: / 75;00 Ali- V �zY /lL � / '�"' J'R Cu 4 City iZip E -Mail Address:r-�V/11( 2`f St/ .f!d C15 A7* Fax Number: c/�S Zits/ 9 7 ?s GENERAL CONTRACTOR INFORMATION - (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: 7-4.-e}:::-;P.".Sidfel ,AG Mailing Address: /71 , /v-/' 1/?) 74-4,4-y A7 /61 Contact Person: �7 i V0 ii /Jfe E -Mail Address x'14 l''1 f Contractor Registration Number: fel �fsi� b3 E?/ Z City Bi ate State Zip Day Telephone: ZZ 7— 5r Z5 Za Fax Number: re -S` 2e5%_ 779s - Expiration Date) —c ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record Company Name: / ,purel $ /9 12 C; A -Y4 Mailing Address: 1/ /d f 11 -ST' Ar Ave ��- �aekwl 5' fA/I /- / City State Zip Day Telephone: Fax Number: Contact Person: ) f T Air! i ). J E -Mail Address: ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record Company Name: S)17'M Mailing Address: Contact Person: E -Mail Address: Q:Applications Tonna-Applications On Lined -2006 - Permit Application.doc Revised: 9-2006 bh City Day Telephone: Fax Number: State Zip Page 1 of 6 BUILDING PERMIT INFORMATION — 206-431-3670 4212 .00 Valuation of Project (contractor's bid price): $ JfjZ>� Existing Building Valuation: $ Scope of Work (please provide detailed information): %,v67171L ZYM 95 serfs, Will there be new rack storage? ❑ Yes .. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) _ *For an Accessory dwelling, provide the following: cy.�y� N'ai;.tt/ Lot Area (sq ft): ItiGb Floor area of principal dwelling: / /v Floor area of accessory dwelling: I Z� *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: ye'/4 Compact: Handicap: Will there be a change in use? 0 Yes 0 No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers 0 Automatic Fire Alarm f None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No If 'yes', attach list of materials and storage locations on a separate 8-1/2"x 11 "paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. Q:' pplications\Fonns-Applications On Line3-2006 - Permit Application.doc Revised: 9-2006 bh Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC' Type of Occupancy per IBC 1gtFloor (VG 11-12 V n f 2nd Floor 3`d Floor Floors thru Basement Accessory Structure* Attached Garage 1(1 O t i e V IA /� v l Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) _ *For an Accessory dwelling, provide the following: cy.�y� N'ai;.tt/ Lot Area (sq ft): ItiGb Floor area of principal dwelling: / /v Floor area of accessory dwelling: I Z� *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: ye'/4 Compact: Handicap: Will there be a change in use? 0 Yes 0 No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers 0 Automatic Fire Alarm f None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No If 'yes', attach list of materials and storage locations on a separate 8-1/2"x 11 "paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. Q:' pplications\Fonns-Applications On Line3-2006 - Permit Application.doc Revised: 9-2006 bh Page 2 of 6 PERMIT APPLICATION NOTES - Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED . GENT: Signature: . . - / Date: 3-07 Print Name: 1 k 4t rV V s-7.2�'� Day Telephone: 4 - 7?/- aD Mailing Address: 44J ('t czy 4 y' City 1n 'yF) 7'! 8 5 City State Zip Date Application Accepted: o2,(0 -1 - QMpplications\Fonns-Applications On Line\3.2006 - Permit Application.doc Revised: 9-2006 bh Date Application Expires: J0(02f 04 Staff Initials: Page 6 of 6 INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION RECORD Retain a copy with permit 7-42 / (206)431-3670 Project: /Type / o spection: Address: /,/937 GZ4v C Date Called: 1 Special Instructions: Date anted .. ,A� (( a.) c Requester: ) Phone 2G�-.39'/- 202 6) nApproved per applicable codes. 0 Corrections required prior to approval. COMMENTS: . '~6,) a illi/ � C F' ,r ') � / =' , ,I •' ; : -_v' �. ! ` � l i t- / -/r"- .11?,', r (-,i/y.,> - .. ,A� (( a.) c ( ) `>/ S j(/(' £/Iver t°/ 67/i' Z-/ n /( (PZ / r Fs( v, -lam —to ,' --1 s 1 /1 ( /L `-, -t 7 (.4 ✓ Li A 1 . 0 r'i 1 1 —0 V -1 i t/ t i ._1' p r -! /,‘,A1 _. Inspector Date: re 6 7 El 5 .00 REINSPECTION FEEEQUIRED. Prior to inspection. fee must be id at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. Re(eipt No.: Date: 40. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431-3 Project: Se /-/)4L D 2.-5 - Type of Inspection: i oo f//1d9 Address: p --/9s/ 62 A/5 Date Called: Special Instructions: Date Wanted: rQ- / O% p.m. Requester: Phone No: ,2-63- 1-70Zo roved per applicable codes. El Corrections required prior to approval. COMMENTS: / \ DK .00 REINSPECTION FI = id at 6300 Southcenter Receipt No.: Date: C17 REQUIRED. REQUIRED. P for to inspection. fee must be lvd., Suite 10 . Call the schedule reinspection. Date: z-, INSPECTION NO. INSPECTION RECORD Retain a copy with permit 12 7_ t2 1 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION (206)431-36 6300 Southcenter Blvd., #1 00, Tukwila, WA 98188 Project: Ad . resss:: tot Special Instructions: Requester: Phone No: -In-Approved per applicable codes. J Corrections required prior to approval. COMMENTS: Inspeckor: Date: �-z4-- 8.00 REINSPECTION REQUIRED. rior to inspection, fee must be �baid at 6300 Southcenter lvd.. Suite 1 0. Call the schedule reinspection. Ilt teipt No.: 'Date: INSPECTION RECORD Retain a copy with permit 1)07-12/ I INSPECTION NO. N{MIT NO. CITY OF TUKWILA BUILDING DIVISION IC . 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 Pro' _1:/ v'f /d , '5. Pff/ r)i-' 42-il.,P *(C �A. q / Type of Infection: 7/ /1/4 / /1/,17 ' -/?/-7-1:51/2e4 A/3 / n, Sz r/17'711(T‘&/ U✓ Address:_ /t// C2na S Date Called: Special Instructions:Date Wanted: (p.m. arrrJ, Reque ter: — Phone No: .7a-39/- 2_67 i) Approved per applicable codes. El Corrections required prior to approval. LVMMCN 13: Pff/ r)i-' 42-il.,P *(C �A. q / /1/,17 ' -/?/-7-1:51/2e4 A/3 / n, Sz r/17'711(T‘&/ U✓ /ti"4 //Z,d k9/44,,,e1/4-- to r.v� \ InspBct r: 14-14'1, 7N -"Li .4-4_ _.,,cc..., U 58.00 REINSPECTIO FEE REO ED. Prior to inspection, fee must be aid at 6300 Southcen r Blvd.. Suite 100. Call the schedule reinspection. Re eipt No.: Date: INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION it 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431-360 INSPECTION NO. roject: , 1'/V -,f-7 (C7 ,/,?t's - Type of Inspection: - /-,71/» -iv.;. ` Addre • /‘/3/ .q Date Called: Special Instructions: Date Wanted: C -7—/L/ -v7 P•r��r!( OP; Requester: Phone No: 06- 39 /- ? Zo proved per applicable codes. ❑ Corrections required prior to approval. COMMENTS: D : , q-�1 : 00 REINSPECTIO FEE REQUIF;ED. Prior to inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. Receipt No.: Date: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION RECORD Retain a copy with permit PER NO. 206)431-3670 Project: 5t4 e4,4, 6( 11-1-42-W 4r // u /F/-k1,71Z Type of Inspection: /7/4"2 e)-refk' Address: / `631----47 44_. Date Called: Special Instructions: . Date Wanted: a.m. P.m. Requester: .." Phone No: 2e1.9.-- / ElApproved per applicable codes. EfF. Corrections required prior to approval. COMMENTS: 11-1-42-W 4r // u /F/-k1,71Z 11-e / ' 4 ' , ------- / / 1 4Afec -r. r_,7 9 0 ) Date: $58.00 REI ECT1ON FEE REQUIRED. Prior to inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. Receipt No.: Date: INSPECTION RECORD Retain a copy with permit D07—/Z/ INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 14 6300 Southcenter Blvd., #100, Tukwila, WA 981 88 (206)431-3 Project: fl Type of Inspection: U (&J,,,' sivA #1A941,1t,4 4.- Addrew... p." t-7 1 6 2 )4I) S Date Called: Special Instructions: Date Wmted: a.m. Requester: Phone No: 0 (.. - I 2 d ? 62 A roved per applicable codes. Corrections required prior to approval. COMMENTS: or: .00 REINSPECTION FEESEQUIRE id at 6300 Southcenter Blvd.. Suite Receipt No.: Date: . Prior to inspection, fee must be 00. Call the schedule reinspection. Date: Aga 62. J vs' £Vs77 l/ovs' 0 1 FILE Copy - - - r •,, PRiu. r.L 0 7 5 7 7e o/ao r .51P go-rd./17c 'deo RECEIVED 11OFTU jA ? 