Loading...
HomeMy WebLinkAboutReg 2018-07-02 Item 4B - Resolution - 2019-2024 Transportation Improvement ProgramCOUNCIL AGENDA SYNOPSIS ----------- ----- --------- -------- MeetingDate Prepared by Mayor's review Council review 06/25/18 HH / 6-1 07/02/18 HH 0 Bid Award AN Date I Public Hearing E] Other 111t1 Date Aug Date Mtg Date Mtg Date 06/25/18 SP ONS Council Mayor Adm Svcs DCD Finance[]fire fl Legal El P&R Police IA PW SPONSOR'S The Transportation Improvement Program (TIP) is required by the RCW to be updated SUMMARY annually. The TIP is primarily a financial planning document for projects competing for federal and state grants. A Public Hearing is scheduled on June 25, 2018 for the 2019 - 2024 Six Year Transportation Improvement Program. After the Public Hearing, the TIP is adopted by City Resolution and is then incorporated into the Regional and State TIPs. RI W I I WIT) BY ITEM INFORMATION ITEM No. 4.B. CAS NUMBIR.: STAFF SPONSOR: HENRY HASH ORIGINAL AG PNDA DATI: 6/25/18 AGENDA ITEM Trl'ITh; Resolution adopting the Six -Year Transportation Improvement Program 2019 - 2024 Cyri;(;()RY I Discussion 06/25/18 0 Motion Alts Dale IZ Resolution Mtg Date 07/02/18 U Ordinance 0 Bid Award AN Date I Public Hearing E] Other 111t1 Date Aug Date Mtg Date Mtg Date 06/25/18 SP ONS Council Mayor Adm Svcs DCD Finance[]fire fl Legal El P&R Police IA PW SPONSOR'S The Transportation Improvement Program (TIP) is required by the RCW to be updated SUMMARY annually. The TIP is primarily a financial planning document for projects competing for federal and state grants. A Public Hearing is scheduled on June 25, 2018 for the 2019 - 2024 Six Year Transportation Improvement Program. After the Public Hearing, the TIP is adopted by City Resolution and is then incorporated into the Regional and State TIPs. RI W I I WIT) BY E] COW Mtg. Cmte • CA&P Cmte F&S Cmte 111 Parks Comm. COMMITTEE CI IAI t.: THOMAS II Transportation Cmte Arts Comm. Planning Comm. MCLEOD U Utilities DATE: 5/29/18 RECOMMENDATIONS: SPONSOR/ADMIN. OJNIMITIEF Public Works Unanimous Approval; Forward to Committee of the Whole COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $0.00 $0.00 $0.00 Fund Source: Comments: MTG. DATE . RECORD OF COUNCIL ACTION 6/25/18 Forward to Regular Meeting 7/02/18 MTG. DATE ATTACHMENTS 6/25/18 Informational Memorandum dated 05/25/18 Draft Resolution Draft 2019 — 2024 TIP Spreadsheets Current Adopted 2018 — 2023 TIP Minutes from the Transportation and Infrastructure Committee meeting of 05/29/18 7/02/18 Resolution 37 38 City of TulF,,.1a F T � N Washington Resolution No. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2019- 2024), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 4726, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2019-2024); and WHEREAS, on June 25 2018, a public hearing was held regarding the City's Six - Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A Six -Year Transportation Improvement Program for the calendar years 2019 to 2024, attached hereto as Exhibit A, is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. W:\Word Processing\Resolutions\TIP 2019-2024 5-18-18 CK:bjs Page 1 of 2 39 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2018. ATTEST/AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk Verna Seal, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Resolution Number: Rachel B. Turpin, City Attorney Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2019 to 2024 W:\Word Processing\Resolutions\TIP 2019-2024 5-18-18 40 CK:bjs Page 2 of 2 Washington State Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside N_ Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment A o c - ' o Improvement Type Utility Codes Total Length Environmental Type RW Required 17 Status WA -07745 40-42 Ave S (S 160 St - S 131 PL) S 160th Street to S 131st Place Design and construct street improvements, underground aerial utilities, drainage, sidewalks, bike facilities, and driveway adjustments 06/25/18 07/02/18 Federal Fund Code I Federal Funds 04 COOPSDOE TW I State Funds Yes Funding I Phase I 1st I Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds 1 State Fund Code I State Funds I Local Funds 1 Total Funds S I CN I 2019 I I I 01 Totals! 