Loading...
HomeMy WebLinkAboutTIC 2018-10-22 COMPLETE AGENDA PACKETCity of Tukwila Transportation and Infrastructure Committee • • • • • • Thomas McLeod, Chair De'Sean Quinn Zak Idan AGENDA Distribution: T. McLeod D. Quinn Z.Idan V. Seal D. Robertson Mayor Ekberg D. Cline R. Bianchi L. Humphrey H. Hash H. Ponnekanti G. Labanara B. Still R. Turpin A. Youn Clerk File Copy 2 Extra Place pkt pdf on Z:\Trans & Infra Agendas e-mail cover to: A. Le, C. O'Flaherty, A. Youn, D. Almberg, B. Saxton, S. Norris, L. Humphrey, T. McLeod MONDAY, OCTOBER 22, 2018 — 5:30 PM HAZELNUT CONFERENCE ROOM (EAST ENTRANCE OF CITY HALL) Item Recommended Action Page 1. PRESENTATIONS 2. BUSINESS AGENDA a) S 140th St/TIB Crosswalk a) Discussion Only Update b) Traffic Calming/Safety Improvement Priorities b) Discussion Only Pg. 1 c) 2019 Overlay and Repair Program c) Forward to 11/5/18 Regular Pg. 9 Design Consultant Selection and Agreement Consent Agenda d) 2019 Legislative Agenda d) Forward to 11/13/18 C.O.W. Pg. 25 Resolution and 11/19/18 Regular e) 2019 Budget Proviso for SeaTac International Airport e) Forward to 11/5/18 Regular Pg. 29 Impact Study Consent Agenda 3. SCATBd/RTC 4. MISCELLANEOUS f) PW Project Updates - Bi-Weekly Summary 10/5/18 f) Information Only Pg. 51 5. ANNOUNCEMENTS Future Agendas: Next Scheduled Meeting: Tuesday, November 13, 2018 (due to holiday) t> The City of Tukwila strives to accommodate individuals with disabilities Please contact the Public Works Department at 206-433-0179 for assistance. City of Ti ` Allan Ekberg, Mayor Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director / /J BY: Cyndy Knighton, Senior Program Manager CC: Mayor Ekberg DATE: October 19, 2018 SUBJECT: Traffic Calming/Safety Improvements Priorities ISSUE Update the Committee on the prioritization process on traffic calming requests and safety improvement needs. BACKGROUND During the September 10, 2018 Transportation and Infrastructure Committee meeting, staff presented a list of locations where traffic calming treatments have been requested on residential streets as well as 8 locations on commercial streets where safety improvements have been identified. The Committee directed staff to bring back the list with some prioritization of the projects for further discussion. DISCUSSION Staff scored the residential locations applying the existing criteria and point schedule in the Neighborhood Traffic Calming Program (NTCP) on the 9 locations where full data was available. The remaining 13 locations have not yet been scored as the necessary data collection has not been completed. While working through the scoring criteria, staff sees the need to revise the criteria in some locations to accommodate locations near all major pedestrian generators and not just K-12 schools. The highest scoring location for the residential locations is currently the S 144th Street at 46th Avenue S intersection where a Rectangular Rapid Flashing Beacon (RRFB) has been installed at the marked crosswalk. This location is a portion of a larger project to improve safety for school children that Tukwila applied for a Safe Routes to School Grant earlier this year. Project awards have not yet been announced. On the commercial locations, the NTCP scoring criteria cannot be applied as it is designed for residential and collector streets with Average Daily Traffic (ADT) volumes of 7,000 or less. Some of the commercial locations have begun design using Traffic Impact Fee funds and one location has already received funding for design and construction through a recently awarded grant. Staff has assigned some preliminary rankings after considering the known urgency of need, status on design, funding availability, and engineering judgement. ADA Accessibility Scores have been included for both the residential and commercial locations. This information could be considered as a factor when assigning a priority ranking as it addresses safety and accessibility needs. RECOMMENDATION Staff recommends continuing refining the scoring and ranking system in the NTCP to meet the needs and priorities of the City. ATTACHMENTS • Priority List for Traffic Calming and Safety Improvements • Map of Locations • Scoring worksheet from the Neighborhood Traffic Calming Program w:\pw eng\projects\a- rw & rs projects\traffic calming\information memo - traffic calming & safety improvement ranking 10-22- 18.docx 1 2 M Priority List for Traffic Calming and Safety Improvements ADA Accessabili Identifier Rank ty Score R-18.A 1 35 NTCP Score 18 Residential Locations S.144th at 46th Ave S Safety issue(s) School Crossing safety Average Volume 7,400 (13 hrs) Average Speed 23 85th %ile Speed 28 PDO 2 2013-2017 Peda-cyclist 0 Accidents Injury 0 Fatality 0 Potential Revisions/Improvements Option 1 RRFB with remarked crossing $ 13k Comments RRFB is ordered, to be install before school year. Safe Routes to School Grant R-18.B 2 n/a 9 5.148th St at 4400 blk Speeding 1,300 21 26 1 0 0 0 Speed Cushions/pair 17k R-18.0 3 n/a 8 Macadam rd s at 13700 blk Speeding/school bus stop safety 2,500 26 29 0 0 0 0 Permanent Radar sign 6k R-18.D n/a 7 5.164th at 4700 blk Speeding 1,800 25 30 0 0 0 0 Permanent Radar sign 6k R-18.E 4 25 7 42nd Ave S at 11900 blk Speeding 3,800 23 29 1 2 0 0 Speed Cushions/pair 17k 85%tile is low but regular dangerous violators R-18.F - n/a 7 44th Ave S at 11800 blk Speeding 700 17 21 1 0 0 0 No Action No evidence of a speeding issue. PD and radar sign studies. R-18.G 25 6 51st Ave S 16200 Block Speeding 3,300 25 30 3 0 0 0 Permanent Radar sign 6k R-18.H 15 4 S.140th at 3500 blk Speeding 3,700 20 25 0 0 0 0 Permanent Radar sign 6k R-18.I 15 3 53rd Ave Sat S.140th Speeding 3,000 23 28 0 0 0 0 Speed Cushions/pair 17k R-18.1 25 n/a 42nd Ave S at 13700 blk Speeding/curve safety 4 1 3 0 Led light warning signs (4) 8k Homeowner association claims 3 road departures in past year R-18.K 36 n/a 62nd Ave at 149th School Crossing safety/speeding 1,600 1 1 0 0 RRFB with remarked crossing 80k Design work complete for ADA improvements. R-18.L 16 n/a S.130th St at 37th Ave S Speeding 0 0 0 0 Speed Cushions/pair 17k No current traffic data, on schedule soon R-18.M 36 n/a S.150th St at Thorndyke Elementary School Crossing safety/marked xing 1 0 0 0 RRFB with marked crossing 80k This was to be addressed with School remodeling R-18.N 36 n/a S.147th St at 59th Ave S School Crossing safety/marked xing RRFB with marked crossing 80k ADA ramp improvements required R-18.O 36 n/a S.144th St at Macadam Rd School Crossing safety/marked xing RRFB with marked crossing 80k ADA ramp improvements required R-18.P 25 n/a S.144th St at 44th PI School Crossing safety/marked xing 7,400 (13 hrs) Marked crossing w/signs and ADA ramps 13k ADA ramp improvements required R-18.Q 15 n/a S.144th St at 37th Ave S Crossing safety/marked xing RRFB with marked crossing 32k At Cascade view park R-18.R 36 n/a TiB at S.141st St Crossing safety/marked xing RRFB with marked crossing 190k Refuge islands and ADA ramps required R-18.S 36 n/a 58th Ave S at S.144th St Speeding No Action No evidence of a speeding issue. PD and radar sign studies. R-18.T n/a n/a 50th Ave S at S 125th PI Speeding Radar sign Temp/Permanent 6k No current traffic data, on schedule soon R-18.0 n/a n/a S.132nd St at 33rd Ave S Speeding Radar sign Temp/Permanent 6k No current traffic data, on schedule soon R-18.V n/a n/a Macadam rd s at 13600 blk Speeding/truck traffic Speed Cushions/pair i his is signea tor no trucks, speea cushions requested Accessibility scores of 36 or higher are considered high priority locations $680k Priority List for Traffic Calming and Safety Improvements ADA Accessability Identifier Score C-18.A 28 Notes Commerical Locations Southcenter Blvd at 65th Safety issue(s) Speeding, left turn delays, high ped crossings Average Volume 9,300 COMMERCIAL Average Speed 35 85th %ile Speed 40 LOCATIONS PDO 10 2013-2017 Peda-cyclist 2 Accidents Injury 1 Fatality 0 Potential Revisions/Improvements Option 1 RRFB/radar sign/rechannel $ $190k Comments Signal warranted, radar sign and RRFB as interim C-18.B 26 Southcenter Blvd at 62nd Speeding, left turn delays, high ped crossings 9,300 35 40 10 4 4 0 Traffic Signal $750k-1M Existing RRFB C-18.0 25 TIB at S.140th st Pedestrian safety and left turn delays 16,000 19 1 10 0 RRFB Traffic Signal $200k $750k-1M High pedestrian traffic area C18-D 20 * Andover Park East at Minkler Left turn delays 12,000 1 0 3 0 Signal revision & rechan $2M 60% design completed C18-E 20 * Andover Park East at Industry Dr Pedestrian safety and left turn delays 12,000 1 1 2 0 Traffic Signal $850k 60% design completed C18-F 15 + S.133rd at SR 599 on/off ramp Left turn delays 10,000 7 0 2 0 Traffic Signal Roundabout $1.9- 2.4M Feasiblity report but no design C18-G 35 # West Valley Hwy at Ped bridge pedestrian access/safety 28,800 25 0 16 0 Full Pedestrian signal $750k-1M Currently under design for West Valley improvements C18-H n/a Flashing Yellow arrow revisions to signalized left turns throughout the City Pedestrian safety and left turn delays Varies List to be compiled on case by case studies. Many locations possible. $5k each FYA operation is safer for pedestrains and increases intersection capacity when used in lieu of protect only phasing. * 60% design is complete, project is shelved pending additional funding + Feasibility report is complete # Grant funds for design and construction in hand, negotiating scope and fee for design $6.6 - $8.5M RESIDENTIAL LOCATIONS R-18.T 11 R-18.11 R-18.A R-18.P "�. •.1 'TA (.. R-18.8 R-18.U R -18. C R-18.Y r 7 R-18.0 �p ~w R-1 li42rarS"51. 8. 1417 .G a4h"rwlrAro ATP City of Tukwila S Not to Scale Vicinity Map Disclaimer:; The location of features and boundaries are approximate and are intended for reference only. Data is based on best information available. rn 0 rn Z. r r- 0 0 0 L GIS Tukwila IJ. FW EnghGNSAGemec.xl MspshSEneels_1I 7_Sep12918.aragd Dole: 55 OIR18 By: R.. L nsao Cale: ifdp'60IIrOc3m d5lreerw 11x,1 nay �nmrr..n anh'w�.. xwwwumwww.�., «'B S'16CIS S14 C-18.F Srrnourr r BI'e C rpm IR11rSI r P!11d;la,nd Or 'Priiarrd Or C-18.E fi C-18.G +var'1' City of Tukwila s Not to Scale Vicinity Map Disclaimer The location of features and boundaries are approximate and are untended for reference only. Data is based on best information available. 