03 2nn7 PERMITCENTER SCOL l =za McGINNIS & ASSOCIATES Consulting Engineers, Inc. 1110 Westmark Drive Saint Louis, Missouri 63131-1735 FILE COP JOB: TS Ranch Garage #170-513143 NO. 14293 SHEET NO. 1 OF 15 CALC. BY CJD DATE 2/14/2007 1-. Structural Calculations 'for: Dawn Schwald Tuff Shed Project No. 170-513143 Bu1ittG n i ns: Overall Building Width: ►�I� nh1G` Overall Building Length: Building Overhangs: Project Location: Building Code: Tukwlt WA _J. IBC 2003 B := 24.ft + 0 • irl L:= 40•ft+ 0•irl Bover:= 12•in Plate Heights: Finished Floor Elevation: Top of Plate Elevation: Roof Angle: oof Pitches: Peak Roof Height: Mean Building Height: Consider Vertical Loads: Dead Loads: Roof Dead Load, DLr f: Wall Dead Load, DLWali: Live Loads: 4 pitch 1— 2 Roof Live Load Correction Factors: Roof Live Load: Snow Loads: Roof Snow Load: Roof Load Summary Roof Support Trusses @ 24 in. c/c Truss Span (ft): 24 Roof Dead Load (psf): 10 Roof Live Load (psf): 25 Roof Snow Load (psf): 25.00 Goveming Total Load (psf): 35 See Calculations to Follow fhb. ridge runs parallel to Length) Lover= 12•ir hfloori 6•ir hfloor2 := 8.1.f O := atan(pitch) hpeak 12•ft+ 5•in hmean (hfloor2 + hpeak)•0.5 DLroof 10 -psi DLwall:= 8•ps, R1 = 1 R2 = 1 LLroof = 25 ps' SLroof 25ps' Roof End Reactions: Dead Load: Total Load: hplate hfloor2 0 = 18.43 deg hpeak = 12.42 ft hmean = 10.26 ft B Rroof DL 2 + Boyer) •DLroof•rtspacing Rroof DL = 260 Ib B 1 SLroof)) Rroof LL �2 + Bover •max LLroof )) Rroof LL = 650 Ib ''spacing RECEIVED CITY OF TUKWIlA APR 0 3 ?007 PERMITCENTER DDS- -X21 P:\0 PROJECTS\14000\14200\14293 TS170 513143 McGINNIS & ASSOCIATES Consulting Engineers, Inc. 1110 Westmark Drive Saint Louis, Missouri 63131-1735 JOB: TS Ranch Garage #170-513143 NO. 14293 SHEET NO. 2 OF 15 CALC. BY CJD DATE 2/14/2007 4 Foot Opening Header Wall A Effective Length Factor: (Ref NDS Table 3.3.3) Le := k • Lu Le = 7.36 ft 1.84 Selected Member Properties Species Beam Design Data Member: # of Mem. 2x4 Beam Span (ft): 4 # of Memb: lx E 2 Unbraced Length (ft): 4 Adjustment Factors - NDS Table 2.3.1 CD CM Hem -Fir Ci CL CI Cr 1.15 1.00 6.13 1.00 See Below 1.00 1.00 Effective Length Factor: (Ref NDS Table 3.3.3) Le := k • Lu Le = 7.36 ft 1.84 Selected Member Properties Species Commercial Grade Member Size # of Mem. b d Area S, lx E (in) (in) (in2) (in3) (in4) (ksi) Hem -Fir No.2 2x4 2 1.5 3.5 10.50 6.13 10.72 1300 • Concentrated Load Data Number DL (kips) LL (kips) a dist. (ft) Description P1 0.00 0.00 0.00 0.06 P2 0.00 0.00 0.00 w2 P3 0.00 0.00 0.00 0.00 P4 0.00 0.00 0.00 0.00 P5 0.00 0.00 0.00 0.00 P6 0.00 0.00 0.00 Uniform Load Data Number DL (kip/ft) LL (kiptft) a dist. (ft) c dist. (ft) trib. wt. (ft) Description w1 0.03 0.06 0.00 0.00 2.50 Roof Load w2 0.00 0.00 0.00 0.00 0.00 1244 w3 0.00 0.00 0.00 0.00 0.00 w4 0.00 0.00 0.00 0.00 0.00 w5 0.00 0.00 0.00 0.00 0.00 w6 0.00 0.00 0.00 0.00 0.00 Calculated Adjustment Factor CL = 0.9969 Reactions Maximum Shear Stress (psi) DL (kips) LL (kips) TL (kips) Left End 0.06 0.13 0.19 Right End 0.06 0.13 0.19 r- riAr RL L rrArr P RR b c � [___o w 1111111111 P L rrAr P RL RR Shears, Moments, & Deflections Maximum Shear Stress (psi) 27 Allowable Shear Stress (psi) 173 OK Maximum Bending Stress (psi) 366 Allowable Bending Stress (psi) 974 OK Max. Dead Load Deflection (in) 0.013 3766 Max Live Load Deflection (in) 0.026 1858 Max Total Load Deflection (in) 0.039 1244 USE 2-2x4 P:\0 PROJECTS\14000\14200\14293_TS170_513143 McGINNIS & ASSOCIATES Consulting Engineers, Inc. 1110 Westmark Drive Saint Louis, Missouri 63131-1735 JOB: TS Ranch Garage #170-513143 NO. 14293 SHEET NO. 3 OF 15 CALC. BY CJD DATE 2/14/2007 3 Foot Opening Header - Wall B Effective Length Factor: k = 1.84 (Ref NDS Table 3.3.3) Le := k • Lu Le = 3.68 ft Selected Member Properties Species Beam Design Data Member: # of Mem. 2x6 Beam Span (ft): 3 # of Memb: Ix E 2 Unbraced Length (ft): 2 Adjustment Factors - NDS Table 2.3.1 CD CM Hem -Fir Ct CL C; Cr 1.15 1.00 15.13 1.00 See Below 1.00 1.00 Effective Length Factor: k = 1.84 (Ref NDS Table 3.3.3) Le := k • Lu Le = 3.68 ft Selected Member Properties Species Commercial Grade Member Size # of Mem. b d Area S. Ix E (in) (in) (in2) (in3) (in4) (ksi) Hem -Fir No.2 2x6 2 1.5 5.5 16.50 15.13 41.59 1300 Concentrated Load Data Number DL (kips) LL (kips) a dist. (ft) Description P1 0.00 0.00 0.00 0.33 P2 0.00 0.00 0.00 w2 P3 0.00 0.00 0.00 0.00 P4 0.00 0.00 0.00 0.00 P5 0.00 0.00 0.00 0.00 P6 0.00 0.00 0.00 Uniform Load Data Number DL (kip/ft) LL (kip/ft) a dist. (ft) c dist. (ft) trib. wt. (ft) Description w1 0.13 0.33 0.00 0.00 13.00 Roof Load w2 0.00 0.00 0.00 0.00 0.00 Max Live Load Deflection (in) w3 0.00 0.00 0.00 0.00 0.00 2301 w4 0.00 0.00 0.00 0.00 0.00 w5 0.00 0.00 0.00 0.00 0.00 w6 0.00 0.00 0.00 0.00 0.00 Calculated Adjustment Factor CL= 0.9976 Reactions MaAmum Shear Stress (psi) DL (kips) LL (kips) TL (kips) Left End 0.21 0.49 0.70 Right End 0.21 0.49 0.70 L L RL Trchr RR 77471, T RR Shears, Moments, & Deflections MaAmum Shear Stress (psi) 63 Allowable Shear Stress (psi) 173 OK Maximum Bending Stress (psi) 414 Allowable Bending Stress (psi) 975 OK Max Dead Load Deflection (in) 0.005 7675 Max Live Load Deflection (in) 0.011 3286 Max Total Load Deflection (in) 0.016 2301 USE 2 - 2x6 P:\0 PROJECTS\14000\14200\14293 TS170 513143 McGINNIS & ASSOCIATES Consulting Engineers, Inc. 1110 Westmark Drive Saint Louis, Missouri 63131-1735 JOB: TS Ranch Garage #170-513143 NO. 14293 SHEET NO. 4 OF 15 CALC. BY CJD DATE 2/14/2007 4 Foot Opening Headers - Wall B Effective Length Factor: k = 1.84 (Ref NDS Table 3.3.3) Le := k•Lu Le = 3.68 ft Selected Member Properties Species Beam Design Data Member: # of Mem. 2x6 Beam Span (ft): 4 # of Memb: kr E 2 Unbraced Length (ft): 2 Adjustment Factors - NDS Table 2.3.1 CD CM Hem -Fir Ct CL C•, Cr 1.15 1.00 15.13 1.00 See Below 1.00 1.00 Effective Length Factor: k = 1.84 (Ref NDS Table 3.3.3) Le := k•Lu Le = 3.68 ft Selected Member Properties Species Commercial Grade Member Size # of Mem. b d Area Sx kr E (in) (in) (in2) (in3) (in4) (ksi) Hem -Fir No.2 2x6 2 1.5 5.5 16.50 15.13 41.59 1300 Concentrated Load Data Number DL (kips) LL (kips) a dist. (ft) Description P1 0.00 0.00 0.00 0.33 P2 0.00 0.00 0.00 w2 P3 0.00 0.00 0.00 0.00 P4 0.00 0.00 0.00 0.00 P5 0.00 0.00 0.00 0.00 P6 0.00 0.00 0.00 Uniform Load Data Number DL (kip/ft) LL (kiplft) a dist. (ft) c dist. (ft) trib. wt. (ft) Description w1 0.13 0.33 0.00 0.00 13.00 Roof Load w2 0.00 0.00 0.00 0.00 0.00 Max Live Load Deflection (in) w3 0.00 0.00 0.00 0.00 0.00 971 w4 0.00 0.00 0.00 0.00 0.00 w5 0.00 0.00 0.00 0.00 0.00 w6 0.00 0.00 0.00 0.00 0.00 Calculated Adjustment Factor CL= 0.9976 Reactions Maximum Shear Stress (psi) DL (kips) LL (kips) TL (kips) Left End 0.28 0.65 0.93 Right End 0.28 0.65 0.93 raiP F„A., RL L L Ib `�1 1111111111 P L RL RR Shears, Moments, & Deflections Maximum Shear Stress (psi) 84 Allowable Shear Stress (psi) 173 OK Maximum Bending Stress (psi) 737 Allowable Bending Stress (psi) 975 OK Max Dead Load Deflection (in) 0.015 3238 Max Live Load Deflection (in) 0.035 1386 Max Total Load Deflection (in) 0.049 971 USE 2 - 2x6 P:\0 PROJECTS114000\14200\14293_TS170_513143 McGINNIS & ASSOCIATES Consulting Engineers, Inc. 1110 Westmark Drive Saint Louis, Missouri 63131-1735 JOB: TS Ranch Garage #170-513143 NO. 14293 SHEET NO. 5 OF 15 CALC. BY CJD DATE 2/14/2007 8 Foot Opening Header - Wall B Effective Length Factor: k = 1.84 (Ref NDS Table 3.3.3) Le := k • Lu Le = 3.68 ft Selected Member Properties Species Beam Design Data Member: # of Mem. 2x12 Beam Span (ft): 8 # of Memb: Ix 2 Unbraced Length (ft): 2 Adjustment Factors - NDS Table 2.3.1 CD CM (ksi) Ct CL C1 Cr 1.15 1.00 33.75 1.00 See Below 1.00 1.00 Effective Length Factor: k = 1.84 (Ref NDS Table 3.3.3) Le := k • Lu Le = 3.68 ft Selected Member Properties Species Commercial Grade Member Size # of Mem. b d Area SX Ix E (In) (in) (1n2) (in3) (in4) (ksi) Hem -Fir No.2 2x12 2 1.5 11.25 33.75 63.28 355.96 1300 Concentrated Load Data Number DL (kips) LL (kips) a dist. (ft) Description P1 0.00 0.00 0.00 0.33 P2 0.00 0.00 0.00 w2 P3 0.00 0.00 0.00 0.00 P4 0.00 0.00 0.00 0.00 P5 0.00 0.00 0.00 0.00 P6 0.00 0.00 0.00 Uniform Load Data Number DL (kip/ft) LL (kip/ft) a dist. (ft) c dist. (ft) trib. wt. (ft) Description w1 0.13 0.33 0.00 0.00 13.00 Roof Load w2 0.00 0.00 0.00 0.00 0.00 OK w3 0.00 0.00 0.00 0.00 0.00 w4 0.00 0.00 0.00 0.00 0.00 w5 0.00 0.00 0.00 0.00 0.00 w6 0.00 0.00 0.00 0.00 0.00 Calculated Adjustment Factor CL= 0.9948 Reactions DL (kips) LL (kips) TL (kips) Left End 0.60 1.30 1.90 Right End 0.60 1.30 1.90 ri L RL 1---t-b 1111111111 yrkrr L RL Shears, Moments, & Deflections Maximum Shear Stress (psi) 84 Allowable Shear Stress (psi) 173 OK Maximum Bending Stress (psi) 719 Allowable Bending Stress (psi) 972 OK Max Dead Load Deflection (in) 0.030 3241 Max Live Load Deflection (in) 0.065 1483 Max Total Load Deflection (in) 0.094 1017 USE 2 - 2x12 P:10 PROJECTS114000\14200\14293 TS170 513143 Iw:=1.1 McGINNIS & ASSOCIATES Consulting Engineers, Inc. 1110 Westmark Drive Saint Louis, Missouri 63131-1735 JOB: TS Ranch Garage #170-513143 NO. 14293 SHEET NO. 6 OF 15 CALC. BY CJD DATE 2/14/2007 IBC Lateral Loads Determine Wind Loads: Basic Wind Speed (3 second gust): Wind Load Importance Factor: Exposure Category: Vwind = 85•mpt- Exposure := "C" Project Location: Tukwila, WA Building Code: IBC 2003 Height and Exposure Coefficient: X = 1.21 Basic Wind Pressures: nb. intermediate roof angles are interpolated Main Windforce Resisting System Loads: p (IBC Table 1609.2.1(1)) Horizontal Loads (psf) Horizontal Loads (psf) Vertical Loads (psf) Wall Interior Zone: Wall Roof Interior Zone: Windward Roof Leeward Roof Transverse 10.3 -2.4 Transverse -9.6 10.0 -7.2 Longitudinal 7.6 -3.5 Longitudinal -9.6 -6.1 Calculated Wind Pressures: (10psf minimum wall load, Opsf minimum roof lateral load). Calculated Wind Loads Horizontal Loads (psf) Vertical Loads (psf) Interior Zone: Wall Roof Interior Zone: Windward Roof Leeward Roof Transverse 12.4 10.0 Transverse -11.6 -8.7 Longitudinal 10.0 10.0 Longitudinal -11.6 -7.4 Wind Loads Transverse Direction: Trib_arearoof t hpeak — hfloor2 Trib_areawall t hplate 2 Transverse wind forces: Force at roof: B = 24 ft L = 40 ft Trib_arearoof t = 4.32 ft Trib_areawall t = 4.05 ft hpeak = 12.42 ft Fwind t Pwhtr•L•Trib_arearoof t + Pwhtw•L•Trib_areawall t Fwind t = 3743.12 Ib Distributed forces at roof: Fdwind t Pwhtr.Trib_arearoof t + Pwhtw•Trib_areawall t Wind Loads Longitudinal Direction: B = 24 ft hplate Trib_areawall_I (hmean — hfloor2) + 2 Longitudinal wind forces: Force at roof: Fwind I Pwhlw.B•Trib_areawall I L = 40 ft Fdwind t = 93.58 pif hmean = 10.26 ft Trib_areawall_I = 6.21 ft Fwind I = 1490 Ib Distributed forces at roof: Fdwind I Pwhlw•Trib_areawall I Fdwind I = 62.08 plf P:\0 PROJECTS\14000\14200\14293 TS170 513143 McGINNIS & ASSOCIATES Consulting Engineers, Inc. 1110 Westmark Drive Saint Louis, Missouri 63131-1735 JOB: TS Ranch Garage #170-513143 NO. 14293 SHEET NO. 7 OF 15 CALC. BY CJD DATE 2/14/2007 SEISMIC LOADS: Seismic Use Group: Max Considered Earthquake Coefficients: Seismic Site Class: Seismic Importance Factor: Site Coefficients: {tables 1615.1.2(1-2)} Adjusted Max considered Earthquake: Design Spectral Response Acceleration: Seismic Design Category: Structural System: Response Modification Factor: Fundamental Period: Use_Group := Ss := 1.360 Site Class := "D" IE := 1.0 Fa = 1 Sms = 1.36 Sds = 0.91 SDC="D" S1 := 0.469 Fv = 1.53 S m 1 = 0.72 Sd1 = 0.48 Basic_Structural_System := "Bearing Wall System" Seismic_Resisting_System := "Light Framed Walls w/ Wood Shear Panels" R := 6.5 {table 1617.6} T := .020 hpeak)75 ) ft Seismic Response Coefficient: Cs := max Determine structural dead load: Ws Floor and Roof Dead Loads: Area of Roof & Floor: Total Roof Dead Load: Exterior Wall Dead Loads Length of wall: Wall Dead Load: Total Structural Dead Load: •sec T = 0.13 s Sds R Rl T IE IE) sec Area := (L + 2 •Lover)•(B + 2 •Bover) Wroof Area•DLroof JSLroof Wroof shear:= i > 30, Area • psf Wall load tributary to roof: Lwall:=L+B+L+B Sd1 Cs = 0.14 Area = 1092 ft2 Wroof = 10.92 kip SLroofi McGINNIS & ASSOCIATES Consulting Engineers, Inc. 1110 Westmark Drive Saint Louis, Missouri 63131-1735 JOB: TS Ranch Garage #170-513143 NO. 14293 SHEET NO. 8 OF 15 CALC. BY CJD DATE 2/14/2007 Determine Total Base Shear Forces: Compare Seismic Forces at Roof: Wind & Seismic Forces: Use Maximum Forces: Roof Diaphragm Design: Controlling Lateral Load: Strut Reaction, R: Uniform Shear in Strut, v: Chord Forces (T = C): FEQ Cs•Ws shear FdEQ_t := FEQ _ L FdEQI := FEQ _ B FEQ = 2.3 kip FdEQ t = 56.4 plf FdEQ I = 93.99 plf Froof_t max(FEQ, Fwind_t) Fdroof_t max(FdEQ_t, Fdwind t) Fwind t = 3.7 kip Fdwind t = 93.58 plf Wind Govems TransverseLoad. Fwind I = 1.5 kip Fdwind l = 62.08 plf Froof I max(FEQ, Fwind_I) Fdroof I max�FdEQ_I Fdwind_I) Seismic Govems Longitudinal Load. Transverse' Load Govems Diaphragm Design. L Rroof Fdroof t*—2 Rroof vd :_ B Tchord 8 •B Fdroof_t* L2 Diaphragm and Fasteners Design Strength: Roof deck is 1/2" wood floor sheathing with 8d common nails @6" o.c. at edges. Use 8d common nails @12" o.c. for interior nailing. Rroof = 1872 Ib Tchord = 780 Ib vallow := 197-plf Since vanow = 197 Ib/ft >= vd 78 Ib/ft OK Consider Diaphragm Chord/Drag: Area of Chord: Allowable Tension in Chord: Load duration factor: chord := "Double 2x4 Hem Fir Top Plate" Achord 5.25.in2 Ft:= 400•psi CD := 1.6 Pa FtAchord •CD Fastener type: R R L L T Roof Diaphragm C v TTTTTTTT w B fastener := "16d nails" Allowable shear per fastener: vfastener 89•Ib Number of Nails Required: Pa = 3360 Ib Nfasteners Use Double 2x4 Hem Fir Top Plate with 6 - 16d nails each side of splice minimum. B Consider Drag Strut: dragspacing dragspacing = 13.7 in Rroof _ vfastener Tchord vfastener*CD P:\0 PROJECTS\14000\14200\14293_TS170_513143 McGINNIS & ASSOCIATES Consulting Engineers, Inc. 1110 Westmark Drive Saint Louis, Missouri 63131-1735 JOB: TS Ranch Garage #170-513143 NO. 14293 SHEET NO. 9 OF 15 CALC. BY CJD DATE 2/14/2007 Consider 2x Wood Studs - Member := "2x4" No of Members: n := 1 Selected Member Properties Species Commercial Grade Member Size # of Mem. b d Area S. ix E (in) (in) (in2) (in3) (in4) (ksi) Hem -Fir Stud 2x4 1 1.5 3.5 525 3.06 5.36 1200 Plate Height ht := hplate – 4.5•ir Compression Parallel to Grain Non -Adjusted Design Value: Grading Adjustment Factor: Coefficient Used for Column Stability Factor: Maximum Bending Unbraced Length: Lu := 12•in Unbraced Length Factor: Fc = 800 psi KcE := 0.3 k := 1.0 Unbraced Length: kl := k.ht (See NDS Section 3.7.1) (See NDS Section 3.7.1) kl = 7.72 ft Effective Length Factor: k := 1.84 Le := k • Lu Le = 1.84 ft (Ref NDS Table 3.3.3) Determine the allowable axial compressive stress per NDS Section 3.6 Adjustment Factors - NDS Table 2.3.1 CM Ct Cp C1 Cr CT 1.00 1.00 1.00 1.00 1.15 1.00 Modified Modulus of Elasticity: Stress used for column stability factor: E':= E•CM•Ct•Ci•CT KcE•E' FcE Column stability factor: Cp Allowable axial compression design stress w/ no lateral load: Maximum Allowable Axial Load w/ no lateral load: Allowable axial compression design stress with lateral load: (ddressed (id)) FcE) 1+ 1 11[ Fc i kl 12 CD := 1.15 CD := 1.E 2•c FcE 2 + —� Fc 2 •c FcE Fc c Fac No_LL:= Fc•CD•CM•Ct•CF•Ci•Cp Pallow No LL:= A(id)•F'c No LL F'c w LL:= Fc•CD•CM•Ct•CF•Ci•Cp E' = 1200000 psi FcE = 513.19 psi Cp = 0.53 F'c_No_LL = 483 psi Pallow No