Loading...
HomeMy WebLinkAboutRes 1938 - 2019-2024 Transportation Improvement ProgramCity of Tukwila Washington Resolution No. j R A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2019- 2024), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2019-2024); and WHEREAS, on June 25 2018, a public hearing was held regarding the City's Six - Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A Six -Year Transportation Improvement Program for the calendar years 2019 to 2024, attached hereto as Exhibit A, is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. W:\Word Processing\Resolutions\TIP 2019-2024 5-18-18 CK.bjs Page 1 of 2 PASSED BY THE CITY COUNCILF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this a ,pday of -Z-1/17 , 2018. ATTEST/AUTHENTICATED: Christy O'FI erty, MMC, City CI APPROVED AS TO FORM BY: Rachel B. Turpin, City Attorney Verna Seal, Council President Filed with the City Clerk: Passed by the City Council: Resolution Number: Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2019 to 2024 W:\Word Processing\Resolutions\TIP 2019-2024 5-18-18 CK:bjs Page 2 of 2 Amok .-7z„. Washington State WI Department of Trans talien Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID co oi cc Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 4th WA -07745 40-42 Ave S (S 160 St - S 131 PL) S 160th Street to S 131st Place Design and construct street improvements, underground aerial utilities, drainage, sidewalks, bike facilities, and driveway adjustments 06/25/18 07/02/18 3,000,000 3,000,000 04 C G O P S TW 2024 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2019 4th 0 5th & 6th 0 3,000,000 3,000,000 P CN 2024 0 0 4,360,000 4,360,000 Totals 0 3,000,000 0 7,360,000 7,360,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 3,000,000 0 0 0 4,360,000 Totals 3,000,000 0 0 0 4,360,000 Report Date: May 17, 2018 Page 1 AIDA Washington State �1 Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 08 BR WA -11101 06/25/18 07/02/18 546,000 2,100,000 11 C G P S T 0.060 DCE No 0 260,000 1,000,000 P CN 2022 BR W 0 2,444,000 12,650,000 Totals 42nd Ave S Bridge Replacement 0 3,250,000 15,750,000 0 250,000 6,250,000 6,150,000 42nd Ave S 0 1,600,000 1,250,000 6,500,000 6,400,000 Interurban Avenue S to North Bridge Design and construct a replacement structure for the existing S 42nd Ave bridge. 8109700 Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 BR 1,554,000 5th & 6th 0 546,000 2,100,000 P RW 2021 BR 740,000 0 260,000 1,000,000 P CN 2022 BR 10,206,000 0 2,444,000 12,650,000 Totals 12,500,000 0 3,250,000 15,750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 1,600,000 0 250,000 250,000 RW 0 0 1,000,000 0 0 CN 0 0 250,000 6,250,000 6,150,000 Totals 0 1,600,000 1,250,000 6,500,000 6,400,000 Report Date: May 17, 2018 Page 2 Adak ington state Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -11113 46th Avenue Safe Routes to School 46th Avenue S S 150th Street to S 144th Street Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S, including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised crosswalk across S 144th Street with RRFB. 06/25/18 07/02/18 0 180,057 05 RW 0.370 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 SRTS 180,057 0 180,057 P RW 2019 0 SRTS 232,000 0 232,000 P CN 2020 0 SRTS 2,124,668 0 2,124,668 Totals 0 0 2,536,725 0 2,536,725 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 180,057 0 0 0 0 RW 232,000 0 0 0 0 CN 0 2,124,668 0 0 0 Totals 412,057 2,124,668 0 0 0 Report Date: May 17, 2018 Page 3 iington State rtment of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -06601 53rd Avenue S S 137th St to S 144th St Design and construct urban residential street improvements that include curb, gutter, sidewalk , illumination and undergrounding. Street portion will coordinate with Water, Surface Water and Sewer capital improvement program projects. 06/25/18 07/02/18 CN 04 C G O P S TW 0.420 CE Yes Funding Status S Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds CN 2019 0 TIB 2,274,365 2,714,849 4,989,214 Totals 0 2,274,365 2,714,849 4,989,214 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 4,101,249 250,000 0 0 0 Totals 4,101,249 250,000 0 0 0 Report Date: May 17, 2018 Page 4 Washington State War Department et hansportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside -n c g. n _. d g co w Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 4th WA -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/25/18 07/02/18 1,200,000 1,200,000 06 0 200,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2019 4th 0 5th & 6th 0 1,200,000 1,200,000 Totals 0 200,000 0 1,200,000 1,200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 200,000 200,000 200,000 200,000 400,000 Totals 200,000 200,000 200,000 200,000 400,000 Report Date: May 17, 2018 Page 5 Washington State I * Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -07746 Andover Park