0 0 m 0 r- 0 0 H Z Co Appendix C: Priority Point Worksheet. Location: Date: Staff Name: Category Points 1. Accidents: 1pts for each recorded accident of the roadway for the past 3years 2. Volume: Average daily traffic volumes (weekday) divided by 100 3. Speed: 5pts for every mph more than 5-10mph above the posted speed limit 4. Sidewalks: If sidewalks exist Opts; if not 5pts 5. School: lOpts for each school within the impacted area Total Points: Speed, Accident and Volume Data Volume = 85% Speed = % l0mph above = Basis for Point Assignment Chart Criteria Basis for Point Assignment Accidents 10 points for each recorded accident of roadway for the past three years total (5 points will be added if there an injury reported) Speed 5 points for every mph greater thanl0mph above the posted speed or [(85th percentile speed limit — 10 mph — posted speed limit) x 5 points] Volume (Residential) 1 point for every 200 vehicles Average daily traffic volumes (weekday) Volume (Collector) 1 point for every 500 vehicles Average daily traffic volumes (weekday) Sidewalks 5 points if there is not a continuous sidewalk on one side of residential streets or both sides of collectors Schools 5 points for every school within the impact area and 2 points for school property within 500 ft of the impact area 7 8 City of Tu wila Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director i, BY: Scott Bates, Traffic Engineering Coordinator CC: Mayor Ekberg DATE: October 19, 2019 SUBJECT: 2019 Overlay and Repair Program Project No. 91910401 Design Consultant Selection and Agreement Allan Ekberg, Mayor ISSUE Execute a contract with KPG, Inc. (KPG) to provide design services for the 2019 Overlay and Repair Program. BACKGROUND Three engineering firms were evaluated from the MRSC Consultant Roster to provide design services for the 2019 Overlay and Repair Program (see attached scoring & selection matrix). All of the firms offer baseline qualifications, however KPG provides a unique blend of knowledge and understanding of the City's overlay program that provides efficiency and benefits which cannot be matched at this time by any other firm. KPG has also performed very well providing construction management services. DISCUSSION KPG has provided a contract, scope of work, and fee estimate to complete design of the 2019 Overlay and Repair Program and advertise for construction bids. Starting the design phase earlier in the year for a projected construction advertisement date of March 1, 2019, should provide a more favorable bidding climate. Preliminary Locations in Design Contract — See attached vicinity map. FISCAL IMPACT 2019 Design Contract KPG Contract $156,172.00 2019 Design Budget $175,000.00 RECOMMENDATION Council is being asked to approve the design contract with KPG, Inc. for the 2019 Overlay and Repair Program in the amount of $156,172.00 and consider this item on the Consent Agenda at the November 5, 2018 Regular Meeting. ATTACHMENTS • Consultant Selection Scoring Matrix • Page 16, Proposed 2019 CIP • Vicinity Map • Consultant Agreement, Scope of Work and Fee Estimate W:1PW Eng1PROJECTS1A- RW & RS ProjectslAnnual Overlay & Repair Programs12019 Overlay & Repair Program (91910401)1Design\Design Consultant Selection12019 Overlay To TIC11nfoMemo Overlay 2019 Design 101918.docx 9 2019 Overlay Program Consultant Selection Matrix 2019 Overlay Program - Contract for Design Services Parametrix U- U- a KPG, Inc. Paving Project Design and Construction Management Experience with the City. 0 3 5 Knowledge of FHWA, State, and Tukwila Standards and Procedures 5 4 5 Environmental Experience 5 5 5 Experience with Similar Projects. 3 4 5 Traffic Control Design Expertise. 4 4 4 Experienced Design Project Manager. 4 4 4 Small Scale Project Experience. 2 3 4 Utilities Coordination Experience. 5 4 5 Storm water, Drainage, and Detention Design. 4 4 5 Public Outreach Experience. 3 3 4 Survey Crew In -House. 4 4 4 TOTALS 39 42 50 For each category, highest score is 5 (with the lowest or worst score 1) Consultant with the highest score is ranked the best. Staff: Dave Sorensen Selection Date: 7/3/18 Selected Consultant: KPG, Inc. Selection Justification: The selected firm has demonstrated relevant pavement overlay design experience on multiple past federal and locally funded paving projects including the City overlay program. KPG has provided excellent design construction management results on City drainage projects as well. They have exceptional familiarity with City Public Works systems, WSDOT and FHWA standards. Based on overall score KPG prevailed. Consultants percieved ablility to perform CM services was also reviewed since the design contract could be extended to include those services as well. 10 CITY OF TUK ILA CAPITAL PROJECT SUMMARY 2019 to 2024 PROJECT: Annual Overlay and Repair ProgramProject No„ 9xx104011 DESCRIPTION: Select, design and construct asphalt and concrete pavement overlays of arterial and residential streets. JUSTIFICATION: Preserve and maintain the street structure in a safe and useable state by resurfacing before failure which also minimizes costs, Some individual sites may be coordinated with water, sewer, and surface water projects. STATUS: Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay, MAINT. IMPACT: Reduces annual maintenance, COMMENT: Ongoing project. Only one year actuals shown in first column, FINANCIAL (in $000's) EXPENSES Design Land (RNV) Const. IMgrnt„ Construction TOTAL EXPENSES Through Estimated 2017 2018 2019 2020 149 151 526 826 150 200 1,050 1,400 150 200 1,050 1,400 150 200 1,050 1,400 2021 2022 2023 2024 BEYON • 150 150 150 150 150 200 200 200 200 200 1,050 1,050 1,050 1,050 1,050 1,400 1,400 1,400 1,400 1,400 FUND SOURCES Awarded Grant Proposed Grant Mitigation Actual Mitigation Expected City Oper„ Revenue TOTAL SOURCES 826 826 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 Project Location TOTAL 1,349 0 1,751 8,926 12,026 0 0 0 0 12,026 12,026 2019 - 2024 Capital Improvement Program 16 11 12 S93 ST S 99 ST S 100 ST S 124 S RAINIER GOLF & COUNTRY CLUB S 116 s t21..srL S U8 sr Si1 Arterial treet Candidates 00.00000000000000000000000000000000 Residential Street Candidates .,,,,oreute/A.1 407 Ve A ST 13 14 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Contract Number: CONSULTANT AGREEMENT FOR ENGINEERING SERVICES THIS AGREEMENT is entered into between the City of Tukwila, Washington, hereinafter referred to as "the City", and KPG, Inc., hereinafter referred to as "the Consultant", in consideration of the mutual benefits, terms, and conditions hereinafter specified. 1. Project Designation. The Consultant is retained by the City to perform engineering services in connection with the project titled '2019 Overlay Program'. 2. Scope of Services. The Consultant agrees to perform the services, identified on Exhibit "A" attached hereto, including the provision of all labor, materials, equipment and supplies. 3. Duration of Agreement; Time for Performance. This Agreement shall be in full force and effect for a period commencing upon execution and ending August 31, 2019, unless sooner terminated under the provisions hereinafter specified. Work under this Agreement shall commence upon written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement no later than August 31, 2019 unless an extension of such time is granted in writing by the City. 4. Payment. The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows: A. Payment for the work provided by the Consultant shall be made as provided on Exhibit "B" attached hereto, provided that the total amount of payment to the Consultant shall not exceed $156,172.00 without express written modification of the Agreement signed by the City. B. The Consultant may submit vouchers to the City once per month during the progress of the work for partial payment for that portion of the project completed to date. Such vouchers will be checked by the City and, upon approval thereof, payment shall be made to the Consultant in the amount approved. C. Final payment of any balance due the Consultant of the total contract price earned will be made promptly upon its ascertainment and verification by the City after the completion of the work under this Agreement and its acceptance by the City. D. Payment as provided in this section shall be full compensation for work performed, services rendered, and for all materials, supplies, equipment and incidentals necessary to complete the work. E. The Consultant's records and accounts pertaining to this Agreement are to be kept available for inspection by representatives of the City and the state of Washington for a period of three (3) years after final payments. Copies shall be made available upon request. 15 5. Ownership and Use of Documents. All documents, drawings, specifications and other materials produced by the Consultant in connection with the services rendered under this Agreement shall be the property of the City whether the project for which they are made is executed or not. The Consultant shall be permitted to retain copies, including reproducible copies, of drawings and specifications for information, reference and use in connection with the Consultant's endeavors. The Consultant shall not be responsible for any use of the said documents, drawings, specifications or other materials by the City on any project other than the project specified in this Agreement. 6. Compliance with Laws. The Consultant shall, in performing the services contemplated by this Agreement, faithfully observe and comply with all federal, state, and local laws, ordinances and regulations, applicable to the services rendered under this Agreement. 7. Indemnification. The Consultant shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or resulting from the acts, errors or omissions of the Consultant in performance of this Agreement, except for injuries and damages caused by the sole negligence of the City. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Consultant's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement. 8. Insurance. The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, or employees. Consultant's maintenance of insurance as required by the agreement shall not be construed to limit the liability of the Consultant to the coverage provided by such insurance, or otherwise limit the City's recourse to any remedy available at law or in equity. A. Minimum Amounts and Scope of Insurance. Consultant shall obtain insurance of the types and with the limits described below: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. Automobile Liability insurance shall cover all owned, non -owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. CA revised : 1-2013 Page 2 16 2. Commercial General Liability insurance with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors and personal injury and advertising injury. The City shall be named as an insured under the Consultant's Commercial General Liability insurance policy with respect to the work performed for the City. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. 4. Professional Liability with limits no less than $1,000,000 per claim and $1,000,000 policy aggregate limit. Professional Liability insurance shall be appropriate to the Consultant's profession. B. Other Insurance Provision. The Consultant's Automobile Liability and Commercial General Liability insurance policies are to contain, or be endorsed to contain that they shall be primary insurance with respect to the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Consultant's insurance and shall not be contributed or combined with it. C. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. D. Verification of Coverage. Consultant shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Consultant before commencement of the work. Certificates of coverage and endorsements as required by this section shall be delivered to the City within fifteen (15) days of execution of this Agreement. E. Notice of Cancellation. The Consultant shall provide the City with written notice of any policy cancellation, within two business days of their receipt of such notice. F. Failure to Maintain Insurance. Failure on the part of the Consultant to maintain the insurance as required shall constitute a material breach of contract, upon which the City may, after giving five business days notice to the Consultant to correct the breach, immediately terminate the contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset against funds due the Consultant from the City. 9. Independent Contractor. The Consultant and the City agree that the Consultant is an independent contractor with respect to the services provided pursuant to this Agreement. Nothing in this Agreement shall be considered to create the relationship of employer and employee between the parties hereto. Neither the Consultant nor any employee of the Consultant shall be entitled to any benefits accorded City employees by virtue of the services provided under this Agreement. The City shall not be responsible for withholding or otherwise deducting federal income tax or social security or for contributing to the state industrial insurance program, otherwise assuming the duties of an employer with respect to the Consultant, or any employee of the Consultant. CA revised : 1-2013 Page 3 17 10. Covenant Against Contingent Fees. The Consultant warrants that he has not employed or retained any company or person, other than a bonafide employee working solely for the Consultant, to solicit or secure this contract, and that he has not paid or agreed to pay any company or person, other than a bonafide employee working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the City shall have the right to annul this contract without liability, or in its discretion to deduct from the contract price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. 11. Discrimination Prohibited. The Consultant, with regard to the work performed by it under this Agreement, will not discriminate on the grounds of race, religion, creed, color, national origin, age, veteran status, sex, sexual orientation, gender identity, marital status, political affiliation or the presence of any disability in the selection and retention of employees or procurement of materials or supplies. 12. Assignment. The Consultant shall not sublet or assign any of the services covered by this Agreement without the express written consent of the City. 13. Non -Waiver. Waiver by the City of any provision of this Agreement or any time limitation provided for in this Agreement shall not constitute a waiver of any other provision. 14. Termination. A. The City reserves the right to terminate this Agreement at any time by giving ten (10) days written notice to the Consultant. B. In the event of the death of a member, partner or officer of the Consultant, or any of its supervisory personnel assigned to the project, the surviving members of the Consultant hereby agree to complete the work under the terms of this Agreement, if requested to do so by the City. This section shall not be a bar to renegotiations of this Agreement between surviving members of the Consultant and the City, if the City so chooses. 15. Applicable Law; Venue; Attorney's Fees. This Agreement shall be subject to, and the Consultant shall at all times comply with, all applicable federal, state and local laws, regulations, and rules, including the provisions of the City of Tukwila Municipal Code and ordinances of the City of Tukwila. In the event any suit, arbitration, or other proceeding is instituted to enforce any term of this Agreement, the parties specifically understand and agree that venue shall be properly laid in King County, Washington. The prevailing party in any such action shall be entitled to its attorney's fees and costs of suit. Venue for any action arising from or related to this Agreement shall be exclusively in King County Superior Court. 16. Severability and Survival. If any term, condition or provision of this Agreement is declared void or unenforceable or limited in its application or effect, such event shall not affect any other provisions hereof and all other provisions shall remain fully enforceable. The provisions of this Agreement, which by their sense and context are reasonably intended to survive the completion, expiration or cancellation of this Agreement, shall survive termination of this Agreement. CA revised : 1-2013 Page 4 18 17. Notices. Notices to the City of Tukwila shall be sent to the following address: City Clerk City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Notices to Consultant shall be sent to the following address: KPG 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 18. Entire Agreement; Modification. This Agreement, together with attachments or addenda, represents the entire and integrated Agreement between the City and the Consultant and supersedes all prior negotiations, representations, or agreements written or oral. No amendment or modification of this Agreement shall be of any force or effect unless it is in writing and signed by the parties. DATED this CITY OF TUKWILA day of , 2019. Mayor, Allan Ekberg CONSULTANT By: Printed Name:Nelson Davis, KPG Title: Principal Attest/Authenticated: Approved as to Form: City Clerk, Christy O'Flaherty Office of the City Attorney CA revised : 1-2013 Page 5 19 EXHIBIT A City of Tukwila 2019 Overlay Program Scope of Work September 25, 2018 The Consultant shall prepare final Plans, Specifications and Estimates for the 2019 Overlay Program. Specific projects will be determined from the following list of candidate streets: ❑ E Marginal Way Norfolk to end of new pavement ❑ S 200th Street Orillia Road to Southcenter Parkway ❑ S 128th Street Military Road to approx. 650' East ❑ 51st Avenue S S 137th Street to S 138th Street ❑ S 137th Street Macadam Road to 43rd Avenue S ❑ 52nd Avenue S Interurban to S 51st Street ❑ 55th Avenue S S 144th Street to S 140th Street Project base maps for S 128th Street and 51st Avenue S were substantially completed in 2018 with additional detail required for channelization and ADA compliance. The Consultant shall provide all necessary field reviews, base mapping, and utility notification required to complete final bid documents for the 2019 Overlay Program. The Consultant shall also prepare the bid tabulation, check low bidder (2) references, and provide a recommendation for award to the City. The 2019 Overlay Program will be bid as a single bid package as budget allows. Projects may be re -prioritized or deferred to a future overlay program based on available budget and other considerations. Detailed estimates will be prepared at the 50% design to verify the final project list to be included in the 2019 Overlay Program. The City of Tukwila may require other services of the consultant. These services could include additional design, right of way, environmental documentation, construction phase services, or other work tasks not included in the scope of work. At the time these services are required, the Consultant will provide the City with a detailed scope of work and an hour and fee estimate. The Consultant will not proceed with the work until the City has authorized the work and issued a Notice to Proceed. City of Tukwila KPG, Inc. 2019 Overlay Program Page 1 of 4 September 2018 20 Assumptions for the 2019 Overlay Program Bid Package • Roadway and utility casting mapping will be based on aerial photography, GIS, and field reviews by the Consultant. Topographic field survey may be required for ADA ramp improvements and will be performed by the Consultant as required. • Typically, only surface utilities requiring adjustment to grade will be shown. • No utility upgrades are anticipated in the project design. • Drainage & Water Quality Reports will not be required. • Environmental Documentation will not be required. Deliverables • 50% review submittal with Plans and Estimate (6 copies) • 90% review submittal with Plans, Specifications, and Estimate (6 copies) • Routing of 50% and 90% Plans to utilities for review and comment. • Bid Documents and Engineer's Estimate for 2019 Overlay Program • 10 sets of Plans (11" X 17") and specifications for the Bid Documents. • Coordinate upload of Plans and Specifications to Builders Exchange. • Bid Analysis and recommendation for award. • Draft and final .pdf of Pavement Management Plan update SCOPE OF WORK TASK 1 — 2019 OVERLAY PROGRAM 1.1 The Consultant shall provide continuous project management and administration for the duration of the Project. (Estimate 6 months). • Hold project coordination meetings with the City to update progress and review submittals. Assume (4) meetings. • The Consultant shall provide monthly status reports and billings. • The Consultant shall provide independent QA/QC reviews by senior in- house staff of all deliverables prior to submittal to the City. 1.2The Consultant shall field review base maps that were prepared in 2018 for accuracy. The Consultant shall prepare base maps for all other project locations using field measurements, available record drawings, and/or ortho-photography. Topographic survey will be utilized only at ADA ramp locations where field conditions require it to meet ADA compliance City of Tukwila KPG, Inc. 2019 Overlay Program Page 2 of 4 September 2018 21 1.3The Consultant shall prepare 50%, 90%, and final Plans for the proposed improvements including the following: • Plans shall be prepared with such provisions in such detail as to permit field layout and construction within a degree of accuracy acceptable to the City and per industry standards. • It is assumed there will be approximately thirty (30) plan sheets at 1"=20' scale full size (22" X 34"), 1"=40' at reduced scale (11" X 17"). • Typical sections and details will be prepared for items not available as standard details from the City, State, or WSDOT standard drawings. • Plans will identify curb ramp replacement limits and pedestrian push button modifications in accordance with ADA requirements. • The plans shall illustrate complete details of construction of the proposed improvements including limits of construction and removals, utility adjustments, surfacing depths and details, and applicable channelization and signing for the segments selected for final design. • Plans and specifications will include required criteria for traffic control plans and pedestrian traffic control during construction. Criteria will be developed in collaboration with the City. • The Consultant shall perform site walkthroughs with the City maintenance staff to determine extent of roadway improvements / resurfacing (Estimate 2 meetings) and to prioritize candidate streets within the available budget. • Pavement sections will be determined through consultation with the City's maintenance staff and previous experience. No geotechnical investigations are anticipated. 