1 01 3,000,0001 3,000,000 P I CN 1 2024 I I 01 1 0 4,360,0001 4,360,000 Totals' 01 I Cil 7,360,0001 7,360,000 'Expenditure Schedule I Phase I 1st I 2nd I 3rd ' 4th I 5th &fish CN I 3,000,0001 01 01 0' 4;360,000 I Totals! 3,000,0001 01 01 01 4,360,000 Report Date: May 17, 2018 Page 1 AM. gr� Washington State .' Department o/ Transportation "Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Priority Number Functional Class A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Adopted Amendment P Improvement Type Utility Codes Total Length '.. Environmental Type RW Required 08 WA -11101 06/25/18 07/02/18 Phase 1 Phase Start Year (YYYY) 1 11 CG P S T 0.060 DCE No I Local Funds I Total Funds P I PE I 2020 W BR I 1,554,0001 RW 1 42nd Ave S Bridge Replacement 01 546,0001 2,100,000 j I P I RW I 2021 I BR I 740,0001 42nd Ave S I 01 01 260,0001 1,000,000 P I CN I 2022 I Interurban Avenue S to North Bridge 10,206,0001 1,600,0001 I 1,250,0001 01 2,444,0001 12,650,000 Design and construct a replacement structure for the existing S 42nd Ave bridge. 8109700 Totalsi 12,500,0001 I 01 3,250,0001 15,750,000 Funding I Phase I 1st Status I Phase 1 Phase Start Year (YYYY) 1 Federal Fund Code I Federal Funds 1 State Fund Code I State Funds I Local Funds I Total Funds P I PE I 2020 I BR I 1,554,0001 RW 1 01 546,0001 2,100,000 j I P I RW I 2021 I BR I 740,0001 I 01 01 260,0001 1,000,000 P I CN I 2022 I BR I 10,206,0001 1,600,0001 I 1,250,0001 01 2,444,0001 12,650,000 Totalsi 12,500,0001 I 01 3,250,0001 15,750,000 [Expenditure Schedule I Phase I 1st I 2nd I 3rd I 4th 1 5th & 6th I PE I 01 1,600,0001 OI 250,0001 250,000 I RW _.....__.I Ol 01 1,000,0001 01 0 r CN I 01 01 250,0001 6,250,0001 6,150,000 I Totals" 01 1,600,0001 1,250,0001 6,500,0001 6,400,000 Report Date: May 17, 2018 Page 2 �� Washington Stat �/ Department of Tfe ansportation Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Priority Number Functional Class A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing ............. Adopted 71 3 m S 3 z .. Improvement Type Utility Codes RW Required Environmental Type Total Length ' WA -11113 46th Avenue Safe Routes to School 46th Avenue S S 150th Street to S 144th Street GIMWE and eruct curt gslter arm sidewalk on the west side of 46th Avenue S, 06/25/18 07/02/18 05 Status 0.370 11 indudiry r sS txrrt-uut at 0h SE carne- n' 46th Avenue S/S 144th Street with raised crosswalk across S 144th Street with RRFB. Funding Status I Phase I Phase Start Year (YYYY) Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2019 -1 I 01 SRTS 1 180,0571 OI 180,057 P 1 RW 1 2019 1 _ I 01 SRTS I 232,0001 01 232,000 I CN 1 2020 1 I OI SRTS 1 2,124,668` 01 2,124,668 Totals) OI 2,536,7251 01 2,536,725 'Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE RW CN 180,0571 01 01 01 232,0001 01 01 01 of 2,124,6681 01 of Totals 412,057 2,124,6681 01 01 Report Date: May 17, 2018 Page 3 7 Washington State �7// Department of Transportation -InAgency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class -i. o 3E. cr A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 I WA -06601 53rd Avenue S S 137th St to S 144th St Design and construct urban residential street improvements that include curb, gutter, sidewalk , illumination and undergrounding. Street portion will coordinate with Water, Surface Water and Sewer capital improvement program projects. 