Loading...
HomeMy WebLinkAboutREG 2018-05-07 Item 7B - Bid Award/Agreement - 2018 Overlay and Repair Program with ICON Materials for $955,945.50COUNCIL AGENDA SYNOPSIS Initials Medi ng Date Prepared by Nlayor's rev )V Coll nei/review 05/07/18 HH /I,//, ❑ Resolution Mlty Date \ib.. 11 Bid _/ward 05/07/18 ❑ Public Fearing _lltg Date ❑ Other llto Date ANDate SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ OCD ❑ Finance ❑ Fire ❑ IT ❑ Pc R ❑ Police 11 PIF SPONsoR'S The 2018 Annual Overlay & Repair Program was advertised for bids on March 22 and 29 SLMni.\RY and four bids were opened April 5, 2018. The apparent low bid of $955,945.50 was submitted from Icon Materials. Four locations are scheduled for asphalt overlay throughout the City in 2018, including a portion of the Fort Dent parking lot. Council is being asked to award the bid to Icon Materials in the amount of $955,945.50. RI.A'II?\VI:D BY ❑ COW NItg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. DATE: 04/23/18 COMMITTEE CHAIR: THOMAS 11 Transportation Cmte ❑ Planning Comm. MCLEOD ITEM INFORMATION ITEM No. 7.B. CAS N1TMBI?R: ST. vI ISPONSOR: HENRY HASH ORIGIN:AI. AGNND.v DAT?: 05/07/18 AGENDA I1'I':\I Tr'1'Lr. 2018 Annual Overlay & Repair Program Bid Award to Icon Materials C.A'I'I:GO12Y ❑ Discussion Jltg Date ❑ .AMotion lltq Date ❑ Resolution Mlty Date ❑ Ordinance JItg Date 11 Bid _/ward 05/07/18 ❑ Public Fearing _lltg Date ❑ Other llto Date ANDate SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ OCD ❑ Finance ❑ Fire ❑ IT ❑ Pc R ❑ Police 11 PIF SPONsoR'S The 2018 Annual Overlay & Repair Program was advertised for bids on March 22 and 29 SLMni.\RY and four bids were opened April 5, 2018. The apparent low bid of $955,945.50 was submitted from Icon Materials. Four locations are scheduled for asphalt overlay throughout the City in 2018, including a portion of the Fort Dent parking lot. Council is being asked to award the bid to Icon Materials in the amount of $955,945.50. RI.A'II?\VI:D BY ❑ COW NItg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. DATE: 04/23/18 COMMITTEE CHAIR: THOMAS 11 Transportation Cmte ❑ Planning Comm. MCLEOD RECOMMENDATIONS: SPONSOR/.ADi»11N. COM\I11Tl:I: Public Works Unanimous Approval; Forward to Regular New Business COST IMPACT / FUND SOURCE FAITNDt'1'URI1 REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $955,945.50 $1,150,000.00 $0.00 Fund Source: 104 ARTERIAL STREETS & 301 PARKS (PAGES 18 & 34, 2017 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 05/07/18 MTG. DATE ATTACHMENTS 05/07/18 Informational Memorandum dated 04/20/18 Vicinity Map 2017 CIP, page 18 Consultant Recommendation Letter Bid Tabulation Minutes from the Transportation & Infrastructure Committee meeting of 04/23/18 162 City of Tukwila Allan Ekberg, Mayor Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director ! 