HomeMy WebLinkAboutTIC 2018-10-08 Item 2C - Final Acceptance - Interurban Avenue South (South 143rd Street to Fort Dent Way) with Walsh Construction CompanyCity of Tukwila
Public Works Department - Henry Hash, Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committee
FROM: Henry Hash, Public Works Director ,-
BY: Michael Ronda, Construction Project Manager
CC: Mayor Ekberg
DATE: October 5, 2018
SUBJECT: Interurban Ave S (S 143rd St to Fort Dent Way)
Project No. 90310402, Contract No. 14-067
Contract Completion and Acceptance
Allan Ekberg, Mayor
ISSUE
Accept construction contract as complete and authorize release of the payment and performance bond.
BACKGROUND
The Notice to Proceed for Contract Number 14-067 with Walsh Construction Co. LLC was issued on
July 21, 2014. This construction project was the final phase of improvements to the Interurban Ave S
corridor between 42nd Ave S and 1-405. The improvements provided new roadway features, including a
retaining wall system at the river bend near Fort Dent, and a new storm drainage system, including a
large underground detention vault.
DISCUSSION
The construction project was physically completed on June 16, 2016 however the project was followed
by several months of dispute negotiations before a final settlement was reached. The settlement
agreement included a final payment of $1,425,000 and a time extension of 141.5 calendar days which
was approved by Council in December 4, 2017. Since then staff has been waiting for all administrative
obligations and payment verification items to come through before accepting the work as complete.
FINANCIAL IMPACT
The original construction budget (including contingency) for the Interurban Roadway Project was
$8,737,508.39. Upon final settlement, the cost was $8,917,921.31. The additional funding was secured
through reimbursement from a Transportation Improvement Board grant, traffic impact fees and cost
savings from the 2017 Overlay & Repair Project. The final project expenditures are as follows:
Expenses
Original Construction Contract Amount $7,597,833.39
Additional Change Order Costs 1,320,087.92
Total Contract Amount $8,917,921.31
RECOMMENDATION
Council is being asked to formally accept the Interurban Ave S project and authorize the release of the
payment and performance bond subject to standard claim and lien release procedures, and to consider
this item on the Consent Agenda at the October 15, 2017 Regular Council Meeting.
Attachment: Notice of Completion, Contract #14-067
Final Contractor Voucher Certificate
W:IPW EngIPROJECTS\A- RW & RS ProjectslInterurban Ave S (90310402)IConstructionl#.400 - ProjectTrackingl- DRAFTSIInfo Memo - IU Roadway Closeout - DRAFr.docx
15
❑ Original
❑ Revised #
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Date: August 1, 2018
Contractor's UBI Number: 603 050 702
Name & Mailing Address of Public Agency
City of Tukwila
6200 Southcenter Blvd
Tukwila WA 98188
UBI Number: 602286020
Department Use Only
Assigned to:
Date Assigned:
Notice is hereby given relative to the completion of contract or project described below
Project Name
Interurban Ave S (S 143rd St - Fort Dent Wy) 90310402
Contract Number
14-067
Job Order Contracting
❑ Yes LitfNo
Description of Work Done/Include Jobsite Address(es)
Construct full roadway improvements to Interurban Avenue South from South 143rd Street to Fort Dent
Way. Included sidewalks, pavement restoration, drainage and lighting.
Federally funded transportation project? d Yes ❑ No (if yes, provide Contract Bond Statement below)
Contractor's Name
Walsh Construction Co II LLC
E-mail Address
emeifert@walshgroup.com
Affidavit ID*
758714
Contractor Address
929 W Adams St, Chicago IL 60607
Te
ephone #
If Retainage is not withheld, please select one of the following and List Surety's Name & Bond Number.
❑ Retainage Bond g Contract/Payment bond (valid for federally funded transportation projects)
Name: Travelers Casualty and Surety of America Bond Number: 106080531
Date Contract Awarded
May 5, 2014
Date Work Commenced
July 21, 2014
Date Work Completed
June 16, 2016
Date Work Accepted
Were Subcontracters used on this project? If so, please complete Addendum A. [Yes ❑ No
Affidavit ID* - No L&I release will be granted until all affidavits listed.
Contract Amount
Additions (+ )
Reductions (- )
Sub -Total
Sales Tax Rate
9.5
(If various rates apply, please send a breakdown)
Sales Tax Amount
Inc..,te. CN
Comments:
7,496,650.20
1,321,808.33
0.00
8,818,458.53
Liquidated Damages $ 0.00
Amount Disbursed $ 8,917,921.31
Amount Retained $ 0.00
$ 99462.78
TOTAL $ 8.917.921.31
NOTE: These two totals must be equal
TOTAL $ 8,917,921.31
Note: The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract.
NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates.
Submitting Form: Please submit the completed form by email to all three agencies below.