E/Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal 06/25/18 07/02/18 134,000 134,000 03 CLOPS TW 2020 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 134,000 134,000 P RW 2020 0 0 10,000 10,000 P CN 2021 0 0 0 1,570,000 1,570,000 Totals 0 0 0 1,714,000 1,714,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 134,000 0 0 0 RW 0 10,000 0 0 0 CN 0 0 1,570,000 0 0 Totals 0 144,000 1,570,000 0 0 Report Date: May 17, 2018 Page 6 Ink � Washington State T// Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 4th WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi-annual inspections as well as construct necessary repairs and maintenance 06/25/18 07/02/18 2,300,000 2,300,000 06 0 335,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2019 4th 0 5th & 6th 0 2,300,000 2,300,000 Totals 0 335,000 0 2,300,000 2,300,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 335,000 335,000 405,000 405,000 820,000 Totals 335,000 335,000 405,000 405,000 820,000 Report Date: May 17, 2018 Page 7 410116, Washington State WAIF Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing, Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 4th WA -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/25/18 07/02/18 10,870,000 10,870,000 06 C G O P S TW 1,740,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2019 4th 0 5th & 6th 0 10,870,000 10,870,000 Totals 0 1,740,000 0 10,870,000 10,870,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,730,000 1,740,000 1,800,000 1,850,000 3,850,000 Totals 1,730,000 1,740,000 1,800,000 1,850,000 3,850,000 Report Date: May 17, 2018 Page 8 =' Washington State -a/ Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside T 3 ,b. DT g 0 m Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes, Total Length Environmental Type RW Required 00 4th WA05409 BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allentown. 06/25/18 07/02/18 100,000 100,000 08 0 0 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 4th 0 5th & 6th 0 100,000 100,000 Totals 0 0 0 100,000 100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 100,000 Totals 0 0 0 0 100,000 Report Date: May 17, 2018 Page 9 Washington State WAIF Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 BR WA -11117 Boeing Access Road over Airport Way Bridge Seismic Retrofit Boeing Access Road to Provide seismic modifications to the Boeing Access Road over Airport Way Bridge to allow it to withstand earthquake forces. 06/25/18 07/02/18 0 370,000 47 CN 0.100 BR No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2019 BR 370,000 0 0 370,000 S CN 2019 BR 2,611,000 0 0 2,611,000 Totals 2,981,000 CN 0 0 2,981,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 370,000 0 0 0 0 CN 0 2,611,000 0 0 0 Totals 370,000 2,611,000 0 0 0 Report Date: May 17, 2018 Page 10 iing on State IIVAI PF Depart of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted, Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 STP(E) WA -11115 Green River Trail Green River Trail Christensen Road to Green River Replace the existing 8 -foot wide Green River Trail with 12 -foot wide concrete paved trail with 2 -foot gravel shoulders, including illumination, CCTV, wayfinding, and pedestrian plaza. 06/25/18 07/02/18 139,860 1,036,000 28 896,140 0.140 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2021 STP(E) 896,140 0 139,860 1,036,000 Totals 896,140 0 0 139,860 1,036,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 0 1,036,000 0 0 Totals 0 0 1,036,000 0 0 Report Date: May 17, 2018 Page 11 Washington State r// Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -11110 Macadam Rd S Complete Streets Project Macadam Road S 150th Street to S 144th Street Design and construction of a complete street on Macadam Road. Road widening and rechannelization to add 5 -foot bike lanes and 5 -foot sidewalks on both sides of the roadway. Includes illumination, curb, and storm drainage. 06/25/18 07/02/18 0 397,369 04 RW 0.350 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 Ped/Bike Program 397,369 0 397,369 P RW 2019 0 Ped/Bike Program 100,000 0 100,000 P CN 2020 0 Ped/Bike Program 2,272,947 460,000 2,732,947 Totals 0 0 2,770,316 460,000 3,230,316 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 397,369 0 0 0 0 RW 100,000 0 0 0 0 CN 0 2,732,947 0 0 0 Totals 497,369 2,732,947 0 0 0 Report Date: May 17, 2018 Page 12 411116 Washington State Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 4th WA -03783 Multipurpose Trails to Wide array of necessary trail improvements to existing trail system infrastructure 06/25/18 07/02/18 150,000 150,000 28 0 0 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2024 4th 0 5th & 6th 0 150,000 150,000 Totals 0 0 0 150,000 150,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 150,000 Totals 0 0 0 0 150,000 Report Date: May 17, 2018 Page 13 i Washington State Var Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -09873 S 140th St