HomeMy WebLinkAboutTIC 2018-05-29 COMPLETE AGENDA PACKETloopno
City of Tukwila
Transportation and
Infrastructure Committee
•:•
•:•
•:•
Thomas McLeod, Chair
De'Sean Quinn
Zak Idan
Distribution:
T. McLeod
D. Quinn
Z. Idan
V. Seal
D. Robertson
Mayor Ekberg
D. Cline
L. Humphrey
H. Hash
G. Labanara
City Engineer
P. Brodin
R. Turpin
A. Youn
Clerk File Copy
2 Extra
Place pkt pdf on Z:\Trans &
Infra Agendas
e-mail cover to: A. Le,
C. O'Flaherty, A. Youn,
D. Almberg, B. Saxton,
S. Norris, L. Humphrey,
V. Seal, T. McLeod
AGENDA
TUESDAY, MAY 29, 2018 — 5:30 PM
HAZELNUT CONFERENCE ROOM
(EAST ENTRANCE OF CITY HALL)
Item
Recommended Action
Page
1. PRESENTATION(S)
2. BUSINESS AGENDA
a) 2019-2024 Transportation Improvement Program
a) Forward to 6/25/18 C.O.W
Pg. 1
Resolution
and 7/2/18 Regular
3. SCATBd
4. MISCELLANEOUS
b) Crosswalks & Stop Signs
b) For Discussion Only
Pg. 1
5. ANNOUNCEMENTS
Future Agendas:
• 2018 Committee Work Plan
Next Scheduled Meeting: Monday, June 25, 2018 (June 11, 2018 cancelled)
SThe City of Tukwila strives to accommodate individuals with disabilities.
Please contact the Public Works Department at 206-433-0179 for assistance.
City of Tukwila
INFORMATIONAL MEMORANDUM
Ilan Ekberg, Mayor
TO: Transportation and Infrastructure Committee
FROM: Henry Hash, Public Works Director /71,
BY: Cyndy Knighton, Senior Program Manager
CC: Mayor lEkberg
DATE. May 25, 2018
SUBJECT: Resolution for Six -Year Transportation Improvement Program 20t9 -2024j
ISSUE
Approve a Resolution adopting the annual update of the Six -Year Transportation Improvement
Program for 2019-2024.
ACKGROUND
The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code
of Washington (ROW). The TIP is adopted by resolution after a public hearing at the local agency level
and incorporated into regional and state TIPs. The TIP is primarily a financial planning document for
projects competing for grants. Any project submitted for federal grant funding must be included in the
local, regional, and state adopted TIPs, The TIP is a rolling plan showing various funding sources:
grants, developer and local funds, Projects "roll" as funds or stages occur (design report, final design
and construction).
Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation -related
projects. The TIP generally lists only those transportation -related projects planned within the next six
years that are deemed regionally significant or that have grant funding awarded or expected. The TIP
is scheduled for adoption on July 2, 2018.
ANALYSIS
The attached spreadsheet is the "Draft"' 2019 - 2024 TIP and was created by modifying the 2018 -
2023 TIP to add or remove projects and adjust project costs. No prioritization was assigned and the
list of projects is presented in alphabetical order. Prioritization of projects is reflected in the current
CIP. Eight new projects were added, and 5 projects were removed because they have either been
completed or moved beyond the 6 -year time frame of the TIP.
Added: 42nd Ave S ridge Replacement, 46' Ave S Safe Route to School (SRTS), Green River Trail,
Macadam Rd Complete Streets, S 152St SRTS, TIB Retrofit, West Valley Highway/Longacres Way
Shared Use Pathways (was combined with West Valley Highway Project in 2018 TIP).
Deleted: Completed: Beacon Ave S Bridge, Cascade View SRTS, Frank Zepp Bridge, Grady Way
ridge. Moved to Beyond: Walk & Roll Program.
FINANCIAL IMPACT
None.
RECOMMENDATION'
Council is being asked to approve the Resolution for the 2019 - 2024 Six -Year Transportation
Improvement Program and consider this item at the June 25, 2018 Committee of the Whole with a
Public Hearing and subsequent July 2, 2018 Regular Meeting.
Attachments: Draft Resolution
Draft 2019-2024 TIP Summary
2019 2024 "Draft" Transportation Improvement Program
current Adopted 2018— 2023 TIP
vvApvv ngT' ROJIECT SLA- RW t?, RS Nolet;RMTIP4Info Memo TIP 2019,docx
A RESOLUTION OF THE CITY COU
OF TUKWILA, WASHINGTON, A
TRANSPORTATION IMPROVE
2024), AND DIRECTING TH
THE STATE SECRETARY
THE TRANSPORTATION IM
'ZING A S
PROGRAM
E TO BE FILED
RANSP ATION AN
EM OARD.
