HomeMy WebLinkAboutReg 2018-07-02 Item 4B - Resolution - 2019-2024 Transportation Improvement ProgramCOUNCIL AGENDA SYNOPSIS
----------- ----- --------- --------
MeetingDate
Prepared by
Mayor's review
Council review
06/25/18
HH
/
6-1
07/02/18
HH
0 Bid Award
AN Date
I Public Hearing
E] Other
111t1 Date
Aug Date
Mtg Date
Mtg Date 06/25/18
SP ONS Council Mayor Adm Svcs DCD Finance[]fire fl Legal El P&R Police IA PW
SPONSOR'S The Transportation Improvement Program (TIP) is required by the RCW to be updated
SUMMARY annually. The TIP is primarily a financial planning document for projects competing for
federal and state grants. A Public Hearing is scheduled on June 25, 2018 for the 2019 -
2024 Six Year Transportation Improvement Program. After the Public Hearing, the TIP is
adopted by City Resolution and is then incorporated into the Regional and State TIPs.
RI W I I WIT) BY
ITEM INFORMATION
ITEM No.
4.B.
CAS NUMBIR.:
STAFF SPONSOR: HENRY HASH
ORIGINAL AG PNDA DATI: 6/25/18
AGENDA ITEM Trl'ITh; Resolution adopting the Six -Year Transportation Improvement
Program 2019 - 2024
Cyri;(;()RY I Discussion
06/25/18
0 Motion
Alts Dale
IZ Resolution
Mtg Date 07/02/18
U Ordinance
0 Bid Award
AN Date
I Public Hearing
E] Other
111t1 Date
Aug Date
Mtg Date
Mtg Date 06/25/18
SP ONS Council Mayor Adm Svcs DCD Finance[]fire fl Legal El P&R Police IA PW
SPONSOR'S The Transportation Improvement Program (TIP) is required by the RCW to be updated
SUMMARY annually. The TIP is primarily a financial planning document for projects competing for
federal and state grants. A Public Hearing is scheduled on June 25, 2018 for the 2019 -
2024 Six Year Transportation Improvement Program. After the Public Hearing, the TIP is
adopted by City Resolution and is then incorporated into the Regional and State TIPs.
RI W I I WIT) BY
E] COW Mtg.
Cmte
•
CA&P Cmte
F&S Cmte
111 Parks Comm.
COMMITTEE CI IAI t.: THOMAS
II Transportation
Cmte
Arts Comm.
Planning Comm.
MCLEOD
U Utilities
DATE: 5/29/18
RECOMMENDATIONS:
SPONSOR/ADMIN.
OJNIMITIEF
Public Works
Unanimous Approval; Forward to Committee of the Whole
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source:
Comments:
MTG. DATE
. RECORD OF COUNCIL ACTION
6/25/18
Forward to Regular Meeting
7/02/18
MTG. DATE
ATTACHMENTS
6/25/18
Informational Memorandum dated 05/25/18
Draft Resolution
Draft 2019 — 2024 TIP Spreadsheets
Current Adopted 2018 — 2023 TIP
Minutes from the Transportation and Infrastructure Committee meeting of 05/29/18
7/02/18
Resolution
37
38
City of TulF,,.1a
F T � N
Washington
Resolution No.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2019-
2024), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 4726, the
City Council of the City of Tukwila has previously adopted a Transportation Improvement
Program and thereafter periodically modified said Transportation Improvement Program
by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2019-2024); and
WHEREAS, on June 25 2018, a public hearing was held regarding the City's Six -
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six -Year Transportation Improvement Program
for the calendar years 2019 to 2024, attached hereto as Exhibit A, is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the Secretary
of Transportation and the Transportation Improvement Board of the State of Washington.