Intersection Improvements S 140th Street Tukwila International Blvd to Design and construct a new traffic signal at the S 140th Street/Tukwila International Blvd intersection 06/25/18 07/02/18 8,000 75,000 04 C G P S T W 0.100 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 Ped/Bike Program 67,000 8,000 75,000 P RW 2021 0 Ped/Bike Program 40,000 10,000 50,000 P CN 2022 0 Ped/Bike Program 568,000 57,000 625,000 Totals 0 0 675,000 75,000 750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 75,000 0 0 RW 0 0 50,000 0 0 CN 0 0 0 625,000 0 Totals 0 0 125,000 625,000 0 Report Date: May 17, 2018 Page 14 � Washington State 7I/ Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 SRTS WA03782 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S 06/12/17 06/19/17 27,000 200,000 28 CN 0.250 SRTS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 SRTS 173,000 0 27,000 200,000 P CN 2019 SRTS 1,047,000 0 163,000 1,210,000 Totals 1,220,000 CN 0 190,000 1,410,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 200,000 0 0 0 0 CN 0 1,210,000 0 0 0 Totals 200,000 1,210,000 0 0 0 Report Date: May 17, 2018 Page 15 iington State rtment el Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -11114 S 144th Street Bridge Sidewalks S 144th Street 51st Avenue S to 53rd Avenue S Design of pedestrian improvements to the S 144th Street Bridge over 1-5 to include widening the existing 3 -foot sidewalks to 6 -feet with a barrier to separate vehicles and pedestrians 06/25/18 07/02/18 27,000 443,000 05 0 0.100 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 Ped/Bike Program 416,000 27,000 443,000 Totals 0 443,000 416,000 27,000 443,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 443,000 0 0 0 0 Totals 443,000 0 0 0 0 Report Date: May 17, 2018 Page 16 Washington State S Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -11112 S 152nd Street Safe Routes to School S 152nd Street Tukwila International Blvd to 42nd Avenue S Design and construct curb, gutter and sidewalks on both sides including widening pavement width by 3 feet to construct on -street parking lane on north side of street. 06/25/18 07/02/18 0 243,000 05 CN 0.300 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 SRTS 243,000 0 243,000 P CN 2020 0 SRTS 2,583,356 0 2,583,356 Totals 0 CN 2,826,356 0 2,826,356 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 243,000 0 0 0 0 CN 0 2,583,356 0 0 0 Totals 243,000 2,583,356 0 0 0 Report Date: May 17, 2018 Page 17 i Washington State Departmenta1T I15[ Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 STP(UL) / 1276(007) TUK-59 Strander Blvd./SW 27th St Extension Strander Blvd./SW 27th St Extension West Valley Highway to Naches Ave This project is Phase 3 of a multi -phase improvement that will connect Strander Blvd./SW 27th St between West Valley Hwy in Tukwila and Oakesdale Ave in Renton. This project will complete the design, right-of-way and construction phases for the roadway segment between West Valley Hwy and Naches Ave. Project components include a railroad bridge for the Union Pacific RR to provide grade separation, a new 4/5 lane roadway segment east of West Valley Hwy, roadway widening of two lanes for a portion of the project segment, a separated joint -use trail, a new trail bridge for the Interurban Trail (including new trail connections to Strander Blvd.), a new flyover bridge connection to the Tukwila Station, a new traffic signal serving the Tukwila Station, and storm drainage facilities. Current funding will complete the preliminary engineering and rightof- way phases. Construction will be funded as part of a future phase. 06/25/18 07/02/18 607,500 4,500,000 01 RW 0.300 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2019 STP(UL) 3,892,500 0 607,500 4,500,000 S RW 2020 STP(UL) 1,254,250 0 195,750 1,450,000 Totals 5,146,750 ALL 0 803,250 5,950,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 4,500,000 0 0 0 0 ALL 0 1,450,000 0 0 0 Totals 4,500,000 1,450,000 0 0 0 Report Date: May 17, 2018 Page 18 Washington State Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 STP(E) WA -03772 TUC/TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Construct bike/pedestrian connection between the Tukwila Urban Center (TUC) and Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented Development (TOD) area. 06/25/18 07/02/18 850,000 4,250,000 28 3,400,000 0.750 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2023 STP(E) 3,400,000 5th & 6th 0 850,000 4,250,000 Totals 3,400,000 0 0 850,000 4,250,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 4,270,000 Totals 0 0 0 0 4,270,000 Report Date: May 17, 2018 Page 19 imp Washington State *// Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID CD SU ' m Adopted Amendments, Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -11118 Tukwila International Boulevard Retrofit Tukwila International Blvd Southcenter Blvd to S 116th Way Design and planning of retrofit to Tukwila International Blvd to implement complete streets, improve pedestrian and vehicular safety, and reduce regional pass-through traffic. 