06/25/18 07/02/18 Federal Funds 1 04 C G O P S TW 0.420 CE Yes Funding Phase I Status S I Phase I Phase Start Year (YYYY) Federal Fund Code I Federal Funds 1 State Fund Code I State Funds Local Funds I Total Funds I CN 2019 I I 01 TIB I 2,274,3651 2,714,8491 4,989,214 250,0001 01 Totals 01 OI 0 I 2,274,3651 2,714,8491 4,989,214 Expenditure Schedule Phase I 1st I 2nd I 3rd I 4th I 5th & 6th CN __..I 4,101,2491 250,0001 01 01 0 Totals! 4,101,2491 250,0001 01 01 0 Report Date' May 17, 2018 Page 4 .iw. ...4111.16,.. Washington State VIII Deportment of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside -n No E- _ Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID_ Hearing Adopted Amendment Resolution No. Improvement Typal Utility Codes Total Length Environmental Type RW Required 00 Status WA -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/25118 07/02/18 Federal Fund Code I Federal Funds 06 State Fund Code j State Funds No Funding Phase I 1st I Status I Phase 1 Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code j State Funds I Local Funds I Total Funds S I ALL I 2019 I I OI 1 01 1,200,0001 1,200,000 I— Totals) 01 1 Oi 1,200,0001 1,200,000 !Expenditure Schedule Phase I 1st I 2nd 1 3rd 1 4th I 5th & 6th I ALL I 200,0001 200,0001 200,0001 200,0001 400,000 I Totals' 200,0001 200,0001 200,0001 200,0001 400,000 Report Date: May 17, 2018 Page 5 .w, Washington State T'*/ Department of Transportation v, Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside 0. IN E E _ ............................. Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID = `; _ r'o Adopted Amendment Resolution No. Improvement Type M r� o d �. Environmental Type Weqired 16 [ Status WA -07746 Andover Park E/Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal 06/25/18 07/02/18 Federal Fund Code I Federal Funds 03 CGOPS TW I State Funds No Funding -- Phase I 1st Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds 1 Total Funds P I PE I 2020 I I 0 01 -, I I 01 01 134,0001 134,000 P I RW I 2020 I I 01 0 I 01 01 ___--10,0001 10,000 P I CN I 2021. I I 01 OI 144,0001 I 01 1,570,0001 1,570,000 Totals) 01 1 01 1,714,0001 1,714,000 Expenditure Schedule Phase I 1st I 2nd I 3rd 1 4th I 5th & 6th PE I 01 __. 134,0001 01 01 0 RW -, I 01 10,0001 01 01 0 CN 0 01 1,570,0001 01 0 Totals) 01 144,0001 1,570,0001 0 0 Report Date: May 17, 2018 Page 6 .AR► Washington State 7w Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside A. PIN/Project No. B. STIP ID z C. Project Title o $c D. Road Name or Number . E. Begin & End Termini F. Project Description G. Structure ID Adopted Amendment Resolution No. Improvement Type L. o , r c s Environmental Type RW Required _ WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi-annual inspections as well as construct necessary repairs and maintenance 06/25/18 07/02/18 Status' Phase 06 Federal Fund Code I Federal Funds I Funding I Phase Status' Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds 1 Total Funds S ' ALL I 2019 I I 335,0001 01 405,0001 I 405,0001 01 2,300,0001 2,300,000 Totals' 335,0001 Totals' 335,0001 01 405,0001 I 405,0001 01 2,300,0001 2,300,000 'Expenditure Schedule I Phase I 1st I 2nd I 3rd I 4th I 5th & 6th 1 ALL I 335,000' 335,0001 405,0001 405,0001 820,000 Totals' 335,0001 335,0001 405,0001 405,0001 820,000 Report Date: May 17, 2018 Page 7 Wil. '� wg.A.thwt. stab* Depart/mat ivanspertation CO w Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 Status WA -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/25/18 07/02/18 Federal Fund Code I Federal Funds 06 C G O P S TW I State Funds No Funding I Phase I Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I ALL I 2019 I I 01 3,900,0 0 I 01 10,870,0001 10,870,000 1,740,0001 1,800,0001 Totals) 1,050,0001 01 1 01 10,870,0001 10,870,000 'Expenditure Schedule I Phase I 1st 1 2nd I 3rd I 4th I 5th & 6th L ALL I 1,730,0001 1,740,000 1,800,0001 1,850,000 3,900,0 0 I Totals 1,730,0001 1,740,0001 1,800,0001 1,050,0001 3,959,000 Report Date: May 17, 2018 Page 8 �tle. Washington State �►�AW Department or Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside `= m o Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Utility Codes Improvement Type Total Length Environmental Type RW Required 00 WA05409 BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allentown. 