W:\Word Processing\Resolutions\TIP 2019-2024 5-18-18
CK:bjs
Page 1 of 2
39
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of , 2018.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk Verna Seal, Council President
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Rachel B. Turpin, City Attorney
Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2019 to 2024
W:\Word Processing\Resolutions\TIP 2019-2024 5-18-18
40 CK:bjs
Page 2 of 2
Washington State
Department of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
N_
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
A
o
c
-
'
o
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
Status
WA -07745
40-42 Ave S (S 160 St - S 131 PL)
S 160th Street to S 131st Place
Design and construct street improvements, underground aerial utilities, drainage,
sidewalks, bike facilities, and driveway adjustments
06/25/18
07/02/18
Federal Fund Code I
Federal Funds
04
COOPSDOE
TW
I
State Funds
Yes
Funding
I
Phase
I
1st I
Status
I
Phase
I Phase Start Year (YYYY) I
Federal Fund Code I
Federal Funds
1
State Fund Code
I
State Funds
I
Local Funds 1
Total Funds
S
I
CN
I 2019 I
I
I
01
Totals!
1
01
3,000,0001
3,000,000
P
I
CN
1 2024 I
I
01
1
0
4,360,0001
4,360,000
Totals'
01
I
Cil
7,360,0001
7,360,000
'Expenditure Schedule
I
Phase
I
1st I
2nd
I
3rd
'
4th
I
5th &fish
CN
I
3,000,0001
01
01
0'
4;360,000
I
Totals!
3,000,0001
01
01
01
4,360,000
Report Date: May 17, 2018
Page 1
AM.
gr� Washington State
.' Department o/ Transportation
"Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Priority Number
Functional
Class
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Adopted
Amendment
P
Improvement Type
Utility Codes
Total Length
'.. Environmental Type
RW Required
08
WA -11101
06/25/18
07/02/18
Phase
1 Phase Start Year (YYYY) 1
11
CG P S T
0.060
DCE
No
I
Local Funds I
Total Funds
P
I
PE
I 2020
W
BR I
1,554,0001
RW
1
42nd Ave S Bridge Replacement
01
546,0001
2,100,000
j
I P
I
RW
I 2021
I
BR I
740,0001
42nd Ave S
I
01
01
260,0001
1,000,000
P
I
CN
I 2022
I
Interurban Avenue S to North Bridge
10,206,0001
1,600,0001
I
1,250,0001
01
2,444,0001
12,650,000
Design and construct a replacement structure for the existing S 42nd Ave bridge. 8109700
Totalsi
12,500,0001
I
01
3,250,0001
15,750,000
Funding
I
Phase
I
1st
Status
I
Phase
1 Phase Start Year (YYYY) 1
Federal Fund Code I
Federal Funds 1
State Fund Code
I
State Funds
I
Local Funds I
Total Funds
P
I
PE
I 2020
I
BR I
1,554,0001
RW
1
01
546,0001
2,100,000
j
I P
I
RW
I 2021
I
BR I
740,0001
I
01
01
260,0001
1,000,000
P
I
CN
I 2022
I
BR I
10,206,0001
1,600,0001
I
1,250,0001
01
2,444,0001
12,650,000
Totalsi
12,500,0001
I
01
3,250,0001
15,750,000
[Expenditure Schedule
I
Phase
I
1st
I
2nd I
3rd
I
4th
1
5th & 6th
I
PE
I
01
1,600,0001
OI
250,0001
250,000
I
RW
_.....__.I
Ol
01
1,000,0001
01
0
r
CN
I
01
01
250,0001
6,250,0001
6,150,000
I
Totals"
01
1,600,0001
1,250,0001
6,500,0001
6,400,000
Report Date: May 17, 2018
Page 2
�� Washington Stat
�/ Department of Tfe
ansportation
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Priority Number
Functional
Class
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
.............
Adopted
71
3
m
S
3 z
..
Improvement Type
Utility Codes
RW Required
Environmental Type
Total Length
'
WA -11113
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
GIMWE and eruct curt gslter arm sidewalk on the west side of 46th Avenue S,
06/25/18
07/02/18
05
Status
0.370
11
indudiry r sS txrrt-uut at 0h SE carne- n' 46th Avenue S/S 144th Street with raised
crosswalk across S 144th Street with RRFB.
