ITEM INFORMATION
ITEM No.
3.B. &
Spec 2.F.
STAIT SpoNsoR: RACHEL BIANCHI
ORIGINAL AGIADA DAM: 12/10/18
AGEND, Inm TITLF Amendment to Weinstein Architects & Urban Designers contract #17-068
CATIc()Ry 11 DzIlvussion
12/10/18
Z Motion
AND ale 12/10/18
E Resolution
Altg Date
E Ordinance
Meg Dale
Bid Award
Altg Date
. Public Hearin c
E Other
Mtg Date
Mt Date
Al tg Date
SPONSOR Council U. Mayor F[R JDCD EFiriance E Fire TS El P&R Police JPW DCourt
SPoNsoR'S Staff is seeking approval on an amendment to Weinstein Architects and Engineering
SUMMARY contract to align with the Washington State Architect and Engineering Fee Guidelines.
R"11'N1'1) BY E C.O.W. Mtg. CDN Comm El Finance Comm.
El Trans &Infrastructure Arts Comm. Parks Comm.
DATE: 12/3/18 COMMITTEE CHAIR: HOUGARDY
11 Public Safety Comm.
El Planning Comm.
RECOMMENDATIONS:
SPoNsoR/ADmIN.
Commumr:
Mayor's Office
Forward to C.O.W./Special Mtg of 12/10/18
COST IMPACT / FUND SOURCE
FAIT:NI-mum,. RkQUIRLD AMOUNT BUDGETED APPROPRIATION REQUIRED
$ $ $
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
12/10/18
MTG. DATE
ATTACHMENTS
12/10/18
Informational Memorandum dated 11/28/18
Weinstein Architects & Urban Designers Amendment No. 2 to Contract #17-068
Minutes from the Public Safety Com. Meeting of 12/3/18
13
14
TO:
FROM:
CC:
DATE:
City of Tukwila
Allan Ekberg, Mayor
INFORMATIONAL MEMORANDUM
Public Safety Committee
Rachel Bianchi, Deputy City Administrator
Mayor Ekberg
November 28, 2018
SUBJECT: Architect's Amendment # 2 to Contract #17-068 for Fire Stations #51 & #52
ISSUE
The City issued the architect's and engineering (A&E) contract with Weinstein Architects
and Urban Designers (WAU) for the design of three fire stations in April of 2017. At that time,
the contract was based on the City's original 2016 estimates for the three fire stations. The
contract was amended July 2018 to reflect the updated construction costs, as well as the
deletion of the new Fire Station 54. However, at that time the additional costs to stations 51 and
52 resulting from removing Fire Station 54 (approximately 5% per station) were inadvertently left
out, resulting in the need to update WAU's contract to reflect the firm's actual fees, which are
tied to the construction costs. In addition, there are some additional fees previously discussed
with Council for making Fire Station 52 a drive -through station and retaining various alternates
associated with each station.
The Council is being asked to approve a contract amendment with WAU for the increase in the
amount of $383,462 in order to compensate the A&E team according to the Washington's
State's A&E Fee Guidelines for their services, as well as some additional services required to
carry out the project designs. This increase is within the existing budget for Fire Stations 51 and
52.
BACKGROUND
In November of 2016, the voters in Tukwila approved the City's Public Safety Bond as a part of
the overall Public Safety Plan. Included in the bond is funding for building three fire stations to
reduce the risk of earthquake damage and provide equitable and improved response times.
By early summer of 2018, the design team completed the programming, site analysis and
estimating for the three stations. Last July, the Council directed the team to remove Fire Station
54 from the Public Safety Plan. The Schematic Design, Design Development and most of
Construction Documents phases of station 51 has been completed. The Schematic Design
phase of station 52 is well underway.
For station 51, the GCCM is planning to bid the subcontractor packages starting in January, and
the start of construction is scheduled to begin in late March. For station 52, the early site work
is scheduled to start in summer of 2019, and the building construction will follow in the late
fall/early winter.
The total original contract amount was proportionally based on the construction costs (including
tax and pre -construction costs) which was approximately $15.36M for three stations. The
updated construction cost estimate for station 51 & 52 is approximately $ 20.1 M. This estimate
includes the additional costs to accommodate the drive -through design for station 52, as well as
all the alternates approved by the council. The previous contract amendment did not include the
necessary fee increase to reflect the higher construction budget and must be amended to align
with the Washington State's A&E Fee Guidelines.