CITY
AR
WHEREAS, pursuant to the
City Council of the City of Tukwila
Program and thereafter periodically
by resolution; and
WHEREAS, the
program, determine
these findings, h
ensuing six calen
WHE
Year Tr
►®C'
WAS
Secti
for the calen
E
•
JAP.0040
ements o
�� iously ado
Tran
•
•
cil has0-
uture
-Year
024); an
8, a
ent Program;
`rent a
epared a
c, -ars (20
Ju
ron
THEREF��a
TON, HERE
•
f
p
Progra
ars 2
Sfi
t,
•
•
ES
Chapters 35.77 and 47.26, the
• a Transportation Improvement
ation Improvement Program
d thk accomplished under said
treet and arterial needs and, based upon
sportation Improvement Program for the
.
ari1g was held regarding the City's Six -
CITY COUNCIL OF THE CITY OF
•° 1
S AS FOLLOWS:
TUKWILA,
opted. A Six -Year Transportation Improvement Program
o 2024, attached hereto as Exhibit A, is hereby adopted.
Section 2. Program. The City Clerk is hereby authorized and directed to
file a copy of this res ution, together with the exhibit attached hereto, with the Secretary
of Transportation and the Transportation Improvement Board of the State of Washington
W:\Word Processing\Resolutions\TIP 2019-2024 5-17-18
CK:bjs
Page 1 of 2
2
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of , 2018.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk Verna Seal, Co cil President
APPROVED AS TO FORM BY:
Rachel B. Turpin, City Attorney
Filed
Pa
� ►",.s e ` * Jerk:
• '•y the Ci`����•uncil:
ution Number
741 t
Exhibit A: City of Tukwila Six -Year Transportation`
ent Program for 2019 to 2024
Fr
W:\Word Processing\Resolutions\TIP 2019-2024 5-17-18
CK:bjs
r%
Page 2 of 2
3
DRAFT 2019 - 2024 TIP SUMMARY
2017 CIP
Page No.
May 22, 2018
Project Costs in Thousands of Dollars FUNDING SOURCES
2019 2020 2021 2022 2023 2024 TOTAL Federal State/TIB Developer Unsecured City
1 42 -42nd Ave S (S 160 St - S 131 PI)
42nd Avenue ue S Bridge Replacement
46th Avenue Safe Routes to School
2 53rd Ave S (S 137th St - S 144th St)
3 ADA Improvements
5 Annual Bridge Inspections and Repairs
6 Annual Overlay and Repair Program
4 APE/Minkler Blvd Intersection
BAR over Airport Wy Bridge Seismic Retrofit"
8 BNSF Regional Center Access
Green River Trail
Macadam Road S Co, e qtr ets P.
12 Multipurpose Trails
13 S 140th St Intersection Improvements
14 S 144th St Bridge Sidewalks
S 152nd Street Safe Routes to School
15 Strander Blvd/SW 27th St St Phase III
17 TUC/TOD Pedestrian Improvements
Tukwila Int'; Blvd Retrofit
19 West Valley Highway
fi(
19 1Y e'fH/Longac.es Way Shared Use Pathways
2
3,000 0 0
1, 1,950
2,125 0
250 0
200 200
335 405
1,740 1,800
0 144
2,614 0
0 0
0
412
3 4,101
20 200
19 335
18 1,730
27 0
367
23 0
0
7 2,733
32 0 0
22 0 0
17 443 0
243 2,583
13 4,500 1,450
25 0 0
100 0
26 318 2,552
726 0
0
0
125
0
0
0
0
0
0
0
0
0
200
405
1,850
1,570
0
0
0
0
0
625
0
0
0
0
0
0
0
0
0
200
405
1,800
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4360 7,360
15,750
2.537
4,351
1,200
2,300
10,870
1,714
2,981
100
0
0
200
415
1,950
0
0
100
0
0
150
0
0
0
0
4,270
0
0
0
150
750
443
2,826
5,950
4,270
100
2,870
726
19,500
2,537
2,274
2,981
896
675
416
2,826
5,147
2,434
628
250
7,360
3,250
0
2,077
1,200
2,300
10,870
1,714
0
100
140
460
150
75
27
0
803
4,270
100
186
98
TOTAL
PROJECTS REVISED FROM 2018-2023 TIP
New:
42nd Avenue S Bridge Rep!ocelent
46th Avenue Safe Routes to Sctoo
Green River ..ail
Macadam Road 5 Complete Streets Pr=oect
5 152nd Street Safe Routes to School
ukvii=. Intl=. Blvd Retrofit
WVH/Longacres Way Shared Use Pathways
" Project added to STIP mid-cycle
16,972 18,182 4,960 11,150
Deleted/Completed:
Beacon Ave S Bridge Preventative Maintenance
Cascade View SFTS Phase 2
Frank Zepp Bridge Preventative Maintenance
Grady Way Bridge Preventative Maintenance
8,805 11,445 71,514 22,152 13,932
Deleted/Moved to Beyond:
Walk & Roll Program
250
35,180
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
5th & 6th
WA -07745
40-42 Ave S (S 160 St - S 131 PL)
S 160th Street to S 131st Place
Design and construct street improvements, underground aerial utilities, drainage,
sidewalks, bike facilities, and driveway adjustments
06/25/18
07/02/18
3,000,000
3,000,000
04
C G O P S
TW
2024
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2019
5th & 6th
0
0
3,000,000
3,000,000
P
CN
2024
0
0
0
4,360,000
4,360,000
Totals
0
0
0
7,360,000
7,360,000
Expenditure Schedule
Phase
1st
2nd
3rd.