Funding
Status
I
Phase
I Phase Start Year (YYYY)
Federal Fund Code I
Federal Funds
I
State Fund Code
I
State Funds I
Local Funds
I
Total Funds
P
I
PE
1 2019
-1
I
01
SRTS
1
180,0571
OI
180,057
P
1
RW
1 2019
1
_ I
01
SRTS
I
232,0001
01
232,000
I
CN
1 2020
1
I
OI
SRTS
1
2,124,668`
01
2,124,668
Totals)
OI
2,536,7251
01
2,536,725
'Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
RW
CN
180,0571
01
01
01
232,0001
01
01
01
of
2,124,6681
01
of
Totals
412,057
2,124,6681
01
01
Report Date: May 17, 2018
Page 3
7 Washington State
�7// Department of Transportation
-InAgency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
-i.
o
3E.
cr
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
I
WA -06601
53rd Avenue S
S 137th St to S 144th St
Design and construct urban residential street improvements that include curb, gutter,
sidewalk , illumination and undergrounding. Street portion will coordinate with Water,
Surface Water and Sewer capital improvement program projects.
06/25/18
07/02/18
Federal Funds
1
04
C G O P S
TW
0.420
CE
Yes
Funding
Phase
I
Status
S
I
Phase
I Phase Start Year (YYYY)
Federal Fund Code I
Federal Funds
1
State Fund Code
I
State Funds
Local Funds I
Total Funds
I
CN
2019 I
I
01
TIB
I
2,274,3651
2,714,8491
4,989,214
250,0001
01
Totals
01
OI
0
I
2,274,3651
2,714,8491
4,989,214
Expenditure Schedule
Phase
I
1st I
2nd
I
3rd
I
4th
I
5th & 6th
CN
__..I
4,101,2491
250,0001
01
01
0
Totals!
4,101,2491
250,0001
01
01
0
Report Date' May 17, 2018
Page 4
.iw.
...4111.16,.. Washington State
VIII Deportment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
-n
No
E- _
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID_
Hearing
Adopted
Amendment
Resolution No.
Improvement Typal
Utility Codes
Total Length
Environmental Type
RW Required
00
Status
WA -05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/25118
07/02/18
Federal Fund Code I
Federal Funds
06
State Fund Code
j
State Funds
No
Funding
Phase I
1st
I
Status
I
Phase
1 Phase Start Year (YYYY) I
Federal Fund Code I
Federal Funds
I
State Fund Code
j
State Funds
I
Local Funds I
Total Funds
S
I
ALL
I 2019 I
I
OI
1
01
1,200,0001
1,200,000
I—
Totals)
01
1
Oi
1,200,0001
1,200,000
!Expenditure Schedule
Phase I
1st
I
2nd
1
3rd
1
4th
I
5th & 6th
I ALL I
200,0001
200,0001
200,0001
200,0001
400,000
I Totals'
200,0001
200,0001
200,0001
200,0001
400,000
Report Date: May 17, 2018
Page 5
.w,
Washington State
T'*/ Department of Transportation
v, Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
0.
IN E
E _
.............................
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
=
`;
_
r'o
Adopted
Amendment
Resolution No.
Improvement Type
M
r�
o
d
�.
Environmental Type
Weqired
16
[
Status
WA -07746
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
06/25/18
07/02/18
Federal Fund Code I
Federal Funds
03
CGOPS
TW
I
State Funds
No
Funding
--
Phase
I
1st
Status
I
Phase
I Phase Start Year (YYYY) I
Federal Fund Code I
Federal Funds
I
State Fund Code
I
State Funds
I
Local Funds 1
Total Funds
P
I
PE
I 2020 I
I
0
01
-, I
I
01
01
134,0001
134,000
P
I
RW
I 2020 I
I
01
0
I
01
01
___--10,0001
10,000
P
I
CN
I 2021. I
I
01
OI
144,0001
I
01
1,570,0001
1,570,000
Totals)
01
1
01
1,714,0001
1,714,000
Expenditure Schedule
Phase
I
1st
I
2nd
I
3rd 1
4th
I
5th & 6th
PE
I
01
__.
134,0001
01
01
0
RW
-, I
01
10,0001
01
01
0
CN
0
01
1,570,0001
01
0
Totals)
01
144,0001
1,570,0001
0
0
Report Date: May 17, 2018
Page 6
.AR►
Washington State
7w Department of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
A. PIN/Project No. B. STIP ID
z C. Project Title
o $c D. Road Name or Number
. E. Begin & End Termini
F. Project Description G. Structure ID
Adopted
Amendment
Resolution No.