LL = 2537 Ib Fc_w LL = 672 psi 1 P:\0_PROJECTS\14000\14200\14293_TS170_513143 McGINNIS & ASSOCIATES Consulting Engineers, Inc. 1110 Westmark Drive Saint Louis, Missouri 63131-1735 JOB: TS Ranch Garage #170-513143 NO. 14293 SHEET NO. 10 OF 15 CALC. BY CJD DATE 2/14/2007 Determine the allowable bending stress per NDS Section 3.3 Determine the slendemessR if L> 0 ft i-e•ddressed(id) 11 ratio: B •= u 2 ' bdressed (id)) Coefficient used for beam stability factor: Tabulated bending design value from Table 4A: Tabulated bending design value multiplied by applicable adjustment factors: KbE := 0.439 Stress value used for beam stability factor: Fb material = 675 psi Fbstar := Fb material•CM•Ct•Ci•CD•Cr Beam stability factor: CL := if Allowable bending stress: Lateral pressure: Maximum moment due to lateral pressure: Maximum bending stress: Lu > 0 -ft, 1 1+ (Fbstar) 1.9 FbE RB = 5.86 KbE • E' FbE = 15.34 ksi FbE := 2 RB FbE 1+ Fbstar) 1.9 Fb allow:= Fb material•CM'Ct'C1 CD•CL'Cr Tributary width of member: Pwhtw = 12.45 ps Mmax Pwhtw'twidth•ht2.0.125 Mmax fb := Sx(id) Find the maximum compressive stress to satisfy the bending and axial compression interaction equation. Solving for the compressive stress results in: Maximum allowable axial load w/ lateral load: fc = 272 psi fb = 485 psi f 12 c F'c) Pallow w LL A(id)•fc Controlling allowable axial Toad: Pallow = 1430 lb Required axial load capacity: Prequired Stud deflection @ midheight: Alateral FbE Fbstar ,1.0 0.95 Fb allow'= 1237 psi twidth = 16 -in Mmax = 124 lb -ft fb fc Fb_allow 1 — FcE) 1 =1 < 1.0 (NDS equation 3.9-3) Pallow w LL = 1430 Ib Arial load w/ lateral load governs Rroof DL + .5Rroof LL rtspacing - twidth 5 • Pwhtw•twidth • ht4 384.E•Ix(id) Prequired = 390 'Ib Alateral = 0.21 in ht Alateral —448 P:\0 PROJECTS\14000\14200\14293 TS170 513143 McGINNIS & ASSOCIATES Consulting Engineers, Inc. 1110 Westmark Drive Saint Louis, Missouri 63131-1735 JOB: TS Ranch Garage #170-513143 NO. 14293 SHEET NO. 11 OF 15 CALC. BY CJD DATE 2/14/2007 Shear Wall Design: Consider Wall A: Percentage of lateral force taken by wall A: Total Wall Length: 1wall 16•f Length of Considered Shear Wall: Shear Stress: Froof t = 3743.12 Ib Percent := 50% lshearwall 16•f Froof t•Percent vv1 Ishearwall vvl = 116.97 plf Wind Govems Transverse Load. Fastener type (penny weight): nail_size := 8 Sheathing grade: sheathing := "Wood Structural Panel" Fastener spacing at edge: edge_spacing := 6•in Sheathing thickness: thickness := 32 •in Hem -Fir Studs Used? HF_reduction := "yes" {18% reduction if hem -fir studs are used} Sheathing Applied Directly? direct applied := "yes" Adjustment for perforated shearwall: max_height_opening := 0.11 perforated_multiplier = 1.00 {Per IBC Table 2305.3.7.2} For 0.469 in. Wood Structural Panel applied directly to framing w/ 8d nails @ 6 in. edge spacing. Check Uplift: Overturning Moment: Roof Tributary Area: vallow = 230 p11 Since vi1 = 117 Ib/ft <= va1bw = 230 Ib/ft OK Mot Froof t•Percent hplate At := 2.5•f Mot = 15.16 kip•ft 2 2 21 2 'wall !wall 31w8all Iw2all Resisting Moment: Mres :=(,DLroof• 2+Fwvtl• +Pwvtw. ).At + hmean Mres = 10.22 kip•ft Since MBs 10.2 k -ft < Ma = 15.2 k -ft Uplift. Check tension. Tension Required: Mot — Mres tension .— !wan — 6•in tension = 318.55 Ib Since Tension 318.5 Ib <= 500.0 Ib Sill Plate will Suffice. P:10 PROJECTS\14000\14200\14293 TS170 513143 McGINNIS & ASSOCIATES Consulting Engineers, Inc. 1110 Westmark Drive Saint Louis, Missouri 63131-1735 JOB: TS Ranch Garage #170-513143 NO. 14293 SHEET NO. 12 OF 15 CALC. BY CJD DATE 2/14/2007 Shear Wall Design: Consider Wall C: Percentage of lateral force taken by wall C: Total Wall Length: 'wall 24.11 Length of Considered Shear Wall: Shear Stress: Froof t = 3743.12 Ib Percent := 50% Ishearwall 24t Froof t•Percent vv1:= 'shearwall Fastener type (penny weight): Fastener spacing at edge: edge_spacing := 6 -in Sheathing thickness: Hem -Fir Studs Used? HF_reduction := "yes" {18% reduction if hem -fir studs are used} Sheathing Applied Directly? nail_size := 8 vv1 = 77.98 plf Wind Govems Transverse Load. Sheathing grade: sheathing := "Wood Structural Panel" 15 thickness := 3— 2 •in direct_applied := "yes" Adjustment for perforated shearwall: max_height_opening := 0 fi perforated_multiplier = 1.00 {Per IBC Table 2305.3.7.2} For 0.469 in. Wood Structural Panel applied directly to framing w/ 8d nails @ 6 in. edge spacing. Check Uplift: Overturning Moment: Roof Tributary Area: Resisting Moment: vallow'= 230p11 Since v„ = 78 Ib/ft Vaiiow = 230 Ib/ft OK Mot Froof_ t• Percent•hplate At := 2.5•f Mot = 15.16 kip •ft 2 2 2) 2 'wall 'wall 3Iwa11 Mres := DLroof 2 + Pwvtl 8 + Pwvtw (wall 8 ) At + DLwaII2 hmean Mres = 23 kip •ft Since Mres 23.0 k -ft >= Mot = 15.2 k -ft OK P:\0 PROJECTS\14000\14200\14293_TS170_513143 McGINNIS & ASSOCIATES Consulting Engineers, Inc. 1110 Westmark Drive Saint Louis, Missouri 63131-1735 JOB: TS Ranch Garage #170-513143 NO. 14293 SHEET NO. 13 OF 15 CALC. BY CJD DATE 2/14/2007 Shear Wall Design: Consider Wall B: Percentage of lateral force taken by wall B: Total Wall Length: 'wall 4•f Length of Considered Shear Wall: Shear Stress: vv1 Froof I = 2255.82 Ib Percent := 10% Ishearwall 4 •fi Froof 1•Percent Ishearwall vv1 = 56.4 pif Fastener type (penny weight): nail_size := 8 Fastener spacing at edge: edge_spacing := 6•in Hem -Fir Studs Used? HF_reduction := "yes" Sheathing Applied Directly? direct_applied := "yes" Adjustment for perforated shearwall: Seismic Govems Longitudinal Load. {Note: 5 - 4' panels each resist 10% of lateral force = 50% total) Sheathing grade: Sheathing thickness: sheathing := "Wood Structural Panel" 15 thickness := 3— 2 -in {18% reduction if hem -fir studs are used} max_height_opening := 0 •fi perforated_multiplier = 1.00 {Per IBC Table 2305.3.7.2} For 0.469 in. Wood Structural Panel applied directly to framing w/ 8d nails @ 6 in. edge spacing. Check Uplift: Overturning Moment: Roof Tributary Area: Resisting Moment: vallow = 230 p11 Since v„1 = 56 Ib/ft <= vallow = 230 Ib/ft OK Mot Froof I •Percent "hplate At := 13f Mot = 1.83 kip•ft lwall2 'wall2 3lwall2" 'wall Mres: DLroof 2 + Pwvll 8 + PwvIw• 8 ) At + DLwall' 2 .hplate 2 Mres = 0.46kip•ft Since Mres 0.5 k -ft < Mot = 1.8 k -ft Uplift. Check tension. Tension Required: tension :- Mot - Mres 'wall - 6•In tension = 390.51 Ib Since Tension 390.5 Ib <= 500.0 Ib Sill Plate will Suffice. P:\O PROJECTS\14000114200114293 TS170 513143 McGINNIS & ASSOCIATES Consulting Engineers, Inc. 1110 Westmark Drive Saint Louis, Missouri 63131-1735 JOB: TS Ranch Garage #170-513143 NO. 14293 SHEET NO. 14 OF 15 CALC. BY CJD DATE 2/14/2007 Shear Wall Design: Consider Wall D: Percentage of lateral force taken by wall D: Total Wall Length: !wall = 4041 Length of Considered Shear Wall: Shear Stress: Froof 1 = 2255.82 Ib Percent := 50% lshearwall:= 4041 Froof 1 -Percent vv1vv1 = 28.2 plf lshearwall nail size := 8 Sheathing grade: edge_spacing := 6 -in Sheathing thickness: HF_reduction := "yes" {18% reduction if hem -fir studs are used} direct_applied := "yes" Fastener type (penny weight): Fastener spacing at edge: Hem -Fir Studs Used? Sheathing Applied Directly? Seismic Govems'LongitudinalLoad. {Note: Shearwall length is lower for perforated walls.