Loading...
HomeMy WebLinkAboutTIC 2018-11-26 Item 2D - Discussion - Design and Funding Options for South 140th Street / Tukwila International Boulevard Intersection ImprovementsAllan Ekberg, Mayor Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director >Lib. BY: Cyndy Knighton, Senior Program Manager CC: Mayor Ekberg DATE: November 21, 2018 SUBJECT: S 140th Street Intersection Improvements Design and Funding Options ISSUE Discuss the design and funding options for the Rectangular Rapid Flashing Beacon (RRFB) on Tukwila International Boulevard (TIB) near the Abu Bakr Islamic Center. BACKGROUND Staff has been working diligently on addressing pedestrian crossing safety in the vicinity of Abu Bakr over the past several months. In coordination with the Transportation and Infrastructure Committee, Council and Mohammed Jama, Executive Director of the Abu Bakr Islamic Center, several options for locating an RRFB on TIB have been studied. DISCUSSION KPG, the design consultant hired to develop the construction plans, has developed conceptual layouts for two potential locations. Location 1 is on the north side of the S 141st Street/TIB intersection, north of Abu Bakr. This is the preferred location as it can be constructed in phases, if necessary, and provides the best visibility for pedestrians. Location 2 is south of S 141st Street and Abu Bakr, in the middle of the Knight's Inn parcel. This option is less desirable from a safety perspective due to more limited visibility for pedestrians and cannot be built in phases. Staff recommends and supportive of having RRFBs at both locations. FINANCIAL IMPACT The current preliminary estimate for the construction of the RRFB at Location 1 is $200,000, $100,000 for Location 2, plus a design cost of $50,000. A grant application has been submitted to the Transportation Improvement Board, but notification on project selection will occur after this information memorandum is published. Staff will update the Committee during the meeting as to the availability of grant funding or if City -only funds will be necessary. If the Council elects to have both locations installed at the same time, staff estimates the total construction costs for two locations at approximately $300,000 and design cost of $50,000 for a total cost of $350,000. RECOMMENDATION Mayor recommends proceeding with the design and construction of the RRFB at both Location 1 & 2 and is supportive of proceeding with design and construction of both locations, if that is the direction of the committee. TIMELINE 2019 (February) Complete final plans, specs, and estimate. Project to be bid 2019 (March) Construction Bid advertisement Procurement 2019 (April -June) Construction ATTACHMENTS RRFB Locations Map w:Ipw englprojectsla- iw & rs projectsks 140th St Oh intersection imprvmnts (91610405)IdesignIrdb at abu bakrlinfo memo update to tic on design 8 funding 11-26-18.docx 103 104 LOCATION 1 - NORTH SIDE OF S 141ST Si LOCATION 2 co 0 cn 0 ce a. C E T• c 115'' E o tb` . Eo EE 0 Eq 8E:1 E C C 00 2.; 2c FCo ., -4? 0 E • s0 O C JD CO -0 5 9, '0 ° 9 • a t C • 4• 11.,) • • I • IS 15144 S 2▪ ,5 • # •1 • • • • • • • • • • 44 a • • a t7 • 4 . i 4 O 44 h 4 I 0 0 0 0 a II' 1•1'• • — 4. 0 • .1 • 2 a re • • g • # • 6 9 •