4th
5th & 6th
CN
3,000,000
0
0
0
4,360,000
Totals
3,000,000
0
0
0
4,360,000
Report Date: May 17, 2018
Page 1
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
08
BR
WA -11101
06/25/18
07/02/18
546,000
2,100,000
11
C G P S T
0.060
DCE
No
6.150.000
0
260,000
1,000,000
P
CN
2022
BR
W
0
2,444,000
12,650,000
Totals
42nd Ave S Bridge Replacement
0
3,250,000
15,750,000
42nd Ave S
Interurban Avenue S to North Bridge
Design and construct a replacement structure for the existing S 42nd Ave bridge. 8109700
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
BR
1,554,000
0
0
546,000
2,100,000
P
RW
2021
BR
740,000
6.150.000
0
260,000
1,000,000
P
CN
2022
BR
10.206,000
0
2,444,000
12,650,000
Totals
12,500,000
0
3,250,000
15,750,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
1,600,000
0
250,000
250,000
RW
0
0
1000000
0
0
CN
0
0
250.000
6.250.000
6.150.000
Totals
0
1,600,000
1,250,000
6,500,000
6,400,000
Report Date: May 17, 2018
Page 2
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA -11113
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S,
including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised
crosswalk across S 144th Street with RRFB.
06/25/18
07/02/18
0
180,057
05
RW
0.370
0
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
SRTS
180,057
0
180,057
P
RW
2019
0
0
SRTS
232.000
0
232.000
P
CN
2020
0
0
SRTS
2.124.668
0
2.124.668
Totals
0
2,536,725
0
2,536,725
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
180.057
0
0
0
0
RW
232,000
0
0
0
0
CN
0
2,124,668
0
0
0
Totals
412,057
2,124,668
0
0
0
Report Date: May 17, 2018
Page 3
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -06601
53rd Avenue S
S 137th St to S 144th St
Design and construct urban residential street improvements that include curb, gutter,
sidewalk , illumination and undergrounding. Street portion will coordinate with Water,
Surface Water and Sewer capital improvement program projects.
06/25/18
07/02/18
2,714,849
4,989,214
04
C G O P S
TW
0.420
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2019
0
TIB
2,274,365
2,714,849
4,989,214
Totals
0
2,274,365
2,714,849
4,989,214
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
4.101.249
250,000
0
0
0
Totals
4,101,249
250,000
0
0
0
co
Report Date: May 17, 2018
Page 4
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
4th
WA -05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/25/18
07/02/18
1,200,000
1,200,000
06
0
200,000
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2019
4th
0
5th & 6th
0
1,200,000
1,200,000
Totals
0
200,000
0
1,200,000
1,200,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
200,000
200,000
200 000
200,000
400,000
Totals
200,000
200,000
200,000
200,000
400,000
Report Date: May 17, 2018
Page 5
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
RW
WA -07746
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
06/25/18
07/02/18
134,000
134,000
03
C G O P S
TW
2020
1.570.000
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
RW
0
10.000
0
134,000
134,000
P
RW
2020
1.570.000
0
0
0
10,000
10,000
P
CN
2021
0
0
1,570,000
1,570,000
Totals
0
0
1,714,000
1,714,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
134,000
0
0
0
RW
0
10.000
0
0
0
CN
0
0
1.570.000
0
0
Totals
0
144,000
1,570,000
0
0
Report Date: May 17, 2018
Page 6
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
4th
WA -03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
06/25/18
07/02/18
2,300,000
2,300,000
06
0
335,000
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2019
4th
0
5th & 6th
0
2,300,000
2,300,000
Totals
0
335,000
0
2,300,000
2,300,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
335,000
335,000
405 000
405,000
820,000
Totals
335,000
335,000
405,000
405,000
820,000
Report Date: May 17, 2018
Page 7
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
4th
WA -03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/25/18
07/02/18
10,870,000
10,870,000
06
C G O P S
TW
1,740,000
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2019
4th
0
5th & 6th
0
10,870,000
10,870,000
Totals
0
1,740,000
0
10,870,000
10,870,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,730,000
1,740,000
1,800,000
1,850,000
3,850,000
Totals
1,730,000
1,740,000
1,800,000
1,850,000
3,850,000
n' Report Date: May 17, 2018
Page 8
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
4th
WA05409
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
900+ daily truck trips from residential streets in Allentown.