06/25/18,07/02/18 '.. 08 EIS No Funding Status Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code State Funds P PE 2024 01 Totals I O1 Si o1 Local Funds 100,0001 Total Funds 100,000 100,OOOI 100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 01 01 01 100.000 Totals I OI 01 01 01 Report Date: May 17, 2018 100,0001 Page 9 Washington State 7417 Deperhnerct al Trensportation 01 OlAgency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside m y N d Priority Number A. PIN/Project No. B. STIP ID C. Project Title D, Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. '.. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 1 Status WA -11117 Boeing Access Road over Airport Way Bridge Seismic Retrofit Boeing Access Road to Provide seismic modifications to the Boeing Access Road over Airport Way Bridge to allow it to withstand earthquake forces. 06/25/18 07/02/18 Federal Fund Code 1 Federal Funds I 47 I 0.100 I No Funding I Phase 1 Status 1 Phase I Phase Start Year (YYYY) I Federal Fund Code 1 Federal Funds I State Fund Code I State Funds I Local Funds 1 Total Funds hS I PE 1 2019 1 BR I 370,000'' 0 I OI i OI 370,000 S I CN I 2019 I BR I 2,611,0001 0 1 01 OI 2,611,000 I 01 01 Totals' 2,981,0001 I 01 01 2,981,000 'Expenditure Schedule I Phase 1st i 2nd I 3rd 1 4th ' 5th 8 6th I PE I 370,0001 01. 01 01 0 I CN i 01 2,611,0001 01 01 0 I Totals' 370,0001 2,611,0001 01 01 0 Report Date: May 17, 2018 Page 10 sink �� Washington State VAPIF Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside ............................ Functio Class nal Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID = p1 ,c y a° o. Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 I WA -11115 Green River Trail Green River Trail Christensen Road to Green River Replace the existing 8 -foot wide Green River Trail with 12 -foot wide concrete paved trail with 2 -foot gravel shoulders, including illumination, CCTV, waytinding, and pedestrian plaza. 06/25/18 07/02/18 Federal Funds I State Fund Code 28 State Funds 0.140 DCE No Funding I Phase I 1st I Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code 1 State Funds I Local Funds I Total Funds I CN 2021 I STP(E) I 896,1401 I 1 01 139,8601 1,036,000 I 01 1,836,0001 Totals) 896,1401 I OI 139,8601 1,036,000 'Expenditure Schedule I Phase I 1st I 2nd I 3rd I 4th I 5th & 6th CN I 01 01 1,036,000 01 0 1 Totals) 01 01 1,836,0001 01 8 Report Date: May 17, 2018 Page 11 JAR& Washington State 7/ Department of Transportation 01 "Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside c l Pi mo Ot m Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m ,'a Adopted Amendment Resolution No., Improvement Type Utility Codes Total Length Environmental Type RW Required 17 1 Status WA -11110 Macadam Rd S Complete Streets Project Macadam Road S 150th Street to S 144th Street Design and construction of a complete street on Macadam Road. Road widening and rechannelization to add 5 -foot bike lanes and 5 -foot sidewalks on both sides of the roadway. Includes illumination, curb, and storm drainage. 06/25/1807/02/18 I Phase Start Year (YYYY) 1 Federal Fund Code I Federal Funds I 04 I 0.350 DCE Na 'Funding 1 Status 1 Phase I Phase Start Year (YYYY) 1 Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE I 2019 I I 01 Ped/Bike Program 1 397,3691 01 397,369 P ' RW 1 2019 1 I 01 Ped/Bike Program 1 100,000 0 100,000 I P 1 CN I 2020 1 I_..... 