1.4The Consultant shall calculate quantities and prepare Engineers Estimate of Probable Construction Cost for each review submittal and the Bid Documents. Projects will be prioritized in collaboration with the City following the 50% Submittal to determine final project segments. 1.5The Consultant shall prepare the Contract Specification per 2018 WSDOT Standard Specifications for the 90% Review Submittal and the Bid Documents. 1.6The Consultant shall distribute 50% and 90% review submittals to franchise utility owners for adjustments within the Project limits. 1.7The Consultant shall assist the City with Project Advertisement and Award by uploading plans and specifications to bxwa.com, preparing addenda, bid tabulation, and recommendation for award. City of Tukwila KPG, Inc. 2019 Overlay Program Page 3 of 4 September 2018 22 TASK 2 — FORT DENT PARK PARKING/ACCESS REPAIRS 2.1 The Consultant shall prepare base maps and design for overlay/reconstruction improvements in the Fort Dent Park area. Overlay plans for Fort Dent Park will be included in a separate bid schedule and bid as part of the 2019 overlay program. Limits of repairs will be determined in collaboration with the City to achieve an approximate $100,000 construction budget. TASK 3 — PAVEMENT MANAGEMENT PLAN UPDATE 3.1 The Consultant shall provide necessary management and coordination to Didrik Voss, PE for update of the City's pavement management program. Work shall include rating of all street segments within the City of Tukwila, update of data files in pavement management software, and data analysis. Didrik Voss will prepare a draft and final report containing recommendations for appropriate funding levels for ongoing maintenance of the roadway system. City of Tukwila KPG, Inc. 2019 Overlay Program Page 4 of 4 September 2018 23 EXHIBIT B PRIME CONSULTANT COST COMPUTATIONS City of Tukwila 2019 Overlay Program September, 2018 y Design Task No.Task Description Labor Hour Estimate Total Hours and Labor Fee Estimate by Task Principal Survey Mgr Sr. Engineer Construction Mgr Business Manger Project Eng/Surveyor Design Engineer CAD Technician Sr. Admin Engineering Technician Survey Crew II Office Admin $ 225 $ 202 $ 184 $ 163 $ 156 $ 141 $ 128 $ 112 $ 112 $ 104 $ 215 $ 92 Hours Fee Task 1 - Project Management 1.1 Project Management and Administrative Services 12 6 12 12 42 $ 6,084 1.2 Prepare Project Base Maps 4 4 40 40 8 60 40 196 $ 28,040 1.3 Prepare 50%, 90%, and Final Plans 40 80 100 60 160 12 452 $ 55,904 1.4 Project Cost Estimates (50%, 90%, Final) 4 4 4 16 24 12 64 $ 8,864 1.5 Project Specifications 4 16 8 40 16 8 92 $ 13,572 1.6 Utility Coordination 2 16 4 2 4 28 $ 3,712 1.7 Project Advertisement and Award 4 4 4 8 4 8 4 8 44 $ 6,104 Task Total 24 4 70 16 6 200 188 76 16 242 40 36 918 $ 122,280 Task 2 - Fort Dent Parking / Access Repairs 2.1 lAlt analysis / prepare final plans, specs, estimate 4 32 24 4 4 8 4 80 $ 10,580 Task Total 4 0 0 0 0 32 24 4 4 8 0 4 80 $ 10,580 Task 3 - Pavement Management Program Update 3.1 !Coordination and subconsultant support 4 2 8 8 4 26 $ 3,812 Task Total 4 0 0 0 2 8 8 0 4 0 0 0 26 $ 3,812 Total Labor Hours and Fee 32 4 70 16 8 240 220 80 24 250 40 40 1,024 $ 136,672 Subconsultants Pavement Engineers (PMP update) $ 15,000.00 Traffic Control $ 2,500.00 Total Subconsultant Expense $ 17,500.00 Reimbursable Direct Non -Salary Costs Mileage at current IRS rate $ 500.00 Reproduction Allowance $ 1,500.00 Total Reimbursable Expense $ 2,000.00 Total Estimated Budget $ 156,172.00 FEE ESTIMATE 9/25/2018 Allan Ekberg, Mayor 061, W� U� TO: Community Development and Neighborhoods Committee Transportation and Infrastructure Committee FROM: Rachel Bianchi, Deputy City Administrator CC� KAmyorEhbmrg DATE: October 2'2O1B SUBJECT: 2D1SLegislative Agenda ISSUE The City of Tukwila develops an annual legislative agenda for use in Olympia during the legislative session, BACKGROUND the Cit'/'L8--EtiveAo8nd8pnOvidSSdi[eCti0ntOotaff and consensus among the elected officials ootowhat policy positions are taken nnbehalf ofthe City 0fTukwila during the legislative session. RECO,;'',,,2NDAT|ON The 'Council -ibeing hnnsked�0oppnova�her8s�|UtioOoDdoOnaide[�hiS�attheNOvember13 Committee Wholemeeting and subsequent November 19Regular Meeting. TheQty's lobbyist, Jennifer Ziegler, will provide a legislative update at the November 19 meeting. -Resolution in draft f0nn -Attachment A — Legislative Agenda 25 LW3 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A LEGISLATIVE AGENDA FOR USE DURING THE 2019 WASHINGTON STATE LEGISLATIVE SESSION. WHEREAS, the City Council has agreed to pursue certain legislative issues for 2019; and WHEREAS, the City Council recognizes this agenda is not all encompassing, in that certain additional items may arise during the legislative session that require support or opposition; and WHEREAS, a legislative agenda outlines the priority issues that elected officials may discuss when speaking to members of the Washington State Legislature; and WHEREAS, the City Council agreed to these priorities at the City Council Meeting on November 19, 2018; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: The Tukwila City Council has identified priorities for the 2019 Washington State Legislative Session that provide a framework for advocacy on behalf of the community. The City of Tukwila 2019 Legislative Agenda is hereby incorporated by reference as Attachment A. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2018. ATTEST/AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk Verna Seal, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Resolution Number: Rachel B. Turpin, City Attorney Attachment A: City of Tukwila 2019 Legislative Agenda W:\Word Processing\Resolutions\Legislative Agenda for 2019 10-11-18 RB:bjs Page 1 of 1 26 ATTACHMENT A City of Tukwila 2019 Legislative Agenda Transportation & Infrastructure • Join the US DOT, Freight Mobility Strategic Investment Board, the cities of Renton and Tukwila and other partners to fund the Strander Extension project to increase freight mobility and remove 55,000 vehicles a day from 1-405, 167 and other nearby roadways. • Provide funding for critical local infrastructure, including the Allentown Bridge, which is Structurally Deficient and Functionally Obsolete. • Create stable, reliable infrastructure assistance funding for cities to assist in repairing roads, bridges and other public infrastructure that support economic development. Housing & Human Services • Fully fund the state Housing Trust Fund to provide resources for affordable housing. • Create new and expand existing local options to generate revenue for housing and human services and for capital construction of affordable housing. • We strongly encourage the state to adequately fund human services programs for the health of the safety net. Shared Revenue • The State must continue its role as a partner with cities, including reinstating funding for the Public Works Assistance Account and Community Economic Revitalization Board. • Reestablish the Streamlined Sales Tax Mitigation Payments to cities hard-hit by the change to destination based sales tax, which provides Tukwila over $1.2 million annually to replace lost revenue, which was ended in the 2018 session. • In addition, the state must retain the local share of liquor taxes to allow jurisdictions to address impacts, such as public safety, of privatized liquor in our cities. Revenue Reform • Allow cities the authority and flexibility to address the fact that growth in the cost of services continue to outstrip revenues. • The state should amend the law that limits annual property tax growth to 1 percent and work with cities to authorize additional funding flexibility and opportunities at the local level. Education • Implement needs based funding for allocation of social emotional student support resources and expand funding for learning opportunities for summer school students. • Increase funding for homeless students and secondary ELL students. • Incorporate early learning for low income students as a part of Basic Education. Law Enforcement • Increase funding for law enforcement training to ensure that all police officers have access to key resources that save lives. • Change the day rate for Department of Corrections inmates to ensure equitable reimbursements for local facilities such as SCORE. Preserve Lodging Tax Flexibility • Ensure the definition of "tourist" in Washington State remains flexible to allow jurisdictions and Lodging Tax Advisory Committees to distribute lodging tax dollars in a manner that best serves each individual community. 27 28 City of Tukwila Allan Ekberg, Mayor INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Brandon Miles, Business Relations Manager CC: Mayor Ekberg DATE: October 9, 2018 SUBJECT: 2019 Budget Proviso for SeaTac International Airport Impact Study ISSUE Authorizing Mayor to Sign Interlocal Agreement (I LC) with the Cities of SeaTac, Normandy Park, Burien, Federal Way, and Des Moines. BACKGROUND Staff has provided several briefings to the Transportation and Infrastructure Committee and the Committee of the Whole regarding a budget proviso that was included in the adopted Washington State budget to provide $300,000 in funding for the Washington State Department of Commerce ("Commerce") to study the impacts of Sea-Tac Airport on surrounding communities. The proviso requires that a local match of $300,000 be provided in order for Commerce to use the funds. Staff from the Cities of Tukwila, SeaTac, Federal Way, Normandy Park, Burien, and Des Moines have met to discuss the basic outline of how the local match could work. The City of SeaTac is prepared to provide $150,000 for the local match, provided the other five cities contribute the remaining $150,000. The table below shows fund allocation for the remaining five cities based on a per capita formula. Tukwila's contribution would be $14,445.61 City 2017 OFM population estimate Per Capita Share 0.7348 (5.1993 SeaTac) Burien 50,680 $37,238.24 Des Moines 30,860 $22,675.06 Federal Way 96,350 $70,795.27 Normandy Park 6,595 $4,845.82 Tukwila 19,660 $14,445.61 Other Cities Subtotal $150,000 SeaTac 28,850 $150,000 Total Population Represented 232,995 Total Local Match Funds for Study $300,000 29 INFORMATIONAL MEMO Page 2 DISCUSSION The Committee of the Whole was briefed on the match framework on July 23, 2018 and supported the proposed match by the City of Tukwila. Staff indicated that the ILA would need to come back through Council for final authorization. Since staff briefed the Council last there has been a major development that staff wanted to bring to the Council's attention. Commerce has convened regular meetings of the City Managers and staff from the Mayor's Office from the six cities outlined above. These meetings were initially just staff from the cities and staff from Commerce. However, at the last two meetings convened, members of the public insisted on being in the meeting. At the meeting on August 27 Reps. Tina Orwall and Mike Pellicciotti attended the meeting and encouraged that the working group include community members and that they be open to the public. Commerce followed up this meeting by asking each city and the Port of Seattle to select one person to serve as a community member for their respective agencies. Additionally, the meetings of this group will now be open to the public. This changes the overall dynamic of the working group and staff has concerns on the overall effectiveness of the group. It is extremely unlikely that the initial competition due date of December 2019 will be met now. RECCOMENDATION Staff recommends that the City Council authorize the Mayor to sign the ILA between the cities of Normandy Park, Burien, Des Moines, SeaTac, and Federal Way for the City to provide $14,445.61 as Tukwila's per capita match for the budget proviso. Staff requests the ILA be placed on the November 5, 2018 consent agenda. ATTACHMENTS A. Final Interlocal Agreement with the cities of Normandy Park, Burien, Des Moines, SeaTac, Federal Way, and Tukwila. B. Commerce Agreement with City of SeaTac. C. Letter from Commerce to Tukwila, dated June 6, 2018. D. Memorandum from Commerce to cities, dated September 12, 2018 E. Staff memo to Committee of the Whole, dated July 17, 2018 (without listed attachments). 