} sheathing := "Wood Structural Panel" 15 thickness := 3— 2 -in Adjustment for perforated shearwall: max_height_opening := 041 perforated_multiplier = 1.00 {Per IBC Table 2305.3.7.2} For 0.469 in. Wood Structural Panel applied directly to framing w/ 8d nails @ 6 in. edge spacing. Check Uplift: Overturning Moment: Roof Tributary Area: Resisting Moment: wallow = 230;p11 'Since v 28 Ib/ft <= ''van°, = 230 Ib/ft OK Mot Froof I•Percent•hplate At := 13f Mot = 9.14 kip •ft !wall !wal2 l 31wa112) lwall2 Mres : DLroof 2 + Pwvll' 8 + Pwvlw` 8 ) At + DLwall' 2 •hplate Mres = 46.04 kip -ft Since Mres 46.0 k -ft >= Mot = 9.1 k -ft OK P:\O_PROJECTS\14000\14200\14293_TS170_513143 McGINNIS & ASSOCIATES Consulting Engineers, Inc. 1110 Westmark Drive Saint Louis, Missouri 63131-1735 JOB: TS Ranch Garage #170-513143 NO. 14293 SHEET NO. 15 OF 15 CALC. BY CJD DATE 2/14/2007 Overall Overturning: Driving Forces: Overturning Moments: Uplifting Moment: Combined Driving Moment: Resisting Moment: {1621.1} 2 hpeak Mot1 Pwhtr'L2 Mot2:= FEQ'hplate B2 B2 Muplift Pwvtw'L'3 8 — Pwvtl L 8 Mdriving max(Mot1 + Muplift, Mott) Bl 2 Mres (Ws_ot • 2 )' Mott = 30.83 kip •ft Mot2 = 18.27 kip•ft Muplift = 125.36 kip •ft Mdriving = 156.2 kip •ft Mres = 171.4 kip•ft Since Mres 171.4 >= Mdriving 156.2 OK Foundation Design: Consider Continuous Wall Footings: Maximum allowable bearing pressure: Roof Tributary Width: Wall Height: Fb = 1000 • ps' twroof 2 + Bover hplate = 8.1 ft Maximum axial Toad per foot of wall: Pmax TLroof'Wroof + DLwall'hplate Minimum footing width required: Pmax bfooting Fb Required Frost Depth: dfooting 12•in bfooting = 6.2 in Pmax = 519.8 plf Use 8" wide x 12" deep footing minimum. P:\0 PROJECTS\14000\14200\14293 TS170 513143 MBR LEN FORCE MBR 1- 2 6.26 -2891 5- 6 2- 3 5.59 -1899 6- 7 3- 4 5.59 -1899 7- 8 4- 5 6.26 -2891 8- 1 10- 5 .88 11 LEN FORCE 6.26 2756 5.59 2756 5.59 2756 6.26 2756 JT REACT ACT BRG REQ BRG CANT 1P 1255.H 3.50" 2.07" 1 -375.0 5R 1255. 3.50" 2.07" 5 -375.0 11631 6-4414 -14 MBR FORCE 2- 8 262 2- 7 -1035 131BR7 f0RRCCE9 JT 3X PLATE 14- 6 -1 262 5 2 X 36 4 3X 4 3-15 2-5-9 4-3-15 3x8- 9 1 12 4� 0-0 5x6- 3 x - HORZ VERT AMO JT PLATE HORZ 4-14 2-1 0 5 3X 8 4-14 1-12 33-2 18 76 3X 8 1-12 3-2 18 S 3X 6 8 2X 4 VERT ANO 2-1 3-8 0 3-8 90 2 11;-$R 3-15 32/ 3x4\ 1111r.10111111 _1:58-10 8 7 6 2x4/ 3x8- 2x4/ 3x6 RECEIVED CITY OFTUKWILA APR 03 ?flfl7 PERMITCEMTER 0-0 55 22 0-0 5 2 0-0 12 0-0 17-7-2 "14 121 24400 0-0 DESIGN CRITERIA - ANSI/TPI 1-2002 SPACING 24.0 IN 0/C REP BEND PLATE : EAGLE METAL PRODUCTS -75 PLATE DUR INC=1.15 10LB LL CHECK ON BOTTOM CHORD WIND LOAD: ASCE7-02 90MPH EXP_C 15' TA DESIGN LOADINGS LOM CASE 1 TOP LL TOP DL BOT LL BOT OL INC 30.0 10.0 .0 10.0 1.15 LOM CASE 2 10LB LL CHECK ON BC's TOP LL TOP DL BOT LL'BOT DL INC .0 10.0 10.0 10.0 1.15 LOAD CASE 3 WIND LOAD: ASCE7-02 90MPH EXP TOP LL TOP DL BOT LL BOT DL TNC 30.0 6.0 .0 6.0 1.33 SECTION DIR LIVE D 1- 3 Norm -25.3 0 3- 5 Norm -25.3 0 9- 1 Norm -40.2 61.0 10- 5 Norm -25.3 1640 LOM CASE 4 WIND LOAD: ASCE7-02 90MPH-VCP TOP LL TOP DL BOT LL BOT -0 30.0 6.0 .0 6: 1. SECTION DIR LIVE READ 1- 3 Norm -25.3 16.0 3- 5 Norm -25.3 6.0 9- 1 Norm -25.3 6.0 10- 5 Norm -40.2 6.0 LUMBER SOLUTION TOP 2X4 HF -#2 TOP PANEL 1- 2 CSI= . 6 BOT 2X4 HF -#2 BOT PANEL 7- 8 CSI= WEB 2X4 HF -Stud DEFLECTION TOTAL LOAD DEF G PANEL = .362" L/DEF=794 L= 288.0 REC CMBR= .30" TOTAL LOAD HOR DEF =; 15" MAX DEF:LL= .207" DLO .162" TL= .362" :n BRACING S NOTE:Brace botto cfrd with properly applied gypsulh'bb r or equal, unless otherwise noted. TIFF SLED, PC. 1777 S. HARRISON ST. #800 DENVER, CO 80210 Phone: 303-753-8833 Fax: 303-753-2185 A copy of this design shall be furnished to the erection contractor. This design is for an individtud building component (a thus). It is based on specifications provided by the component mwracatrer and performed In accordance with the current versions of TPI and NDS design standards. No responsibility is assumed for the accuracy of information provided by the thus designer. Dimensions shall be verified by the manufacturer ad/or building designer prior to fabrication. The buildsngdesigner shall review loading and truss configuration to ensure that this design meets or exceeds minimum loading required by applicable local balding codes. Compression chords shall be laterally braced by the roof or floor sheathing directly anached. unless otherwise noted. Bottom chord bracing shall be as noted. Bracing shown is for lateral support of individual tress components only to reducebuckling length. It is not wind or lateral load bracing or overall building design bracing which is by others. Refer to HIB -91 (TPI) for reconmended truss handling and erection Do not apply Toads beyond weight of erectors until all pemsnent brscirg is in place. Concentration of con- struction arstructi n loads greater than the design loads shall not be applied to the trusses x wry time. Trusses shall be handled with case prior to erection to avoid danage. laanber moisture content shall be 19% or less at the time of fabrication, unless noted otherwise(U.N.0.). Connector plates shall be marsefacnued by Eagle Metal Products (ICBG #4420) from 20, 18 or 16 gat ASTM A653 SQ grade 40 steel. with 060 (min.) coating. Plates shall be applied on both faces of thus at each joint. Plate dimensions are listed width x length Slots (holes) in plate shall run parallel to the plate length. Slots inplate shall be oriented as shown on the draw- ing. The plate shall be centered on pint U.N.O. Design assumes drat adeauae drainage will be provided to prevent ponding, and adequate anchorage will be provided resist uplift at supports. The seal on this drawing indicates ace of professional engineering respa"ibility solely for the thus component i n shown. The suitability and d use of this component for wry particular building design is the responsibility of the building designer, per ANSUi'P1 1-1995 Section 2. Job ID:513146\T01 DATE: 2/13/07 SPAN: 24- 0- 0 Oty 12 SHEET 1 of 1 KEYMARK ENGINEERING BOULDER -COLORADO -80301 KEYsmart 3.202 SCALE= 1/4":1' JOB:513146\T01 DATE 2/13/07 TIME 8:45 PAGE 1 JOB: 513146\T01 SPAN: 24-00-00 PITCH: 4.00 TRUSS OTT: 12 LEFT OH: 0-10-08 RIGHT OH: 0-10-08 11-1R _ A-4-14— 12-0-0 10-8 6-4-14 3-15 12 -n -n 5-7-2 HEEL TO PEAK : 12-9-1 3x8- 1 Z-5-9 12 324/ 17-7-7 12-0-0 5-7-2 -}� 6-4-14 ____111-11R4-3-15 2-5-9 3-15 I 5x6- 3 3x4\ 4 RT TC W/0 OVERHANG : 12-7-13 12 3x8- 5 ( -8 8 7 6 (3- ) 1255# 2x41 3x6 3x8- 2x41 1255# 0-0 0-0 0-0 0-0 LOADS: TOP LIVE DEAD 30.0 10.0 SPACING 24.0 6-4-14 6-4-14 BOTTOM LIVE DEAD .0 10.0 INCREASE 1.15 5-7-2 5-7-2 6-4-14 12-0-0 24-0-0 17-7-2 24-0-0 BDFT:T/C 224.0 B/C 192.0 WEB 160.0 DEF: LL= .207" DL= .162" TL= .362" 20 GAUGE PLATES: 48 2X4 48 3X4 24 3X6 24 5X6 72 3X8 CHD1-3 TS Si OVERALL 13-08-01 13-06-14 18.4// 13-06-14 // 18.4 24 2X4 HF -#2 B/C 13-08-00 CHD7-1 BU S1 UPSET: 0-00-04 9-02-04 .01 W/0 Upset 9-02-1.3 71.6 10-00-00 12 2X4 HF -#2 B/C 10-00-00 CHD5-7 BU Si UPSET: 0-00-04 13-02-04 .0( W/O Upset 13-02-13171.6 14.00-00 12 2X4 HF -#2 B/C 14-00-00 WEB2-8 S1 OVERALL 1-11-04 1-10-15 18.41 1-10.06 1 .0 24 2X4 HF -Stud B/C 1-10-15 WEB3-7 S1 OVERALL 3-08-13 .0( 3-08-12 ) 118.4 / 18.4 12 2X4 HF -Stud B/C 3-08-12 WEB2-7 S1 OVERALL 5-07-10 51.7// 19.81 5-07-10 1 19.8 / 70.2 24 2X4 HF -Stud B/C 5-07-10 JOB:513146\TO1 DATE 2/13/07 TIME 8:45 PAGE 2 J . iiiiiir JOINT:4 3x4 Angle:18degs 1-12 N JOINT:2 1--1 1-12 3x4 Angle:l8degs r 4-14 ..4II JOINT:1 3x8 Angle:Odegs JOINT:3 5x6 Angle:Odegs 4-14 � I 1 1 I 1 1 1U1 I 1 1 �sIell III ro T 1 1 I INI --- - - —- 1 1 m 1 1 m JOINT:5 3x8 Angle:Odegs JOINT:7 3x8 Angle:Odegs JOINT:8 2x4 Ang1e:90degs JOINT:6 2x4 Angle:90degs 1 :8-81 it2-8-8 3-15 4-3-15 5x5 12 3x5 „; . 3x5 4V 3x5 3x5 3x5 3x5 3x5 iTlIIIlII 1 .�.�.•.�.❖.❖...•.....❖...❖.....•...•...❖.❖.❖.❖.•...❖.❖.•...❖...❖.......•...❖.•...❖...•...•.......❖...❖.•...•...❖.•...❖.❖.•...❖.❖.