Contact Name: Diane Jaber
Email Address: diane.jaber@tukwilawa.gov
tta
Department of Revenue
Public Works Section
(360) 704-5650
PWC@dor.wa.gov
REV 31 0020e(10/26/15) F215-038-000 10-2014
Washington State Department of
Labor & Industries
Contract Release
(855) 545-8163, option # 4
ContractReiease@LNI. WA.GOV
Title: Fiscal Specialist
Phone Number: 206-433-1871
Employment Security
Department
Registration, Inquiry,
Standards 8 Coordination
Unit
(360) 902-9450
publicworks@esd.wa.gov
16
Addendum A: Please List all Subcontractors and Sub -tiers Below
This addendum can be submitted in other formats.
Provide known affidavits at this time. No L&I release will be granted until all affidavits are listed.
Subcontractor's Name:
UBI Number: (Required)
Affidavit ID*
1-Alliance Geomatics
603
260
116
663976
ADP Construction Services
601
429
361
761534
Northwest Traffic
602
140
049
654708
Global Concrete Cutting
603
081
735
Out of Business
The Bag Lady
601
734
719
656204
DHD Trucking
602
677
969
654633
Peterson Brothers
600
072
474
657132
Pyramid Grinding
602
778
944
636620
American Pride - Trucking
602
643
008
656294
Bravo Environmental
602
946
216
651545
Pearson Drilling
601
078
030
758252
Salinas Sawing & Sealing
601
717
158
654700
Highmark Concrete Contractors
603
004
408
759783
Edge Concrete
602
134
915
654765
AAA Contractors
602
884
326
660700
Ever -Green Tree Care
601
533
876
563735/551856
The Tree Expert ( Ever -Green Lower Tier Sub)
602
850
400
568926/559097
National Concrete Cutting (ADP Lower Tier)
600
195
813
758921
Terra Dynamics
601
030
794
657896
Lakeside Industries
601
106
847
654444
Design Groundwater Services
602
911
176
566210
Statewide Parking Lot Services (Pyramid Lower Tier)
601
356
352
571093
Danasco, LLC
603
314
401
651674
Wilson Concrete
602
168
956
760634
Harris Rebar
601
327
419
654673
Columbia Basin Rebar (Harris Lower Tier)
601
872
824
639585
PR Systems
601
303
110
632555
Linescapes of Washington
602
663
114
654648
Mobile Fabrication Services
603
190
679
641108
De Novo Construction (subtier to Highmark)
603
305
991
653064
Lloyd's Trucking
171
004
642
758640
Ness & Campbell Crane
602
493
962
579349
Van Dam Welding, Inc. (subtier to Highmark)
602
787
437
758308
CAD of Puget Sound
603
058
404
758601
Penhall Company
601
258
537
645314
DC Transport and Leasing
603
470
328
760215
Speer Taps (Service)
600
491
975
637785
Ralph's Concrete Pumping (Service)
578
085
430
645048
Pacific Topsoil
600
405
438
760073
Cannon Construction
601
590
363
758279
Statewide Rent -a -Fence
600
348
533
609351
NRC Environmental Services
601
421
393
529415
Glacier Northwest (Concrete Supplier)
601
301
145
759380
Corliss Resources
602
237
779
759581/759583/759584
Miles Sand & Gravel
171
004
760
760243/760242
Olson Bros ProVac
602
170
975
759584
For tax assistance or to request this document in an alternate format, please call 1-800-647-7706. Teletype (TTY) users may use the
Washington Relay Service by calling 711.
REV 31 0020e Addendum (10/26/15) F215-038-000 10-2014
7
OP
Final Contract
Voucher Certificate
Contractor
Walsh Construction Co II LLC
Street Address
16400 Southcenter Parkway, Ste 501
City
Seattle
State
WA
Zip
98188
Date
8/14/18
City Project Number
03-RW02 — 90310402
Federal -Aid Project Number
STPUL-1045(007)
Contract Title
Interurban Ave S. Roadway Improvements
Date Work Physically Completed
June 16,2016
Final Amount
$8,917,921.31
Contractors Certification
1, the undersigned, having first been duly sworn, certify that I am authorized to sign for the claimant; that in connection
with the work performed and to the best of my knowledge no loan, gratuity or gift in any form whatsoever has been
extended to any employee of the City of Tukwila nor have I rented or purchased any equipment or materials from any
employee of the City of Tukwila; I further certify that the attached final estimate is a true and correct statement showing all
the monies due me from the City of Tukwila for work performed and material furnished under this contract; that I have
carefully examined said final estimate and understand the same and that I hereby release the City of Tukwila from any
and all claims of whatsoever nature which I may have, arising out of the performance of said contract, which are not set
forth in said estimate.
0NCNEC �fido
Signature Required
Ray Riojas, Area Manager
ibed and sworn to before me this
kQ(.,Ortary Public in and for the State of
Residing at
Printed Signature Name
day of Ze ck . 20
5\4
Owner Certification
I, certify the attached final estimate to be based upon actual
measurements, and to be true and correct.
x �d
1
Project EngineeY/ Projec Administrator
Approved Date
Public Works Director
18