HomeMy WebLinkAboutPermit D14-0091 - STENSON RESIDENCE - GARAGE DEMOLITIONSTENSON GARAGE DEMO
15404 40 AVE S
D14-0091
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.gov
DEVELOPMENT PERMIT
Parcel No: 0043000266
Address: 15404 40 AVE S
Project Name: STENSON GARAGE DEMOLITION
Permit Number: D14-0091
Issue Date: 4/21/2014
Permit Expires On: 10/18/2014
Owner:
Name: FLS DEVELOPMENT LLC
Address: 1801 S 93RD ST #C-27 , SEATTLE, WA,
98108
Contact Person:
Name: LEE STENSON Phone: (206) 423-8425
Address: 155 SW 152 ST, BURIEN, WA, 98166
Contractor:
Name: F LEE STENSON INC. Phone: (206) 241-7738
Address: 155 SW 152ND ST UNIT A, SEATTLE,
WA, 98166
License No: FLEESI*122CA Expiration Date: 3/7/2015
Lender:
Name: N/A ( $5,000.00
Address:
III
DESCRIPTION OF WORK:
REMOVE EXISTING 600 SQ FT OUT BUILDING
Project Valuation: $2,000.00
Type of Fire Protection: Sprinklers:
Fire Alarm:
Fees Collected: $224.66
Type of Construction: VB Occupancy per IBC: U
Electrical Service Provided by: TUKWILA FIRE SERVICE Water District: 125
Sewer District: VALLEY VIEW SEWER SERVICE
Current Codes adopted by the City of Tukwila:
Internations Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
2012 International Fuel Gas Code:
2012 WA Cities Electrical Code:
2012 WA State Energy Code:
2012
2012
2012
2012
Public Works Activities:
Channelization/Striping:
Curb Cut/Access/Sidewalk:
Fire Loop Hydrant:
Flood Control Zone:
Hauling/Oversize Load:
Land Altering:
Landscape Irrigation:
Sanitary Side Sewer:
Sewer Main Extension:
Storm Drainage:
Street Use:
Water Main Extension:
Water Meter:
Volumes: Cut: 0 Fill: 0
Number: 0
No
Permit Center Authorized Signature:
Date:
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
development permit and agree to the conditions attached to this permit.
y
Signature: Date: 4 0/
Print Na e: A Jm/
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or
if the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: ***BUILDING PERMIT CONDITIONS***
2: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
3: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector
based on satisfactory completion of this requirement.
5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the
City of Tukwila Building Department (206-431-3670).
6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the
City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or
other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
8: Temporary erosion control measures shall be implemented as the first order of business to prevent
sedimentation off -site or into existing drainage facilities.
9: The site shall have permanent erosion control measures in place as soon as possible after final grading has
been completed and prior to the Final Inspection.
10: From October 1 through April 30, cover any slopes and stockpiles that are 3H:1V or steeper and have a
vertical rise of 10 feet or more and will be unworked for greater than 12 hours. During this time period,
cover or mulch other disturbed areas, if they will be unworked more than 2 days. Covered material must
be stockpiled on site at the beginning of this period. Inspect and maintain this stabilization weekly and
immediately before, during and following storms.
11: From May 1 through September 30, inspect and maintain temporary erosion prevention and sediment at
least monthly. All disturbed areas of the site shall be permanently stabilized prior to final construction
approval.
12: Any material spilled onto any street shall be cleaned up immediately.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1700 BUILDING FINAL**
0101 PRE -CONSTRUCTION
CITY OF TUKW-
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
Building Perna.. No. .t om 006,(
Project No.