06/25/18
07/02/18
100,000
100,000
08
0
0
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2024
4th
0
5th & 6th
0
100,000
100,000
Totals
0
0
0
100,000
100,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
100,000
Totals
0
0
0
0
100,000
Report Date: May 17, 2018
Page 9
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
BR
WA -11117
Boeing Access Road over Airport Way Bridge Seismic Retrofit
Boeing Access Road
to
Provide seismic modifications to the Boeing Access Road over Airport Way Bridge to
allow it to withstand earthquake forces.
06/25/18
07/02/18
0
370,000
47
CN
0.100
BR
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2019
BR
370,000
0
0
370,000
S
CN
2019
BR
2,611,000
0
0
0
2,611,000
Totals
2,981,000
0
0
0
2,981,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
370,000
0
0
0
0
CN
0
2,611,000
0
0
0
Totals
370,000
2,611,000
0
0
0
7,1
Report Date: May 17, 2018
Page 10
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
STP(E)
WA -11115
Green River Trail
Green River Trail
Christensen Road to Green River
Replace the existing 8400t wide Green River Trail with 12400t wide concrete paved
trail with 2400t gravel shoulders, including illumination, CCTV, wayfinding, and
pedestrian plaza.
06/25/18
07/02/18
139,860
1,036,000
28
896,140
0.140
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
CN
2021
STP(E)
896.140
0
139,860
1,036,000
Totals
896,140
0
0
139,860
1,036,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
0
0
1,036,000
0
0
Totals
0
0
1,036,000
0
0
Report Date: May 17, 2018
Page 11
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -11110
Macadam Rd S Complete Streets Project
Macadam Road
S 150th Street to S 144th Street
Design and construction of a complete street on Macadam Road. Road widening
and rechannelization to add 5 -foot bike lanes and 5 -foot sidewalks on both sides of
the roadway. Includes illumination, curb, and storm drainage.
06/25/18
07/02/18
0
397,369
04
RW
0.350
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
Ped/Bike Program
397,369
0
397,369
P
RW
2019
0
0
Ped/Bike Program
100,000
0
100,000
P
CN
2020
0
0
Ped/Bike Program
2,272,947
460,000
2,732,947
Totals
0
2,770,316
460,000
3,230,316
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
397.369
0
0
0
0
RW
100,000
0
0
0
0
CN
0
2,732,947
0
0
0
Totals
497,369
2,732,947
0
0
0
Report Date: May 17, 2018
Page 12
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
4th
WA -03783
Multipurpose Trails
to
Wide array of necessary trail improvements to existing trail system infrastructure
06/25/18
07/02/18
150,000
150,000
28
0
0
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2024
4th
0
5th & 6th
0
150,000
150,000
Totals
0
0
0
150,000
150,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
0
150,000
Totals
0
0
0
0
150,000
Report Date: May 17, 2018
Page 13
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
RW
WA -09873
S 140th St Intersection Improvements
S 140th Street
Tukwila International Blvd to
Design and construct a new traffic signal at the S 140th Street/Tukwila International
Blvd intersection
06/25/18
07/02/18
8,000
75,000
04
C G P S T
W
0.100
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
RW
0
Ped/Bike Program
67,000
8,000
75,000
P
RW
2021
0
0
Ped/Bike Program
40,000
10,000
50,000
P
CN
2022
0
Ped/Bike Program
568,000
57,000
625,000
Totals
0
675,000
75,000
750,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
75,000
0
0
RW
0
0
50,000
0
0
CN
0
0
0
625.000
0
Totals
0
0
125,000
625,000
0
Fos
Report Date: May 17, 2018
Page 14
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
SRTS
WA03782
S 144th St Bridge Sidewalks
S 144th Street
51st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S
06/12/17
06/19/17
27,000
200,000
28
CN
0.250
SRTS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
SRTS
173,000
1210,000
0
27,000
200,000
P
CN
2019
SRTS
1,047,000
0
0
163,000
1,210,000
Totals
1,220,000
0
190,000
1,410,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
200,000
0
0
0
0
CN
0
1210,000
0
0
0
Totals
200,000
1,210,000
0
0
0
Report Date: May 17, 2018
Page 15
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -11114
S 144th Street Bridge Sidewalks
S 144th Street
51st Avenue S to 53rd Avenue S
Design of pedestrian improvements to the S 144th Street Bridge over 1-5 to include
widening the existing 3 -foot sidewalks to 6 -feet with a barrier to separate vehicles
and pedestrians
06/25/18
07/02/18
27,000
443,000
05
0
0.100
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
Ped/Bike Program
416,000
27,000
443,000
Totals
0
443.000
416,000
27,000
443,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
443.000
0
0
0
0
Totals
443,000
0
0
0
0
Report Date: May 17, 2018
Page 16
N
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA -11112
S 152nd Street Safe Routes to School
S 152nd Street
Tukwila International Blvd to 42nd Avenue S
Design and construct curb, gutter and sidewalks on both sides including widening
pavement width by 3 feet to construct on -street parking lane on north side of street.
