HomeMy WebLinkAboutReg 2011-09-06 Item 5C.1 - Change Order - Gilliam Creek Stormwater Overflow Project with Reed Trucking and Excavating Inc for $50,000COUNCIL AGENDA SYNOPSIS Initial r Meeting Date Prepared by May '.r reviem I CWticil revien) 09/06/11 RT ITEM INFORMATION ITEM NO. 5.C. CAS NUMBER: 11 -088 STAFF SPONSOR: BOB GIBERSON ORIGINALAGENDA DA'1'1',: 09/06/11 A(,i,m);\ Trri.i Gilliam Creek Basin Stormwater Overflow Change Order 6 Approval, Final Payment, and Project Closeout CATLGORI' ®Di.rcur.,ian ®Motion Resolution Ordinance ❑Bid_Azvarcl ❑Public Hearing Other tlltg Date 09106111 tAltg Date 916111 Mtg Date Mtg Date tlVltg Date Alt Date All Date SPONSOR Council Mayor PR DCD Finance Fire IT P6R Police PW SPONSOR'S Consider for approval a construction contract change order in the amount of $50,000 that SUikIMARY provides final and all compensation to the contractor to close out the project. Council is being asked to authorize the Mayor to sign this change order and to accept the project as complete and release all retainage. RIjvII,WrD BY COW Mtg. CA &P Cmte Utilities Cmte Arts Comm. DATE: N/A RECOMMENDATIONS: S1'ONS()z /Ai)N41N. Public Works CONM' IFFIT"I" N/A EkPr.NDI'rURI-; Rh;OUIIzJ�D $50,000 Fund Source: 412 FUND Coininents: MTG. DATE 09/06/11 F &S Cmte Transportation Cmte Parks Comm. Planning Comm. COMMITTEE CHAIR: N/A COST IMPACT FUND SOURCE AMOUNT BUDGETED $50,000 APPROPRIATION REQUIRED $0 RECORD OF COUNCIL ACTION MTG. DATE J ATTACHMENTS 09/06/11 Informational Memorandum Dated August 23, 2011 Change Order 6 Notice of Completion of Public Works Contract 17 I: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Public Works Director DATE: August 23, 2011 SUBJECT: Gilliam Creek Stormwater Overflow Proiect Project No. 03 -DR09, Contract 09.149 Project Completion and Acceptance ISSUE Accept contract as complete and authorize release of retainage. BACKGROUND The Notice to Proceed for Contract No. 09 -149 with Reed Trucking and Excavating, Inc., of Puyallup, Washington, was issued on September 28, 2009 for construction of the Gilliam Creek Stormwater Overflow Project. This involved the construction of a 24" overflow pipe along Strander Blvd. between Andover Park East and Andover Park West to allow the Gilliam Creek Basin to drain to the Strander Blvd. pump station to reduce potential flooding associated with high river events. ANALYSIS Construction was physically completed on November 19, 2009. Six change orders were issued during construction for $68,256.04. Change Orders included providing additional Portable Changeable Message Boards to alert motorists of pending construction, dewatering pumping, excavation and disposal of unsuitable materials for re -use, utility lines conflicts and the discovery of a manhole labeled "sanitary sewer" which was actually a combination sanitary sewer /storm drainage structure, which then became the connection point of the new system. Change Order No. 6 in the amount of $50,000.00, is the end result of the claim filed by the contractor on May 3, 2010 after negotiations and deliberation. Cost over -runs and under -runs, were due to changes infield conditions. The budget for this contract with a 20% contingency was $432,636.00 and the outstanding retainage amount is $21,752.94. Contract Award Amount 360,530.00 Change Order Nos 1 through 6 68,256.04 Cost Overru ns/(U nder- runs) 6,272.94 Total Amount Paid (incl. retainage) 435.058.98 RECOMMENDATION The Council is being asked for formal acceptance and retainage release authorization, subject to standard claim and lien release procedures, forthe contract with Reed Trucking Excavating, Inc. in the amount of $435,058.98 and consider this item on the consent agenda of the September 6, 2011 Regular Meeting. Attachment: Dept of Revenue Notice of Completion C: \Documents and SettingsVobin \Local Settings \Temporary Internet Files \Content.0utlook \Y7Q110RZ \Info Memo Closeout B- 23- 11.doc 19 CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 6 DATE: 08 -23 -2011 BUDGET NO.: 412.98.594.382.65.00 PROJECT NO.: 03 -DR09 CONTRACT NO.: 09 -149 PROJECT NAME: Gilliam Creek Stormwater Overflow Project TO: Reed Trucking and Excavating, Inc. CHANGE: The Gilliam Creek Stormwater Overflow Project involved the construction of a 24" overflow pipe along Strander Blvd between Andover Park East and Andover Park West to allow the Gilliam Creek Basin to drain to the Strander Blvd pump station to reduce potential flooding associated with high river events. On May 3, 2010, Reed Trucking and Excavating, Inc. filed a claim requesting additional payments primarily for unanticipated storm trench sloughing and backfill, and asphalt replacement costs. The City and Reed Trucking and Excavating, Inc. have agreed to resolve that claim for an additional payment by the City of $50,000 to Reed Trucking and Excavating, Inc. The undersigned Contractor and City agree that payment pursuant to this change shall operate to release and discharge all claims by and among them relating to the above referenced project. ACCEPTED: Date By Original Contract (without tax) 360,530.00 Previous Change Orders 18,256.04 This Change Order (without tax) 50,000.00 REV. CONTRACT AMOUNT 428,786.04 No Additional Calendar Days due to this change. ORIGINAL: City Clerk (1 of 2) Contractor (2 of 2) Contractor: Reed Trucking and Excavating, INC. Title APPROVED BY THE CITY OF TUKWILA Date Mayor cc: Finance Department (w /encumbrance) Construction Inspector Construction Engineer file: 20