Date Application Accepted: ?)`-{
' ry /1
Date Application Expires:
(For office use only)
CONSTRUCTION PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**Please Print**
SITE LOCATION
Site Address: A.5--'41 U1-/ y 0 -S
Tenant Name: Si P A/3 U4/
King Co Assessor's Tax No.: t." S Gd ..` 4 -6
Suite Number: Floor:
New Tenant: ❑ Yes o
PROPERTY OWNER
Name: fi 3 f1' f G"!• i.e.'', el,,tr s.. /i
x I. _.,._
Address
City: /? f/,r1 //='4.,State: 1.4, /1
Zip: 9,l<d
CONTACT PERSON — person receiving all project
communication
Name: 6//45
57tr it' 0 A,,,,,,r
Address:` f, -,
,- c"./ i 4"y :2 5 t.,
City: A 6,;rq
, w./ Stater /1 Zip:.t r
s
6
Phone , _ d/
? ' k'e/G� x:
Emai 14(fr:. s: / /'",Coovt!, o,9ti) `. con,
GENERAL CONTRACTOR INFORMATION
Company
Address45...r. 5.€4,r /1,, :d S 7
City: `} c.",,fix r`"F- /i State: t. 44 Ztp` '%6
'
Phon y. _iat 3. %,1 s. ax:
Contr Reg N,pi 0 0 s.1 40/2 7e.AExp Date: 3/2 ax --
Tukwila Business License No.: 0,c/9 r /
ARCHITECT OF RECORD
Company Name:
Nif
Architect Name:
Address:
City:
State:
Zip:
Phone:
Fax:
Email:
ENGINEER OF RECORD
Company Name:
Engineer Name:
Address:
City:
State:
Zip:
Phone:
Fax:
Email:
LENDER/BOND ISSUED (required for projects $5,000 or
greater per RCW 19.27.095)
Name:
fI_
f
Address:
City:
State:
Zip:
H:\Applications\Forms-Applications On Line 12012 Applications\Permit Application Revised - 2-1-12.docx
Revised: February 2012
hh
Page 1 of 4
BUILDING PERMIT INFORMATIOI 106-431-3670
001
Valuation of Project (contractor's bid price): $ .20
♦,P
Existing Building Valuation: $ 4-5-0OO
Describe the scope of work (please provide detailed information):
Will there be new rack storage? ❑ ....Yes
21..No If yes, a separate permit and plan submittal will be required.
Provide All Building Areas in Square Footage Below
Existing
Interior Remodel
Addition to
Existing
Structure
New
Type of
Construction per
IBC
Type of
Occupancy per
IBC
Ica' Floor
2nd Floor
3rd Floor
Floors thru
Basement
Accessory Structure*
Attached Garage
Detached Garage
0
Attached Carport
Detached Carport
Covered Deck
Uncovered Deck
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard: Compact: Handicap:
Will there be a change in use? ❑ Yes 0 No If "yes", explain:
FIRE PROTECTION/HAZARDOUS MATERIALS:
❑ Sprinklers ❑ Automatic Fire Alarm „[2] None ❑ Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes 0 No
If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets.
SEPTIC SYSTEM
❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H: Applications\Forms-Applications On Line\2012 Applications\permit Application Revised - 2-7-12.docx
Revised: February 2012
bh
Page 2 of 4
PUBLIC WORKS PERMIT INFC 'ATION — 206-433-0179
Scope of Work (please provide detailed information):
7'O fi F i7 v v /S tom'" S OM
Call before you Dig: 811
Please refer to Public Works Bulletin #1 for fees and estimate sheet.
Water District
❑ .. Tukwila WI... Water District # 125
❑ .. Water Availability Provided
Sewer District
❑ .. Tukwila
❑ .. Sewer Use Certificate
('...Valley View
❑ ...Sewer Availability Provided
❑... Highline
❑... Renton
❑...Renton ❑... Seattle
-t-
Septic System:
0 On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department.
Submitted with Application (mark boxes which apply):
❑ .. Civil Plans (Maximum Paper Size — 22" x 34")
❑ .. Technical Information Report (Storm Drainage)
0 .. Bond 0... Insurance ❑... Easement(s)
Proposed Activities (mark boxes that applv):
❑ .. Right-of-way Use - Nonprofit for Tess than 72 hours
❑ .. Right-of-way Use - No Disturbance
❑ .. Construction/Excavation/Fill - Right-of-way ❑
Non Right-of-way WI
❑ .. Total Cut t?