30 AGREEMENT BETWEEN THE CITIES OF BURIEN, DES MOINES, NORMANDY PARK, FEDERAL WAY, TUKWILA, AND SEATAC TO PROVIDE LOCAL MATCHING FUNDS FOR THE SEA-TAC AIRPORT IMPACT STUDY This Agreement is entered into between the City of Burien, a municipal corporation, hereinafter referred to as "Burien;" the City of Des Moines, a municipal corporation hereinafter referred to as "Des Moines;" the City of Federal Way, a municipal corporation hereinafter referred to as "Federal Way;" the City of Normandy Park, a municipal corporation hereinafter referred to as "Normandy Park;" the City of Tukwila, a municipal corporation hereinafter referred to as "Tukwila;" and the City of SeaTac, a municipal corporation hereinafter referred to as "SeaTac;" and all six cities collectively referred to as the "Parties" or "Cities", for the purpose of providing local matching funds to the Washington State Department of Commerce, a state agency hereinafter referred to as "Commerce," for the "Sea-Tac International Airport Impacts Study," hereinafter referred to as "the Study." Background. The Washington State Legislature enacted Engrossed Substitute Senate Bill 6032 during the 2018 regular session. Section 127(63) (hereinafter referred to as "the Proviso") provides in part that, "$300,000 of the general fund -state appropriations for fiscal year 2019 and $300,000 of the general fund -local appropriation are provided solely for the department to contract with a consultant to study the current and ongoing impacts of the Sea-Tac International Airport. The general fund -state funding provided in this subsection serves as a state match and may not be spent unless $300,000 of local matching funds is transferred to the department." The Parties have determined a method to equitably provide the local matching fund obligation of $300,000 so that the Study may proceed. 2. Purpose. The purpose of this Agreement is for the Parties to define each Party's funding obligation, which Party will enter into a contract with Commerce, and to establish a process for participating in and responding to the study as it is prepared by Commerce. 4. Contract Administration. The Parties agree that SeaTac will serve as the contracting and fiscal agent for the local matching contributions to the Study from the other jurisdictions and has the sole responsibility to collect any such funds. SeaTac commits to transfer funds to Commerce at such dates and in such amounts as required and will collect contributions from other jurisdictions either prior to or after such transfers occur. Joint Roles a. Responsibilities. Each Party shall be responsible for the following: Each Party shall assign a representative(s) ("Party Representative(s)") to help prepare and participate in review of draft work products as provided by Commerce. The Party Representative for SeaTac will communicate any changes to schedules and other pertinent information in a timely manner so as to keep each Party apprised of the status of the Commerce's work. b. Time is of the essence for this Study. The Parties shall work expeditiously and in Page 1 of 6 31 good faith to achieve the smooth progress of review and commenting. This includes allocating adequate staff time and providing all necessary data and other information or materials needed by Commerce to facilitate preparation of the Study. 5. Co ttract Manag,einen t. The agreement with Commerce shall be solely administered by the City of SeaTac on behalf of all Parties. These responsibilities include arrangement of meetings with Commerce as needed to address the comments of the Parties and coordinating communications with Commerce. 6. Fiscal Management. By entering into this Agreement, the Parties commit to providing their defined share of the $300,000 local matching funds. Management of fiscal matters associated with this Agreement shall be administered by the City of SeaTac. Parties shall transfer their defined share of local matching funds to SeaTac in accordance with the schedule identified in Exhibit A. While SeaTac may elect to transfer funds to Commerce in advance of receiving payments from all or some of the other Parties, the Parties affitin their share will be remitted to SeaTac on or before their established payment dates. 7. Duration. This Agreement shall be effective upon execution by each party and shall remain in full force and effect through completion of the Study process or full payment by all Parties per Exhibit A, whichever comes last. This Agreement may be extended upon mutual agreement of all Parties. 8. iermination. Any party may withdraw from this Agreement, effective upon thirty (30) days written notice to the other Parties and upon payment of the balance of their full defined share to the City of SeaTac. If the State Legislature or Commerce terminate the Study, SeaTac will remit any payments received but not sent to Commerce, plus any refund for payments received from Commerce to the Parties in accordance with defined local share as outlined in Exhibit A. The remittance by SeaTac to all Parties may be pro -rated equally if necessary to maintain the balance of contributions and refunds from Commerce. 9. Modification. This Agreement may be modified by further written agreement upon mutual acceptance by all parties. 10. Alternative Dispute Resolut to . If a dispute arises from or relates to this Agreement or the breach thereof and if the dispute cannot be resolved through direct discussions, the parties agree to endeavor first to settle the dispute in an amicable manner by mediation administered by a mediator under JAMS Alternative Dispute Resolution service rules or policies before resorting to arbitration. The mediator may be selected by agreement of the parties or through JAMS. 11. Written Notice. All communications regarding this Agreement shall be sent to the Parties at the addresses listed in Exhibit B, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of transmittal, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. Page 2 of 6 32 12. Hold Harmless. Each party to this Agreement shall defend, indemnify and hold the other party, its appointed and elected officers and employees, harmless from claims, actions, injuries, damages, losses or suits including attorney fees, arising or alleged to have arisen directly or indirectly out of or in consequence of the performance of this Agreement to the extent caused by the fault or negligence of the indemnitor, its appointed or elected officials, employees, officers, agents, assigns, volunteers or representatives. 13. Non- II iscri ation. The Parties shall not discriminate in any ma er related to this Agreement on the basis of race, color, national origin, sex, sexual orientation, religion, age, marital status or disability in employment or the provision of services. Use Co erce language. 14. Severability. If any provision of the Agreement shall be held invalid, the remainder of this Agreement shall not be affected thereby if such remainder would then continue to serve the purposes and objectives of both parties. 15. Entire Agreement. This Agreement constitutes the entire agreement between the parties. Any modifications or amendments to this Agreement shall be in writing and shall be signed by each party. Page 3 of 6 33 CITY F fU: "'.:EN Brian J. DATE: APP son, City Manager OVE AS TO :FO Lisa Marshall, City Attorney CITY OF TUC ILA Allan Ekberg, Mayor DATE: APP11%VED AS TO FO Rachel Turpin, City Attorney CITY OF FE I E AY Jim F erreil d, Mayor DATE: APP Ill. OVE I AS T FO J. Ryan Call, City Attorney CITY OF ES OIN:ES Michael MQatthias, City ager DATE: APP VED AS T FORM: TIl George, City Attorney CITY OF NO: ' :ANY PA Mark E. Hopp n, Ci y DATE: AP VEIDASTOF aes Haney, City CITY F S:EAC oseph Senteio, City Manager DATE: ` — 2./ v i AP VE AS TO F i/I E. naunte Bartollo, City A u�ey Page 4 of 6 34 CITY OF U EN /316 Brian. J. Wilson DATE: rty Manager 1 APP AS TO F Li_ a -Marshall, City Attorney CITY F TLJ A Allan Ekberg, Mayor DATE: APP. VEI) AS T Rachel Turpin, City Attorney CITY FFE E AY Jim Ferrell, Mayor DATE: CITY OF ES INES Michael Matthias, City Manager DATE: APPRI VE AS FO • Tim. George, City Attorney CITY F NO ANDY PA. Mark E. Hoppen, City Manager DATE: APP OVE AST FO James Haney, City Attorney CITY SEATAC Joseph Scorci.o, City Manager DATE: APP OVE AS T F APP J. Ryan Call, City Attorney VE S AS 1 F( Mary E. Mirante Bartolo, City Attorney Page 4 of 6 35 CITY I F EN Brian J. Wilson, City Manager DATE: P VE AS T I F p Lisa arshall, City Attorney CITY F TU ILA All. Ekberg, Mayor DATE: APP • VE a AS T I F • Rachel T APP • 400 $ n, City Attorney AS T 0 1 F J. Ryan Call, City Attorney CITY F ES SINES Michael atthias, City anager DATE: P • I AS T F • Tim George, City Attorney CITY I F N I • , P Mark E. Hoppen, City anager DATE: APP • I VE AS T F I • es Haney, City Attorney CITY I F SEATAC Joseph Scorcio, City anager DATE: P • VE a AS T F ary E. Mirante Bartolo, City Attorney Page 4 of 6 36 CITY OF BU EN Brian J. Wilsol 'ity Manager DATE: APPRO D AS TO FO Lisa Marshall, City Attorney CITY OF TU. ILA Allan Ekberg, Mayor DATE: OVED AS TO FO Rachel T sin, City Attorney CITY OF FE Jim Ferrell, Mayor L WAY CITY OF DES OINES Michael Matthias, City Manager DATE: /0: iF APPROVED AS TO FO • Tim George, City Attorney CITY OF NO • , NDY PA • Mark E. Hoppen, City M. ager DATE: APPROVED AS TO FO • James Haney, City Attorney CITY OF SEATAC Joseph Scorcio, City Manager DATE: DATE: APPROVED AS TO FO • J. Ryan Call, City Attorney APPROVED AS TO FOR Mary E. Mirante Bartolo, City Attorney Page 4 of 6 37 C. Burien Des Moines Federal ay Normandy Park Tukwila Other Cities Subtota SeaTac Total Population Re •resented Total Local Match Funds for Study I 20 7 • • IT A po ulation Per Capita Share 0.7348 esti ate (5.1993 SeaTac) 50,680 $37,238.24 30,860 $22,675.06 96,350 6,595 19,660 $70,795.27 $4,845.82 14,445.6 $150,000 28,850 $150,000 232,995 PAY ENT SC E ULE $300,000 The Cities identified below agree to make payment to the City of SeaTac in the amount and on the dates indicated below. Pa ents shall be delivered to: City of SeaTac, Attn: Finance Department, 4800 South 188th Street, SeaTac, WA 98188, and should reference "Sea-Tac Impact Study Local Match." u ien: es oines: $37,238.24 no later than September 30, 2018. $22,675.06 no later than July L 2019 Federal ay: $35,397.64 no later than L yJW20 1 9 and $35,397.63 no later than January 31, 2020. No andy Park: $4,845.82 no later than S tent ber 1, 2018. Tukwila: $14.445.61 no later than December 31. 