HomeMy WebLinkAboutCDN 2018-08-28 Item 2B - Handout Distributed at Meeting - Justice Center Landscape and Site Plan14
SSSS—SS''' SS--SS'SS—SS- SSSSSSSS'
619
9 11. 14,17 COMPKT STALS
I + + tinal•zo WIPWCECAUSERS1141.5
4144+4 rsCISSIPLE 49.4
SD DRAFT VERSION - 2018-04-06
Jc
Th-
r- LAWN
PPP 45 PPPPPPPP
1-7
SHRUB/
GROUNDCOVER
AREA TYP
-- CONCRETE
PAVEMENT TYP
CONCRETE, STEEL.
AND WOOD
FURNISHINGS. TYP
QUANTITY
-
LARGE TREES
MEDIUM TREES
SMALL TREES
2
70
124
SHRUB/GROUNDCOVER AREA: 42000 SF
STORMWATER DETENTION AREA: 6200 SF
LAWN AREA
• - • CONCRETE AREA:
ASPHALT AREA:
SITE FURNISHINGS:
4050 SF
17500 SF
73000 SF
200 LE
•
CCCCC C C C C CC C CC CCC
Z31r="'
S SS S SS SS,S SS
SS SSSS SSSS
- ASPHALT
PAVEMENT. TYP
SSi.
1
1
01
In
10
SSSSr
0
cD
2 (7)
0 w
C13 CI
F-•
0
Lu
0
0
auJ
1--
E)
0_
(f)
0
2