15
INFORMATIONAL MEMO
Page 2
This increase is included within the Council approved overall project budget of $13.273M for
station 51 and $19.260M for station 52. No additional project budget increase is requested for
this amendment.
RECOMMENDATION
The Public Safety Committee is asked to approve the contract amendment no. 2 for services
with Weinstein AU. The staff asks that the contract be moved to the December 10, 2018
Committee of the Whole meeting and subsequent Special meeting that same evening
ATTACHMENTS
Proposed Amendment No. 2 to Contract 17-068
16
W:12018 Info Memos\Weinstein Amendment 2 Memo to Council.doc
SECOND AMENDMENT TO
CONSULTANT AGREEMENT FOR ARCHITECTURAL DESIGN AND PLANNING
SERVICES
FOR
TUKWILA FIRE STATIONS 51, 52, AND 54 PROJECT
This Second Amendment (the "Second Amendment"), effective as of , 2018 (the
"Effective Date"), is entered into by and between CITY OF TUKWILA, WASHINGTON
("City"), and WEINSTEIN AU, LLC ("Architect"). This Second Amendment is an addition to
and modifies the Consultant Agreement for Architectural Design and Planning Services between
the parties dated April 19, 2017 (the "Agreement"). This Second Amendment incorporates the
contractual obligations outlined in the Agreement, and modifies the Agreement as stated below.
Unless defined differently herein, all capitalized terms in this Second Amendment have the same
meaning as in the Agreement. Now for and in consideration of the mutual promises contained
herein and other good and valuable consideration, the receipt of which is hereby acknowledged,
the parties agree as follows:
1. Basis for Amendment. The original compensation for the Architect in the Agreement
was based on the construction costs for three fire stations and calculated with Washington State's
A/E Fee guidelines. The First Amendment deleted one fire station (Fire Station 54) from the
Agreement, but increased the compensation amount due to increased project costs on the
remaining two fire stations (Fire Station 51 and Fire Station 52) and additional services requested
by the City. This Second Amendment increases the compensation for the Architect according to
Washington State's A/E Fee guidelines because of increased project construction costs and
identifies the fees the City had incurred for Fire Station 54. This Second Amendment also
increases the compensation for the following additional services approved by the City:
AS13a FS51: Southcenter Pkwy Redesign Scope Adjustment $6,079
AS16 FS54: Rehab Concept Scope Development $1,563
AS 17 FS52: Drive -Through Added Drilling $10,120
AS18a FS51: Additional Civil Scope $12,760
AS18b FS52: Additional Civil Scope $16,500
AS20 FS51: Site Alternates Documentation Fees $37,360
Second Amendment Additional Services $84,382
2. Compensation. Architect's compensation for the Project shall be increased by a net total
of Three Hundred Eighty -Three Thousand Four Hundred Sixty -Two Dollars ($383,462).
Accordingly, Architect's total compensation for the Project will not exceed Two Million Eight
Hundred Sixty -Eight Seven Hundred Sixteen Dollars ($2,868,716), as further described in the
A/E Fee Reconciliation Summary dated November 26, 2018, which is attached as Exhibit A and
incorporated by this reference. All provisions of the Agreement referring to Architect's
compensation, including Exhibit B Article 11, shall be revised accordingly.
{AET1822272.DOC;2/05720.000001/ )
17
The Table of Fees on Page 5 of the Agreement shall be revised to read:
FS 51 Design and Construction $1,027,750
FS 52 Design and Construction $1,370,308
Subtotal $2,398,058
First Amendment Additional Services $148,051
Second Amendment Additional Services $84,382
Subtotal $232,433
Programming Phase (completed) $155,116
Site Selection (completed) $83,109
Subtotal $238,225
Total Fee
$2,868,716
3. All other terms and conditions of the Agreement remain unchanged and are hereby
ratified and confirmed.
IN WITNESS WHEREOF, the Parties have executed this Second Amendment as shown
below.