Improvement Type
L.
o
, r
c
s
Environmental Type
RW Required
_
WA -03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
06/25/18
07/02/18
Status'
Phase
06
Federal Fund Code I
Federal Funds
I
Funding
I
Phase
Status'
Phase
I Phase Start Year (YYYY) I
Federal Fund Code I
Federal Funds
I
State Fund Code
I
State Funds
I
Local Funds 1
Total Funds
S '
ALL
I 2019 I
I
335,0001
01
405,0001
I
405,0001
01
2,300,0001
2,300,000
Totals'
335,0001
Totals'
335,0001
01
405,0001
I
405,0001
01
2,300,0001
2,300,000
'Expenditure Schedule
I
Phase
I
1st
I
2nd
I
3rd
I
4th
I
5th & 6th
1
ALL
I
335,000'
335,0001
405,0001
405,0001
820,000
Totals'
335,0001
335,0001
405,0001
405,0001
820,000
Report Date: May 17, 2018
Page 7
Wil.
'� wg.A.thwt. stab* Depart/mat ivanspertation
CO w Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
Status
WA -03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/25/18
07/02/18
Federal Fund Code I
Federal Funds
06
C G O P S
TW
I
State Funds
No
Funding
I
Phase
I
Status
I
Phase
I Phase Start Year (YYYY) I
Federal Fund Code I
Federal Funds
I
State Fund Code
I
State Funds
I
Local Funds I
Total Funds
S
I
ALL
I 2019 I
I
01
3,900,0 0
I
01
10,870,0001
10,870,000
1,740,0001
1,800,0001
Totals)
1,050,0001
01
1
01
10,870,0001
10,870,000
'Expenditure Schedule
I
Phase
I
1st
1
2nd
I
3rd
I
4th
I
5th & 6th
L
ALL
I
1,730,0001
1,740,000
1,800,0001
1,850,000
3,900,0 0
I
Totals
1,730,0001
1,740,0001
1,800,0001
1,050,0001
3,959,000
Report Date: May 17, 2018
Page 8
�tle.
Washington State
�►�AW Department or Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
`=
m o
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Utility Codes
Improvement Type
Total Length
Environmental Type
RW Required
00
WA05409
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
900+ daily truck trips from residential streets in Allentown.
06/25/18,07/02/18
'..
08
EIS
No
Funding
Status
Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code
State Funds
P
PE
2024
01
Totals I
O1
Si
o1
Local Funds
100,0001
Total Funds
100,000
100,OOOI
100,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
01
01
01
100.000
Totals I
OI
01
01
01
Report Date: May 17, 2018
100,0001
Page 9
Washington State
7417 Deperhnerct
al Trensportation
01
OlAgency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
m
y
N d
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D, Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
'.. Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
1 Status
WA -11117
Boeing Access Road over Airport Way Bridge Seismic Retrofit
Boeing Access Road
to
Provide seismic modifications to the Boeing Access Road over Airport Way Bridge to
allow it to withstand earthquake forces.
06/25/18
07/02/18
Federal Fund Code 1
Federal Funds I
47
I
0.100
I
No
Funding
I
Phase
1 Status
1
Phase
I Phase Start Year (YYYY) I
Federal Fund Code 1
Federal Funds I
State Fund Code
I
State Funds
I
Local Funds
1
Total Funds
hS
I
PE
1 2019 1
BR I
370,000''
0
I
OI
i
OI
370,000
S
I
CN
I 2019 I
BR I
2,611,0001
0
1
01
OI
2,611,000
I
01
01
Totals'
2,981,0001
I
01
01
2,981,000
'Expenditure Schedule
I
Phase
1st
i
2nd I
3rd
1
4th
'
5th 8 6th
I
PE
I
370,0001
01.
