Background
History
• Nearly 20 Years of Experience With Wireless Collocation
• 400+ Existing Wireless Attachments
Street & Area Lights
1Nireline
Small CeII Wireless
• Presents New Challenges With Increased Volume & New Applications.
Pole Services Department
• Consolidated PSE's wireless, wireline and streetlight operations.
• Resource Optimization (People, Systems & Budget).
• Streamlined Pole Asset Utilization, Planning, Coordination & Tracking
Key Business Drivers
• Safety Focus
• Ensure Public Safety & Safety of PSE Crews and Contractors
• Regulatory Adherence
• Federal (FCC), State of Washington (RCW/UTC) & Local Jurisdictions
• Minimize Service Outages & Increase Reliability
118,00C
40
378,949
PUGE
SOUND
Process Overview
• Verifyy Pole
Ownership &
Candidacy
• Verify Application
Contains All
Necessary
Information For
Review
• Identify Obvious
Issues & Conflicts
• 45-Day "Shot Clock"
(FCC)
• Internal Review To
Determine Conditions
For Approval
• 14-Day Shot Clock For
Engineering Work &
Make Ready For Make
Ready Construction
• Review To Ensure
Structural Integrity &
Compliance with PSE
Standards
• Design Finalized &
Approved
• Right of Way (ROW) &
Traffic Control Plan
(TCP) Submitted &
Approved.
• Estimate For Make -
Ready Construction
Sent To Wireless
Carrier For Approval.
• 90-Day "Shot Clock"
To Complete Make -
Ready Work
• Includes
rearrangement of
existing attachments
and replacement of
poles where needed
to create sufficient
space and capacity.
• Installation Of
Wireless Antennas &
Equipment
PUCE
SOUND
ENEMY
Separations & Clearances
10' from Transmission.
40" from. Neutral I Secon
Antenna Space
Supply Space
No Attach ants Permitted
ety Space
Communications
Space
Transition
Space
N ESC
■ Minimum 40" from distribution conductor.
■ Minimum approach distance starts at 10'
and increases as voltage increases.
■ Safety Space: Off Limits.
■ Qualified Workers Required For Energized
Conductor Work.
PSE
■ Minimum 7' from distribution
■ Minimum 10' from transmission
■ Attachments of radiating antenna in Supply
Space & Communications Space are
currently not permitted.