06/25/18 07/02/18 100,000 100,000 15 C G O P S TW 2.400 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 100,000 100,000 Totals 0 100,000 0 100,000 100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 100,000 0 0 0 0 Totals 100,000 0 0 0 0 Report Date: May 17, 2018 Page 20 ANIL mi Washington State Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA03779 West Valley Highway SR 181/West Valley Highway 1-405 to Strander Blvd Design and construct completion of 7 lane sections of West Valley Highway with sidewalks, curbs, gutters, storm drainage, lighting, and traffic control, including safety and capacity improvements at the S 156th St intersection. 06/25/18 07/02/18 37,180 318,000 03 C G O P S TW 0.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2019 0 TIB 280,820 37,180 318,000 S CN 2020 0 TIB 1,872,740 679,161 2,551,901 Totals 0 CN 2,153,560 716,341 2,869,901 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 318,000 0 0 0 0 CN 0 2,551,901 0 0 0 Totals 318,000 2,551,901 0 0 0 Report Date: May 17, 2018 Page 21 AMA Washington State Wi Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 CMAQ TUK-60 West Valley Highway/Longacres Way Shared Use Pathways SR 181 & Longacres Way W end of planned Green River Bridge to Longacres Way Improvements will be completed on SR 181 from the west end of the planned Green River non -motorized Bridge to Longacres Way, including a 12-14 ft. separated shared use path with a 5 ft. landscaped buffer strip on the west side of the highway. Design -only will be completed for future improvements on Longacres Way between SR 181 to the Tukwila Sound Transit Link Station. 06/25/18 07/02/18 29,160 216,000 28 CN 0.170 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2019 CMAQ 186,840 0 29,160 216,000 S CN 2019 CMAQ 441,063 0 68,836 509,899 Totals 627,903 CN 0 97,996 725,899 Expenditure Schedule Federal Funds State Funds Local Funds Total Funds Phase 26,771,793 1st 13,652,322 2nd 73,542,411 3rd 4th 5th & 6th PE 216,000 0 0 0 0 CN 509,899 0 0 0 0 Totals 725,899 0 0 0 0 Report Date: May 17, 2018 Page 22 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 26,771,793 13,652,322 33,118,296 73,542,411 Report Date: May 17, 2018 Page 22 Christy O'Flaherty From: Christy O'Flaherty Sent: Monday, July 9, 2018 11:57 AM To: 'G regA@TI B.wa.gov' Subject: Tukwila Transportation Improvement Program 2019-2024 Importance: High July 9, 2018 TO: TRANSPORTATION IMPROVEMENT BOARD RE: CITY OF TUKWILA 2019-2024 TRANSPORTATION IMPROVEMENT PROGRAM Following is a link to City of Tukwila Resolution #1938 passed July 2, 2018, adopting the Transportation Improvement Program for 2019-2024. Res 1938: Adopting a Six -Year Transportation Improvement Program (2019-2024) http://records.tukwilawa.gov/WWebLink/1/doc/306730/Page1.aspx Please contact me with any questions at 206 433-1855. Please respond to this email to ensure it was received satisfactorily. Thank you. Sincerely yours, Christy O'Flaherty, MMC, Records Governance Manager, City Clerk Attachment xc: Henry Hash, Public Works Director 1 Christy O'Flaherty From: Christy O'Flaherty Sent: Monday, July 9, 2018 11:56 AM To: 'millarr@wsdot.wa.gov' Subject: Tukwila Transportation Improvement Program 2019-2024 Importance: High July 9, 2018 TO: WASHINGTON STATE DEPT OF TRANSPORTATION RE: CITY OF TUKWILA 2019-2024 TRANSPORTATION IMPROVEMENT PROGRAM Following is a Zink to City of Tukwila Resolution #1938 passed July 2, 2018, adopting the Transportation Improvement Program for 2019-2024. Res 1938: Adopting a Six -Year Transportation Improvement Program (2019-2024) http://records.tukwilawa. gov/WebLink/1 /doc/306730/Pagel . aspx Please contact me with any questions at 206 433-1855. Please respond to this email to ensure it was received satisfactorily. Thank you. Sincerely yours, Christy O'Flaherty, MMC, Records Governance Manager, City Clerk Attachment xc: Henry Hash, Public Works Director i Christy O'Flaherty From: Christy O'Flaherty Sent: Monday, July 9, 2018 11:55 AM To: 'Andi Markley' Subject: Tukwila Transportation Improvement Program 2019-2024 Importance: High July 9, 2018 TO: PUGET SOUND REGIONAL COUNCIL RE: CITY OF TUKWILA 2019-2024 TRANSPORTATION IMPROVEMENT PROGRAM Following is a link to City of Tukwila Resolution #1938 passed July 2, 2018, adopting the Transportation Improvement Program for 2019-2024. Res 1938: Adopting a Six -Year Transportation Improvement Program (2019-2024) http://records.tukwilawa.gov/WebLink/1 /doc/306730/Pagel .aspx Please contact me with any questions at 206 433-1855. Please respond to this email to ensure it was received satisfactorily. Thank you. Sincerely yours, Christy O'Flaherty, MMC, Records Governance Manager, City Clerk Attachment xc: Henry Hash, Public Works Director