Loading...
HomeMy WebLinkAboutCOW 2018-10-22 Item 4G - Public Safety Plan - New Fire Station 54 Site Demolition Contract Amendment #2 with Lydig Construction for $67,998 Plus TaxCOUNCIL AGENDA SYNOPSIS Initials Meet/ ng Date Prepared by Mayor's rev' w Council review 10/22/18 RB ,,Lt ITEM INFORMATION ITEM No. 4.G. & Spec 2.C. STAFF SPONSOR: RACHEL BIANCHI ORIGINAL AGENDA DATE: 10/22/18 AGENDA ITEM TITLE Contract amendment number 2 for Lydig construction to add demolition scope of the future 54 site. CATEGORY DzIraission Mtg Date 10/22/18 Z Motion Aug Date 10/22/18 E Resolution Mtg Date E Ordinance TEg Date E Bid .42varcl Mtg Date E Public Hearing AN Date E Other Mtg Date SPONSOR "o nil ZMayor El FIR EDCD 'inance Fire Tic 0P&R Police W Court SP oNSoit.' s The Council is being asked to approve a contract amendment with Lydig construction for SUMMARY demolition of the structures at the property purchased to site the new fire station 54. The amendment does not increase the cost of the contract due to the lack of need for preconstruction services for a new Fire station 54; this amendment simply adds the demolition to the contractor's scope of work. REvii\x/iM BY Z C.O.W. Mtg. E CDN Comm 0 Finance Comm. 0 Public Safety Comm. E Trans &Infrastructure Arts Comm. 0 Parks Comm. 0 Planning Comm. DATE: 10/22/18 COMMITTEE CHAIR: N/A RECOMMENDATIONS: SPoNsoR/ADmiN. CommiTivr- Mayor's Office; Forward to 10/22/18 C.O.W and Special Mtg. to follow No Committee per Council President COST IMPACT / FUND SOURCE ExITNDITuRI REQUIR1,1) AMOUNT BUDGETED APPROPRIATION REQUIRED $67,998 plus tax $ $ Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 10/22/18 MTG. DATE ATTACHMENTS 10/22/18 Informational Memorandum dated October 16, 2018 Proposed Contract Amendment 1 Al 164 City of Tukwila Allan Ekberg, Mayor INFORMATIONAL MEMORANDUM TO: City Council FROM: Rachel Bianchi, Deputy City Administrator CC: Mayor Ekberg DATE: October 16, 2018 SUBJECT: Lydig GCCM Contract Amendment for Demolition of existing structures on future Fire Station 54 site ISSUE The City purchased the property at 42nd Ave. S. between S. 139th and S. 140th earlier this year in anticipation of siting the new Fire Station 54 at this location. Since that time, the Council has chosen to defer construction of the building. The existing structures on the site — a single family home that has been long vacant and a former greenhouse — are a public nuisance and need to be demolished. The Administration proposes to amend the GCCM preconstruction services contract with Lydig Construction, the GCCM already contracted to complete the Fire Station projects, to demolish the buildings. BACKGROUND In November of 2016, the voters in Tukwila approved the City's Public Safety Bond as a part of the overall Public Safety Plan. Higher than expected construction cost escalation rate as well as extremely saturated construction market in the greater Seattle area have resulted in the construction budgets much higher than originally anticipated in the Bond measure. As a result, Fire Station 54 was removed from the program and Public Works scaled to the original budget of $30M. In November 20, 2018, the City signed a GCCM contract with Lydig for Fire Stations 51, 52 and 54, including $372,000 in preconstruction services. In July, the City authorized Amendment 1 to Lydig's contract which removed Fire Station 54 from the contract. In order to accomplish the demolition of the structures on the site, the demolition scope must be included in the contract. However, the savings in preconstruction services from not moving ahead with building the new 54 will cover the cost of demolition services, and no additional funds are needed. Council is simply being asked to modify the scope to include demolition. At the City's request, Lydig has completed a competitive bid process for the demolition of existing structures on the future Fire Station 54 site. The City seeks to amend Lydig's scope of work for preconstruction services to include demolition of these existing structures. The cost of this effort is approx. $67,998 plus Washington State sales tax, to complete the demolition of existing structures and is within the already approved preconstruction budget. RECOMMENDATION The Council is being asked to authorize the Mayor to sign Amendment 2 to Lydig's GCCM pre - construction services contract for the demolition of existing structures at the future Fire Station 54 site after the October 22, 2018 C.O.W. at the Special Meeting that same night. ATTACHMENTS 165 Lydig Contract Amendment 2 166 SECOND AMENDMENT TO CONTRACT 18-001 AIA DOCUMENT A133-2009 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER FOR TUKWILA FIRE STATIONS 51, 52, AND 54 , This Second Amendment (the "Second Amendment"), effective as of , 2018 (the "Effective Date"), is entered into by and between CITY OF TUKWILA ("Owner"), and LYDIG CONSTRUCTION ("Contractor"). This Second Amendment is an addition to and modifies the AIA Document A133-2009 Standard Form of Agreement Between Owner and Construction Manager for the Tukwila Fire Stations 51, 52, and 53, dated August 7, 2018, and the AIA Document A201-2007 General Conditions of the Contract for Construction (collectively, the "Agreement"). This Second Amendment incorporates the contractual obligations outlined in the Agreement and prior amendment, and modifies them as stated below. Unless defined differently herein, all capitalized terms in this Second Amendment have the same meaning as in the Agreement. Now for and in consideration of the mutual promises contained herein and other good and valuable consideration, the receipt of which is hereby acknowledged, the parties agree as follows: 1. Addition of Fire Station 54 Demolition to the Project. The Project, as defined in AIA Document A133 and in Section 1.1.4 of AIA Document A201, is revised to include the demolition and removal of all existing structures on the Fire Station 54 site, including the foundations of those structures. For the sake of clarity, this Second Amendment adds the demolition and removal of Fire Station 54 structures to the Project notwithstanding the prior First Amendment's removal of all Work related to Fire Station 54. This Second Amendment supersedes Section 1 of the First Amendment, but only to the extent of the Work related to demolition and removal of the existing structures on the Fire Station 54 site. 2. Cost for Fire Station 54 Demolition. Contractor's costs related to the demolition and removal work described in the preceding paragraph shall not exceed Sixty -Seven Thousand Nine Hundred Ninety -Eight Dollars ($67,998), plus WSST. This amount is included in the Preconstruction Services Amount as stated in Section 2.1.4.1 of the AIA Document A133, which the parties confirm remains Three Hundred Seventy -Two Thousand Dollars ($372,000) and is not changed by the Second Amendment. 3. All other terms and conditions of the Agreement remain unchanged and are hereby ratified and confirmed. IN WITNESS WHEREOF, the Parties have executed this Second Amendment as of the dates shown below. CITY OF TUKWILA LYDIG CONSTRUCTION OWNER (Signature) CONSTRUCTION MANAGER (Signature) (Printed name and title) (Printed name and title) 1AET1801756.DOC;1/05720.000001/ 167