01
01
0
I
CN
i
01
2,611,0001
01
01
0
I
Totals'
370,0001
2,611,0001
01
01
0
Report Date: May 17, 2018
Page 10
sink
�� Washington State
VAPIF Department of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
............................
Functio
Class
nal
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
=
p1
,c
y
a°
o.
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
I
WA -11115
Green River Trail
Green River Trail
Christensen Road to Green River
Replace the existing 8 -foot wide Green River Trail with 12 -foot wide concrete paved
trail with 2 -foot gravel shoulders, including illumination, CCTV, waytinding, and
pedestrian plaza.
06/25/18
07/02/18
Federal Funds I
State Fund Code
28
State Funds
0.140
DCE
No
Funding
I Phase I
1st
I Status
I
Phase
I Phase Start Year (YYYY) I
Federal Fund Code I
Federal Funds I
State Fund Code
1
State Funds
I
Local Funds I
Total Funds
I
CN
2021 I
STP(E) I
896,1401
I
1
01
139,8601
1,036,000
I
01
1,836,0001
Totals)
896,1401
I
OI
139,8601
1,036,000
'Expenditure Schedule
I Phase I
1st
I
2nd
I
3rd I
4th
I
5th & 6th
CN
I
01
01
1,036,000
01
0
1
Totals)
01
01
1,836,0001
01
8
Report Date: May 17, 2018
Page 11
JAR&
Washington State
7/ Department of Transportation
01
"Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
c
l Pi
mo
Ot m
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
,'a
Adopted
Amendment
Resolution No.,
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
1 Status
WA -11110
Macadam Rd S Complete Streets Project
Macadam Road
S 150th Street to S 144th Street
Design and construction of a complete street on Macadam Road. Road widening
and rechannelization to add 5 -foot bike lanes and 5 -foot sidewalks on both sides of
the roadway. Includes illumination, curb, and storm drainage.
06/25/1807/02/18
I Phase Start Year (YYYY) 1
Federal Fund Code I
Federal Funds I
04
I
0.350
DCE
Na
'Funding
1 Status
1
Phase
I Phase Start Year (YYYY) 1
Federal Fund Code I
Federal Funds I
State Fund Code
I
State Funds I
Local Funds I
Total Funds
P
I
PE
I
2019
I
I
01
Ped/Bike Program
1
397,3691
01
397,369
P
'
RW
1
2019
1
I
01
Ped/Bike Program
1
100,000
0
100,000
I P
1
CN
I
2020
1
I_.....
01
Ped/Bike Program
1
2,272,9471
460,0001
2,732,947
1
Totals'
01
2,770,3161
460,0001
3,230,316
'Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
397,3691
01
0
RW
1
100,0001
01
F
CN
2,732,9471
OI
01
01
0
Totals
497,3691 2,732,9471
Report Date: May 17, 2018
Page 12
Washington Se
department oreansportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
T
cl 2
—
El_
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
FF..
F. Project Description G. Structure ID
=
0
y
a
n
Y
a.
Resolution No.
