HomeMy WebLinkAboutCOW 2018-05-14 Item 4D - Public Safety Plan - Justice Center Design DevelopmentCOUNCIL AGENDA SYNOPSIS
lrriliatJ
Meet in; Dale
Prepared by
_Mayor's review
Connell review
05/14/18
RB
�'
l�
❑ Ordinance
.1ltg Date
❑ 13id 'board
Altg Date
❑ Public Hearing
,111; Date
❑ Other
:1118 Date
C.A"1'FGt)RY ►1 Discussion
zlltg Date
SPONS(>I2 ❑Council
❑IIR ❑DO) ❑I'inune ❑Fire ❑7S ❑P&R ❑Po/ice ❑Pit"' ❑Court
Mayor
SPONsc>12's Staff is seeking Council consensus to move forward to the Design Development phase of
SUMNI,AR1' the Justice Center.
RI .v II :AV'I.1) BY ❑ C.O.W. Mtg. ❑ CDN Comm
❑ "Trans &Infrastructure ❑ Arts Comm.
DATE: 5/7 & 5/8
11 Finance
ITEM INFORMATION
ITEM No.
4.D.
SI', -AFF SPONSOR: RACHEL BIANCHI
ORIGINAL AG I?N1),A DAM: 1: 5/14/18
AGI.N1) \ hll:MTrrl.l•: Justice Center Schematic Design and Cost Estimate
5/14/18
❑ ,Motion
,1 kg Date
❑ Resolution
AIig Date
❑ Ordinance
.1ltg Date
❑ 13id 'board
Altg Date
❑ Public Hearing
,111; Date
❑ Other
:1118 Date
C.A"1'FGt)RY ►1 Discussion
zlltg Date
SPONS(>I2 ❑Council
❑IIR ❑DO) ❑I'inune ❑Fire ❑7S ❑P&R ❑Po/ice ❑Pit"' ❑Court
Mayor
SPONsc>12's Staff is seeking Council consensus to move forward to the Design Development phase of
SUMNI,AR1' the Justice Center.
RI .v II :AV'I.1) BY ❑ C.O.W. Mtg. ❑ CDN Comm
❑ "Trans &Infrastructure ❑ Arts Comm.
DATE: 5/7 & 5/8
11 Finance
Comm.
Comm.
CI-L1IR: HOUGARDY/QUINN
11 Public Safety Comm.
❑ Parks
COMMITTEE
❑ Planning Comm.
RECOMMENDATIONS:
SPONSOR/ADMIN.
CO I.\II
Mayor's Office
D111.I? Unanimous Approval from PS Committee to move to C.O.W.
COST IMPACT / FUND SOURCE
E\I'I:NI)I'1'UR1: RF:OU1RI::D AMOUNT BUDGETED APPROPRIATION REQUIRED
$ $
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
MTG. DATE
ATTACHMENTS
5/14/18
Informational Memorandum dated May 1, 2018
Justice Center Schematic Design Presentation
Minutes from the Public Safety Committee meeting of 5/7/18
4 1_ r_
166
TO:
City of Tukwila
Allan Ekberg, Mayor
INFORMATIONAL MEMORANDUM
Public Safety Committee
Finance Committee
FROM: Rachel Bianchi
CC: Mayor Ekberg
DATE: May 1, 2018
SUBJECT: Justice Center Schematic Design and Updated Fire Station Budget
ISSUE
The City has completed Schematic Design of the Justice Center. As the Council's Program
Management Quality Assurance (PMQA) Consultant has indicated, the end of Schematic
Design provides the owner with the first "real" budget number for the project. At the end of the
programming phase, the budget for the Justice Center was increased to $68.5 million, largely
due to cost escalation and market conditions. The Schematic Design estimates confirm this
budget.
BACKGROUND
The Justice Center will hold the City's Police Department, Municipal Court and Emergency
Operations Center. It will provide a seismically safe, efficient facility for City staff and better
access to key City services for the public. Stakeholders from the Police Department, Court and
EOC have been directly involved in the planning and design of the facility, which features the
following:
• Conference center area allows for flexible use by City staff and the community that morphs
into the Emergency Operations Center during an activation; this maximizes the use of
key space.
• Modern Court facilities, including necessary private meeting rooms, holding area, and
probation spaces.
• Critical police functions addressed, including records area, evidence, training facilities and
team areas to facilitate teamwork.
• NeighborHUB theme that creates a joint staff room area for co-worker collaboration.
• Planned areas for future expansion (second court room when needed, additional office
space for the Police Department).
The pre-program Justice Center square footage was targeted at 45,500. While the architects
and stakeholders worked to produce a design at that square footage, it was determined that the
loss of key functions in the building were not acceptable and the building as currently designed
is at 47,200. The City's General Contractor/Construction Management firm, BNBuilders (BNB),
confirmed that the savings was less than $350,000 to achieve the 45,500 square footage. Key
efficiencies lost in the 45,500 SF design include the hallway in the conference center, requiring
public access to that space to go through the Police Department, loss of evidence storage,
training space and an interview room in the Police Department, and reduction to one holding cell
in the Court. The 47,200 SF version is what was estimated at $68.5 million.