201 . Page 5 of 6 38 III 1. Brian J. Wilson, City Manager, Burien City Hall, 400 SW 152nd St., Suite 300, Burien, WA 98166 2, Lisa Marshall, City Attorney, Burien City Hall, 400 SW 152nd St., Suite 300, Burien, WA 98166 3 Michael Matthias, City Manager, City of Des Moines, 21630 llth Ave. S., Suite A, Des Moines, WA 98198 4, Tim George, City Attorney, City of Des Moines, 21630 1 lth Ave. S., Suite D, Des Moines, WA 98198 5. Allan Ekberg, Mayor, City of Tukwila, 6200 Southcenter Boulevard, Tukwila, WA 98188 6. Rachel Turpin, City Attorney, City of Tukwila, Kenyon Disend, PLLC, 11 Front St. S., Issaquah, WA 98027 7. Mark E. Hoppen, City Manager, Normandy Park City Hall, 801 SW 174th Street, Notmandy Park, WA 98166 Jim Haney, City Attorney, City of Normandy Park, Ogden Murphy Wallace, P.L.L.C., 901 5th Ave., Ste. 3500, Seattle, WA 98164 9. Jim Ferrell, Mayor, Federal Way City Hall, 33325 8th Ave. S., Federal Way, WA 98003 10. Ryan Call, City Attorney, Federal Way City Hall, 33325 8th Ave. S., Federal Way, WA 98003 11. Joseph Scorcio, City Manager, SeaTac City Hall, 4800 South 188th Street, SeaTac, WA 98188 12. Mary E. Mirante Bartolo, SeaTac City Hall, 4800 South 188th Street, SeaTac, WA 98188 Page 6 of 6 39 AGREEMENT BETWEEN THE CITY OF SEATAC AND THE WASHINGTON STATE DEPARTMENT OF COMMERCE TO PROVIDE LOCAL MATCHING FUNDS FOR THE SEA-TAC AIRPORT IMPACT STUDY This Agreement is entered into between the City of SeaTac, a municipal corporation hereinafter referred to as "SeaTac," and the Washington State Department of Commerce, a state agency hereinafter referred to as "Commerce," collectively referred to as the "Parties," for the purpose of securing a commitment from SeaTac to transfer to Commerce $300,000 of local matching funds ((hereinafter referred to as "Matching Funds") for the "Sea-Tac International Airport Impacts Study," hereinafter referred to as "the Study". 1. Background. The Washington State Legislature enacted Engrossed Substitute Senate Bill 6032 during the 2018 Regular Session. Section 127(63) (hereinafter referred to as "the Proviso") provides in part that, "$300,000 of the general fund —state appropriation for fiscal year 2019 and $300,000 of the general fund —local appropriation are provided solely for the department to contract with a consultant to study the current and ongoing impacts of the SeaTac International Airport. The general fund —state funding provided in this subsection serves as a state match and may not be spent unless $300,000 of local matching funds is transferred to the department." 2. Purpose. The Parties desire by this Agreement to secure a commitment from SeaTac to transfer the full amount ($300,000) of the Matching Funds to allow Commerce to proceed with the Study without delay. While the Parties acknowledge that other cities named in the Proviso (as listed in Paragraph 4 of this Agreement) will contribute a portion of the Matching Funds, a delay in negotiating a multi -party agreement would negatively impact Commerce's ability to complete the Study by the intended completion date of December 1, 2019. Therefore, by this Agreement, SeaTac accepts responsibility to transfer to Commerce the Matching Funds as detailed in the Proviso, and by separate agreement will receive contributions from the other cities named in the Proviso. The Parties intend that SeaTac shall serve as fiscal agent for contributions to the Study from such other cities, with sole responsibility to collect any such funds. 3. Transfer of Local Matching Funds to Commerce. SeaTac shall transfer $300,000 to Commerce representing the Matching Funds, through minimum installment payments on or around the following dates: A minimum of one-third (1/3) of the Matching Funds payable at the time of execution of this Agreement; an additional one-third (1/3) of the Matching Funds (totaling a minimum of 2/3 of the Matching Funds) payable prior to January 15, 2019; and the remainder of any unpaid Matching Funds payable prior to June 15, 2019. Such funds, in combination with the State's general fund appropriation of $300,000, will be used for the purpose of financing the Study, including Commerce's related staffing and administrative costs. Upon request, but not more City of SeaTac/Dept. of Commerce (07/2018) Page 1 of 4 40 frequently than once per quarter, Commerce will provide SeaTac with an accounting of all funds expended to complete the Study. 4. Local Participation in the Study. The Proviso directs Commerce to seek feedback on project scoping and consultant selection from the Cities of SeaTac, Burien, Des Moines, Tukwila, Federal Way, and Normandy Park. The Parties acknowledge that nothing in this Agreement is intended to limit Commerce's ability to consult with such jurisdictions. 5. Joint Roles and Responsibilities. Each Party shall be responsible for the following: a. Assign a representative ("Representative(s)") to be responsible for all communications and billings regarding this agreement, and promptly notify the other Party if its Representative changes. • The Representative for SeaTac is Steve Pilcher, Community and Economic Development Director, 206-973-4832, spidcher@ci.seatac.wa.us • The Representative for Commerce is Gary Idleburg, Senior Planner, 360-725-3045, gary.idleburg@commerce.wa.gov b. Time is of the essence for the Study. The Parties shall work expeditiously and in good faith to transfer Matching Funds in accordance with this Agreement and complete the Study prior to December 1, 2019. This includes allocating adequate staff time and providing all necessary data and other information or materials needed for completion of the Study. 6. Study Management. Responsibility for managing the Study, including procurement and oversight of any contracts for consultant(s), shall be the exclusive responsibility of Commerce, except for consultation with the named Cities and other parties as directed by the Proviso. Commerce's responsibilities include monitoring of work of the consultant in terms of content and timeliness; coordinating with the Cities; arranging meetings; preparing and finalizing a report of the Study and providing that report to the Legislature, etc. 7. Administration of Agreement. Supervision and administration of this Agreement shall be the responsibility of each Parties' Representative, or his/her respective designee. 8. Duration. This Agreement shall be effective upon execution by each party and shall remain in full force and effect through completion of the Study, or December 1, 2019, whichever occurs first. This Agreement may be extended upon mutual agreement of the Parties. 9. Termination. Any party may withdraw from this Agreement, effective upon thirty (30) days written notice to the other parties. If SeaTac is the withdrawing Party, SeaTac shall still be responsible for the transfer of Matching Funds to Commerce as specified in Paragraph 3 of this Agreement. If Commerce is the withdrawing Party, all unobligated or unspent Matching Funds received by Commerce shall be returned to SeaTac. City of SeaTac/Dept. of Commerce (07/2018) Page 2 of 4 41 10. Modification. This Agreement may be modified only by written agreement of the Parties. Additionally, this Agreement may be amended if additional funds for the study become available from either Party or one of the cities named in the Proviso. 11. Disputes. Disputes arising under this Agreement shall be resolved by a panel consisting of one representative from SeaTac, one representative from Commerce, and a mutually agreed upon third party. The dispute panel shall thereafter decide the resolution of the dispute with the majority prevailing. 12. Written Notice. All communications regarding this Agreement shall be sent to the parties at the email addresses listed in Paragraph 5 of this Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of transmittal, and shall be deemed sufficiently given if sent to the addressee at the email address stated in this Agreement or such other address as may be hereafter specified in writing. 13. No Indemnification. Each Party to this Agreement shall be solely responsible for its own acts and/or omissions and those of its officers, employees and agents. No Party to this Agreement shall be responsible for the acts and/or omissions of entities or individuals not a party to this agreement. Subcontracts, if any, shall include a comprehensive indemnification clause holding harmless the Parties, the state of Washington, and their officers, employees and authorized agents. The provisions in this section shall survive the termination of this Agreement. 14. Non -Discrimination. The Parties shall not discriminate on the basis of race, color, national origin, sex, sexual orientation, religion, age, marital status, or any other basis protected under state or federal law as it relates to each Party's performance and obligations under this Agreement. 15. Venue. This Agreement shall be deemed to be made in Thurston County, State of Washington, and the legal rights and obligations of the Parties shall be determined in accordance with the laws of the State of Washington. All legal actions in connection with this Agreement shall be brought in the Superior Court situated in Thurston County, State of Washington, and each Party shall be liable for its own attorneys' fees and costs. 16. Severability. If any provision of the Agreement shall be held invalid, the remainder of this Agreement shall not be affected thereby if such remainder would then continue to serve the purposes and objectives of both Parties. 