Improvement Type
,
8
Total Length
Environmental Typel
RW Required
00
Status
WA -03783
Multipurpose Trails
to
Wide array of necessary trail improvements to existing trail system infrastructure
106/25/18
07/02/18
Federal Fund Code I
Federal Funds
28
State Fund Code
1
CE
No
Funding
Phase
I
1st
Status
'
Phase
I Phase Start Year (YYY() I
Federal Fund Code I
Federal Funds
I
State Fund Code
1
State Funds
1
Local Funds I
Total Funds
P
ALL
2024 I
I
150,000
OI
Totals'
I
01
01
150,0001
150,000
01
01
150,000
Totals'
01
1
01
156,0001
150,000
Expenditure Schedule
Phase
I
1st
I
2nd
I
3rd
I
4th
I
5th & 6th
ALL
I
01
°I
OI
01
150,000
Totals'
01
61
01
01
150,000
Report Date: May 17, 2018
Page 13
.Ilfil�
Washington State
P' Department of Transportation
01
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
Adopted
Amendment
A
m
o
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
C. Project Title=
I
c
D. Road Name or Number
Federal Fund Code 1
Federal Funds
E. Begin & End Termini
01
1
F. Project Description G. Structure ID
2
o
14
I
WA -09873
06/25/18
07/02/18
01
04
CD P S T
0.100
DCE
Yes
0
I
RW
1 2021 1
0
01
Ped/Bike Program
W
40,0001
10,0001
50,000
1
S 140th St Intersection Improvements
I 2022 I
1
01
Ped/Bike Program
I
568,0001
57,0001
625,000
625,0001
S 140th Street
Totals)
TotalsI
01
OI
I
675,0001
75,0001
750,000
625,0001
Tukwila International Blvd to
0
Design and construct a new traffic signal at the S 140th Street/Tukwila International
Blvd intersection
Funding
1
Status
I
Phase
1 Phase Start Year (YYYY) I
Federal Fund Code 1
Federal Funds
1
State Fund Code
1
State Funds I
Local Funds 1
Total Funds
P
I
PE
I 2021 I
I
01
Ped/Bike Program
1
67,0001
8,0001
75,000
0
I
RW
1 2021 1
0
01
Ped/Bike Program
1
40,0001
10,0001
50,000
1
CN
I 2022 I
1
01
Ped/Bike Program
I
568,0001
57,0001
625,000
625,0001
0
Totals)
TotalsI
01
OI
I
675,0001
75,0001
750,000
IExpenditure Schedule
1
Phase
I
1st
I
2nd
I
3rd
I
4th
I
5th & 6th
PE
I
0
01
75,0001x
01
0
RW
I
0
01
50.0001
01
CN
I
01
01
01
625,0001
0
TotalsI
OI
OI
125,0001
625,0001
0
Report Date: May 17, 2018
Page 14
w
�•� Washington StatO
-/O Department of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
m
in
mE.
N _
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
Begin & End Termini
F. Project Description G. Structure ID
m
m'
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
I
WA03782
S 144th St Bridge Sidewalks
S 144th Street
51st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S
06/12/17
06/19/17
Federal Funds I
State Fund Code
28
State Funds
0.250
Local Funds 1
No
Funding
I
Phase
Status
I
Phase
I Phase Start Year (YYYY) 1
Federal Fund Code I
Federal Funds I
State Fund Code
I
State Funds
I
Local Funds 1
Total Funds
P
I
PE
I 2019 I
SRTS I
173,0001
I
°I
27,0001
200,000
P
I
CN
I 2019 I
SRTS I
1,047,0001
I
-
OI
163,0001
1,210,000
Totals!
200,0001
1,210,0001
Totals'
1,220,0001
I
0
190,0001
1,410,000
'Expenditure Schedule
I
Phase
1st
I
2nd I
3rd
14th
'
5th 86th
I
PE
I
200,0001
01
01
OI
0
CN
I
01
1,210,0001
01
01
-
0
Totals!
200,0001
1,210,0001
01
01
0
Report Date: May 17, 2018
Page 15
AMA
®Departnwator Trarevertatian
01
CD Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
c
m o
N .
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
improvement Type
a
2
i
z
Environmental Type
z
`—
a
17
WA -11114
S 144th Street Bridge Sidewalks
S 144th Street
51st Avenue S to 53rd Avenue S
Design of pedestrian improvements to the S 144th Street Bridge over 1-5 to include
widening the existing 3 -foot sidewalks to 6 -feet with a barrier to separate vehicles
and pedestrians
06/25/18
07/02/18
05
0.100
DCE
No
Funding
Status
P
Phase I Phase Start Year (YYYY) I Federal Fund Code
PE
2019 I I
Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds
416, 0001 27,0001 443,000
0 Ped/Bike Program 1
Totals I
416,000 27,0001 443,000
Expenditure Schedule
Phase
PE
1st
2nd
3rd
4th
443,0001
Totals]
443,0001
01
01
of
01
] 5th & 6th
01
01
Report Date: May 17, 2018
Page 16
41116.
Departnwat0
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin 8 End Termini
F. Project Description G. Structure ID
Hearing
y
a
LAmendment
......_
Resolution No.