CITY OF TUKWILA WEINSTEIN AU, LLC
Allan Ekberg, Mayor
By:
(Signature)
Printed Name:
Title:
Attest/Authenticated: Approved as to Form:
City Clerk, Christy O'Flaherty Office of the City Attorney
{AET1822272.DOC;2/05720.000001/ } 2
18
Exhibit A
Please see the attached A/E Reconciliation Summary, dated November 26, 2018
{AET1822272.DOC;2/05720.000001/ } 3
19
20
TUKWILA FIRE STATIONS
Weinstein A+U
FS51 Additional Services Summary, Amendment #2
11/26/18
Basic Fee Change
Fee Increase per MACC $105,318
Reduced CA Fee -$10,000
$95,318
AS13a FS51: Southcenter Pkwy Redesign WHPacific $5,526
Scope Adjustment WAU Mark-up $553
TOTAL $6,079
AS16 FS54 Rehab Concept Scope Development K. Wild, 12,5hrs $1,563
TOTAL $1,563
AS18a FS51 Additional Civil Scope LPD $11,600
WAU Mark-up $1,160
TOTAL $12,760
AS20 FS51 Site Alternates Documentation Fees LPD $19,800
Swift $14,164
WAU Mark-up $3,396
TOTAL $37,360
TOTAL $153,080
21
TUKWILA FIRE STATIONS
Weinstein A-I-U
FS52 Additional Services Summary, Amendment #2
11/26/18
FS52 MACC Calculation (per Lydig conceptual estimate of 8/23/18)
Total cost of work $8,996,885
Admin Build -out $450,000
-27% for CA phase -$121,500
TOTAL $9, 325, 385
Sub bonds 1.50% $139,881
SUBTOTAL $9, 465, 266
Design Contingency 10.00% $946,527
SUBTOTAL $10, 411, 792
L&M Escalation - January 2020 $460,310
L&M Escalation - Early Start July 2019 $154,971
SUBTOTAL $11, 027, 073
CM Contingency 3,00% $330,812
Neg. Support Services $300,000
MACC TOTAL $11,657,886
Basic Fee Change Fee Increase per MACC $213,762
Reduced CA Fee -$10,000
$203,762
AS17 FS52 Drive -Through Added Drilling Hart Crowser $9,200
WAU Mark-up $920
TOTAL $10,120
AS18b FS52 Additional Civil Scope LPD $15,000
WAU Mark-up $1,500
TOTAL $16,500
TOTAL $230,382
22
Weinstein A+U
Tukwila Fire Stations
Fee Proposal
FS51 Fee Calculation
Amendment #2
Baseline Building Area
Site Area
Project (MACC) per 8/15/18 Estimate
NE Base Service Per WA State Fee Schedule 2015 - Type "B"
Assumes a 15 Month Construction Period
Percent Fee
Total Base Fee b Phase
November 26, 2018
BASIC SERVICES (Scope per State Fee Schedule Guidelines)
Description
Architectural
Consultant Budgets
Structural
Specifications
Mechanical, Plumbing & Fire Protection
Electrical, Fire Alarm and Lighting
Civil (Basic Scope)
BASIC PHASE' SUBTOTALS .
Firm
Weinstein AIU
Swenson Say Faget
Axt
Greenbusch
Travis Fitzmaurice
LPD
11,933 SF
+/-85,000 SF
$8,457,576
8.23%
COMPLETE
18%
$125,291
COMPLETE
25%
$174,015
ee Summa
027,751
Total Basic Fee = $650,496
Total Extra Services = $355,131
Total Reimbursable Allowar $22,124
-ictai based
26% 2% 27 % 2% 100% Ja ;;us';
$180,975 $13,921 $187,936 $13,921 $696,059 ri'-lev.
De i Construction Bidding+" Contract
Documents Negotiation Administration Close Ou
58,241 80,890 107,745 8,256 122,500 8,673
12,996 18,050 16,718 1,286 17,361 1,286
4,500 6,250 15,834 1,250 5,833 833
18,057 25,079 22,732 1,749 23,606 1,749
11,340 15,750 16,380 1,260 17,010 1,260
1,084 1,506 1,566 120 1,626 120
147,525 180,975 13,921, . _ 187,9.36 13;921
TOTA
$386,305
$67,697
$34,500
$92,972
$63,000
$6,022
650496
EXTRA SERVICES SUBTOTAL (See following page for detail)
$355,131
REIMBURSABLES ALLOWANCE
Reimbursable allowance - Fixed Fee (2% of Total Fee)
SUBTOTAL WIWAU Multiplier 10%;
TOTAL FEE PROPOSAL
Previous Basic Fee Total
Delta
WAU
$20,113
22124
$932,433
$95,318
TFS_MainContractFeeRevision November18 FINAL
Printed: 11/26/2018
Weinstein A+U
Tukwila Fire Stations
Fee Proposal
FS52 Fee Calculation
Amendment #2
Baseline Building Area
Site Area
Project (MACC) per 8/23/18 Estimate
NE Base Service Per WA State Fee Schedule 2015 - Type "B"
Assumes a 15 Month Construction Period
Percent Fee
Total Base Fee b Phase
November 26, 2018
15,500 SF
+/- 60,000 SF
$11,657,886
7.87%
18%
$165,146