17. Entire Agreement. This Agreement constitutes the entire agreement between the Parties. City of SeaTac/Dept. of Commerce (07/2018) Page 3 of 4 42 WASHINGTON STATE DEPARTMENT OF COMMERCE CITY OF SEATAC Mark Barkley, Assistant Director Joseph Scorcio, City Manager DATE: DATE: APPROVED AS TO FORM: APPROVED AS TO FORM: Sandra Adix, Mary Mirante Bartolo Assistant Attorney General SeaTac City Attorney City of SeaTac/Dept. of Commerce (07/2018) Page 4 of 4 43 STATE OF WASHINGTON DEPARTMENT OF COMMERCE 1011 Plum Street SE PO Box 42525 Olympia, Washington 98504-2525 (360)725-4000 www. commerce.wa.gov June 6, 2018 r. randon Miles usiness Relations Manager City of Tukwila 6200 Southcenter Boulevard Tukwila, Washington 98188 RE: Study on the current and on -going impacts of the Seattle -Tacoma International Airport - The implementation of Engrossed Substitute Senate Bill (ESSB) 6032-Section 127(63). Dear Mr. Miles: The Washington State Legislature formally asked the Department of Commerce (Commerce) to begin a study that evaluates the on -going impacts of the Seattle -Tacoma International Airport. The study has the following parameters: $300,000 of the general fund —state appropriation for fiscal year 2019 and $300,000 of the general fund local appropriation are provided solely for Commerce to contract with a consultant to study the current and ongoing impacts of the SeaTac International Airport State finding provided in this serves as a state match and may not be spent unless $300,000 of local matching funds is transferred to Commerce. Commerce must seek input on project scoping and consultant selection from the cities of SeaTac, Burien„ Des Moines, Tukwila, Federal Way and Normandy Park and the Port of Seattle plus members of the legislature. Commerce must collect data and relevant information from various sources including the Port of Seattle, the listed cities and communities (above), and other studies. The study must include, but not be limited to, an analysis of the impacts that the current and ongoing airport operations have on quality of life. These impacts are associated with air traffic noise, public health, traffic, congestion, parking in residential areas, pedestrian access to and around the airport, public safety and crime within the cities, effects on residential and non-residential property values, and economic development opportunities, in the cities of 44 Mr. Brandon Miles Business Relations Manager June 6, 2018 Page 2 SeaTac, Burien, Des Moines, Tukwila, Federal Way, Normandy Park, and other impacted neighborhoods. The study should also provide options and recommendations for mitigating any negative impacts identified through the analysis. The study must be delivered to the legislature by December 1, 2019. This letter is a formal introduction and invitation. Commerce would like to begin having discussions with you and/or your representatives about forming a committee that will develop a final scope of work and/or he part of the process of choosing a consultant to help complete this task by December 1, 2019. Please contact me if you have any questions. our initial activities. W will be contacting you to begin to meet and organize We look forward to working with you and your representatives. Sincerely, Gary Idleburg Senior Planner Growth Management Services Gar Jellebur commeree,wa. ov 360.725.3045 GElw cc: Mark McCaskill, AICP, Managing Director, Growth Management Services Ike Nwankwo, Western Region Manager, Growth Management Services Jaime Rossman, Policy Advisor, Directors Office, Department of Commerce 45 STATE OF WASI-IINGTON DEPARTMENT OF COMMERCE 1011 Plum Street SE • PO Box 42525 • Olympia, Washington 98504-2525 ® (360) 725-4000 www.commerce.wa.gov MEMORANDUM DATE September 12, 2018 TO: Sea-Tac International Airport Study Advisory Committee (SSAC) FROM: Gary Idleburg, Senior Planner, Local Government Division SUBJECT: Public participation and next steps for the study This memorandum is a reminder and a request for public participation in this study. Our last meeting resulted in a number of important decisions which will affect our work 1. Committee representative from each City and the Port of Seattle will select a public representative from their jurisdiction to sit on the full SSAC in developing the "statement of work" among other duties tasked to the committee. 2. A new project schedule and project charter will be developed for signature by the full SSAC. 3. Subsequent meetings will be in the following format; A subcommittee comeposed of City and Port staff representatives will develop draft work products for the full SSAC (including public representatives) to review and help finalize. 4. The State Legislators on the SSAC will work with their colleagues in the legislature to change the due date of the study. The Department of Commerce (Commerce) requests that the the City and Port representatives select a public representative for the committee as soon as possible. We will need an aggressive schedule to complete this work. This added step in our process will likely delay our delivery date to the legislature until sometime in the spring of 2020. We would like to reduce that delay as much as possible by filling the public representative positions and meeting again as soon as practicable. Please contact me at Commerce (nary.idleburg commerce.wa.gov) or by phone 360.725.3045 if you have questions or need assistance. Thank you for your participation and cooperation. 46 City of Tukwila Allan Ekberg, Mayor INFORMATIONAL MEMORANDUM TO: FROM: Brandon Miles, Business Relations Manager CC: Mayor Ekberg DATE: July 17, 2018 SUBJECT: 2019 Budget Proviso for SeaTac International Airport Impact Study ISSUE Update on 2019 Budget Proviso for SeaTac International Airport Impact Study. Committee of the Whole BACKGROUND On February 26, 2018 Committee of the Whole was briefed on a proposed budget proviso pending with the Washington State Legislature. The proviso was included in the final adopted budget for the State. The proviso would provide funding for the Washington State Department of Commerce ("Commerce") to study the impacts of Sea-Tac Airport on surrounding communities. The proviso requires that a local match be provided in order for Commerce to use the funds. The City's Transportation and Infrastructure Committee discussed the proviso at four of its meeting to discuss if the City should provide funds for the local match requirement. The final adopted budget proviso language, as amended, is as follows: (63)(a) $ 300,000 of the general fund -state appropriation for fiscal year 20191 and 300,000 of the general funds -local appropriation are provided solely for the department to contract with a consultant to study the current and ongoing impacts of the SeaTac International airport. The general fund -state funding provided in this subsection serves as a state match and may not be spent unless $300,000 of local matching funds is transferred to the department. The department must seek feedback on project scoping and consultant selection from the cities listed in (b) of this subsection. b) The study must include, but not be limited to: i) The impacts that the current and ongoing airport operations have on quality of life associated with air traffic noise, public health, traffic, congestion, and parking in residential areas, pedestrian access to and around the airport, public safety and crime within the cities, effects on residential and nonresidential property values, and economic development opportunities, in the cities of Sea Tac, Burien, Des Moines, Tukwila, Federal Way, Normandy Park, and other impacted neighborhoods; and ii) Options and recommendations for mitigating any negative impacts identified through the analysis. c) The department must collect data and relevant information from various sources including the port of Seattle, listed cities and communities, and other studies. d) The study must be delivered to the legislature by December 1, 2019. The fiscal year for the State began on July 1, 2018. 47 INFORMATIONAL MEMO Page 2 Following the adoption of the budget, the Chairs of the State House Appropriations Committee and the State Senate Ways and Means Committee sent a letter to Commerce with refined language (see attached). It was noted that the language came too late to be included in the final draft of the State budget. The main modification was that Commerce was also directed to look at the benefits of SeaTac International Airport on surrounding cities as a result of proximity to the airport. The options section was also expanded to include a discussion regarding " bolstering potential benefits." Per Commerce, the adopted budget language governs, but the letter provides good guidance on the legislative intent of the proviso. The Cities of Tukwila, SeaTac, Federal Way, Normandy Park, Burien, and Des Moines have been meeting to discuss providing the local match. The City of SeaTac is prepared to provide $150,000 for the local match, provided the other five cities contribute the remaining $150,000. The table below shows fund allocation for the remaining five cities based on a per capita formula. Tukwila's contribution would be $14,445.61 City 2017 OFM population estimate Per Capita Share 0.7348 (5.1993 SeaTac) Burien 50,680 $37,238.24 Des Moines 30,860 $22,675.06 Federal Way 96,350 $70,795.27 Normandy Park 6,595 $4,845.82 Tukwila 19,660 $14,445.61 Other Cities Subtotal $150,000 SeaTac 28,850 $150,000 Total Population Represented 232,995 Total Local Match Funds for Study $300,000 Staff from the six cities supports the allocation of the match as outlined in the table above. City Councils from the other cities may need to approve the final contribution. With the local match and the State Funds, the total amount of funds available is $600,000. There is some initial concern that these funds may be insufficient to complete an in-depth study. Commerce has already indicated they study would like to be survey of existing studies and data already available and that it's unlikely that new primary research will be completed. The City of SeaTac has indicated it may be willing to contribute an additional $100,000 to expand the scope of the study. DISCUSSION Tukwila's impact from Sea-Tac Airport are much different than the other five cities. While Tukwila has some minor impacts from noise and odor, the City does not have the same 48 INFORMATIONAL MEMO Page 3 significant impact as the other cities that are directly below the takeoff and landing approaches. Tukwila is impacted by traffic, land use patterns, and impacts to public services. A recent study by the Port of Seattle estimates that Sea-Tac Airport contributes $742 million in economic activity within the City, providing over 5,000 jobs. Participation in the budget proviso study will also identify the positive impacts the Airport has on the City and will assist the City in how to better leverage our relationship with the Port to benefit the City's community members. RECCOMENDATION Staff recommends that the City provide $14,445.61 as Tukwila's per capita match for the budget proviso. ATTACHMENTS A. June 6, 2018 Letter from Department of Commerce to the City of Tukwila. B. Pages from the adopted Washington State Budget. C. March 21, 2018 Letter from Washington State Legislature to Department of Commerce. D. February 12, 2018 Letter, with attachment, from City of SeaTac to City of Tukwila. E. February 14, 2018 Letter from City of Des Moines to Representative Timm Ormsby. F. Federal Way Resolution No. 18-735. 