• 4x6 0i0 3x5 3x5 3x5 3x5 4x6 0-0 3x5 3x5 3x5 3x5 3x5 0-0 18:8:8 R-8-8 LUMBER SOLUTION TOP 2X4 HF -Stud BOT 2X4 HF -Stud BLK 2X4 HF -Stud BLK SPACING 24.0 IN 0/C GABLE PLATES PLATE : EAGLE METAL PRODUCTS -95 Heel/Splice 4-0x6-0 Blocks 3-0x5-0 Pitch Break 5-0x5-0 Note: This design assumes that the bottom chord is supported vertically continuously along its length and that both the top and bottom chords are supported laterally. All members shown on this drawing are prescribed by the user and must be manually reviewed to ensure their ability to resist all applied loads. Vertical blocks may require lateral support(s) to resist applied wind loading. TIFF SHA INC. 1777 S. HARRISON ST. #800 DENVER, CO 80210 Phone: 303-753-8833 Fax: 303-753-2185 A copy of this design shall be furnished to the erection contractor. This design is for an individual building component (a truss). It is based on specifications provided by the component manufacturer and performed in accordance with the current versions of TPI and NDS design stadards. No responsibility is assured for the accuracy of information provided br the truss designer. Dimensions shall be verified by the manufacturer and/or building designer prior to fabrication. The buildift designer shall review loading and truss configuration to ensure that this design meets or exceeds minimum tiding required by applicable local building codes. Compression chords shall be laterally braced by the roof or floor sheathing,directly attached, unless otherwise noted. Bottom chord bracing shall e as noted. Bractntaagg shown is for lateral support of individual thus components only to reducebuckling length. It is not wind or lateral load bracing or overall building des# bracing which is by oder. Refer o HIB -91 (TPI) for mrotruss handling and erection. Do not apply loads beyond weight of erectors until all permanent bracing is in place. Concentration of con- struction bads greater than the design loads shall not be applied to the muses it any time. Trusses shall be handled with can: prior to erection to avoid damage. Lumber moisture covert shall be 19% or less at the time of fabrication, unless noted etherwise(U.N.O.). Connector plates shall be manufactured Eagle Metal Products (ICBG #4421» from 20, 18or 16 gee ASTM A653 SQ grade 40 steel. with G60 (min.) coating. Plates shalt beap plied on bah facers or truss at each joint. Plate dimensions are listed width a lengdn. Slots (holes) in plate shall run parallel to the plate length. Slots in late shall be oriented as shown an the draw- ing. The plate shall be centered on joint U.N.O. Design assumes that drainage will be provided to prevent ponding, and adequate anchorage wil be provided resist uplift at supports. The seal on this drawing indicates acceptance of pmfessioiel engineers miss responsibility solely for the ss component design shown. The suitability and use of this component for any particular building design is the responsibility of the building designer, per ANSI/f IP 1-1995 Section 2. Jab ID:513146\L01 DATE: 2/13/07 SPAN: 24- 0- 0 Qty 2 SHEET 1 of 1 KEYMARK ENGINEERING 2905 Wilderness Place,STE 202 Boulder,Colorado 80301 KEYsmart 3.202 SCALE= 1/410:1' JOB:513146\LO1 DATE 2/13/07 TIME 8:45 PAGE 1 JOB: 513146\L01 SPAN: 24-00-00 PITCH: 4.00 TRUSS QTY: 2 LEFT OH: 0-10-08 RIGHT OH: 0-10-08 11-1. 1 -. _ 10 t� 12-0-0 12-0-0 101 3-15 4-3-15 3-15 HEEL TO PEAK : 12-9-1 5x5 RT TC W/0 OVERHANG : 12-7-13 3x5 3x5 0-0 3x5 3x5 4x6 0-0 10-0-0 10-0-0 LOADS: TOP BOTTOM LIVE DEAD LIVE DEAD 30.0 10.0 .0 10.0 SPACING 24.0 INCREASE 1.15 3x5 3x5 3x5 3x5 14-0-0 24-0-0 24-0-0 3x5 0-0 BDFT:T/C 37.3 B/C 32.0 WEB 33.3 DEF: LL= .207" DL= .162" TL= .362" 20 GAUGE PLATES: 68 3X5 4 5X5 12 4X6 CHD1-2 TS Si OVERALL 13-08-01 13-06-14 18.4// 13-06-14 // 18.4 4 2X4 HF -Stud B/C 13-08-00 CHD4-1 8U S1 UPSET: 0-00-04 9-02-04 .01 W/O Upset 9-02-1; 71.6 10-00-00 2 2X4 HF -Stud B/C 10-00-00 CHD3-4 BU S1 UPSET: 0-00-04 13-02-04 .01 W/O Upset 13-02-1\\ 71.6 14-00-00 2 2X4 HF -Stud B/C 14-00-00 GBLK E S1 OVERALL 1-01-13 3-01-05 18.4\ 3-00-12 .0 B/C 3-01-05 4 2X4 HF -Stud GBLK E S1 OVERALL 1-01-13 4/ 2-05-05 4/ 1-09-05 4/ 1-01-05 REFER TO PREVIOUS GABLE BLOCK TICKET GBLK A S1 OVERALL 3-08-13 .01 3-08-12 \ 18.4 / 18.4 2 2X4 HF -Stud B/C 3-08-12 JOB:513146\LO1 DATE 2/13/07 TIME 8:45 PAGE 2 N I F--1 3-0 bilV. 3-0 N 6 �+1 I ' I I I 6 JOINT:4 4x6 Angle:Odegs JOINT:3 4x6 Angle:Odegs JOINT:1 4x6 Angle:Odegs JOINT:2 5x5 Angle:90degs JOB:513146\T01 SPAN: 24- 0- 0 4.00/12 TRUSS TYPE 0100 KEYsmart II Version:3.202 DATE: 2/13/2007 - ANSI/TPI GRIPPING REPORT - CRITICAL TOP CHORD PANEL 1- 2 T/C AXIAL STRESS INDEX .21 T/C BENDING STRESS INDEX .63 COMBINED STRESS INDEX .85 CRITICAL BOTTOM CHORD PANEL 7- 8 B/C AXIAL STRESS INDEX .61 B/C BENDING STRESS INDEX .18 COMBINED STRESS INDEX .79 JT# MBR FORCE AREA #TEETH MBR FORCE AREA #TEETH MBR FORCE AREA #TEETH 1 1- 3 771 2.43 19 1- 5 -663 2.04 16 2 1- 3 293 1.29 10 2- 8 88 .95 7 2- 7 347 .91 7 3 3- 5 531 1.26 10 3- 1 531 1.26 10 3- 7 -189 .98 7 4 3- 5 289 1.30 10 4- 6 88 .95 7 4- 7 342 .91 7 5 5- 3 767 2.42 19 5- 1 -658 2.03 16 6 5- 1 88 1.42 11 6- 4 88 .87 6 7 5- 1 44 1.37 10 7- 2 347 .89 7 7- 3 -189 .98 7 7- 4 342 .89 7 8 5- 1 88 1.42 11 8- 2 88 .87 6 NOTES: 1. Plate areas above calculated for forces in members shown. 2. All members analyzed for minimum 375 Pound force. 3. Chord forces on interior joints represent shear from adjacent panels. 4. Positive force is tension. Negative force is compression. 5. Member forces are for 1 ply of multiple ply trusses. 6. Areas and #teeth represent the minimum required per plate on each side. May 9, 2007 City of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director Theo Vervilles 17500 West Valley Hy Tukwila, WA 98188 RE: CORRECTION LETTER #1 Development Permit Application Number D07-121 Schwald Residence Dear Mr. Vervilles, This letter is to inform you of corrections that must be addressed before your development permit(s) can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Planning Department. At this time the Building, Fire, and Public Works Departments have no comments. Planning Department: Brandon Miles at 206 431-3684, if you have questions regarding the attached memo. Please address the attached comments in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that four (4) complete sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 431-3760. Brenda Holt Permit Coordinator encl File No. D07-121 P:\Jennifer\Correction Letters \2007\D07-121 Correction Ltr #1.DOC jem 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206-431-3665 I DATE: CONTACT: RE: ADDRESS: ZONING: PLANNING DIVISION COMMENTS April 5, 2007 Theo Vervilies D07-121 14931 62nd Ave S LDR The Planning Division of DCD has reviewed the above permit application. The application as submitted cannot be approved. 1. Clarify the proposed use of the structure. The site plan notes that this is a "garage", however, the site plan does not show a driveway extended to the structure. The description of the application notes that the structure is a shop. While the application also notes that this is an accessory dwelling unit. An accessory dwelling unit is not permitted as an accessory structure to the main house. `-' PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: D07-121 DATE: 05-29-07 PROJECT NAME: SCHWALD RESIDENCE SITE ADDRESS: 14931 62 AV S Original Plan Submittal Response to Incomplete Letter # X Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: Building Division Public Works Fire Prevention Planning Division Structural Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete IM Incomplete ❑ Comments: DUE DATE: 05-31-07 Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: TUES/THURS ROUTING: Please Route d Structural Review Required REVIEWER'S INITIALS: No further Review Required DATE: APPROVALS OR CORRECTIONS: Approved ❑ Notation: Approved with Conditions DUE DATE: 06-28-07 Not Approved (attach comments) ❑ REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping ❑ PW 0 Staff Initials: Documents/routing slip.doc 2-28-02 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: D07-121 DATE: 04-03-07 PROJECT NAME: SCHWALD RESIDENCE SITE ADDRESS: 14931 62 AV S X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued _ DEPARTMENTS: Build gDivision zi X1144, 4, Fire Prevention Pub is Works 411 Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete El Incomplete ❑ E Planning Division f;t4 Permit Coordinator Comments: DUE DATE: 04-5-07 Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: TUES/THURS ROUTING: Please Route REVIEWER'S INITIALS: Structural Review Required No further Review Required DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) 171 Notation: REVIEWER'S INITIALS: DUE DATE: 0503-07 DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: 6.