25%
$229,369
26
$238,544
Fee Su
$1,370,308
2%
$18,350
27%
$247,718
Total Basic Fee =
Total Extra Services =
Total Reimbursable Allowar
$917,476
$423,334
$29,498
2%
$18,350
100%
$917,476
BASIC SERVICES (Scope per State Fee Schedule Guidelines)
Description
Fir,
Schematic Design Construction Bidding + Contract
Design Development Documents Negotiation Administration
Close Out
TOTAL
Architectural
Consultant Budgets
Weinstein AIU
113,633
157,824
164,137
12,626
170,450
12,626
$631,296
Structural
Specifications
Mechanical, Plumbing & Fire Protection
Electrical, Fire Alarm and Lighting
Civil (Basic Scope)
BASIC PHASE SUBTOTALS
Swenson Say Faget
Axt
Greenbusch
Travis Fitzmaurice
LPD
15,385
1,406
21,501
11,700
1,519
21,370
1,953
29,862
16,250
2,110
22,225
2,969
31,056
16,900
2,194
1,710
234
2,389
1,300
169
23,080
1,094
32,251
17,550
2,279
1,710
156
2,389
1,300
169
166,144 229,369 239,481 : ` 18,428 ,', 246,703 18,350
$85,480
$7,812
$119,448
$65,000
$8,440
7,476
EXTRA SERVICES SUBTOTAL (See following page
or detail)
$423,334
REIMBURSA
Reimbursable allowance - Fixed Fee (2% of Total Fee)
SUBTOTAL Wi;'NJAU Multiplier 10% . .
TOTAL FEE PROPOSAL
Previous Basic Fee Total
Delta
WAU
$26,816
29,498
$1,166,546
$203,762
TFS MainContractFeeRevision November18 FINAL
Printed: 11/26/2018
City of Tukwila
City Council Public Safety Committee
PUBLIC SAFETY COMMITTEE
Meeting Minutes
December 3, 2018 - 5:30 p.m. - Hazelnut Conference Room, City Hall
Councilmembers: Kathy Hougardy, Chair; Dennis Robertson, Thomas McLeod
Staff: David Cline, Raejean Kreel, Bruce Linton, Rachel Bianchi, Trish Kinlow, Kim
Walden, Chris Flores, Jay Wittwer, Laurel Humphrey
CALL TO ORDER: Chair Hougardy called the meeting to order at 5:30 p.m.
I. ANNOUNCEMENT
II. BUSINESS AGENDA
A. Resolution: 2018 Comprehensive Emergency Management Plan
Staff is seeking Council approval of a resolution that adopt the City of Tukwila 2018
Comprehensive Emergency Management Plan (CEMP). Staff is proposing no changes to the
CEMP that was adopted in 2014 at this time, but state law requires renewal every five years in
order to maintain eligibility for federal grants. A more thorough review and update will be
conducted in 2019. UNANIMOUS APPROVAL. FORWARD TO DECEMBER 10, 2018 SPECIAL
CONSENT AGENDA.
B. Fire Department Purchase of Extrication Equipment
Staff is seeking Council approval to purchase four sets of extrication equipment ("jaws of life")
in the amount of $100,590.30 using Public Safety Plan bond funds. The current equipment is
fourteen years old and needs replacing. The proposed new equipment is battery powered,
more environmentally responsible, stronger, and designed to defeat modern vehicle design
and construction. Committee members expressed support for the purchase but requested a
single page showing the total cost. UNANIMOUS APPROVAL. FORWARD TO DECEMBER 10,
2018 SPECIAL CONSENT AGENDA.
C. Contract Amendment: Weinstein Architects and Urban Designers
Staff is seeking Council approval of Amendment No. 2 to Contract 17-068 in the amount of
$383,462 with Weinstein Architects & Urban Designers for the design of the new fire stations.
This addition will compensate the A&E team for the approximately 5% of additional costs to
Stations 51 and 52 that resulted from the removal of Station 54. There are also some additional
fees associated with the Council's decision to make Station 52 a drive -through station and
retaining various alternates associated with each station. The increase to the contract is within
the existing Council -approved budget for Stations 51 and 52. Mr. Goldblatt stated that this
amendment will capture the A&E scope for the rest of the project. UNANIMOUS APPROVAL.
FORWARD TO DECEMBER 10, 2018 COMMITTEE OF THE WHOLE AND SPECIAL MEETING.