❑ .. Total Fill C
cubic yards
cubic yards
❑ .. Sanitary Side Sewer
❑ .. Cap or Remove Utilities
❑ .. Frontage Improvements
❑ .. Traffic Control
❑ .. Backflow Prevention - Fire Protection
Irrigation
Domestic Water
❑... Geotechnical Report
O ...Maintenance Agreement(s)
❑ .. Traffic Impact Analysis
❑ .. Hold Harmless — (SAO)
❑ .. lold I !armless — (ROW)
0...Right-of-way Use - Profit for less than 72 hours
0...Right-of-way Use — Potential Disturbance
O ...Work in Flood Zone
0...Storm Drainage
0...Abandon Septic Tank
❑...Curb Cut
0...Pavement Cut
0...Looped Fire Line
0...Grease Interceptor
❑... Channelization
❑...Trench Excavation
0...Utility Undergrounding
❑ .. Permanent Water Meter Size (1) " WO # (2) " WO # (3) " WO #
❑ .. Temporary Water Meter Size (1) " WO # (2) " WO # (3) " WO #
❑ .. Water Only Meter Size 1 3 WO # ❑ .. Deduct Water Meter Size "
❑ .. Sewer Main Extension Public 0 Private 0
❑ .. Water Main Extension Public 0 Private 0
FINANCE INFORMATION
Fire Line Size at Property Line Number of Public Fire Hydrant(s)
❑ .. Water ❑ .. Sewer ❑ .. Sewage Treatment
Monthly Service Billing to:
Name: Day Telephone:
Mailing Address:
City State Zip
Water Meter Refund/Billing:
Name:
Mailing Address:
Day Telephone:
City
State Zip
11:\ApplicationsWorms-Applications On Line\2012 Applicalions\Permit Application Revised - 2-7-12.docx
Revised: February 2012
Page 3 of 4
PERMIT APPLICATION NOTES —
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OW ER R AUTHORIZED AGENT:
Signature:
Print Name: I s S Tr Ai' v
Mailing Address: f._i ,- 5 6c," AS" 1
Date: /e 1/ /
Day Telephone:1 - if) -3 if 4c2 $ T
City
State Zip
HAApplications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx
Revised: February 2012
bh
Page 4 of 4
Receipt Number
DESCRIPTIONS
PermitTRAK
ACCOUNT QUANTITY
I PAID
$140.48
D14-0091 Address: 15404 40 AVE S
Apn: 0043000266
$140.48
DEVELOPMENT
$134.00
PERMIT FEE
R000.322 100 00.00
$129.50
WASHINGTON STATE SURCHARGE
B640.237.114
$4.50
TECHNOLOGY FEE
$6.48
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R1855
R000.322.900.04.00
$6.48
$140.48
Date Paid: Monday, April 21, 2014
Paid By: FREDERICKLEE STENSON
Pay Method: CREDIT CARD 005293
Printed: Monday, April 21, 2014 9:02 AM 1 of 1
DESCRIPTIONS
PermitTRAK
ACCOUNT
QUANTITY
PAID
D14-0091 Address: 15404 40 AVE S Apn: 0043000266
$84.18
DEVELOPMENT
PLAN CHECK FEE
TOTAL FEES PAID BY RECEIPT: R1540
R000.345.830.00.00
$84.18
$84.18
$84.18
Date Paid: Thursday, March 20, 2014
Paid By: FREDERICK LEE STENSON
Pay Method: CREDIT CARD 025622
Printed: Thursday, March 20, 2014 10:26 AM 1 of 1
INSPECTION RECORD
Retain a copy with permit
INS PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 431-2451
Project: (��
71e N .l.€SNAU
Type g"i�rM spec,tion:
T- (N �
Address.
511 °1' 46
Date Called:
Special Instructions:
q�'L[?
23
Date Wanted:
�. I l C,.�
a
p.m.
Requster:
Phone
...2,14 i _773 e)
171.!roved per applicable codes. Corrections required prior to approval.
