HomeMy WebLinkAboutPS 2018-09-04 Item 2B - Public Safety Plan - Fire Station 52 Pre-Design Options and EstimatesCity of Tukwila Allan Ekberg, Mayor INFOR ATIONAL E ORANDU TO: Public Safety Committee FROM: David Cline, City Administrator CC: Mayor Ekberg DATE: September 4, 2018 SUBJECT: Fire Stations #52 Pre -Design Options and Estimates ISSUE The Project Team has updated the Pre -Design estimate for Fire Station #52 project, using the latest square footage costs recently generated for the Fire Station #51 Design Development estimate. Due to the high site development cost, storm detention cost and the current construction market, the project would only be within the currently approved construction budget of $13,298,000 (including tax and preconstruction cost), if we can delay the interior finishes of the Fire Department's administrative offices, and the Training Room / back up EOC space. In addition, the Project Team was requested by the Fire Department to explore an alternate site plan of being able to drive through the apparatus bays, in lieu of the currently designed back -in configuration. For long-term operational efficiency, this site plan is preferred by the Fire Department. BACKGROUND In November of 2016, the voters in Tukwila approved the City's Public Safety Bond as a part of the overall Public Safety Plan. Included in the bond is funding for building fire stations to reduce the risk of earthquake damage and provide equitable and improved response times. In the past 2 months, the Project Team updated the Pre -Design phase estimate for FS #52 (from the 2017 estimate). Utilizing the current square foot cost derived from FS#51 DD estimate, and fine-tuning the site development cost with better geotechnical and storm infiltration test results, the GCCM was able to stay within budget with a strategy to bid the interior finishes for the administrative area including the Training Room / back-up EOC as an alternate. If we caTy-bid this scope as an alternate (shown in Teal in attachments A2 & 132, with approximately $800,000 in project value), the construction cost estimate of $12,005,384 is $5,384 over the budget, which is within an acceptable range of the target value to start the Schematic Design phase. The project Team including the Fire Department agreed that the proximity of this station to the existing 6300 building (with the assumption of utilizing the vacancy after the Police Department's move into the new Justice Center), is a reasonable strategy to be able to keep moving forward with the project within the current schedule and budget. See Attachments Al & A2 for details. The Project Team also evaluated the drive -through station design. The additional paved area for the rear apron, combined with the expected higher cost of excavation and import of structural fill material resulted in $650,000 above the current budget (this also assumes bidding the Teal areas as an alternate). See Attachments B1, B2 for details. 23 INFORMATIONAL MEMO Page 2 RECOMMENDATION The Public Safety Committee is asked to make a recommendation to the full Council on whether to proceed into the Schematic Design phase between the following options: 1) Retain the current back -in station design, with the alternate bidding of the interior finishes as described above. This option will keep the City in budget moving forward. 2) Design the drive -through site plan preferred by the Fire Department, with the understanding of the additional $650,000 of funding required to complete the project. The time -sensitive decision to be made is to choose one of the two site plans. While there is still time for the Council to decide on whether or not to include finishing of the interior spaces, the decision to change the site plan to the drive -through option has to be made now. The design team can not proceed into the Schematic Design phase unless one option is selected by the Council. The additional project funding required by these decisions would have to be identified to provide direction to City staff on moving forward. Some of the possible options for additional funding could come from one of the following sources; through additional debt financing, utilizing future apparatus and equipment funds, decreasing costs in other projects or repurposing of general funds. ATTACHMENTS Al - Weinstein AU's site plan for back -in station A2 — Weinstein AU's pre -design floor plan for back -in station B1 - Weinstein AU's site plan for drive -through station B2 - Weinstein AU's pre -design floor plan for drive -through station 24 11citystorelCity Common \Council Agenda Items\Communications1PublicSafetySep41Fire Station 52 PreDesign Estimate Memo to Council - dc_lh.docx Attachment Al SECTION A ' C :1 ! I i 1 : EXISTING RETAINING WALL = A \i-/+,131.5 RETAINING. WALL )'? 01,126,0. EXISTING RETAINING WALL FILL LINE OF EXISTING GRADE NEW +/-15'H RETAINING WALL ENTR, PLAZA NEW RETAINING WALL VISITING APPARATUS PARKING SECURE FIREFIGHTER PARKING MOTORIZED: 16 SPACES GATE - ' SECURITY FENCE- -- STAIR & LIFT FROM ` CITY HALL PARKING NEW RETAIN -IN WALL - , 7-) -Y. 1T552 BACK -IN TOTAL BUILDING = APPROX 15,800 GSF ADMIN = APPROX 3,000 SF NEW CONCRETE ACCESS DRIVE (RESURFACE, WIDEN, IMPROVE SLOPE) NEW CONCRETE CURB AND SIDEWALK SITE AREA: 110,469 SF -/- 01 PRELIMINARY SITE STUDY SCALE: 1" = 40' Weinstein A+U TUKWILA FIRE STATIONS 8/22/18 N 6) Attachment A2 TFS52 BACK -IN CONCEPTUAL LAYOUT TOTAL BUILDING = APPROX 15,800 GSF ADMIN (TEAL) = APPROX 3,000 SF BACKUP EMI TRAINING CONCEPTUAL PROGRAM STUDY ED SCALE: 1/32" = 1'-0" Weinstein A+U TUKWILA FIRE STATIONS 8/22/18 N CO 123.0 40'-0" SECTION A EXISTING RETAINING WALL FILL 12.0 LINE OF EXISTING GRADE NEW +/-10'H RETAINING WALL ------ 105.0 NEW RETAINING WALL MOTORIZED: SECURE SECURE FIREFIGHTER PARK1NG„ GATE 16 CES SECURITY FENCE — STAIR & LIFT FROM - CITY HALL PARKING ic)) PRELIMINARY SITE STUDY ENTRY PLAZA V SITING APPARATUS PARKING 3% MAX SLOPE ON APRON---1.- Attachment B1 TFS52 DRIVE-THRU TOTAL BUILDING = APPROX 15,800 GSF ADMIN = APPROX 3,000 SF NEW CONCRETE ACCESS DRIVE (RESURFACE, WIDEN, IMPROVE SLOPE) NEW CONCRETE CURB AND SIDEWALK SITE AREA: 110,469 SF SCALE: 1" = 40' Weinstein A+U TUKWILA FIRE STATIONS 8/22/18 CA) O Attachment B2 FIRST FLOOR CEIV AIRLOCK 1 ELEC we TFS52 DRIVE-THRU CONCEPTUAL LAYOUT MECH OFFICE PUBLIC SECOND FLOOR CONCEPTUAL PROGRAM STUDY TOTAL BUILDING = APPROX 15,800 GSF ADMIN (TEAL) = APPROX 3,000 SF SCALE: 1/32" = 1'-0" Weinstein A+U TUKWILA FIRE STATIONS 8/22/18