HomeMy WebLinkAboutPS 2018-08-06 Item 2A - Public Safety Plan - Demolition Services Contract Amendment #2 with BNBuilders) City of Tukwila
A an Ekberg, Mayor
INFORMATIONAL MEMORANDUM
TO: Public Safety Committee
FROM: Rachel Bianchi, Communications and Government Relations Manager
CC: Mayor Ekberg
DATE: July 30, 2018
SUBJECT: GC/CM Contract Amendment No. 2 for the Justice Center
ISSUE
In April 2018 the City acquired the property located at 14835 Tukwila International Boulevard
("JC-9") for the Justice Center project. Amendment No. 2 to BNBuilders' contract would allow
for demolition of the existing vacant building on this property.
BACKGROUND
JC-9 is a 10,785 square foot parcel, with a 6,600 square foot building and associated parking on
the site. The building is vacant and has been unoccupied for an extended period of time.
Previous tenants of the building included a restaurant and driving school. Of the buildings being
acquired as part of the Justice Center location, this is the only building that does not have
tenants and is vacant.
Both the City's Police Department and Code Enforcement has incidents, calls for service, and
actions related to the property. Small fires have been set in the rear of the building. Despite
signs saying No Trespassing" individuals keep going on the property and though the building
has been secured, there is evidence of squattersuse of the building, including considerable
human waste and trash. Based on these risks, the City believes the building poses an
immediate and continued threat to public safety and should be demolished as soon as possible.
The necessary work includes biohazards cleanup, rodent control, hazardous building materials
abatement, and building demolition. BNBuilders, the City's General Contractor/Construction
Manager (GC/CM), has received competitive bids for the demolition and associated work and is
ready to award subcontracts pending Council action.
The demolition and associated work is included in the revised project budget for the Justice
Center. The contractor is hoping to begin demolition on Monday, August 13, 2018.
The contract amendment was prepared by the City's outside legal counsel and reviewed by the
City's project management consultant and the Council's Project Management Quality Assurance
consultant.
RECOMMENDATION
The Public Safety Committee is asked to approve the contract amendment. The staff asks that
the contract amendment be moved to the full Council meeting on August 6, 2018 to facilitate the
demolition of the building as soon as possible.
ATTACHMENTS
BNBuilders Contract Amendment No. 2
1
2
Inft
Document Al3 'I 2009 Exhibi
IA
Guaranteed Maximum Price Amendment
for the following PROJECT:
(Name and address or location)
Tukwila Justice Center
Tukwila WA
THE OWNER:
(Name, legal status and address)
City of Tukwila
6200 Southeenter Boulevard
Tukwila WA 98188
THE CONSTRUCTION MANAGER:.
(Name, legal status and address)
BNBuilders, Inc,
2601 Fourth Ave
Suite 350
Seattle, WA 98121
ARTICLE A.1
§ A.1.1 Total Contract Cost
Pursuant to Section 2.2 of the Agreement, the Owner and Construction Manager hereby
amend the Agreement to establish a Maximum Allowable Construction Cost (MACC),
Total Contract Cost (TCC) and terms governing a specified scope of vvork related to early
abatement and demolition of a single nuisance building in the JC-9 parcel, which is one of
several parcels for the future Justice Center ("JC-9 Early Abatement and Demolition
Scope"). As agreed by the Owner and Construction Manager, the 'fowl Contract Cost is an
amount that the Contract Sum shall not exceed. The Total Contract Cost consists of the
MACC (including the Construction Cost, Negotiated Support Services, and MACC
Contingency); the Fixed Fee; the Fixed Amount for Specified General Conditions work;
and applicable Washington State sales tax,
§ A.1.1.1 The Total Contract Cost for the JC-9 Early Abatement and Demolition Scope,
including Washington State Sales Tax is guaranteed by the Construction Manager not to
exceed One Hundred Thirty -Four Thousand Five Hundred Seventy -One Dollars ($
134,57 I ), subject to additions and deductions by Change Order as provided in the
Contract Documents.