COMMENTS:
firA
Dats2
1-
ECTION FEE REQUIR D. Prior to net inspection. fee ust be
6300 Southcenter Blvd. Suite 100. 11 to schedule reel spection.
INSPECTION RECORD
Retain a copy with permit
IN P N PERMIT NO.
CITY OFTUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3S70
Permit Inspection Request Line (206) 431-2451
Project:
Lee S-1P1Jt 04\/
T1bof Inspe ion:
t<"t P - 'JE M c}
Address:
itiLYi 9 O ttv .S`
Date Called:
Special Instructions:
Date Wanted:
kequester:
Phone No:
Approved per applicable codes. Corrections required prior to approval.
OMMENTS:
•
41SPECTION FEE REt
d at 6300 Southcenter
IRED, Prior 6 next inspection, fee must be
tvd., Suite 100. Call to schedule reinspection.
REVISIONS
No changes shall be made to the scope
of work without prior approval of
Tukwila Building Division
NOTE: Revisions will require a new plan submitt,-1
and may include additional plan review fees.
PLANNING APPROVED •
No changes can be made to thes
plans without approval from the
Planning Division of DCD
Approved By:
Date: UN t o1 I I�
FILE CO
Permit No.
Plan review apptovvi stied
Approval of con suction documents
fhi violation of any adopted Mode or
nl approved Fi jicopYandoonhior*
v'
and missions.
not aLl.f,-., 1
. Receipt
acknowledged
My ltibtella
BUILDING DIVISION -
/ Lf) I I 410 r vci7--
Reduced stream buffer boundary (25')
Under permit .PW 13-0146
Existirgarage
To be removed
Existing roadway
Easement AFN 572ti I60
w11
/./4L
F. Lee Stenson Inc
155 SW 152 nd Street
Burien Wa
98166
Sewer line easement
SITE
A4E4
-2Qgo l
RECEIVED _
CIT OF TUKWILA
R 2 0 2014
PERM( CENTER
P-I 1
M A A/ µDLL
REVIEWED FOR
CODE COMPLIANCE
APPROVED
APR 0 4 2014
'la
VISION
RECEIVE"
MAR 212014
�I iir�av�
PUBLIC WORT
PERMIT COORD COPY
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: D14-0091 DATE: 03/20/14
PROJECT NAME: STENSON GARAGE DEMOLITION
SITE ADDRESS: 15404 40 AVE S
X Original Plan Submittal Revision # before Permit Issued
Response to Correction Letter # Revision # after Permit Issued
DEPARTMENTS:
AT O/C --
Building Division
Public Works
Fire Prevention
rthikmed
Structural
vL..Planning Divson
Permit Coordinator 11
PRELIMINARY REVIEW:
Not Applicable ❑
(no approval/review required)
DATE: 03/25/14
Structural Review Required
REVIEWER'S INITIALS: DATE:
El
APPROVALS OR CORRECTIONS:
Approved
Corrections Required
Approved with Conditions
Denied
(corrections entered in Reviews) (ie: Zoning Issues)
DUE DATE: 04/22/14
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
12/18/2013
F LEE STENSON INC
Page 1 of 3
0 Washington State Department of
Labor & Industries
F LEE STENSON INC
Owner or tradesperson
STENSON, FREDERICK LEE
Principals
STENSON, FREDERICK LEE STENSON,
CHARLENE (End: 01/01/1980)
Doing business as
F LEE STENSON INC
WA UBI No.
601 036 362
155 SW 152 ND STREET
SEATTLE, WA98166
206-241-7738
KING County
Business type
Corporation
Governing persons
CHARLENE STENSON FREDERICK L STENSON;
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor
License specialties
GENERAL
License no.
FLEESI*122CA
Effective — expiration
02/01/1988 — 03/07/2015
Bond
CBIC
Bond account no.
638940
Received by L&I
01/22/2002
Active.
Meets current requirements.
$12,000.00
Effective date
01/25/2002
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601036362&LIC=FLEESI* 122CA&SAW= 04/21/2014