06/25/18
07/02/18
0
243,000
05
CN
0.300
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
SRTS
243,000
0
243,000
P
CN
2020
0
0
SRTS
2,583,356
0
2,583,356
Totals
0
0
2,826,356
0
2,826,356
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
243,000
0
0
0
0
CN
0
2,583,356
0
0
0
Totals
243,000
2,583,356
0
0
0
Report Date: May 17, 2018
Page 17
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
STP(UL)
I 1276(007) TUK-59
Strander Blvd./SW 27th St Extension
Strander Blvd./SW 27th St Extension
West Valley Highway to Naches Ave
This project is Phase 3 of a multi -phase improvement that will connect Strander
Blvd./SW 27th St between West Valley Hwy in Tukwila and Oakesdale Ave in
Renton. This project will complete the design, right-of-way and construction phases
for the roadway segment between West Valley Hwy and Naches Ave. Project
components include a railroad bridge for the Union Pacific RR to provide grade
separation, a new 415 lane roadway segment east of West Valley Hwy. roadway
widening of two lanes for a portion of the project segment, a separated joint -use trail,
a new trail bridge for the Interurban Trail (including new trail connections to Strander
Blvd.), a new flyover bridge connection to the Tukwila Station, a new traffic signal
serving the Tukwila Station, and storm drainage facilities. Current funding will
complete the preliminary engineering and rightof- way phases. Construction will be
funded as part of a future phase.
06/25/18
07/02/18
607.500
4.500.000
01
RW
0.300
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2019
STP(UL)
3,892 500
0
607.500
4.500.000
S
RW
2020
STP(UL)
1.254.250
ALL
0
195.750
1.450.000
Totals
5,146,750
0
803,250
5,950,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
4,500,000
0
0
0
0
ALL
0
1,450,000
0
0
0
Totals
4,500,000
1,450,000
0
0
0
N
n' Report Date: May 17, 2018
Page 18
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
STP(E)
WA -03772
TUC/TOD Pedestrian Improvements
Baker Blvd (if extended)
Andover Park W to E City Limits
Construct bike/pedestrian connection between the Tukwila Urban Center (TUC) and
Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented
Development (TOD) area.
06/25/18
07/02/18
850,000
4,250,000
28
3,400,000
0.750
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2023
STP(E)
3,400,000
5th & 6th
0
850,000
4,250,000
Totals
3,400,000
0
0
850,000
4,250,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
0
4.270.000
Totals
0
0
0
0
4,270,000
Report Date: May 17, 2018
Page 19
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -11118
Tukwila International Boulevard Retrofit
Tukwila International Blvd
Southcenter Blvd to S 116th Way
Design and planning of retrofit to Tukwila International Blvd to implement complete
streets, improve pedestrian and vehicular safety, and reduce regional pass-through
traffic.
06/25/18
07/02/18
100,000
100,000
15
C G O P S
TW
2.400
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
0
100,000
100,000
Totals
0
100.000
0
100,000
100,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
100.000
0
0
0
0
Totals
100,000
0
0
0
0
Report Date: May 17, 2018
Page 20
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA03779
West Valley Highway
SR 181/West Valley Highway
I-405 to Strander Blvd
Design and construct completion of 7 lane sections of West Valley Highway with
sidewalks, curbs, gutters, storm drainage, lighting, and traffic control, including safety
and capacity improvements at the S 156th St intersection.
