ITEM INFORMATION
CAS NUMBER: STAFI,SPONSOR: HENRY HASH ORIGINAL AGENDA DATE: 09/17/18
AGENDA ITEM TITLE Surface Water Fund - 2017 Annual Small Drainage Program
Project Completion and Acceptance
CATEGoRy [11 Discussion Z Motion 0 Resolution 0 Ordinance 0 Bid Award 0 Public Hearing Ei Other
Meg Date Mtg Date 09/17/18 Meg Date Meg Date Mtg Date Meg Date Mtg Date
SPONSOR El Council 0 Mayor 0 HR 0 DCD 0 Fznance 0 Fire 0 IT El P&R [] Police Z PW
SP oNS()R's The contract with McCann Construction of Renton, WA is complete for the 2017 Annual
SUMMARY Small Drainage Program. This contract installed drainage improvements at three locations
throughout the City. Construction began August 11, 2017 and was completed on January
11, 2018. One change order was issued for$7,716.15 and under-runs credited
($11,068.19). Council is being asked to accept and finalize the contract with McCann
Construction for$448,471.71.
REVIEWED BY 0 COW Mtg. 0 CA&P Cmte El F&S Cmte 11 Transportation Cmte
El Utilities Cmte 11]Arts Comm. El Parks Comm. El Planning Comm.
DATE: 09/10/18 COMMITTEE CHAIR: THOMAS MCLEOD
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works
CommumE Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPINDITURI REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$448,471.71 $497,006.13 $0.00
Fund Source: 412 SURFACE WATER(PG 96, 2017 CIP)
Comments:
MTG. DATE RECORD OF COUNCIL ACTION
09/17/18
I
MTG. DATE ATTACHMENTS
09/17/18 Informational Memorandum dated 09/07/18
State of WA Department of Revenue Notice of Completion 17-121
Minutes from the Transportation &Infrastructure Committee meeting of 09/10/18
51
52
tiC'%
! `, h/ o Allan Ekberg, Mayor
a
�'s �Q Public Works Department-Henry Hash,Director
.v 0o
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committee
FROM: Henry Hash, Public Works Director "'of/-
BY: Mike Perfetti, Habitat Project Manager
CC: Mayor Ekberg
DATE: September 7, 2018
SUBJECT: Surface Water Fund - 2017 Annual Small Drainage Program
Project No. 91741201, Contract No. 17-121
Project Completion and Acceptance
ISSUE
Accept construction contract as complete and authorize release of retainage.
BACKGROUND
The Small Drainage Program constructs drainage projects throughout the City that are too large for city
staff to complete but are smaller than a typical capital improvement project. The 2017 Annual Small
Drainage Program installed drainage improvements at three locations:
1) 48th Ave S between S 160' and S 162"d St;
2) Strander Blvd sidewalk (in front of Target);
3) 58th Ave S, 14423 to 14455.
A fourth project, the S 150th St Gilliam Creek inlet overflow structure was an additive alternate and was
not accepted as part of the project.
DISCUSSION
The Notice to Proceed for Contract Number 17-121 with McCann Construction of Renton, WA was
issued on August 11, 2017 and construction was physically completed on January 16, 2018. The last
remaining Affidavit of Wages Paid was received on August 17, 2018.
FINANCIAL IMPACT
The 2017 budget was $497,006.13 with additional funding from the Water Quality Retrofit project,
utilizing excess SDP design funds and excess Gilliam Creek Culvert funds. One change order was
issued for $7,716.15 and the underruns were primarily in unspent force account dollars for site
changes, property restoration and resolution of utility conflicts. Retainage is being held by the City in
the amount of$22,423.58.
Expenses
Construction Contract Amount (N/A— Rule 171) $451,823.75
Change Order No. 1 7,716.15
Unit Price Underruns (11,068.19)
Total Contract Amount $448,471.71
RECOMMENDATION
Council is being asked to formally accept the 2017 Annual Small Drainage Program with McCann
Construction, Inc. in the amount of$448,471.71 as complete, and authorize the release of retainage subject
to standard claim and lien release procedures, and to consider this item on the Consent Agenda at the
September 17, 2018 Regular Council Meeting.
Attachment: Notice of Completion,Contract#17-121
W:IPW EngIPROJECTSIA-DR ProjectslAnnual Small Drainage Programs12017 SDP(91741201)1ConstructonW.700-PostConstructon&Closeoutllnfo Memo_2017SDP_Closeout_082418g1 sm.doco 53
54
��,{
L i Original
❑ Revised#
dye /A 89
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Date: August 24, 2018 Contractor's UBI Number: 602 271 532
Name& Mailing Address of Public Agency Department Use Only
City of Tukwila Assigned to:
6200 Southcenter Boulevard
Tukwila, WA 98188 Date Assigned:
UBI Number:
Notice is hereby given relative to the completion of contract or project described below
Project Name Contract Number Job Order Contracting
2017 Annual Small Drainage Project 17-121 ❑ Yes E'No
Description of Work Done/Include Jobsite Address(es)
Construct drainage improvements at 3 public right-of-way sites: 1) S. 48th St. 2) S 58th St. 3) Strander
Blvd.
Federally funded transportation project? ❑ Yes No (if yes,provide Contract Bond Statement below)
Contractor's Name E-mail Address Affidavit ID*
McCann Construction Inc. arlene@mccannconst.com 851561
Contractor Address Telephone#
13029 136th Ave SE Renton, WA 98059 425-228-2316 Ext 7303
If Retainage is not withheld,please select one of the following and List Surety's Name&Bond Number.