§ A.1.1.2 Itemized Statement of the Total Contract Cost. Provided below is an itemized
statement of the Total Contract Cost for the JC-9 Early Abatement and Demolition Scope
organized by its component parts;
A
ADDITIONS AND DELETIONS:
The author of this document has
added information needed for its
completion. The author may also
have revised the text of the original
AIA standard form. An Additions and
Deletions Report that notes added
information as well as revisions to the
standard form text is available from
the author and should be reviewed. A
vertical line in the left margin of this
document indicates where the author
has added necessary information
and where the author has added to or
deleted from the original AIA text.
This document has important legal
consequences. Consultation with an
attorney is encouraged with respect
to its completion or modification.
AIA Document A201Tm-2007,
General Conditions of the Contract
for Construction, is adopted in this
document by reference Do not use
with other general conditions unless
this document is rnodlfiect
AIA Document A133" — 2009 Exhibit A. Copyright 0 1991, 2003 and 2009 by The American institute or Architects. AIII rights reserved, WARNING; This AIAl
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA s Document, or any
portion of It, rnay result in severe clvll and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was
produced by AIA software at 13:20 51 on 07/30/2013 under Order No,3600792784 which expires on 06/30/2018, and is not for resale,
User Notes: (610165144)
1
3
Init.
Specified General Conditions
$25,818--
Maximum Allowable Construction Contract (MACC)
Construction Total
$83,539
Negotiated Support Services (NSS)
$6,2 6
MACC Contingency A 2.5%
$2,088
GC/CM Fixed Fee @ 5% (Fee is not allowed on the Specified General
Conditions, or Preconstruction Allowance)
$4,596
TOTAL CONTRACT COST (Excluding WSST)
$122,337
Washington State Sales Tax
$12,234
Sum
$134,571
(Paragraphs deleted)
§ A.1.1.2.1 The Preconstruction Services NTE Li/nit, as previously agreed to by the parties, is:
To be stated in the GMP Amendment for the full scope of the Work.
§ A.1,1.3 The 'Ibtal Contract Cost for the JC-9 Early Abatement and Demolition Scope is based on the following
alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner:
(State the northers or other identification of accepted alternates If the Contract Documents permit the Owner to
accept other alternates- subsequent to the execution of this Amendment, attach o schedule of such other alternates
showing the amount /or each and the date when the (mount expires.)
Not applicable.
§ A.1.1.4 Allowances included in the Total Contract Cost, if any:
(Identi35 allowance and state exclusions, if any, from the allowance price.
Item Price ($0,00)
Not app)icable. Not applicable.
§A.I.1.5 Assumptions, if any, on which the Total Contract Cost is based:
Not applicable.
§ A.1.1.6 'Fhe 'Iota! Contract Cost is based upon the following General Conditions:
AIA Document A20 1 — 2007. General Conditions ol-the Contract for Construction, as modified
(Table deleted)
§ A.1.1.7 Thc Total Contract Cost is based upon the following Specifications:
(Either list the Specifications here, or refer to on exhibit attached to this Agreement )
Not applicable.
Section Title Date Pages
§ A.1.1.8 The Total Contract Cost is based upon the following Drawings:
(Either list the Drawings here, or refer o an exhibit attached to this Agree,
Not applicable.
Number
n
Title Date
§ A.1.1.9 The Total Contract Cost is based upon the following other documents and information:
(List any other documents or information )rere, or refer to an exhibit attached to this Agreement)
AIA Document A133"— 2009 Exhibit A. Copyright 0 1991, 2003 end 2009 by The American institule of Architects. All rights reserved. WARNING: This AIA°
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlAi Document, or any
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law, This document was
produced by AIA software at 13,20:51 on 07/30/2018 under Order No 3600792784 which expires on 08130/2018, and is not for resale
User Notes: (810168144)
4
1 nit.
See BNBuilders Building System Summary / contract package attached hereto as Exhibit A.
ARTICLE A,2
§ A21 Substantial Completion Dates
The required date for Substantial Completion of the JC-9 Early Abatement and Demolition Scope established by this
Arnendrnent:
September 14, 20 1 Ft
§ A.2.2 Physical Completion Dates
Thc required date for Physical Completion of the JC-9 Early Abatement and Demolition Scope established by this
Amendment:
Not applicable.