06/25/18
07/02/18
37,180
318,000
03
C G O P S
TW
0.500
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2019
0
TIB
280,820
37,180
318,000
S
CN
2020
0
0
TIB
1.872.740
679.161
2.551.901
Totals
0
0
2,153,560
716,341
2,869,901
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
318.000
0
0
0
0
CN
0
2.551.901
0
0
0
Totals
318,000
2,551,901
0
0
0
cn
"n Report Date: May 17, 2018
Page 21
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
CMAQ
TUK-60
West Valley Highway/Longacres Way Shared Use Pathways
SR 181 & Longacres Way
W end of planned Green River Bridge to Longacres Way
Improvements will be completed on SR 181 from the west end of the planned Green
River non -motorized Bridge to Longacres Way, including a 12-14 ft separated
shared use path with a 5 ft landscaped buffer strip on the west side of the highway.
Design -only will be completed for future improvements on Longacres Way between
SR 181 to the Tukwila Sound Transit Link Station.
06/25/18
07/02/18
29,160
216,000
28
CN
0.170
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2019
CMAQ
186,840
0
0
29,160
216,000
S
CN
2019
CMAQ
441,063
0
0
68.836
509.899
Totals
627,903
0
97,996
725,899
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
216.000
0
0
0
0
CN
509.899
0
0
0
0
Totals
725,899
0
0
0
0
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
26,771,793
13,652,322
33,118,296
73,542,411
Report Date: May 17, 2018
Page 22
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
5th & 6th
WA -07745
40-42 Ave S (S 160 St - S 131 PL)
S 160th Street to Southcenter Blvd
Design and construct street improvements, underground aerial utilities, drainage,
sidewalks, bike facilities, and driveway adjustments
06/12/17
06/19/17
2,465,000
2,465,000
04
C G O P S
TW
2023
0
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
5th & 6th
0
0
2,465,000
2,465,000
P
CN
2023
0
0
0
4,360,000
4,360,000
Totals
0
0
0
6,825,000
6,825,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,465,000
0
0
0
4,360,000
Totals
2,465,000
0
0
0
4,360,000
Report Date: May 24, 2017
Page 1
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -06601
53rd Avenue S
S 137th St to S 144th St
Design and construct urban residential street improvements that include curb, gutter,
sidewalk , illumination and undergrounding. Street portion will coordinate with Water.
Surface Water and Sewer capital improvement program projects.
06/12/17
06/19/17
1,710,000
2,610,000
04
C G O P S
TW
0.420
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
0
TIB
900,000
1,710,000
2,610,000
Totals
0
900,000
1,710,000
2,610,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,610,000
0
0
0
0
Totals
2,610,000
0
0
0
0
co
co
Report Date: May 24, 2017
Page 2
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
4th
WA -05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/12/17
06/19/17
1,200,000
1,200,000
06
0
200,000
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2018
4th
0
5th & 6th
0
1,200,000
1,200,000
Totals
0
200,000
0
1,200,000
1,200,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
200,000
200,000
200,000
200,000
400,000
Totals
200,000
200,000
200,000
200,000
400,000
Report Date: May 24, 2017
Page 3
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
RW
WA -07746
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
06/12/17
06/19/17
134,000
134,000
03
C G O P S
TW
2020
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
RW
0
0
0
134,000
134,000
P
RW
2020
0
0
0
0
10,000
10,000
P
CN
2021
0
0
1,570,000
1,570,000
Totals
0
0
1,714,000
1,714,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
134,000
0
0
RW
0
0
10.000
0
0
CN
0
0
0
1.570.000
0
Totals
0
0
144,000
1,570,000
0
Report Date: May 24, 2017
Page 4
w
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
4th
WA -03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
06/12/17
06/19/17
2,220,000
2,220,000
06
0
335,000
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2018
4th
0
5th & 6th
0
2,220,000
2,220,000
Totals
0
335,000
0
2,220,000
2,220,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
335,000
335,000
335,000
405,000
810,000
Totals
335,000
335,000
335,000
405,000
810,000
Report Date: May 24, 2017
Page 5
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
4th
WA -03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/12/17
06/19/17
10,320,000
10,320,000
06
C G O P S
TW
1,730,000
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2018
4th
0
5th & 6th
0
10,320,000
10,320,000
Totals
0
1,730,000
0
10,320,000
10,320,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,400,000
1,730,000
1,740,000
1,800,000
3,600,000
Totals
1,400,000
1,730,000
1,740,000
1,800,000
3,600,000
Report Date: May 24, 2017
Page 6
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
STP(BR)
I 1320(004) TUK-57
Beacon Ave S Bridge Preventative Maintenance Project
Beacon Avenue South over South Ryan Way
S Victor St to S 170th St
Remove and replace failed bridge deck and paint structural steel.