Similar to the process with the fire stations, once Schematic Design was finished, DLR Group's
cost estimator, Roen, and BNB, independently of each other, developed cost estimates for the
Justice Center. Both initial cost estimates came within less of one percent of each other and the
two organizations have agreed to the $68.5 million budget. The ability to have a GC/CM on
167
INFORMATIONAL MEMO
Page 2
board early and intimately involved in the Schematic Design effort directly led to this successful
cost estimate reconciliation.
RECOMMENDATION
Staff is seeking committee approval to forward this issue to the May 14, 2018 Committee of the
Whole meeting for consensus with a recommendation that the City continue into the Design
Development phase for the Justice Center. The Council's PMQA Consultant concurs with the
staff recommendation.
Despite the budget challenges, the need for a modern, Justice Center remains very real, for the
broader community and for the staff that work in these facilities. Staff recommends moving
forward to the next phase, Design Development, while the Finance Committee continues its
work to identify strategies for closing the financial gap on the Public Safety Plan. Roen, the cost
estimator for DLR Group estimates that cost escalation for this project is $115,000 per month.
The Council will continue to have multiple decision points in the future that provide "off ramps" if
so desired.
ATTACHMENT
Justice Center Schematic Design Presentation
168 W.12018 Info MemoslJusticeCenterDesign.doc
TUKWILA JUSTICE CENTER
)
11 171C-,. 01:094T 5IX1L.
1{, 2IT N119 PaCt CV-P6L7 al K=N,F.
73 JD:tram siALLS
ti 3
, -1
11.111
[ 5'9
Nmpna.lr.
+rm.
- -
sS$SS5
.1.1
,
1 „
I r
- ,__--
OLIANTIITY
LARGE TREES
MEDIUM TREES 70
SMALL TREES 124
SHRU RIGROUNDCOVE R AREA: 4.201113 SF
STORMWATER 0 ETENTPON AREA' 6200 SF
LAWN AREA
' CONCRETE AREA:
ASPHALT AREA
..16
51TE FURNISH INGS :
4050 SF
17500 SF
73000 SF
200 LF
e C CC CC CCC c C C 4cC C7 -C C
TX 'NW Ili, at STANDAR° 1311W,LE
reicEMi,9
SSSSsSss
SSSSS
re)
ASPHALT
Cri
IS S
PAVEM ENT TYP
S.S SS S
1/1
SSSS,
_
C.4
Sl
SD DRAFT VERSION - 2018-04-06
SHRUB!
GROLJ NDCOVER
AR EA. TYP
CONCRETE
PAVEMENT, TY P
- CONCRETE, STEEL,
AND WOOO
F1NIHI0, TYP
ez ...,,„..
W
xr-or
SWI FTCOM l'ANY
rt,g1,1.
.I -d-..# 1•44111 -ma
.411....ormwmpaw.
0
U.J
UJ
WD
LANDSCAPE + SITE PLAN : CONCEPT
0
TUKWILA JUSTICE CENTER
FIRST FLOOR
SALLY
SALLY
N
8 16 32
FUTURE COURTROOM
LEVEL 1 AREA TOTAL FACILITY GROSS SF AREA
Police 13,583 Police 28,154
EOC 1,906 EOC 1,906
Courts 9,571 Courts 9,571
Shared Spaces 5,260 Shared Spaces 5,260
Building Support 4,728 Building Support 4,983
Total 31,864 GSF Total 46,690 GSF
SECOND FLOOR
0
o 0
0
16 32
LEVEL 2 AREA TOTAL FACILITY GROSS SF AREA
Police 14,571 Police 28,154
EOC EOC 1,906
CourtsCourts 9,571
Fria-
Shared SpacesShared Spaces 5,260
Building Support 255 Building Support 4,983
Total 14,826 GSF Total 46,690 GSF
COST ESTIMATE
CITY OF TUKWILA
Public Safety Plan
Justice Center
Conceptual udget Summary
YOE $ (in thousands)
FUNDING SOURCE - ased on Initial Project Costs
YEAR OF EXPENDITURE (YOE) SUM MARY
Justice Center
A/E Services (both design & CA)
11/16/17
UTGO (voter-
approved)
Impact Fees
General
Fund
Enterprise
Funds
TOTAL
Fire Stations
18,824
4,750
858
-
24,432
Justice Center
28,629
-
-
-
28,629
Public Works Shop
-
-
14,747
14,746
29,493
Facilities Total
47,453
4,750
15,605
14,746
82,554
Fire Apparatus/Equipment
29,932
-
-
-
29,932
Public Safety Plan Total
$ 77,385
$ 4,750
$ 15,605
$ 14,746
$ 112,486
PROJECT COSTS
Justice Center Program -INITIAL UDGETESTIMATE
Project Category
Justice Center
A/E Services (both design & CA)
2,292,714
Permits/Fees
439,890
Construction for uilding (pre -con, const, tax)
16,532,615
Construction for Site Development
-
Construction Related Costs (incl bond)
1,034,797
PM Services (incl other prof svcs)
_ 1,269,789
Contingency (incl Construction & Proj)
1,059,195
Land Acquisition
6,000,000
TOTAL
28, 629, 000
Justice Center - UDGET ESTIMATE (Schematic Design, May2018)
FUNDING
GAP
Project Category
Justice Center
A/E Services (both design & CA)
3,500,000
1,207,286
Permits/Fees
700,000
260,110
Construction for uilding (pre -con, const, tax)
26,477,794
9,945,179
Construction for Site Development (incl ROW)
12,260,884
12,260,884
Construction Related Costs (incl bond)
2,112,639
1,077,842
PM Services (incl other prof svcs)
1,594,000