1 BY: David Sorensen, Project Manager DATE: April 20, 2018 CC: Mayor Ekberg SUBJECT: 2018 Overlay and Repair Program Project No. 91810401 Bid Award ISSUE Award the bid for construction of the 2018 Overlay and Repair Program. BACKGROUND The Overlay and Repair Program preserves and maintains the street structure in a safe and useable condition. Construction will include pavement repairs and an asphalt overlay at four locations citywide including the Fort Dent parking lot, as well as other incidental items of work. ANALYSIS A call for bids was advertised for the 2018 Overlay and Repair Program on March 22 and 29, 2018. Four bids were opened on April 5, 2018. The lowest apparent bidder was ICON Materials with a bid of $955,945.50. The Engineer's Estimate was $1,137,680.00. There were no bidding errors. Based on the bidding results, the project design consultant KPG concurred to award the 2018 Overlay and Repair Program to the apparent low bidder, ICON Materials. BUDGET AND BID SUMMARY (All amounts include sales tax) Bid Results Bid Schedule "A" $ 838,423.50 Contingency (5%) 41,921.18 Bid Schedule "B" Fort Dent 117,522.00 Contingency (5%) 5,876.10 Total $1.003.742.78 Engineer's Estimate $1,012,575.00 125,105.00 0.00 $1,137,680.00 2018 Budget $1,050,000.00 100,000.00 0.00 $1,150.000.00 RECOMMENDATION Council is being asked to award construction for the 2018 Overlay and Repair Program to ICON Materials in the amount of $955,945.50 and consider this item on the Consent Agenda of the May 7, 2018 Regular Meeting. attachments Vicinity Map Page 18, 2017 CIP Consultant Recommendation Bid Tabulation W:1PW EngIPROJECTSIA- RW & RS ProjectstAnnual Overlay & Repair Programs12018 Overlay & Repair Program (91810401)1DesigntAd and AwardV ward\Docs to TIC Bid Award 163 164 2018 Overlay Program Vicinity Map 165 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Annual Overlay and Repair Program Project No. 9xx10401 DESCRIPTION: Select, design and construct asphalt and concrete pavement overlays of arterial and residential streets. JUSTIFICATION: Preserve and maintain the street structure in a safe and useable state by resurfacing before failure which also minimizes costs. Some individual sites may be coordinated with water, sewer, and surface water projects. STATUS: Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay. MAINT. IMPACT: Reduces annual maintenance. COMMENT: Ongoing project. Only one year actuals shown in first column. FINANCIAL Through Estimated (in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 123 135 150 150 175 175 200 200 200 1,508 Land (R/W) 0 Const. Mgmt. 276 175 200 200 225 225 250 250 275 2,076 Construction 1,289 1,260 , 1,050 1,050 1,330 1,340 1,350 1,350 1.375 11;394 TOTAL EXPENSES 1,688 1,570 1,400 1,400 1,730 1,740 1,800 1,800 1,850 14,978 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 1,688 1,570 1;400 1,400 1,730 1,740 1,800 1,800 1,850 14,978 TOTAL SOURCES 1,688 1,570 1,400 1,400 1,730 1,740 1,800 1,800 1,850 14,978 2017 - 2022 Capita! Improvement Program 166 18 SEATTLE .TACOMA April 6, 2018 City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 RE: 2018 Overlay and Repair Program Dear Mr. Sorensen, On April 5, 2018 sealed bids were received and opened for the 2018 Overlay and Repair Program. Four (4) bids were submitted, with the results of the bids and Engineer's Estimate as follows: # Bidder's Name Written Bid Governed Bid Engineer's Estimate $1,137,680.00 __ $1,137,680.00 01 ICON Materials $ 955,945.50 $ 955,945.50 02 Watson Asphalt Paving, Inc. $ 1,152,612.20 $ 1,152.612.20 03 Miles Resources $ 1,346,472.50 $ 1,346,472.50 04 Lakeside Industries $ 1,392,448.10 $ 1,422,698.10 ICON Materials (dba CPM Development Corporation) is the apparent low bidder. As requested, KPG has completed the verification for ICON Materials for the 2018 Overlay and Repair Program for their bid in the amount of $955,945.50. We have checked the status of ICON Materials and their proposed subcontractors on the Washington State Labor and Industries web page to confirm they are currently insured, bonded, and licensed. Additionally, no strikes or debarment records arose federally or statewide regarding ICON Materials. We phoned the references listed in ICON's bid and were able to speak with several of thein. Jeff Huynh with the City of Federal Way worked with them on the 2014 Overlay project. He said that they did great, there were no concerns on the project and he would be happy to work with them again. Jason Brant with the City of Kent said that they were attentive, their office was ran very smooth and they finished ahead of schedule on the 2017 Street Patch and Overlay project. Lastly, Steve Murdoch, with CA Carey Corporation, gave them an A+ rating and said that they were a great contractor! It is KPG's recommendation that the City of Tukwila's 2018 Overlay and Repair Program be awarded to ICON Materials. We have enclosed the contractor Bid Tabulation, ICONS verification package and reference checks for your review. Respect! ally, lie Kelly Clark Project Manager KPG, Inc. Cc: Project Files 167 168 CITY OF TUKWILA - DEPARTMENT OF PUBLIC WORKS 2018 Ovetlay Program Engineers Estimate - BID Project No. 17135 311912018 KPG Total !- Engineer's Estimate II Icon Materials I Watson Asphalt Paving Co. Inc. I Miles Resources, LLC Lakeside Industries No. $°No10n Item II Quantity I Unit I Unit Cost I Total Cost II Unit Cost I Total Cost I Unit Cost Total Cost Unit Cost Total Cost I Unit Cost Total Cost - ROADWAY _ --- - - - - - 1 1-04 Unexpected Site Changes 1 FA 9. 3.000.00 5 3.000.00 $ 3,000.00 $ 3,000.00 $ 15,500.00 $ 15,500.00' $ 1,500.00 $ 1,500.00 $ 1.600.00 $ 1,600.00 $ 50,000.00 $ 50,000.00 $ 80,000.00 $ 80,000.00' $ 108.00 $ 4,320.00 $ 55.00 $ 18,150.00 $ 15.00 $ 8,550.00 $ 1,350.00 $ 1,350.00 $ - $ 40.00 $ 800.00 $ 15.00 $ 600.00 $ 63.00 $ 10,710.00 . $ 126.00 $ 20,160,00 81.00 $ 59,940.00 $ 81.00 $ 243,000.00 $ 134,00 $ 20,100.00 $ 134.00 $ 5,360.00 $ 220.00 $ 2,200.00 $ - $ 2.30 $ 506.00 $ 3.60 $ 95,616.00 $ 3,000.00 $ 3,000,00 $ 593.00 $ 15,418.00 $ 3,000.00 $ 3,000.00 $ 58.00 $ 1,218.00 $ 41.50 $ 19,090.00 $ 62.00 $ 1,240.00 $ 36.50 $ 1,825.00 $ 100.00 $ 8,000.00 $ 593.00 $ 2,965.00 $ 3,000.00 $ 3,000.00 $ 10,000.00 $ 10,000.