06/12/17
06/19/17
0
1,740,920
14
1,740,920
0.010
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
STP(BR)
1,740,920
0
0
1,740,920
Totals
1,740,920
0
0
1,740,920
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,740,920
0
0
0
0
Totals
1,740,920
0
0
0
0
Report Date: May 24, 2017
Page 7
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA05409
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
900+ daily truck trips from residential streets in Allentown.
06/12/17
06/19/17
100,000
100,000
08
0
100,000
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2018
0
0
100,000
100,000
Totals
0
100,000
0
100,000
100,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
100,000
0
0
0
0
Totals
100,000
0
0
0
0
Report Date: May 24, 2017
Page 8
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
SRTS
I 1320(005) TUK-58
Cascade View Elementary Safe Routes to School Project - Phase 2
33rd Ave S and S 140th Street
S. 144th at 34th Ave. S. to 140th St at 34th Ave. S.
Concrete sidewalks are proposed on one side of 33rd Ave S (S 140th St to S 144th
St) and on one side of S. 140th St (Military Road South to 34th Ave 5) along with a
standard curb and gutter separating the sidewalk from the roadway. A traffic circle is
proposed at the intersection of 33rd Ave S and S 140th St to assist in reducing
vehicle speeds and increase visibility and safety of pedestrians crossing the street.
Curb bulb -outs and/or pedestrian refuge islands at the east entrance/exit to the traffic
circle would be constructed to improve the safety of crossing S 140th St at 33rd Ave
S. There are currently no ADA facilities to connect to within the project limits. Minor
storm water improvements will be added to the general action area. The new
sidewalk along 33rd Ave S. will require reconstruction of the pavement cross section
to establish proper crown slopes.
06/12/17
06/19/17
100,000
814,000
28
714,000
0.510
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
SRTS
714,000
0
100,000
814,000
Totals
714,000
814,000
0
100,000
814,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
814,000
0
0
0
0
Totals
814,000
0
0
0
0
cn
"n Report Date: May 24, 2017
Page 9
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
STP(BR)
I 1274(009) TUK-55
Frank Zepp Bridge Preventative Maintenance Project
S 180th Street over the Green River
SR 181 - West Valley Highway to Sperry Drive S
Paint the structural steel, overlay deck and replace the deck joint, and install seismic
protection.
06/12/17
06/19/17
0
2,534,812
14
2,534,812
0.040
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
STP(BR)
2,534,812
0
0
2,534,812
Totals
2,534,812
0
0
2,534,812
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,534,812
0
0
0
0
Totals
2,534,812
0
0
0
0
Report Date: May 24, 2017
Page 10
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
STP(BR)
I 1288(005) TUK-56
Grady Way Bridge Preventative Maintenance Project
Grady Way Bridge over BN and UP Railroads
Interurban Avenue S to Longacres Drive SW, Renton
Retrofit existing bridge with seismic protection.
06/12/17
06/19/17
0
197,725
14
197,725
0.230
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
STP(BR)
197,725
0
0
197,725
Totals
197,725
197,725
0
0
197,725
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
197,725
0
0
0
0
Totals
197,725
0
0
0
0
Report Date: May 24, 2017
Page 11
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
ALL
WA -03783
Multipurpose Trails
to
Wide array of necessary trail improvements to existing trail system infrastructure
06/12/17
06/19/17
62,000
62,000
28
ALL
2023
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2018
ALL
0
0
0
62,000
62,000
P
ALL
2023
0
0
150,000
0
150,000
150,000
Totals
0
0
212,000
212,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
62,000
0
0
0
0
ALL
0
0
0
0
150,000
Totals
62,000
0
0
0
150,000
co
co
Report Date: May 24, 2017
Page 12
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
RW
WA -09873
S 140th St Intersection Improvements
S 140th Street
Tukwila International Blvd to
Design and construct a new traffic signal at the S 140th Street/Tukwila International
Blvd intersection
06/12/17
06/19/17
8,000
75,000
04
C G P S T
W
0.100
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
RW
0
Ped/Bike Program
67,000
8,000
75,000
P
RW
2020
625.000
0
Ped/Bike Program
40,000
10,000
50,000
P
CN
2020
0
Ped/Bike Program
568,000
57,000
625,000
Totals
0
675,000
75,000
750,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
75,000
0
0
0
RW
0
0
50,000
0
0
CN
0
0
625.000
0
0
Totals
0
75,000
675,000
0
0
Report Date: May 24, 2017
Page 13
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
SRTS
WA03782
S 144th St Bridge Sidewalks
S 144th Street
51st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S
06/12/17
06/19/17
27,000
200,000
28
CN
0.250
SRTS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
SRTS
173,000
0
0
27,000
200,000
P
CN
2019
SRTS
1,047,000
0
0
163,000
1,210,000
Totals
1,220,000
0
190,000
1,410,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
200,000
0
0
0
CN
0
0
1,210,000
0
0
Totals
0
200,000
1,210,000
0
0
Report Date: May 24, 2017
Page 14
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
STP(UL)
TUK-59
Strander Blvd./SW 27th St Extension
Strander Blvd./SW 27th St
West Valley Highway to Naches Ave
This project is Phase 3 of a multi -phase improvement that will connect Strander
Blvd./SW 27th St between West Valley Hwy in Tukwila and Oakesdale Ave in
Renton. This project will complete the design, right-of-way and construction phases
for the roadway segment between West Valley Hwy and Naches Ave. Project
components include a railroad bridge for the Union Pacific RR to provide grade
separation. a new 4/5 lane roadway segment east of West Valley Hwy. roadway
widening of two lanes for a portion of the project segment, a separated joint -use trail,
a new trail bridge for the Interurban Trail (including new trail connections to Strander
Blvd.), a new flyover bridge connection to the Tukwila Station, and a new traffic
signal serving the Tukwila Station. Current funding will complete the preliminary
engineering and right-of-way phases. Construction will be funded as part of a future
phase.