❑ Retainage Bond ❑ Contract/Payment bond (valid for federally funded transportation projects)
Name: Bond Number:
Date Contract Awarded Date Work Commenced Date Work Completed Date Work Accepted
June 19, 2017 August 16, 2017 January 11, 2018
Were Subcontracters used on this project?If so,please complete Addendum A. E Yes ❑No
Affidavit ID*-No L&I release will be granted until all affidavits are listed.
Contract Amount $ 451,823.75
Additions (+) $ 7,716.15 Liquidated Damages $ 0.00
Reductions (-) $ 11,068.19 Amount Disbursed $ 426,048.12
Sub-Total $ 448,471.71 Amount Retained $ 22,423.59
Sales Tax Rate 10
(If various rates apply,please send a breakdown)
Sales Tax Amount $ 0
TOTAL $ 448.471.71 TOTAL $ 448,471.71
NOTE: These two totals must be equal
Comments:
Note:The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract.
NO PAYMENT SIIALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates.
Submitting Form:Please submit the completed form by email to all three agencies below.
Contact Name: Diane Jaber Title: Fiscal Specialist
Email Address: dianejaber@tukwilawa.gov Phone Number: (206)433-1871 x1871
gr-
(ea Department of Revenue � Washington state Department of Employment Security
Public Works Section ,Tit Labor & Industries Department
(360)704-5650 Contract Release Registration,Inquiry,
Standards&Coordination
PWC@dorma.gov (855)545-8163,option tt 4
Unit
ContractRelease@LNI.WA.GOV (360)902-9450
publicworks@esd.wa.gov
REV 31 0020e(10/26/15) F215-038-000 10-2014
55
Addendum A: Please List all Subcontractors and Sub-tiers Below
This addendum can be submitted in other formats.
Provide known affidavits at this time. No L&I release will be granted until all affidavits are listed.
Subcontractor's Name: UBI Number: (Required) Affidavit ID*
Wilson Concrete Construction Inc 602168956 789927
RCNW 602286010 779070
Salinas Sawing&Sealing Inc. 601717158 771323
Best Parking Lot Cleaning Inc 601901928 770435
OMA Construction Inc. 601872128 770226
Stanley Patrick Striping Co 602015949 769710
Corliss Resources Inc 602237779 769157
Cascade Sawing&Drillilng Inc 600436993 768536
Advanced Government Services 603585454 765059
The Davey Tree Expert Company 602000069 757328
Pacific Topsoils Inc 600405438 757072
Grass Master 601517336 756571
Western Crane Inc. 601713857 756502
Ralph's Concrete Pumping 578085430 755010
American Surveying and Environmental LLC 603226051 747744
For tax assistance or to request this document in an alternate format,please call 1-800-647-7706.Teletype(TTY) users may use the
Washington Relay Service by calling 711.
REV 31 0020e Addendum(10/26/15) F215-038-000 10-2014
56
Transportation&Infrastructure Committee Minutes September 10,2018
C. Grant Acceptance: Stormwater Quality Retrofit Project
Staff is seeking Council approval of a grant agreement with the Washington State Department
of Ecology (DOE) in the amount of $287,500.00 for the Stormwater Quality Retrofit Project.
This project will select seven candidate sites for water quality retrofits and advance up to four
projects to 90%design.The 15%required City match will come from Surface Water funds with
$115,000 currently budgeted in 2019. Councilmember Quinn reiterated his request to expand
the memo to better define the Surface Water fund. UNANIMOUS APPROVAL. FORWARD TO
SEPTEMBER 17, 2018 REGULAR CONSENT AGENDA.
D. Contract Amendment: Riverton Creek Flapgate Removal Project
Staff is seeking Council approval of Amendment 2 to Contract 17-070 in the amount of
$37,064.00 with OTAK, Inc. for the Riverton Creek Flapgate Removal Project. The project will
remove two culverts and flap gates and replace a section of at-grade trail with a bridge over
the restored open channel. The proposed amendment will incorporate current
recommendations into final design and bid documents and will bring the total contract
amount to $182,420. The amendment will be funded through remaining 2018 surface water
design funds and the 2019 design budget,then be partially or wholly reimbursed through the
2017 Salmon Recovery Funding Board design and construction grant. Councilmember Idan
asked if any projects would go funded as a result, and staff replied there is adequate budget
for other planned projects. UNANIMOUS APPROVAL. FORWARD TO SEPTEMBER 17, 2018
REGULAR CONSENT AGENDA.
E. Project Completion: 2017 Sm ll Drainage Program
Staff is seeking Council approval of project completion and release of retainage to McCann
Construction, Inc. in the amount of$448,471:,71 for the 2017 Annual Small Drainage Program.
*
Drainage improvements were installed at three locations: 48"Avenue South between South
160' Street and South 162nd Street, Strander Boulevard sidewalk in front of Target, and 58'
Avenue South,14423 to 1,4455.The projectwas physically completed on January 16,2018 and
concluded under budget. UNANIMOUS APPROVAL. FORWARD TO SEPTEMBER 17, 2018
REGULAR CONSENT AGENDA
F. Supplemental Agreement: 2018 Annual Small Drainage Program
Staff is seeking Council approval of Supplement No. 1 to Contract No. 18-063 with KPG, Inc. in
the amount of$57,480,00 for construction management services for the 2018 Small Drainage
Program. This is an extension of the design engineering services contract already executed
with KPG. To save,money, staff will be doing more of the inspection work rather than
contracting it out. UNANIMOUS APPROVAL. FORWARD TO SEPTEMBER 17, 2018 REGULAR
CONSENT AGENDA.