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 76,000.00 $ 76 000.00 $ 122,700.00 $ 122,700.00 $ 130.00 $ 5,200.00 $ 45.00 $ 14,850.00 $ 30.00 $ 17,100.00 $ 1,500.00 $ 1,500.00 $ - $ - $ 40.00 $ 800.00 $ 50.00 $ 2,000.00 $ 110.00 $ 18,700.00 $ 88.00 $ 14,080.00 $ 97.00 $ 71,780.00 $ 89.00 $ 267,000.00 $ 155.00 $ 23,250.00 $ 165.00 $ 6,600.00 $ 200.00 $ 2,000.00 $ - $ 3.00 $ 660.00 $ 5.00 $ 132,800.00 $ 3,000.00 $ 3,000.00 $ 400.00 $ 10,400.00 $ 3,000.00 $ 3,000.00 $ 60.00 $ 1,260.00 $ 48.00 $ 22,080.00 $ 78.00 $ 1,560.00 $ 39.00 $ 1,950.00 $ 105.00 $ 8,400.00 $ _ 400.00 $ 2.000.00 $ 3,000.00 $ 3,000.00 $ 10,000.00 $ 10,000.00 $ 1,500.00 $ 1,500.00 $ 1,000.00 $ 1,000.00 $ 75,000.00 $ 75,000.00 $ 180,000.00 $ 180,000.00 $ 150.00 $ 6,000.00 $ 47.00 $ 15,510.00 $ 25.00 $ 14,250.00 $ 1,000.00 $ 1,000.00 $ - $ 75.00 $ 1,500.00 $ 50.00 $ 2,000.00 $ 60.00 $ 10,200.00 $ 250.00 $ 40,000.00 $ 115.00 $ 85,100.00 $ 98.00 $ 294,000.00 $ 180.00 $ 27,000.00 $ 290.00 $ 11,600.00 $ 150.00 $ 1,500.00 $ - $ - 5 1.00 $ 220.00 $ 6.00 $ 159,360.00 $ 3,000.00 $ 3,000.00 $ 700.00 $ 18,200.00 $ 3,000.00 $ 3,000.00 $ 100.00 $ 2,100.00 $ 70.00 $ 32,200.00 $ 70.00 $ 1,400.00 $ 65.00 $ 3,250.00 $ 140.00 $ 11,200.00 $ 700.00 $ 3.500.00 $ 3,000.00 $ 3,000.00 $ 20,000.00 $ 20,000.00 $ 1,500.00 $ 1,500.00 $ 2,000.00 $ 2,000.00 $ 250,000.00 $ 250,000.00 $ 225,000.00 $ 225,000.00 $ 100.00 $ 4,000.00 $ 60.00 $ 19,800.00 $ 30,00 $ 17,100.00 $ 2,500.00 $ 2,500.00 $ - $ 75.00 $ 1,500.00 $ 25.00 $ 1,000.00 $ 35.00 $ 5,950.00 $ 75.00 $ 12,000.00 $ 100.00 $ 74,000.00 $ 80.00 $ 240,000.00 $ 150.00 $ 22,500.00 $ 200,00 $ 8,000.00 $ 200.00 $ 2,000.00 $ _ $ 2.00 $ 440.00 $ 5.00 $ 132,800.00 $ 3,000.00 $ 3,000.00 $ 400.00 $ 10,400.00 $ 3,000.00 $ 3,000.00 $ 100.00 $ 2,100.00 $ 53.60 $ 24,656.00 $ 55.50 $ 1,110.00 $ 51.75 $ 2,587.50 $ 111.00 $ 8,880.00 $ 400.00 $ 2.000.00 2 1-05 ADA Features Surveying 1 LS 0 10.000.00 $ 10,000.00 3 1-07 Resolution of Utility Conflicts 1 FA 5, 1.500.00. $ 1,500.00 4 1-07 SPCC Plan 1 LS 1. 2,000.00 $ 2.000.00 5 1-09 Mobilization 1 LS 5• 80.000.00 $ 80.000.00 6 1-10 Project Temporary Traffic Control l LS 5 78.00000 $ 78.000.00 7 1-10 Off -Duty Uniformed Police Officer 40 HR 1 120.00 $ 4,800.00 8 2-02 Cement Conc. Sidewalk Removal Incl. Haul 330 SY $'. 60.00 $ 19.800.00 9 2-02 Cement Conc. Curb Removal Incl. Haul 570 LF 25.00 $ 14,250.00 10 2-02 Removal of Structure and Obstruction 1 LS 1 2,500.00 $ 2,500.00 63 2-02 Roadway Excavation Incl. Haul 200 CY 1'• 90.00 $ 11 2-03 Unsuitable Foundation Excavation Incl. Haul 20 CY 9. 95.00 $ 1,900.00 12 2-03 Gravel Borrow Incl, Haul 40 TON 5'. 