324,211
Contingency (incl Construction & Project)
5,757,731
4,698,536
Contingency for Site Contamination (soils, hazmat)
750,000
750,000
SU TOTAL
53,153,048
30,524,048
Land Acquisition
14,133,295
8,133,295
Contingency for Land Acquisition
1,250,000
1,250,000
TOTAL
68,536,343
39,907,343
NEXT STEPS
•COUNCIL CONSENSUS TO PROCEED
•DESIGN DEVELOPMENT
•TARGET VALUE COORDINATION WITH GCCM
•COORDINATION WITH CITY OF TUKWILA
PLANNING AND PARKS DEPARTMENT
•EARLY CONSTRUCTION PACKAGES FOR GCCM
City of Tukwila
City Council Public Safety Committee
PUBLIC SAFETY COMMITTEE
Meeting Minutes
May 7, 2018 - 5:30 p.m. - Hazelnut Conference Room, City Hall
Councilmembers: Kathy Hougardy, Chair; Dennis Robertson, Thomas McLeod
Staff: David Cline, Rachel Bianchi, Chris Flores, Peggy McCarthy, Eric Dreyer, Ben
Hayman, William Rodal, Henry Hash, Bruce Linton, Laurel Humphrey
Guests: Justine Kim & Ethan Bernau, Shiels Obletz Johnsen; Steve Goldblatt, consultant;
Erica Loynd & Lori Coppenrath, DLR Group
CALL TO ORDER: Chair Hougardy called the meeting to order at 5:30 p.m.
I. ANNOUNCEMENT
11. BUSINESS AGENDA
A. Legislation related to Hazardous Materials Incident Responses
Staff is seeking Council approval of an ordinance and a resolution that would allow the City to
recover the cost associated with responding to hazardous materials incidents. The proposed
ordinance would reenact TMC 6.14, "Hazardous Materials Cleanup," to include new language
requiring those responsible for a hazardous materials incident to assume responsibility for the
cost of the response. The resolution would amend the Fire Department Fee Schedule to include
a $250 minimum fee for hazardous incident response plus any "extraordinary costs" as defined
in the code. UNANIMOUS APPROVAL. FORWARD TO MAY 14, 2018 COMMITTEE OF THE
WHOLE.
B. Fire Department Apparatus Equipment Purchase
Staff is seeking Council approval to purchase outfitting equipment in an amount not to exceed
$235,000.00 for the two Fire engines and ladder truck approved by Council in February 2018.
Existing department inventory will be transferred to the new apparatus if it is still serviceable.
As follow up to the April 16, 2018 Committee discussion, staff presented a list detailing the
estimated equipment costs for one Pierce Aerial #5905 and two Pierce Pumpers #5904 and
#5906. UNANIMOUS APPROVAL. FORWARD TO MAY 21, 2018 REGULAR CONSENT AGENDA.
C. Justice Center Schematic Design and Updated Budget
*Staff is seeking Council approval to proceed with the Design Development phase of the new
Justice Center building. Schematic Design is now complete, providing the Council with the first
predictable budget for the project, which is verified at the $68.5 million estimated at the end of
the programming stage. The schematic design is for a 46,690 square foot building. The pre-
program square footage was targeted at 45,500, but it was not possible to design a building that
size without losing key functions. The building design reflects the collaborative effort of the
stakeholders in Police, Court, and Emergency Operations. The proposal includes a flexible
175
Public Safety Committee Minutes May 7, 2018
conference area, modern court facilities, police functionality, joint staff areas, and planned
areas for future expansion if needed. Schematic design represents 30% design while design
development will be 60%. UNANIMOUS APPROVAL. FORWARD TO MAY 14, 2018 COMMITTEE
*
OF THE WHOLE.
D. Public Safety Plan Financing
Staff updated the Committee on the work that the Finance Committee has been doing on Public
Safety Plan financing, specifically developing potential strategies to address the budget gap
that has resulted from market conditions. The Finance Committee has been reviewing these
strategies since February, and have discussed debt capacity, impact fees, land sales, REET, new
revenue options, general fund and capital improvement prioritization, and more. The Finance
Committee has requested information on the overall budget forecast for the City and the six-
year financial plan before it can make a recommendation to the Full Council. Once the Council
makes a final decision, an open house for the public will be held. DISCUSSION ONLY.
III. MISCELLANEOUS
The 2018 Public Safety Committee Work Plan was included in the packet for Councilmember
reference.
Adjourned 6:51 p.m.
176
Committee Chair Approval