§ A.2.3 Final Completion Dates
The required date for Final Completion of thc JC-9 Early Abatement and Demolition Scope established by this
Amendment;
Not applicable.
§ A.2,4 Construction Schedule
Construction Managers Construction Schedule, current as of the date of this Guaranteed Maximum Price Amendment
No. 2. is attached.
ARTICLE A.3 Key Personnel
The following named key personnel shall remain assigned for the duration of the Project unless otherwise agreed to in
writing by Owner;
Project Manager: Geri Urbas
Project Superintendent: David Cantrell
Project Engineer: To be assigned.
OWNER (Signature) CONSTRUCTION MANAGER (Signature
(Printed name and title)
(Prmted name and title)
AIA Document A133"" —2009 Exhibit A. Copyright IPO 1991, 2003 and 2009 by The American instiute of Architects. All rights reserved. WARNING: This A lika'
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIMDocument, or any
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extont possIbla under the law. This document was
produced by AIA software at 13,20:51 on 07/30/2018 under Order No 3600792784 which expires on 08/30/2018, and is not for resale,
User Notes: (810168144)
5
EXHIBIT A
1. BNBuilders — Building System Summary for JC-9 Early Building Demolition and Tukwila
Justice Center Construction Schedule.
DLR Group — Architecture/Engineering— Site Plan for Parcel JC-9 Building Demolition.
3. Sound Earth Strategies — Hazardous Building Materials Survey Report for Parcel JC-9
(incorporated by reference).
{A.1111763738. DOCX;1/05720.000002/ }
6
BNBuiIders
PROJECT: JUSTICE CENTER
OWNER: CITY OF TUKWILA
ARCHITECT: DLR GROUP
Budding System Breakdown
A10 - Foundations
A20 - Basement Construction
B10 - Superstructure
B20 - Exterior Enclosure
B30 - Roofing
C10 - Interior Construction
C20 - Stairs
C30 - Interior Finishes
D10 - Conveying
D20 - Plumbing
D30 - HVAC
D40 - Fire Protection
D50 - Electrical
El 0 - Equipment
E20 - Furnishings
F10 - Special Construction
F20 - Selective Building Demo
G10 - Site Preparation
G20 - Site Improvements
G30 - Site Mech Utilities
G40 - Site Elec Utilities
G90 - Other Site Construction
Direct Construction Costs (DCC)
Design / Estimating Contingency
Escalation
Negotiated Support Services
Trade Package Bonds (See Sub Plan)
MACC Contingency (%-DCC + Des + Esc + TP)
-Maximum Allowable Construction Cost (MACC)
Contractors Fee (% of MACC - Bid %)
Specified General Conditions
Specified General Conditions
GC/CM Performance & Payment Bond
BNB Insurances
B&O Taxes
Preconstruction Services
Total Contract Costs (TCC)
Washington State Sales Tax
Guaranteed Maximum Price (GMP)
$ per GSF / Component GSF
EXHIBIT A
Building System Summary
ESTIMATE TYPE: EARLY WORK
ISSUE DATE: 7/20/2018
JC-9 Early Bldg Demo (Jul/Aug '18)
Location 00
0
0
0
0
0
0
0
$
$ -
$ -
$ -
$ - $ -
$ - $
0
$ - $
$ $ -
$ - $ -
$
0 $
0 $ -
0 $ -
6,600 $ 12.66
0 $ -
0 $
O $ -
O $ -
O $ -
12.66
$
$ 83,539
$
12.66
$83,539
NOT APPLICABLE
NOT APPLICABLE
SEE EST DETAIL
NOT APPLICABLE
2.50%
$
6,296
2,088
13.93 $91,923
5.00%
(Early Work Extra)
Add'I MACC Value
Included w/Fee $
$ 4,596
25,818
Included w/Fee
Included w/Fee
Owner (Bid) Value
$ 18.54 $ 122,338
10.000%
12,234
$ 134,571
20.39 6,600
CONFIDENTIAL
7
8