25.00 $ 1.000.00 13 4-04 Crushed Surfacing Top Course 170 TON 9'• 60.00 $ 10.200.00 14 5-04 Pavement Repair Excavation Incl. Haul 160 CY II 90.00 $ 14,400.00 15 5-04 MMA Cl. 1/2" PG 64-22 740 TON 5. 100.00 $ 74,000.001$ 16 5-04 HMA Cl. 1/2" PG 70-22 3.000 TON 1. 110.00 $ 330.000.00 17 5-04 HMA for Pavement Repair Cl. 1/2" PG 64-22 150 TON 9. 150.00 $ 22,500.00 18 5-04 HMA for Pavement Repair Cl. 1/2" PG 70-22 40 TON 1. 175.00 $ _ 7,000.00 19 5-04 Temporary Pavement 10 TON 1. 175.00 $ 1,750.00 $ 1,500.00 'SIDE WALK LF T. 5.00 20 5-04 Thickened Edge 220 LF 1. 3.00 $ 660.00 21 5-04 Planing Bituminous Pavement 26.560 SY 7. 5.00 $ 132.800.00 22 5-04 Joint/Crack Sealing 1 FA 1. 3,000.00 $ 3,000.00 23 7-12 Adjust Water Valve 26 EA 1. 500.00 $ 13.000.00 24 8-01 Erosion/Water Pollution Control 1 FA 9. 3.000,00 $ 3.000.00 25 8-01 Inlet Protection 21 EA 5 80.00 $ 1.680,00 26 8-04 Cement Conc. Curb and Gutter 460 LF 9. 40.00 $ 18.400.00 27 8-04 Reinforced Cement Conc. Curb and Gutter 20 LF I'• 60.00 $ 1,200.00 28 8-04 Integral Curb 50 SF 9. 30.00 $ 1.500.00 29 8-06 Cement Conc. Driveway Entrance 80 SY 1. 80.00 $ 6,400.00 30 8-13 ' Adiust Monument Case and Cover i 5 EA 1. 700.00 $ 3,500.00 'FICSIGNALS $ 800.00 31 8-20 Traffic Signal Modifications (Southcenter Blvd & Macadam Rd S) 1 LS $ 23.000.00 $ 23.000.00 $ 27,000.00 $ 27,000.00 $ 16.200.00 $ 16.200.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 18.000.00 $ 18.000.00, $ 20.000.00 $ 20,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50.000,00 32 8.20 Traffic Signal Modifications (Southcenter Blvd & 61st Ave S) I 1 LS $ 13,000.00 $ 13,000.00 SIDEWALK 33 8-14 (Cement Conc. Sidewalk 0 300 1 SY 1 $ 70.001 $ 21,000.00 5 46.50 $ 13,950.00 $ 2,830.00 $ 14,150.00 $ - $ 44.00 $ 1,540.00 $ 53.00 $ 15,900.00 $ 3,600.00 $ 18,000.00 $ - $ 48,_00 $ 1,680.00 $ 85.00 $ 25,500.00 $ 3,100.00 $ 15,500.00 $ - $ - $ 75.00 $ 2.625.00 $ 67.60 $ 20,280.00 $ 2,455.00 $ 12,275.00 $ - $ 60.00 $ 2.100.00 34 8-14 (Cement Conc. Curb Ramp II 5 1 EA $ 2,700.00 1 $ 13,500.00 __ -on II 1 $ 3,500.00 I 35 I 8-26 IN -Skid Surface Treatment 9 35 1 SF 1 $ 25.00 1 5 875.00 STORM SEWER 36 1 7-05 !Adjust Catch Basin 5 12 1 EA I $ 800.00 1 5 9,600.00 5 863.00 5 10,356.00 $ 500.00 $ 6,000.00 $ 1,000.00 $ 12,000.00 $ 350.00 5 6,600.00 $ 25.00 $ 1.000.00 $ 17.00 $ 680.00 37 I 7-05 'Storm Drain Marker 0 40 1 EA 1 $ 30.00 I $ 1,200.00 $ 18.00 $ 720.00 $ 20.40 $ 816.00 SANITARY SEWER 38 1 7-05 16+5051 Manhole 9 14 1 EA 1 5 900.00 1 $ 12.600,00 11 5 063.03 5 12.082.00 1 $ 500.00 $ 7,000.00 1 5 1,00.0.00 5 14,000.00 1 $ 550.00 $ 7.700.00 TRAFFIC CONTROL DEVICES 39 8-09 -'Raised Pavement Marker Type 1 "' - 14 HUND II 500.00 5 7,000.00 5 158.50 5 2,219.00 $ 410.00 $ 1,640.00 $ 1,600.00 $ 1,600.00 $ 53.50 $ 2;354.00 $ 190.00 $ 380.00 $ 7.00 $ 1,400.00 $ 4.25 $ 1,147.50 $ 4,25 $ 425.00 $ 3.00 $ 360.00 $ 1.60 $ 6,992.00 $ 1.60 $ 80.00 $ 0.22 $ 1,166.00 5 176.40 5 2,469,60 $ 456.00 $ 1,824.00 $ 3,500.00 $ 3,500,00 $ 59.40 $ 2,613.60 $ 210.00 $ 420.00 $ 8.20 $ 1,640.00 $ 