01 Ped/Bike Program 1 2,272,9471 460,0001 2,732,947 1 Totals' 01 2,770,3161 460,0001 3,230,316 'Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 397,3691 01 0 RW 1 100,0001 01 F CN 2,732,9471 OI 01 01 0 Totals 497,3691 2,732,9471 Report Date: May 17, 2018 Page 12 Washington Se department oreansportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside T cl 2 — El_ Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini FF.. F. Project Description G. Structure ID = 0 y a n Y a. Resolution No. Improvement Type , 8 Total Length Environmental Typel RW Required 00 Status WA -03783 Multipurpose Trails to Wide array of necessary trail improvements to existing trail system infrastructure 106/25/18 07/02/18 Federal Fund Code I Federal Funds 28 State Fund Code 1 CE No Funding Phase I 1st Status ' Phase I Phase Start Year (YYY() I Federal Fund Code I Federal Funds I State Fund Code 1 State Funds 1 Local Funds I Total Funds P ALL 2024 I I 150,000 OI Totals' I 01 01 150,0001 150,000 01 01 150,000 Totals' 01 1 01 156,0001 150,000 Expenditure Schedule Phase I 1st I 2nd I 3rd I 4th I 5th & 6th ALL I 01 °I OI 01 150,000 Totals' 01 61 01 01 150,000 Report Date: May 17, 2018 Page 13 .Ilfil� Washington State P' Department of Transportation 01 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID Adopted Amendment A m o Improvement Type Utility Codes Total Length Environmental Type RW Required C. Project Title= I c D. Road Name or Number Federal Fund Code 1 Federal Funds E. Begin & End Termini 01 1 F. Project Description G. Structure ID 2 o 14 I WA -09873 06/25/18 07/02/18 01 04 CD P S T 0.100 DCE Yes 0 I RW 1 2021 1 0 01 Ped/Bike Program W 40,0001 10,0001 50,000 1 S 140th St Intersection Improvements I 2022 I 1 01 Ped/Bike Program I 568,0001 57,0001 625,000 625,0001 S 140th Street Totals) TotalsI 01 OI I 675,0001 75,0001 750,000 625,0001 Tukwila International Blvd to 0 Design and construct a new traffic signal at the S 140th Street/Tukwila International Blvd intersection Funding 1 Status I Phase 1 Phase Start Year (YYYY) I Federal Fund Code 1 Federal Funds 1 State Fund Code 1 State Funds I Local Funds 1 Total Funds P I PE I 2021 I I 01 Ped/Bike Program 1 67,0001 8,0001 75,000 0 I RW 1 2021 1 0 01 Ped/Bike Program 1 40,0001 10,0001 50,000 1 CN I 2022 I 1 01 Ped/Bike Program I 568,0001 57,0001 625,000 625,0001 0 Totals) TotalsI 01 OI I 675,0001 75,0001 750,000 IExpenditure Schedule 1 Phase I 1st I 2nd I 3rd I 4th I 5th & 6th PE I 0 01 75,0001x 01 0 RW I 0 01 50.0001 01 CN I 01 01 01 625,0001 0 TotalsI OI OI 125,0001 625,0001 0 Report Date: May 17, 2018 Page 14 w �•� Washington StatO -/O Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside m in mE. N _ Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number Begin & End Termini F. Project Description G. Structure ID m m' Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 I WA03782 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S 06/12/17 06/19/17 Federal Funds I State Fund Code 28 State Funds 0.250 Local Funds 1 No Funding I Phase Status I Phase I Phase Start Year (YYYY) 1 Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds 1 Total Funds P I PE I 2019 I SRTS I 173,0001 I °I 27,0001 200,000 P I CN I 2019 I SRTS I 1,047,0001 I - OI 163,0001 1,210,000 Totals! 200,0001 1,210,0001 Totals' 1,220,0001 I 0 190,0001 1,410,000 'Expenditure Schedule I Phase 1st I 2nd I 3rd 14th ' 5th 86th I PE I 200,0001 01 01 OI 0 CN I 01 1,210,0001 01 01 - 0 Totals! 200,0001 1,210,0001 01 01 0 Report Date: May 17, 2018 Page 15 AMA ®Departnwator Trarevertatian 01 CD Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside c m o N . Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. improvement Type a 2 i z Environmental Type z `— a 17 WA -11114 S 144th Street Bridge Sidewalks S 144th Street 51st Avenue S to 53rd Avenue S Design of pedestrian improvements to the S 144th Street Bridge over 1-5 to include widening the existing 3 -foot sidewalks to 6 -feet with a barrier to separate vehicles and pedestrians 06/25/18 07/02/18 05 0.100 DCE No Funding Status P Phase I Phase Start Year (YYYY) I Federal Fund Code PE 2019 I I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds 416, 0001 27,0001 443,000 0 Ped/Bike Program 1 Totals I 416,000 27,0001 443,000 Expenditure Schedule Phase PE 1st 2nd 3rd 4th 443,0001 Totals] 443,0001 01 01 of 01 ] 5th & 6th 01 01 Report Date: May 17, 2018 Page 16 41116. Departnwat0 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Project Description G. Structure ID Hearing y a LAmendment ......_ Resolution No. Improvement Type C> v, Environmental Type Total Length RW Required 19 Status WA -11112 S 152nd Street Safe Routes to School S 152nd Street Tukwila International Blvd to 42nd Avenue S Design and construct curb, gutter and __ - 0i boob s l€Ourbng uddeni: wsw CO Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside l�� l c ttt m o 8 = Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID = _ ,o Adopted 1 D m I. Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required ....................... 16 3rd / 1276(007) TUK-59 06/25/18 07/02/18 5th & 6th 01 1 :...............__ 0.300 .. DCE Yes 01 Strander Blvd./SW 27th St Extension 0 ALL 1 01 1,450,0001 °I 01 Strander Blvd./SW 27th St Extension Totals) 4,500,0001 1,450,0001 01 01 West Valley Highway to Naches Ave This project is Phase 3 of a multi -phase improvement that will connect Strander Blvd./SW 27th St between West Valley Hwy in Tukwila and Oakesdale Ave in Renton. This project will complete the design, right-of-way and construction phases for the roadway segment between West Valley Hwy and Naches Ave. Project components include a railroad bridge for the Union Pacific RR to provide grade separation, a new 4/5 lane roadway segment east of West Valley Hwy, roadway widening of two lanes for a portion of the project segment, a separated joint -use trail, a new trail bridge for the Interurban Trail (including new trail connections to Strander Blvd.), a new flyover bridge connection to the Tukwila Station, a new traffic signal serv8r the Tia Stat. a. d Own e facilKes. Cuffer& fang ON Wrnpinte rrm preDninary eripinntwing and - way grayes, DwrwrwAYInn will be funded as part of a future phase. Funding Status 1 S 1 Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds 1 State Fund Code PE RW 2019 2020 STP(UL) STP(UL) Totals 3,892,5001 1,254,2501 5,146,7501 State Funds I Local Funds 1 Total Funds 01 607,5001 4,500,000 01 195,7501 1,450,000 01 803,2501 5,950,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th & 6th PE 1 4,500,0001 01 01 01 0 ALL 1 01 1,450,0001 °I 01 0. Totals) 4,500,0001 1,450,0001 01 01 Report Date: May 17, 2018 Page 18 AMA Washington State Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC V Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m LI a. m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 I WA -03772 TUC/TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Construct bike/pedestrian connection between the Tukwila Urban Center (TUC) and Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented Development (TOD) area. 06/25/18 07/02/18 Federal Funds I State Fund Code I State Funds 0.750 CE Yes Funding - - Phase Status I Phase 1 Phase Start Year (YYYY) I Federal Fund Code i Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I ALL 2023' STP(E) 3,400,0001 01 I 01 01 850,0001 4250.006 Totals) 01 TotalsI 3,400,0001 01 1 01 01 850,0001 4,250,000 'Expenditure Schedule ' Phase 1 1st ' 2nd -__ 3rd I 4th I 5th & 6th I ALL I 01 01 01 01 4,270,000 I Totals) 01 01 01 01 