Improvement Type
C>
v,
Environmental Type
Total Length
RW Required
19
Status
WA -11112
S 152nd Street Safe Routes to School
S 152nd Street
Tukwila International Blvd to 42nd Avenue S
Design and construct curb, gutter and __ - 0i boob s l€Ourbng uddeni:
wsw
CO Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
l��
l c
ttt
m o
8 =
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
=
_
,o
Adopted
1
D
m
I.
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
.......................
16
3rd
/ 1276(007) TUK-59
06/25/18
07/02/18
5th & 6th
01
1
:...............__
0.300
..
DCE
Yes
01
Strander Blvd./SW 27th St Extension
0
ALL
1
01
1,450,0001
°I
01
Strander Blvd./SW 27th St Extension
Totals)
4,500,0001
1,450,0001
01
01
West Valley Highway to Naches Ave
This project is Phase 3 of a multi -phase improvement that will connect Strander
Blvd./SW 27th St between West Valley Hwy in Tukwila and Oakesdale Ave in
Renton. This project will complete the design, right-of-way and construction phases
for the roadway segment between West Valley Hwy and Naches Ave. Project
components include a railroad bridge for the Union Pacific RR to provide grade
separation, a new 4/5 lane roadway segment east of West Valley Hwy, roadway
widening of two lanes for a portion of the project segment, a separated joint -use trail,
a new trail bridge for the Interurban Trail (including new trail connections to Strander
Blvd.), a new flyover bridge connection to the Tukwila Station, a new traffic signal
serv8r the Tia Stat. a. d Own e facilKes. Cuffer& fang ON
Wrnpinte rrm preDninary eripinntwing and - way grayes, DwrwrwAYInn will be
funded as part of a future phase.
Funding
Status 1
S 1
Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds 1 State Fund Code
PE
RW
2019
2020
STP(UL)
STP(UL)
Totals
3,892,5001
1,254,2501
5,146,7501
State Funds I Local Funds 1 Total Funds
01 607,5001 4,500,000
01 195,7501 1,450,000
01 803,2501 5,950,000
Expenditure Schedule
Phase
1
1st 1
2nd 1
3rd
1
4th
1
5th & 6th
PE
1
4,500,0001
01
01
01
0
ALL
1
01
1,450,0001
°I
01
0.
Totals)
4,500,0001
1,450,0001
01
01
Report Date: May 17, 2018
Page 18
AMA
Washington State
Department of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
V Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
LI
a.
m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
I
WA -03772
TUC/TOD Pedestrian Improvements
Baker Blvd (if extended)
Andover Park W to E City Limits
Construct bike/pedestrian connection between the Tukwila Urban Center (TUC) and
Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented
Development (TOD) area.
06/25/18
07/02/18
Federal Funds I
State Fund Code
I
State Funds
0.750
CE
Yes
Funding
-
-
Phase
Status
I
Phase
1 Phase Start Year (YYYY) I
Federal Fund Code i
Federal Funds I
State Fund Code
I
State Funds
I
Local Funds I
Total Funds
P
I
ALL
2023'
STP(E)
3,400,0001
01
I
01
01
850,0001
4250.006
Totals)
01
TotalsI
3,400,0001
01
1
01
01
850,0001
4,250,000
'Expenditure Schedule
'
Phase
1
1st
'
2nd
-__
3rd
I
4th
I
5th & 6th
I
ALL
I
01
01
01
01
4,270,000
I
Totals)
01
01
01
01
4,270,000
Report Date: May 17, 2018
Page 19
Aft
Washington State
WO Department of Transportation
rn
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
m c
_
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
c
_
''
o
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
t 14
1 Status
WA -11118
Tukwila International Boulevard Retrofit
Tukwila International Blvd
Southcenter Blvd to S 116th Way
Design and pledging c4 r edfd to Tukwila International Blvd to implement complete
06/25/18
07/02/18
Federal Fund Code 1
Federal Funds
15
COOPS
TW
2.400
State Funds
No
streets, 7nmmsrve pedastdan vehlodaf safety, and reduce regional pass-through
traffic.