4.70 $ 1,269.00 $ 4.80 $ 480.00 $ 3.30 $ 396.00 $ 1.80 $ 7,866.00 $ 0.70 $ 35,00 $ 0.50 $ 2,650.00. $ 200.00 $ 2,800.00 $ 450.00 $ 1,800,00 $ 2,000.00 $ 2,000.00 $ 60.00 $ 2,640.00 $ 200.00 $ 400.00 $ 8.00 $ 1,600.00 $ 5.00 $ 1,350.00 $ 5.00 $ 500.00 $ 4.00 $ 480.00 $ 2.00 $ 8,740.00 $ 1.50 $ 75.00 $ 1.50 $ 7.950.00 $ 147.00 $ 2,058.00 $ 380.00 $ 1,520.00 $ 5,000.00 $ 5,000.00 $ 49.50 $ 2,178.00 $ 175.00 $ 350.00 $ 6.80 $ 1,360.00 $ 3.90 $ 1,053.00 $ 4.00 $ 400.00 $ 2.75 $ 330.00 $ 1,45 $ 6,336.50 $ 0.57 $ 28.50 $ 1.00 $ _ 5,300.00 40 8-09 Raised Pavement Marker Type 2 4 HUND 500.00 5 2.000.00 41 8-21 Permanent Signing 1 LS $ 2.500.00 1 2,500.00 42 8-22 Plastic Traffic Arrow 44 EA 5 80.00 51 3.520.00 43 8-22 Flask Traffic Letter _ 2 EA 9; 100.00 $ 200.00 44 8-22 Plastic Stop Line 200 LF I; 50.00 5 10,000.00 45 8-22 Plastic Crosswalk Line _ 270 SF $ 8.00 1 2.160.00 46 8-22 Plastic Line, 12 Inch 100 LF I, 3.00 € 300.00 47 8-22 Plastic Line. 8 Inch 120 LF 9, 3.00 $. 360.00 48 8-22 Plastic Line, 41nch 4.370 LF 11 1.00 1 4.370.00 49 _ 8-22 Paint Line, 4 Inch 50 LF $ 1.00 5 50.00 50 8-23 Temporary Pavement Markings 5.300 LF $ 0.50 5 2.650.00 ROADSIDE DEVELOPMENT 51 I 8-02 'Topsoil TypeA II 10 1 CY 1 5 45.00 5 450.0011 $ 350.00 $ 3,500.00 $ 250.00 $ 2,500.00 $ 100.00 $ 1,00000 $ 200.00 $ 2,000.00 $ 4.00 $ 4,000.00 $ 5.00 $ 5,000.00 $ 3.000.00 $ 3.000.00 $ 3,000.00 $ 3.000,00 52 8-02 Edge Restoration 11 1.000 1 LF I $ 4.00 1 $ 4,000.00 II $ 5.00 $ 5,000.00 $ 4.80 $ 4,800.00 53 8-02 Property Restoration 11 1 1 FA 1 $ 3.000.00 1 $ 3,000.00 II $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3.000.00 FRANCAISE UTILITY ITEMS 54 1 8-19 'Adjust Franchise Utility Manh5leNault G 7 1 EA 1 $ 900.00 1 5 6.300.00 11 $ 1,100.00 $ 7,700.00$ 1,000.00 5 7,000.00 $ 1,850.00 $ 12,650,00 $ 850.00 $ 5,950.00 55 1 8-19 'Adjust Gas Valve 0 8 1 EA 1 $ 650.00 I $ 5.200.00 II $ 593.00 $ 4.744.00 I $ 400.00 $ 3,200.00 I $ _ 700.00 $ 5.600.00 I $ 400.00 $ 3,200.00 Subtotal 5 1,012,575 11 $ 838,423.501 1 $ 989,729.201 1 $ 1,195,100.001 1, 5 1,297,522.50 NoSectio No. n Item Quantity Unit Unit Cost Total Cost ROADWAY 56 1-04 Unexpected Site Changes _ 1 FA $ 1,000.00 5 1.000.00 $ 1,000.00 $ 1,000.00 $ 1,600.00 $ 1,600.00 $ 8,100.00 $ 8,100.00 $ 6,800.00 $ 6,800.00 $ 55.00 $ 3,850.00 $ 15.00 $ 2,100.00 $ 1,350.00 $ 1,350.00 $ 83.00 $ 16,600.00 $ 40.00 $ 2,400.00 $ 63.00 $ 630.00 $ 81.00 $ 36,450.00 $ 21,00 $ 1,680.00 $ 593.00 $ 593.00 $ 58.00 $ 580.00 $ 67.50 $ 8,775.00 $ 36.50 $ 1,825.00 $ 1,000.00 $ 500.00 $ 19,200.00 $ 18,500.00 $ 60.00 $ 50.00 $ 500.00 $ 90.00 $ 40.00 $ 150.00 $ 100,00 $ 75.00 $ 900.00 $ 60.00 $ 72.00 $ 39.00 $ 1,000.00 $ 500.00 $ 19,200.00 $ 18,500.00 $ 4,200.00 $ 7,000.00 $ 500.00 $ 18,000.00 $ 2,400.00 $ 1,500.00 $ 45,000.00 $ 6,000.00 $ 900.00 $ 600.00 $ 9,360.00 $ 1.950.00 $ 1,000.00 $ 1,000.00 $ 10,000.00 $ 10,000.00 $ 55.00 $ 50.00 $ 1,000.00 $ 115.00 $ 90.00 $ 100.00 $ 110,00 $ 125.00 $ 700.00 $ 100,00 $ 50.00 $ 65.00 $ 1,000.00 $ 1,000.00 $ 10,000.00 $ 10,000.00 $ 3,850.00 $ 7,000.00 $ 1,000.00 $ 23,000.00 $ 5,400.00 $ 1,000.00 $ 49,500.00 $ 10,000.00 $ 700.00 $ 1,000.00 $ 6,500.00 $ 3,250.00 $ 1,000.00 $ 1,000.00 $ 20,000.00 $ 10,000.00 $ 60.00 $ 30.00 $ 1,500.00 $ 75.00 $ 75.00 $ 35.00 $ 85.00 $ 25.00 $ 400.00 $ 100.00 $ 39.30 $ 51.75 $ 1,000.00 $ 1,000.00 $ 20,000.00 $ 10,000.00 $ 4,200.00 $ 4,200.00 $ 1,500.00 $ 15,000,00 $ 4,500.00 $ 350.00 $ 38,250.00 $ 2,000.00 $ 400.00 $ 1,000.00 $ 5,109.00 $ 1587.50 57 1-07 SPCC Plan 1 LS 5 1,000.00 $ 1.000.00 58 1-09 Mobilization 1 LS 5 10.000.00 $ 10,000.00 59 1-10 Project Temporary Traffic Control 1 LS 5 10.000.00 $ 10,000.00 60 2-02 Cement Conc. Sidewalk Removal Incl. Haul 70 SY 5 60.00 5 4.200.00 61 2-02 Cement Conc. Curb Removal Incl. Haul 140 LF 6 25.00 5 3,500.00 62 2-02 Removal of Structure and Obstruction 1 LS 5 1,000.00 $ 1,000.00 63 2-02 Roadway Excavation Incl. Haul 200 CY 3 90.00 $ 18.000.00 64 2-03 Unsuitable Foundation Excavation Incl. Haul 60 CY 5 95.00 5 5,700.00 65 4-04 Crushed Surfacing Top Course 10 TON 5 60.00 $ 600.00 66 5-04 HMA Cl. 1/2 PG 6422 450 TON s 100.00 $ 45.000.00 67 5-04 HMA Speed Bump 80 LF 5 5.00 $ 400.00 68 7-12 Adjust Water Valve 1 EA $ 500.00 Si 500.00 69 8-01 Inlet Protection 10 EA 3 80.00 9 800.00 70 8-04 Cement Conc. Curb and Gutter 130 LF 9 40.00 $ 5,200.00 71 8-04 Integral Curb 50 SF $ 30.00 $ 1,500.00 'SIDE WALK 1 72 8-14 Cement Conc. Sidewalk 70 1 SY $ 70.00 $ 4,900.00 $ 92.50 $ 6,475.00 5 98.00 $ 3,000.00 $ 6,000.00 $ 3,600.00 $ 6,750.00 $ 6.750.00 $ 8.300.00 5 6,860.00 $ 7,200.00 $ 8.300.00 $ 70.00 $ 3,100.00 $ 3,000.00 $ 4,900.00 $ 56.40 $ 6,200.00 $ 2,455.00 $ 3,000.00 $ 2,420.00 $ 3,948.00 $ 4,910.00 $ 2.420 00 73 8-14 Cement Conc. Curb Ramp - II 2 EA $ 2,700.00 $ 5,400.00 74 8-14 Dual Cement Conc. Curb Ramp H 1 EA $ 3,500.00 $ _ 3,500.00 STORM SEWER 75 7-05 .0I.-r:°i Drain Marker fl 5 1 EA 1 5 30.00 $ 150.0011 5 18.00 $ 90.00 I $ 20.40 $ 102.00 1 $ 25.00 $ 125.00 1 5 17.00 5 85.00 IC COAITROL DEVICES 76 8-22 Paint Line, 4 Inch 730 I LF 15 1.00 I $ 730.00 $ 0.60 $ 438.00 I $ 0.70 $ 511.00 I $ 0.75 $ 547.50 I $ 0,57 5 416.10 ROADSIDE DEVELOPMENT 77 8-02 Topsoil Type II 5 CY $ 45.00 $ _ 22500 $ 350.00 $ 1,750.00 $ 200.00 11 $ 500.00 $ 500.00 $ 500.00 $ 1,000.00 $ 500.00 $ 100.00 $ 500.00 $ 500.00 $ 200.00 $ 500.00 $ 500.00 $ 1,000.00 $ 500.00 78 8-02 Property Restoration II 1 FA $ 500.00 $ 500.00 FRANCHISE UTILITY ITEMS 79 8-19 Adjust Gas Valve II 2 I EA I $ 650.00 I $ 1.300.00 1 $ 593.00 $ 1.156,501 $ 900.00 $ _ 1,000.00 1 $ 700.00 $ 1,400.00 1 $ 400.00 $ 800.00 Subtotal 5 _ 125.105 --EiMilEELI$ 162,883.00 1 $ 151.372.501 $ 125,175.60 SCHEDULE A TOTAL ESTIMATED CONSTRUCTION COST $ 1,012,575 SCHEDULE B TOTAL ESTIMATED CONSTRUCTION COST $ 125,105 TOTAL ESTIMATED CONSTRUCTION COSTI $ 1,137,680.00 5 8311423.50 117,522.00 S 8$6,646.60 5 989,729.20 5 152,8$3.00 $ 1,152,612.20 $ 1,19:.166.00 $ 155.372.50 5 