Loading...
HomeMy WebLinkAboutTIC 2018-09-10 Item 2G - Discussion - Tukwila International Boulevard Retrofit AnalysisIIY City of Tukwila Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director //1 BY: Cyndy Knighton, Senior Program Manager CC: Mayor Ekberg DATE: September 7, 2018 SUBJECT: TIB Retrofit Analysis Project No. 81710404 Allan Ekberg, Mayor ISSUE Additional analysis is needed to fully understand the potential impacts and costs of the proposed TIB Retrofit Project. BACKGROUND In 2017, a community workshop was conducted by the Congress for New Urbanism (CNU) and the City to build upon and identify specific actions that could be taken to implement the 2015 TIB District goals and policies of creating TIB into a "main street." The CNU workshop resulted in a report issued in April 2017 with recommendations to reduce the number of through lanes on TIB by half, add bike lanes and on -street parking. Tukwila subsequently contracted with Fehr & Peers to study the impacts of the proposed road diet on TIB. The preliminary report was presented to the Transportation and Infrastructure Committee (TIC) on November 14, 2017. Given the likely significant impacts to parallel residential streets, the Committee did not arrive at a recommendation but directed staff to conduct further study and report back in 2018 for further discussion. ANALYSIS More analysis should be undertaken to understand the full impacts of the proposed road diet on TIB, especially the impacts to the residential streets impacted by the diversion of traffic. The type of traffic calming treatments needed to be effective in protecting the local access streets should be more fully analyzed. Cost estimates need to be produced for the traffic calming treatments, not just the road diet options being considered. Further discussions are warranted with all stakeholders that consider if the changes are prudent. FISCAL IMPACT If the Council desires more comprehensive studies, additional funding will be required. RECOMMENDATION Information only. w:1pw englprojectsla- rw & rs projectslfib retrofit (81710404)101 preliminary engineering0nfo memo - analysis of impacts 9-7-18sm hp gl.docx