Funding
___
_.....__...
1 Status
I
Phase
1 Phase Start Year (YYYY)
Federal Fund Code 1
Federal Funds
1
State Fund Code
I
State Funds
I
Local Funds I
Total Funds
P
I
PE
I 2019 II
OI
1
01
100,0001
100,000
Totals'
01
01
10%000'
100,000
'Expenditure Schedule
Phase
PE
1st
2nd
3rd
4th
5th & 6th
1
Totals'
100,0001
100,000'
01
0
01
01
01
01
Report Date: May 17, 2018
Page 20
wisk
Washington state
War Departmenk of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Funding
Priority Number
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
m
West Valley Highway
SR 181/West Valley Highway
1-405 to Strander Blvd
Design and construct completion of 7 lane sections of West Valley Highway with
arowa..wo. pine. gutters, Mirth a": , lighting, and traffic control, including safety
ard miry h mmy smarts at the. S 156Th St intersection.
WA03779
06/25/18
Funding
I
Status
1
Phase
I Phase Start Year (YYYY)
Federal Fund Code I
Federal Funds
1
State Fund Code
I
State Funds I
Local Funds I
Total Funds
S
I
PE
I 2019
I
01
TIB
1
280,8201
37,1801
318,000
0
1
CN
1 2020 I
I
OI
01
TIB
I
1,872,7401
679,1611
2,551,901
0
1
Totals!
01
I
2,153,5601
716,3411
2,869,901
'Expenditure Schedule
I
Phase
I
1st
I
2nd
I
3rd
I
4th
I
5th & 6th
PE
I
318,0001
OI
01
01
0
1
CN
1
OI
2,551,9011
01
OI
0
1
Totals
318,0001
2,551,9011
01
01
0
Report Date: May 17, 2018
Page 21
ww
..,-/"•4111111116.,..,-/"•4111111116.,.Washington State
WI Department of Transportation
rn
N Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
'Funding
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
__ _.........
Adopted
Amendment
Resolution No.
Improvement Type
Total Length
Environmental Type
RW Required
Status
D. Road Name or Number
=
C)
�^.
E. Begin & End Termini
_
c
,� m _
F. Project Description G. Structure ID
m'
N
( 14
I
TUK-60
06/25/18
07/02/18
186,8401
01
28
_ 01
0.170
DCE
No
S
I
West Valley Highway/Longacres Way Shared Use Pathways
1 2019 I
CMAQ 1
441,0631
1
01
68,8361
509,899
1
0
SR 181 8 Longacres Way
Totals'
627,9031
725,8991
I
01
01
97,9961
725,899
(
W end of planned Green River Bridge to Longacres Way
Improvements will be completed on SR 181 from the west end of the planned Green
River non -motorized Bridge to Longacres Way, including a 12-14 ft. separated
shared use path with a 5 ft. landscaped buffer strip on the west side of the highway -
Design -only will be =r1plelod for #utvr lmprcvn:.wnts on Longacres Way between
[
SR 181 to the Ttiwrita end Transit Link S//at
'Funding
__ _.........
____
I
Status
I
Phase
I Phase Start Year (Y(YY)
Federal Fund Code I
Federal Funds I
State Fund Code
1
State Funds
I
Local Funds I
Total Funds
I S
I
PE
1 2019 1
CMAQ 1
186,8401
01
I
_ 01
01 __--
29,1601
216,000
S
I
CN
1 2019 I
CMAQ 1
441,0631
1
01
68,8361
509,899
1
0
I
Totals'
627,9031
725,8991
I
01
01
97,9961
725,899
'Expenditure Schedule
I
Phase
1st
I
2nd
I
3rd
1_____
4th
I
5th 8 6th
I
PE
I
216,0001
01
_ 01
01
_0
I
CN
1
509,8991
01 —..
01
01
0
I
Totals'
725,8991
01
01
01
0
I Federal Funds 1
State Funds I Local Funds 1 Total Funds
Grand Totals for Tukwila'
26,771,7931
13,652,3221
33,118, 2961 73, 542,411
Report Date: May 17, 2018
Page 22