06/12/17
06/19/17
607,500
4,500,000
01
RW
0.300
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2018
STP(UL)
3,892,500
0
607,500
4,500,000
S
RW
2018
STP(UL)
1,254,300
0
195,700
1,450,000
P
CN
2020
TIGER
13,794,000
TIB
5,000,000
706,000
19,500,000
P
CN
2020
FMSIB
5,000,000
0
0
5,000,000
S
CN
2020
Discretionary
5,000,000
0
0
5,000,000
P
CN
2020
0
0
706,000
706,000
Totals
28,940,800
5,000,000
2,215,200
36,156,000
Report Date: May 24, 2017
Page 15
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
2,500,000
2,000,000
0
0
0
RW
450,000
1,000,000
0
0
0
CN
50,000
0
18,300,000
14,200,000
0
Totals
3,000,000
3,000,000
18,300,000
14,200,000
0
Report Date: May 24, 2017
Page 16
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
STP(E)
WA -03772
TUC/TOD Pedestrian Improvements
Baker Blvd (if extended)
Andover Park W to E City Limits
Construct bike/pedestrian connection between the Tukwila Urban Center (TUC) and
Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented
Development (TOD) area.
06/12/17
06/19/17
850,000
4,250,000
28
3,400,000
0.750
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2023
STP(E)
3,400,000
5th & 6th
0
850,000
4,250,000
Totals
3,400,000
0
0
850,000
4,250,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
0
4,250,000
Totals
0
0
0
0
4,250,000
Report Date: May 24, 2017
Page 17
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -03761
Walk & Roll Plan (Nonmotorized Transportation Plan)
Various City Streets
to
Evaluate deficiencies and create a prioritized list of projects and recommended
design standards.
06/13/17
06/20/17
P
28
2021
0
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
2nd
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
0
0
0
0
1
1
1
Totals
0
0
0
0
1
0
1
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
1
Totals
0
0
0
0
1
Report Date: May 24, 2017
Page 18
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2018 to 2023
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
STP
WA03779
West Valley Highway
SR 181/West Valley Highway
1-405 to Strander Blvd
Design and construct completion of 7 lane sections of West Valley Highway with
sidewalks, curbs, gutters, storm drainage, lighting, and traffic control, including safety
and capacity improvements at the S 156th St intersection.
06/12/17
06/19/17
38,000
227,000
03
PE
0.500
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2018
STP
189,000
0
38,000
227,000
P
PE
2018
0
0
TIB
155,000
0
155,000
S
RW
2018
0
100,000
0
100,000
100,000
S
CN
2019
STP
438,000
0
0
62,000
500,000
P
CN
2019
0
TIB
2,389,000
582,000
2,971,000
Totals
627,000
2,544,000
782,000
3,953,000
Expenditure Schedule
Federal Funds
State Funds
Phase
Total Funds
1st
39,375,257
2nd
3rd
28,513,201
4th
5th & 6th
PE
382,000
0
0
0
150,000
RW
100,000
0
0
0
100,000
CN
0
2,070,000
0
0
1,150,000
Totals
482,000
2,070,000
0
0
1,400,000
cn
"n Report Date: May 24, 2017
Page 19
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
39,375,257
9,119,000
28,513,201
77,007,458
cn
"n Report Date: May 24, 2017
Page 19