1,346,472.50 5 1.,297,522.50 5 125,175.60 I $ 1,422,698.10 Lakeside Calculations appear to be correct, however, their total is incorrect Lakeside Calculations appear to be correct, however, their total is incorrect 169 170 City of Tukwila City Council Transportation & Infrastructure Committee TRANSPORTATION & INFRASTRUCTURE COMMITTEE Meeting Minutes April 23, 2018 - 5:30 p.m. - Hazelnut Conference Room, City Hall Councilmembers: Thomas McLeod, Chair; De'Sean Quinn, Zak Idan Staff: David Cline, Henry Hash, Steve Carstens, Dave Sorensen, Jack Pace, Jaimie Reavis, Cyndy Knighton, Gail Labanara, Laurel Humphrey CALL TO ORDER: Committee Chair McLeod called the meeting to order at 5:30 p.m. I. PRESENTATIONS II. BUSINESS AGENDA A. BNSF Flagging and Inspection Cost Increases Staff is seeking Council approval of BNSF's increased flagging and inspection costs for the remainder of the Boeing Access Road over BN RR Bridge Rehabilitation Project. An Overpass Agreement currently in effect allows the City and its contractor to work in the BNSF right-of- way and pays for the required railroad flagging and inspection services performed by BNSF. The original flagging and inspection fees were estimated at $149,428, and the additional $300,000 was calculated based upon average charges from the previous six months. The project contingency is sufficient to cover this additional cost. Committee members expressed concern about the change in cost and asked staff to communicate with BNSF to ensure there are no further increases. The Committee decided to place this item under New Business at the May 7, 2018 Council meeting rather than the Consent Agenda to give staff opportunity to explain the change. UNANIMOUS APPROVAL. FORWARD TO MAY 7, 2018 REGULAR MEETING. B. Bid Award: 2018 Overlay and Repair Program *Staff is seeking Council approval to award a construction bid to ICON Materials in the amount of $955,945.50 for the 2018 Overlay and Repair Program. Construction will include pavement repairs and an asphalt overlay at four locations in the City as determined by the pavement condition index rating on which all roads in the City are evaluated. ICON was the low bidder and constructed last year's overlay program and staff was very happy with their work. Chair McLeod heard from a resident with professional experience in road paving who shared personal opinions about the responsive bidders. Chair McLeod asked what compels the City to go with the lowest responsive bidder and staff replied this is state law. Unless the City has a specific negative experience with a company, it cannot legally turn down the lowest responsive bid. Councilmember Quinn noted that funding of this program should be evaluated with regard to the 2019-2020 budget. The Committee decided to place this item under New Business rather than the Consent Agenda of the May 7, 2018 Regular Meeting. UNANIMOUS APPROVAL. FORWARD TO MAY 7, 2018 REGULAR MEETING. 171