•/I o� Bldg ❑ Fire ❑ Ping (i2( PW ❑ Staff Initials: 124" Documents/routing slip.doc 2-28-02 City of Tukwila Steven M Mullet, Mayor Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.ci.tukwila.wa.us Steve Lancaster, Director Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: Plan Check/Permit Number: D07-121 ❑ Response to Incomplete Letter # • Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: Schwald Residence Project Address: 14931 — 62nd Avenue S Conta6 Person: Theo Vervilles Phone Number: Summary of Revision: rA;s Not AG c L td R� d [c! trill tiiv1 �. wiJ� 1:2f A 9,3 et? 47f/zAsaRAsh}a, f jj N4n7t exaosits i»e fox Gym/LS cv� t -u; A L.1 r..ri d si cit LaAht 1C;ra (JR; rt_uo4r 'd 7h A Ai w r. f z y- Sheep ilfS0 MAS 7 9 1001 rUktsu PFRmir TE, Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: Entered in Permits Plus on 614,01 ,01 \applications\forms-applications on line\revision submittal Created: 8-13-2004 Revised: Look Up a Contractor, Electrician or Plumber License Detail Page 1 of 2 Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L&I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. License Information License TUFFSI*038RZ Licensee Name TUFF SHED INC Licensee Type CONSTRUCTION CONTRACTOR UBI 601645132 Ind. Ins. Account Id Business Type CORPORATION Address 1 17500 W VALLEY HWY STE 100 Address 2 City TUKWILA County KING State WA Zip 981885500 Phone 4252518833 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 12/9/1997 Expiration Date 7/2/2007 Suspend Date Separation Date Parent Company Previous License Next License Associated License Business Owner Information Name Role Effective Date Expiration Date SAUREY, TOM Cancel Date 01/01/1980 Bond Amount LANGTON, STEVE 01/01/1980 PROLOW, LEE 01/01/1980 Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date TRAVELERS CASUALTY https://fortress.wa.gov/lni/bbip/printer.aspx?License=TUFFSI*038RZ 06/07/2007 12 j 4 1 4040 WINDOW 1 J 24'-0' WALL A ELEVATION 12 4 1 L J 24'-01' I WALL C ELEVATION • • 1.-o. RANCH GARAGE 24' X 40' = 960 SQ FT FINISHED GRADE FINISHED GRADE • • 1'-0' DRAWING INDEX Al - PROJECT NOTES, ELEVATIONS A2 - PLANS, SHEAR WALL SCHEDULE A3 - SECTIONS, DETAILS 11 ; I 1` r, � 1 I, ! 1.' 1 .1 1 i i.' J 1.... : 1. .1 ; !.la j 11-1 i 1 L 1l` T•; .1 3.1, w..littt•- : !1 : ,1 1:11 1 r1r.: �, 1'r ! 1i 1ri 1 1 I! 1 1 7_ i ' 1'r r r 1 r 1_I. !.1 r. : 1 ='i'.I-11.r111-1.1:1s.t.111 .1 l i j I' - .I :, 11..11 1 i 1 r , 1-1 ::.' r.iL ' 1 1'113.11' 1 ;.7 IS' 1" 1 1 1 r 1 1 1 1 1 ,11 :�.l r•� 1 1 1 1 I ; ! 1 r 1 1 ). .I ' 1' r .' ! -i i31 -",11_ j!• r 1 �• I T '. •Mier_ 1" r 1: j. l &,, J 1 t,;_.','_. `1_r' 1lrti:�—��`-1--'.•J_-�,1'.�1,1,J � ;_-=`T�•'-•L� 2% DOWNSLOPE FOR 51—\ MINIMUM ON ALL SIDES FINISHED GRADE 4040 WINDOW 1 1 4040 WINDOW 8070 DOOR 11-0' 2% DOWNSLOPE FOR 5 MINIMUM ON ALL SIDES MASHED GRADE 40'-0' 1 WALL B ELEVATION c-^ firtAT PERMIT vim% IED FOR: City of Tukwila BUILDING DIVISION 1 REVIEWED FOR— CODE COMPLIANCE APPROVED 44Y :; 20 7 Of Tukwila BUILDING DMSIO.I shall be made to the scope -::aill:cu't prior appr1o: t1 cr Cul:ding D v;::an. moire a wt. p'an rn,;y inciue..e additional plan review fees. 40'-O" WALL D ELEVATION • • PROJECT NOTES DESIGN REQUIREMENTS 1. GOVERNING CODES: 2003 IRC OCCUPANCY REQUIREMENTS: GROUP U CONSTRUCTION TYPE: V-8 2. DESIGN SCHEDULE A. BUILDING SIZE WIDTH: 24'-0' LENGTH: 406-0' SIDE WALL HEIGHT: 8'-1 118' TOTAL HEIGHT: 12'-5118' B. BUILDING LOADS ROOF UNE LOAD: 25 PSF ROOF DEAD LOAD: 10 PSF C. DESIGN WIND 3 SECOND GUST. Vas: 85 MPH WIND EXPOSURE: C D. SEISMIC DESIGN CATEGORY: D E. SITE CLASS: D F. ROOF PITCH: 4112 3. ROOFING SCHEDULE A. ROOF SHEATHING SHALL BE APA RATED 15132' THICK 4 -PLY CDX PLYWOOD. STAGGER LAYOUT PER APA CONDITION 1. B. PI /32/16 MIN UNBLOCKED. C. MIN GRADE PLYWOOD AT OVERHANGS TO BE CDX OR iX TEG SHEATHING. D. SHEATHING NAILING SHALL BE PER NAIUNG SCHEDULE. E. 20 YEAR FIBERGLASS SHINGLES (CLASS A) (U.N.O.). F. 15 LB. ROOFING FELT. G. TYPE 'D' METAL FLASHING AND DRIP EDGE REQUIRED ALL SIDES. H. TRUSSES SHALL BE SPACED 0 24' OC. J. SEE SEPARATE TRUSS SHEETS FOR TRUSS FRAMING AND MATERIALS. K. TRUSS CONNECTION PLATES 'EAGLE METAL PLATES' ICBG HESR 1082. L THE TRUSS PLATE INSTITUTE (TPI) (NER QA 430)1S THE INSPECTION AGENCY RESPONSIBLE FOR IN -PLANT INSPECTIONS. M. TRUSS MANUFACTURER: TUFF SHED. INC. 4. WOOD FRAMING B. ALL FRAMING MEMBERS SHALL BE STUD.GRADE OR BETTER WITH THE FOLLOWING DESIGN VALUES: Fb = 675 PSI. Ft = 400 PSI, Fv = 75 PSI Fc = 800 PSI PARALLEL TO GRAIN. E =1.200.000 PSI. C. STUDS SHALL BE SPACED 16-0C. D. FASTEN EXTERIOR WALL SHEATHING TO FRAMING PER NAILING SCHEDULE. E. PROVIDE SOLID BLOCKING AT ALL HORIZONTAL JOINTS OCCURRING IN BRACED WALL PANELS PER 2308.9.3. F. SHEAR WALL MATERIAL SHALL BE AS SPECIFIED IN SHEAR WALL SCHEDULE G. SHEAR WALL NAILING SHALL BE AS SPECIFIED IN SHEAR WALL SCHEDULE. 5. SOIL A MIN. REQUIRED SOIL TYPE SHALL BE CLAY, SANDY CLAY, SLTY CLAY. OR CLAYEY SILT (CL. ML. MH & CH). PRESCRIPTIVE ALLOWABLE SOIL BEARING PRESSURE USED IN DESIGN IS 1500 PSF AT 12' DEEP. VALUES ARE PER TABLE 18042. B. IN THE EVENT OF THE DISCOVERY OF EXPANSIVE SOILS. FOUNDATION WLL EXTEND MIN. 2'-0' BELOW GRADE. C. ALL FOOTINGS SHALL BE FOUNDED ON UNDISTURBED NATURAL SOIL D. IN THE EVENT EXCAVATIONS REVEAL UNFAVORABLE CONDITIONS. THE SERVICES OF A SOILS ENGINEER MAY BE REQUIRED. 6. PERMIT A. P':RMIT APPLICATIONS. WHERE NO PERMIT IS ISSUED. SHALL EXPIRE PER LIMITATIONS SET BY LOCAL CODES. SECTION 105.5. B..I03 CARD REQUIRED TO BE AVAILABLE FOR SIGNATURE AT JOB SITE GENERAL NOTES 1. GENERAL A. ERECTION PROCEDURES SHALL CONFORM TO OSHA STANDARDS. BUILDER SHALL PROTECT ALL ADJACENT PROPERTY, STRUCTURES. TREES, UTILITIES, ETC. B. BUILDER IS RESPONSIBLE FOR SAFETY OF BUILDING DURING CONSTRUCTION. PROVIDE ALL SHORING OR BRACING AS REQUIRED AND PER GOVERNING REGULATIONS. C. ALL WOOD CONSTRUCTION CONNECTORS REFERENCED IN THIS DRAWING SHALL BE SIMPSON 'STRONG -TIE' OR EQUIVALENT. D. GREEN VINYL SINKER NAILS DO NOT MEET THE NAIUNG REQUIREMENTS OF COMMON NAILS. 2. PLYWOOD DIAPHRAGMS PRODUCT STD PS 1-95. DOUGLAS FIR -LARCH, STRUCTURAL 1 (OR CDX). 3. MATERIAL EVALUATION REPORT IDENTIFICATIONOO A TRUSS CONNECTION PLATES BY EAGLE METAL PLATES PER IGBO ES REPORT IESR 1082. B. DURATEMP SIDING BY SIMPSON LUMBER COMPANY 1S APPROVED FOR USE WITHOUT UNDERLAYMENT PER ICBG ES REPORT IER-4856. C. HARDIPANEL SIDING BY JAMES HARDIE BLDG PRODUCTS PER NES REPORT BNER-405 D. LAMINATED VENEER LUMBER (LVL) PER IC80 ES REPORT TIER -4979. E. PID PRE -DEFLECTED HOLOOWNS BY SIMPSON PER IC80 ES REPORT TIER -5328- F. SSTB ANCHOR BOLTS BY SIMPSON PER ICBG ES REPORT TIER -4935 FILE COPY N. Permit NO. flan review 2" proval IS subjixt to caws and Approve c: c: =uctt�y�doormTye�r doormats ss not authatas eb'��� C t. / £ epos code M c, '-c.