49 50 City of Tukwila Bi-Weekly Summary Public Works October 5, 2018 CITY PRIORITIES — Tukwila International Boulevard Community Transformation; Community livability; Create community partners to implement city-wide plans and visions; Develop/implement comprehensive economic development plan; Continue to create a more effective organization; Improved communications and community identity Construction Project Updates * 42nd Ave Phase Ill: Estimated Completion: Doroild00 2'010 The road construction contractor has re -mobilized to the project site for asphalt paving work on South 160th Street, and asphalt overlay work on 42nd Avenue South. The current schedule is that final overlay on both 42nd Avenue South and South 160th Street on October 9 and 10. During the time for the asphalt paving on 42nd Avenue South, traffic movement will be limited to local access only during work hours 7:00am-5:00pm. The electrical subcontractor is also installing private service connections to properties along 42nd Avenue South. The road construction contractor will also be continuing their work on miscellaneous items such as installation of modular block walls, guardrail work, landscaping, and concrete work. Seattle City Light finished installation of the major feeder and distribution cable on 42nd Avenue South. They will be working with the road construction contractor for private service connections through the next few weeks. crew continues their work on the new underground system, which is expected to continue for several weeks. There will be some traffic delays due to congestion with multiple working crews on site. '�� UM9k"�I4b i�wrrPM1�Iu • * 53rd Ave S: Estimated Completion: March !' 19 The contractor is making headway with the joint utility trench (JUT). They are tackling the hardest and most impactful section between 139th and 140th Street. Once completed this week, many of the full road closures due to trench crossings will be limited in the future. Public Works Bi-Weekly 10/05/18 Summary— Page 1 51 City of Tukwila Bi-Weekly Summary Public Works October 5, 2018 ° A " nHt p° ° s f Y a /!°h'��y, W �, ti 'r�' d 1'l J./ NRR ,nai' .. ,: Y Ik �$*"J n x4 rei ��'�ul r yip �i�"'�"`'r �% ,2 ✓$ 14 S I / "A u 'irak'r w a `"'brir 4r 41.E S �uY ril % µ jl�� �Cp4� �1 r V II'N 111IV li9 dy41'1 4V �r w9Vly�ill,ia "44' IIII fd�A' ee Estimated sidewalk and steel to install the contractor continues to work during the railroads This will allow the the railroad rather than "W 1 �Orv�lf rW'VI^�IYI l Iv iii vll� 1 I ,A& `f, Completion: be r a. .. ����'�' V✓✓7' /I/fF i Y v��{�i/�r"' ✓r� ✓ �s I1 ,p r h.,d ; Nar • BAR Bridge Rehabilitation: The contractor is working on the south side work on the bridge deck. They also continue pressure grouting for the footings. The on time. They were granted the ability to seasonal shutdown that occurs mid -October. contractor to finish all work that impacts shutdown for the season. 1, 1,'"'�; ruary !' ��� at µ 1 A RI • 2018 Small Drainage: Estimated Completion: Deco try beg '0 The contractor began work on the Gilliam Creek outfall location and the 180th St flood wall extension. Next week the catch basin repairs will commence on Interurban. • Green the Green: Estimated Completion: Deco try beg 2'020 Notice to Proceed issued September 24th. Contractor submitted schedule and is preparing other required documentation. • * CBD Sewer Rehabilitation 2017/2018: Estimated Completion: „„1 anua Ile ' n r Our contractor has completed the initial round of cleaning and video inspection and is scheduled to return starting the week of October 22nd to begin the slip lining portion of the project. Coordination with affected property owners/managers is ongoing in preparation for the final scope. Slip lining/repair is currently scheduled to be complete prior to the holiday moratorium. • Andover Park E Water/Sewer: Estimated Completion: 0 c to b ow '0 Final payment is being processed. Our contractor is slowly working through the closeout paperwork and we expect to take the project through Council for Acceptance soon. We have a request headed to Council for a new CM contract (previous contract expired prior to completion) to finalize the project documents and return to the City for appropriate archiving. Public Works Bi-Weekly 10/05/18 Summary— Page 2 52 City of Tukwila Bi-Weekly Summary Public Works October 5, 2018 • TUC Pedestrian/Bicycle,urtaii`irVete 121/1 Staff is trying to settle all the outstanding disputes with the contractor to close this project out. • S 144"' St Phase II: � ��u�ri���������� i`t�r���� t����l�° ����� t ��� t ���� �� 12 1������ ��,����017 Staff is finishing up the contract supplement, change orders and final pay estimate, to close this project out. • Major Maintenance on 3 Bridges: „Isl������������iu Wien t'���l�' ����� ;pie t „��� °�� °" � ,,������ 1 8 Grady Way Bridge, Frank Zepp Bridge (S 180th), Beacon Ave S Bridge All three projects are substantially complete, and the project is currently being closed out. Design Project Updates • Strander Blvd Ext Phase 3: Design continues. The consultant, Berger ABAM, is incorporating staff and other agency comments into the 30% design plans. The consultant continues to work with utility companies to coordinate relocation work. Staff have met with Berger ABAM and the City of Renton to review upcoming Value Engineering. • West Valley Highway: Staff met with KPFF to discuss the design contract. We continue to work with the design team to work towards an acceptable contract negotiation. • Boeing Access Rd over Airport Way Bridge: Six RFQ proposals were submitted. Staff is reviewing and scoring the submittals. From this process, a minimum of three firms will move forward to be interviewed by staff in late October. • S 196tI/200"' Street Bridge Repair: Staff anticipates the project to be advertised for bids late fall 2018 to allow for better construction pricing. • Tukwila 205 Levee Cert. Phase II: • Riverton Creek Flapgate Removal: Awaiting signed amendment #2 agreement from OTAK. • Gilliam Creek Fish Barrier Removal: PBS Environmental performing monthly water quality testing. • Chinook Wind: City placed 10th out of 15 in the RCO ALEA grant funding scoring. The grant manager believes that that the project is in a good enough position to receive funding • Stormwater Quality Retrofits: Awaiting grant agreement from DOE. Public Works Bi-Weekly 10/05/18 Summary— Page 3 53 City of Tukwila Bi-Weekly Summary Public Works October 5, 2018 Maintenance & Operations • Streets: Roadway: Cleaned out the dirt behind the jersey barrier on Interurban Ave South. Asphalted around new pedestrian crossing at S. 144th/46th Ave South, and re -graded the bridge approach on East Marginal Way South/S. 115th with asphalt. Pressure washed, cleaned, and swept all sidewalks under 1-5, 1-405, 509 due to pigeon droppings and litter. A resident came in to express his gratitude for the cleanup. Roadside: Continued hauling brush to Sunset Materials. Blew out all the remaining water from the irrigation lines and turned the controllers off for the winter. Started trimming islands in the CBD. Spraying blackberries on the R.O.W. and continued sweeping of the neighborhoods. Tree trimming along the slide area on Interurban Ave and on SCBLVD behind the jersey barrier. Painted graffiti under 200th bridge and bus stops on Tukwila International Blvd. Litter control throughout the city and bus stops, collected 10 truckloads of litter in the last 2 weeks. Finished cutting the outfalls for 2018. Signals: Install luminaire, and a new UPS and set up video detection at the signal at 87th/ East Marginal Way. Installed and activated Polara equipment at SCBLVD/ 61st Ave South. Put up new camera at SCPKWY/Strander Blvd. Picked up downed utility pole on SCBLVD near the bike lane. PMs on signal cabinets and line locates. • Water: Completed valve and hydrant maintenance inspection of Zone 7 (North Hill, S.144th Street, Interurban Ave, between 59th and 1-5) Started valve and hydrant maintenance inspection of Zone 8 (Interurban Ave, from 48th Ave South to 42nd Ave South). Repaired 2" service line at 290 Andover Park East. Completed asphalt and sidewalk restoration at 290 Andover Park East. Completed investigation of zero consumption meters. Repaired fire hydrant #195, located 402 Baker Blvd. • Sewer. Cleaned wet wells at Stations 2, 12, and 8. Pump one at Station 3 was running longer than it should. The crew pulled the pump and removed several pieces of rags from the pump and the check valve. The sewer crew worked the night shift this week jetting sewer lines in the CBD. This work is being done to get ahead of the contractor who is lining the mains in this area. • Surface Water:. Rented a 28 ton crane to remove debris from in front of the Gilliam Creek control structure, and the Gillion Creek outfall to the Green River. This is done annually before fall and winter rainfall. Removed several truckloads of watercress from ditches and streams around town. The plant overgrows the ditches and can cause localized flooding. Cleaned and replaced filters from the filter tanks on SCPKWY in the CBD. There was a total of 30 filter cartridges that needed to be changed out. Public Works Bi-Weekly 10/05/18 Summary— Page 4 54 City of Tukwila Bi-Weekly Summary Public Works October 5, 2018 • Facilities: City Hall Campus: Assisted in trash removal in HR director's office. Installed portable a/c unit serving PD Professional Standards Suite; waiting on new HVAC unit, toilet repaired in PD Major Crimes' Suite, and Locker repair in PD. TCC: Fire inspection, completed all corrections needed, installed new interface for chiller unit, Boiler pm completed, repaired panic hardware in banquet room, shower valve repair in women's locker room, and exterior brick pavers grouting underway. Fire Stations roof cleaning PMs complete for all fire stations — 51: HVAC repairs on the atrium unit. 53: Flagpole lighting repairs. Golf/Parks Maint: Separator cleaning completed. Parks: Cleaned roof at Crystal park. • Fleet: Fire: 5524, replaced windshield, coolant sensor and repaired deck monitor. 1820, transported forklift to Kent training and back. 5526, repaired seat belt, diagnosed SYS system, parts on order. Replaced cross lay ball valve, resealed pump shift cylinder, and corrected air brake system air leaks. Installed tablet mount. 5525, replaced officer's head phone jack. 5518 L-54, out of service for annual ladder test. PD: 1018 CDU trailer, replaced tongue jack and trailer battery. 1916, installed tablet mounts and monitors. 1026 firearms trailer, installed new battery. 1725, flat repair and fixed rubbing brake pad mount. 1086 motorcycles, replaced rear tire. 1743, flat repair. ITS: 1223 van, flat repair. Parks/Rec: 1200 15 passenger van, replace fuel tank due to fuel theft. 1246 1-ton dump truck, replaced air door motor and temperature control module for defroster. Public Works: Street: 1460 sweeper, replaced gutter broom. 2301 backhoe, replaced 4 leaking hydraulic hoses. 1318 1-ton dump, replaced battery. 2201 pick up, replaced strobe and tail gate latch. 2308 10yd dump, replaced tire. 2004 message board, out of service for hoist cylinder repair. 2001 arrow board, rewired trailer tail lights. 1378 1-ton dump, replaced transmission range selector and brake light switch. Surface Water: 2311 Vactor, repaired hydraulic leak and replaced and set high pressure water relief valve. Water: 1428 backhoe, service call to repair broken fitting on bucket thumb.15 PMs complete 8903, 15 passenger recreation van placed in service. Ir�is*PfUDDD�JiII friffid Public Works Bi-Weekly 10/05/18 Summary— Page 5 55