4,270,000 Report Date: May 17, 2018 Page 19 Aft Washington State WO Department of Transportation rn Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside m c _ Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment c _ '' o Improvement Type Utility Codes Total Length Environmental Type RW Required t 14 1 Status WA -11118 Tukwila International Boulevard Retrofit Tukwila International Blvd Southcenter Blvd to S 116th Way Design and pledging c4 r edfd to Tukwila International Blvd to implement complete 06/25/18 07/02/18 Federal Fund Code 1 Federal Funds 15 COOPS TW 2.400 State Funds No streets, 7nmmsrve pedastdan vehlodaf safety, and reduce regional pass-through traffic. Funding ___ _.....__... 1 Status I Phase 1 Phase Start Year (YYYY) Federal Fund Code 1 Federal Funds 1 State Fund Code I State Funds I Local Funds I Total Funds P I PE I 2019 II OI 1 01 100,0001 100,000 Totals' 01 01 10%000' 100,000 'Expenditure Schedule Phase PE 1st 2nd 3rd 4th 5th & 6th 1 Totals' 100,0001 100,000' 01 0 01 01 01 01 Report Date: May 17, 2018 Page 20 wisk Washington state War Departmenk of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Funding Priority Number A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x m West Valley Highway SR 181/West Valley Highway 1-405 to Strander Blvd Design and construct completion of 7 lane sections of West Valley Highway with arowa..wo. pine. gutters, Mirth a": , lighting, and traffic control, including safety ard miry h mmy smarts at the. S 156Th St intersection. WA03779 06/25/18 Funding I Status 1 Phase I Phase Start Year (YYYY) Federal Fund Code I Federal Funds 1 State Fund Code I State Funds I Local Funds I Total Funds S I PE I 2019 I 01 TIB 1 280,8201 37,1801 318,000 0 1 CN 1 2020 I I OI 01 TIB I 1,872,7401 679,1611 2,551,901 0 1 Totals! 01 I 2,153,5601 716,3411 2,869,901 'Expenditure Schedule I Phase I 1st I 2nd I 3rd I 4th I 5th & 6th PE I 318,0001 OI 01 01 0 1 CN 1 OI 2,551,9011 01 OI 0 1 Totals 318,0001 2,551,9011 01 01 0 Report Date: May 17, 2018 Page 21 ww ..,-/"•4111111116.,..,-/"•4111111116.,.Washington State WI Department of Transportation rn N Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside 'Funding Priority Number A. PIN/Project No. B. STIP ID C. Project Title __ _......... Adopted Amendment Resolution No. Improvement Type Total Length Environmental Type RW Required Status D. Road Name or Number = C) �^. E. Begin & End Termini _ c ,� m _ F. Project Description G. Structure ID m' N ( 14 I TUK-60 06/25/18 07/02/18 186,8401 01 28 _ 01 0.170 DCE No S I West Valley Highway/Longacres Way Shared Use Pathways 1 2019 I CMAQ 1 441,0631 1 01 68,8361 509,899 1 0 SR 181 8 Longacres Way Totals' 627,9031 725,8991 I 01 01 97,9961 725,899 ( W end of planned Green River Bridge to Longacres Way Improvements will be completed on SR 181 from the west end of the planned Green River non -motorized Bridge to Longacres Way, including a 12-14 ft. separated shared use path with a 5 ft. landscaped buffer strip on the west side of the highway - Design -only will be =r1plelod for #utvr lmprcvn:.wnts on Longacres Way between [ SR 181 to the Ttiwrita end Transit Link S//at 'Funding __ _......... ____ I Status I Phase I Phase Start Year (Y(YY) Federal Fund Code I Federal Funds I State Fund Code 1 State Funds I Local Funds I Total Funds I S I PE 1 2019 1 CMAQ 1 186,8401 01 I _ 01 01 __-- 29,1601 216,000 S I CN 1 2019 I CMAQ 1 441,0631 1 01 68,8361 509,899 1 0 I Totals' 627,9031 725,8991 I 01 01 97,9961 725,899 'Expenditure Schedule I Phase 1st I 2nd I 3rd 1_____ 4th I 5th 8 6th I PE I 216,0001 01 _ 01 01 _0 I CN 1 509,8991 01 —.. 01 01 0 I Totals' 725,8991 01 01 01 0 I Federal Funds 1 State Funds I Local Funds 1 Total Funds Grand Totals for Tukwila' 26,771,7931 13,652,3221 33,118, 2961 73, 542,411 Report Date: May 17, 2018 Page 22