-zzi ;A' r= -d co lddors 14 adv>avledXtl,` Date 1- 0 of TUkwila BUILDING pMSION HEC` :"ED CilYOF ,UKW1 I A -- pcR9SI ITER P01-12.1 • 1 r , 1McGINNIS & ASSOCIATES CONSULTIIVG ENGINEERS, INC. 1110 WESTMARK DRIVE SAINT LOUIS, MISSOURI 63131 PHONE: (314) 469-6460 #14293 PO No. 513143 Inv No. 265938 Customer: DAWN SCHWALD Description: RANCH GARAGE 124'X40'=960 SO FT Site Address: 14931 62ND AVE SE TUKWILA, WA 98168 THESE DRAWINGS AND THE DESIGN ARE THE PROPERTY OF TUFF SHED, INC. THESE DRAWINGS ARE FOR A BUILDING TO BE SUPPLIED AND BUILT BY TUFF SHED. ANY OTHER USE IS FORBIDDEN BY BOTH TUFF SHED AND THE ENGINEER OF RECORD McGinnis ASSOCIATES. TUFF SHED Storage Buildings & Garages TUFF SHED, INC. deal 17500 W. VALLEY HWY TUKWILA, WA 96188 (425) 2618833 STORE 170 Drawn By: PK Date: 211W07 Checked By: CJD Date: 2114107 Revised: Revised: The: PROJECT NOTES ELEVATIONS Scale: 1t4" =1'-0" Sheet A 1 Sheet 1 of 3 1 NAILING SCHEDULE CHORD SPLICE NAILING: 8 - 16d NAILS EACH SIDE OF SPLICE. TRUSS BLOCKING: (4) - 16d (TOENAILED) SHEAR WALL SCHEDULE CALC. SWEAR LOAD ALLOW SHEAR LOAD () SHEAR WALL SCHEDULE CALC. ALLOW SHEAR SHEAR LOAD LOAD PM) (W) FRAMING NAILING: STUD TO TOP PLATE, 2-16d END NAIL STUD TO SILL PLATE. 2-16d END NAIL OR 4-8d TOENAIL DBL. HEADER 16d @ 16" OC ALONG EACH EDGE HEADER TO KING STUD 4-8d TOENAIL OR 4-16d END NAIL UNLESS SPECIFIED HEREIN, ALL NAILING SHALL BE PER 2003 IBC TABLE 2304.9.1. UPLIFT TRANSFER: PROVIDE SIMPSON H2.5 AT EACH END OF TRUSSES. PROVIDE 2X4 SOLID BLOCKING ON ALL UNSUPPORTED EDGES OF PLYWOOD ON SHEAR WALLS PER 320.11.3. 2X4 FRAMING. SHEATHE EXTERIOR WITH 1/2" DURATEMP. 24'-0" LONG TOTAL. 16' USED FOR SHEAR. NAILING: A % EDGE: 8d COMMON @ 6" OC FIELD: 8d COMMON @ 12" OC NO HOLDOWNS REQUIRED. 117 230 2X4 FRAMING. SHEATHE EXTERIOR WITH 1/2" DURATEMP. 40'-0" LONG TOTAL. (4'+4'+4'+4'+4')=20' USED FOR SHEAR. NAILING: EDGE: 8d COMMON @ 6" OC FIELD: 8d COMMON @ 12" OC NO HOLDOWNS REQUIRED. 56 230 UNBLOCKED ROOF DIAPHRAGM ROOF SHEATHING NAILING: BORDER: 8d COMMON @ 6" OC EDGE: 8d COMMON @ 6" OC FIELD: 8d COMMON @ 12" OC 78 197 2X4 FRAMING. SHEATHE EXTERIOR WITH 1/2" DURATEMP. 24'-0" LONG TOTAL. 24' USED FOR SHEAR. NAILING: EDGE: 8d COMMON @ 6" OC FIELD: 8d COMMON @ 12" OC NO HOLDOWNS REQUIRED. 78 230 2X4 FRAMING. SHEATHE EXTERIOR WITH 1/2" DURATEMP. 40'-0" LONG TOTAL. 40' USED FOR SHEAR. �NAILING: 1 / EDGE: 8d COMMON @ 6" OC FIELD: 8d COMMON @ 12" OC NO HOLDOWNS REQUIRED. 28 230 C -11 SEE FOOTING DETAIL CF -1 REFERENCE SECTION 31A3 FOR ANCHOR BOLT SIZE, SPACING, AND ADDITIONAL REQUIREMENTS. FOUNDATION PLAN • • 2X4 TREATED SOLE PLATE— TYPICAL ALL WALLS (U.N.O.) 1 24'-0" 4'-0' 4'-0' 16'4' C> 4'-Ov x 4'-0' 3-0xVOX 4' 4' r' ow -0' 4'-0' x wow WALL FRAMING STUDS@ 16' OC FLOOR PLAN • DOUBLE TOP PLATES INTERLOCK AT CORNER 0 111 0 4'-0" HEADER 2- 2X4 HF #2 OR 2-1314'X5112'LVL D W 4 «c m 4 15j LO1 11 TOI A 1 1 —l1 II 11 11 11 11 11 i @24'OC W O re CATWAUCS 11 11 II 11 11 11 11 II 11 11 11 11 11 11 11 11 II 11 ROOF FRAMING PLAN CATWALKS a REvltwtW CODE COMPLIANCE APPROVED i MAY : 2007 j City Of Tukwila 1 B JLDIN Dn car .t RECE, tD C1TYOFTTIic.': LA v PE#MTCPATP 1 Ts dlizO • I ;$ I MCGINNIS & ASSOCIATES CONSULTING ENGINEERS, INC. 1110 WESTMARK DRIVE SAINT LOUIS, MISSOURI 63131 PHONE: (314) 469-6460 #14293 PO No. 513143 Inv No. 265938 Customer: DAWN SCHWALD Description: RANCH GARAGE 24'X40'=960 SQ FT Site Address: 14931 62ND AVE SE TUKWILA, WA 98168 THESE DRAWINGS AND THE DESIGN ARE THE PROPERTY OF TUFF SHED. INC. THESE DRAWINGS ARE FOR A BUILDING TO BE SUPPLIED AND BUILT BY TUFF SHED. ANY OTHER USE 1S FORBIDDEN BY BOTH TUFF SHED AND THE ENGINEER OF RECORD McGinnis ASSOCIATES. TUFF SHED Storage Buildings & Garages TUFF SHED, INC. 17600HWY TUK W. , WA 168 TUKWILA, WA 09168 (425) 2914833 STORE 170 Dravm By: PK Date: 2/10107 Chedced By: CJD Date: 2/14!07 Revised: Revised: Title: PLANS SHEAR WALL SCHED NAILING SCHEDULE Scale: 114- =11-0' onset A2 Sheet2 of 3 • SEE PROJECT NOTES FOR MATERIALS NAIL TO INTERMEDIATE FRAMING MEMBERS - REFERENCE NAILING SCHEDULE/A2 45th' CDX SHINGLES 1r�.T51 ��f�w� ,44EAVAIMI-"wir - ,• IP EDGE DIAPHRAGM BOUNDARY TRIM PANEL EDGE IS NOT SUPPORTED BY BLOCKING - UNLESS NOTED. AND OR TRUSSES. REFERENCE NAILING SCHEDULE/A2 SIDING ROOFING SHEATHING NAILING DTL TRUSS BLOCKING WALL TOP PLATES RAFTER OR TRUSS 400000•111 SIMPSON H2.5 PLATE INSIDE AT EACH TRUSS DOR RAFTER TOE NAIL AS REQUIRED BOTH SIDES ZSIDING NOT SHOWN FOR CLARITY STUDS H2.5 RANCH GARAGE TRUSS ATTACHMENT DETAIL WITH BOTTOM CHORD I0! TOP PLATES CRIPPLES (AS REQ.) SPACER (IF REQ.) DOUBLED HEADER STUD TRIMMER SOLE PLATE FOR OPENINGS UP TO 5'-11 1/2" TOP PLATES CRIPPLES (IF REQ.) SPACER (IF REQ.) DOUBLED HEADER STUD DOUBLE TRIMMERS SOLE PLATE FOR OPENINGS 6'-0" AND WIDER NAILING: HEADER TO STUD - 4-8d TOENAIL OR 4-16d END NAIL DOUBLED HEADER - 16d (8316' STAGGERED FACE NAIL REFERENCE TABLE 2304.9.1 HEADER DETAIL NOT TO SCALE ROOF SHEATHING --�—�" 2X4 BLOCK W/ A34 AT EACH END AND 6-8d COMM NAILS THRU ROOF SHEATHING 2X4 BRACE AT 8' OC ATTACH WITH (6) 16d COMMON FACE NAILS AT BLOCK AND AT ROOF SHEATHING. 3 NAILS EACH SIDE TRUSS END WALL TRUSS --� ATTACH END WALL TRUSS TO TOP PLATE WITH NAILS PER SHEAR WALL SCHEDULE. 2X4 FULL LENGTH OF BUILDING 0 8' OC BOTH END WALLS. ATTACH TO TRUSS BOTTOM CHORD WITH 2-16d NAILS. NAIL ALSO AT END WALL TRUSS. MATCH DIAGONAL BRACE LOCATION. H10 ANCHOR AT EACH 2X4 BRACE THIS DETAIL IS PROVIDED IN LIEU OF A RIGID CEILING SYSTEM END WALL BRACE and 4 TRUSS BOTTOM CHORD BRACE NOT TO SCALE 1 1 iP GABLE TRUSS GABLE TRUSS BOTTOM CORD NAIL SHEATHING PER NAILING SCHEDULE NAIL BOT. CHORD TO UPPER TOP PLATE FROM BELOW W/ 16d NAILS t 9' O.C. BEFORE SETTING ON WALL BOTTOM EDGE OF TOP SHEATHING PANEL NAIL TO PLATE 2 FASTEN END TRUSS - PLATE ASSEMBLY TO LOWER TOP PLATE Wl 16d016'0.C. WALL STUDS SECTION ENDWALL ASSEMBLY DETAIL Pot 1 KtVi.tYVW I'+! 1 CODE COMPLIANCE APPROVED MAY =� l 2001 City Of Tukwila i BUILDING DI IISLGNq 2X SOUD BLOCKING BETWEEN TRUSSES NAIL SHEATHING TO WALL STUD PER SHEAR WAIL SCHED(LE SHEAR TRANSFER NOTES: 1. REFERENCE SHEAR WALL SCHEDULE FOR IVUUNG AND HOLDO MI REQUIREMENTS_ 2. REFERENCE ROOFING SCHEDULE FOR MATERIAL AND NPJLRIG REQUIREMENTS. NAIL SHEATHING TO SOLE PLATE PER SHEAR WALL SCHEDULE EDGE NAL G 0 SHEAR TRANSFER DETAIL 3+w-= r -or D 1 ATTACH 15132' CDX PLYWOOD SHEATHING TO TRUSSES PER NAILING SCHEDULE. REFERENCE TABLE 23-11-B-2. CERJNG AND WALLS SHALL BE LEFT UNFAVISHED 411, 24'-O' BUILDING SECTION ATTACH EACH END OF EACH TRUSS TO TOP PLATES WITH H2.S OR EQUWCUPS. WALL FRAMING TO BE 2X4 HF STUD GRADE a 16' OC. 1N' = • • • • V ( FINISH GRADE 14. z 3'CLR TYP. ig UNHEATED GARAGE SPACE 14 CONTINUOUS TOP & BOTTOM CONCRETE FL Q 4 ,/ WWF PER NOTES BELOW THICKENED MONOLITHIC FOUNDATION • CONFNUOUS FOOTING NOTES 1. TOP OF SLAB TO BES- MN. ABOVE GRADE SLAB REINFORCEMENT SHALL BE WWF 603 W1001I0 PER ASTM AI66. LOCATE AT M40EP'TH OF SLAB. 2. ALL F•OOTNG FORMS SHALL BE INSPECTED FOR SITE AND REINFORCING BEFORE POURIFG TE 3. FOOTINGS SHALL BEAR ON UNDISTURBED NATURAL. COMPETENT SOLAR PROPERLY COMACTED STRUCTURAL FILL. ALLOYrABLESOL BEARING PRESSURE IS 1000 PSF AT 1TBELOW GRACIE 4. CONCRETE MLI .ua 23 DAY COMPRESSIVE STRENGTH. rc= 2500 PSL. S: RERIFORCNG STEEL- AMIS. GRADE 4O OR GRAM 60. ALL REINFORCING STEB SHOWNS MAY BE TAPPED A lifilifUlfOF3!sBAR GIN/ETERS OR 24' ILNIRIUM rN0DEVER IS LARGER. 6. SB C DESIGN CATEGORY_ 0 A. ATTACH PRESSE TREATED SOLE RATE TO THE FOOTRO3 USING Sir DIA X 1r WHOM' BOLTS rMTH NLITSAI)WASIERS. B. ANATORBOLTS SHALL SEANEDOEDATLEAST T INTO THE CONCRETE ANDSHALL BE SPACED NOT MORE THAN SOC. C. THERE SHALL BEAMBAOALOF 2BOLTS PER SOLE RATE PIECE WITH 1 BOLT LOCATED NOT MORETWIN 1TNOR LESSTHAN7BOLTOIMETERS FROM EACH BW &CA PIECE. O CF -1 FOUNDATION DETAIL 31�= T-Owa 1116s 1;tC ENO RAFTER ROOF SHEATHING STRUCTURAL TRUSS 2X4 LADDER FRAME STANDARD GABLE TOP PLATE WALL STUD SECTION AT RIDGE LAY OUTRIGGERS FLAT AND 'LET INTO TOP CHORD OF ENDWALL (GABLE) TRUSS TO SUPPORT OVERHANG. ATC -0" O.0 BUTT NAIL TO FIRST STRUCTURAL TRUSS. STRUCTURAL TRUSS 2X4 LADDER FRAME STAPKIARD GABLE BLOCKING END RAFTER -' RECE; ICD GITY0FMKVALA A=R. O - ITER CANTILEVERED LADDERRMIT# FRAME OVERHANG DETAIL ert 4 (4.1 O g facts �sv r ox V .• rn a DaUl =111 ZW= TA111 0LL3mY. coau Du. I EL O D Drawn By: PK Date: 2110107 Checked By: CJD Date: 2/14107 Revised: Revised: Title: SECTIONS DETAILS Scale: NONE Sheet A3 L. Sheet as 1