Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit D14-0289 - LA VISTA APARTMENTS - REROOF
LA VISTA APARTMENTS 5555 S 152 ST D14-0289 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov DEVELOPMENT PERMIT 1157200221 Permit Number: 5555 S 152ND ST COMPLEX Project Name: LA VISTA APARTMENTS Issue Date: Permit Expires On: D14-0289 9/3/2014 3/2/2015 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: LA VISTA ESTATES APTS 10520 GRAVELLY LAKE DR SW , LAKEWOOD, WA, 98499 ED EHNAT 1015 145 ST S , TACOMA, WA, 98444 PREFERRED ROOF SERVICES INC 1015 145TH ST 5 , TACOMA, WA, 98444 PREFERS936QT Phone: (253) 381-8775 Phone: (253) 318-8918 Expiration Date: DESCRIPTION OF WORK: REMOVE EXISTING ROOF. PRS WILL NAIL DOWN OVER WOOD SUBSTRATE FR10 SHEET, MECHANICALLY ATTACH EPS TAPERED ROOF INSULATION, MECHANICALLY ATTACH TPO ROOF MEMBRANE, AND HEAT WELD SEAMS. (REFERENCE EXPIRED PERMIT D13-070 - NO INSPECTIONS.) Project Valuation: $26,800.00 Type of Fire Protection: Sprinklers: Fire Alarm: Type of Construction: IIB Fees Collected: $667.05 Occupancy per IBC: R-2 Electrical Service Provided by: TUKWILA FIRE SERVICE Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: 2012 2012 2012 2012 International Fuel Gas Code: WA Cities Electrical Code: WA State Energy Code: 2012 2012 2012 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Volumes: Cut: 0 Fill: 0 Number: 0 No Permit Center Authorized Signature: I hearby certify that I have read and provisions of law and ordinances gov xamin rning Date: d this permit and know the same to be true and correct. All his work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agrf o the conditions attached to this permit. Signature: Print Name: Date: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Fire retardant treated wood shall have a flame spread of not greater than 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 6: All wood to remain in placed concrete shall be treated wood. 7: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 8: All construction noise to be in compliance with Chapter 8.22 of the City of Tukwila Municipal Code. A copy can be obtained at City Hall in the office of the City Clerk. 9: Prior to final inspection for this building permit, a copy of the roof membrane manufacturer's warranty certificate shall be provided to the building inspector. 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** CITY OF T Y A Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building �r._. t No. 12241 Project No. Date Application Accepted: 1, - 0;1LI r, Date Application Expires: . 1 (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.: 2Na 2-2-1 Site Address: S 5-5 5 /S )n c) _J Suite Number: Floor: Tenant Name: titPC VAC Y' \T tV*t iftittitC New Tenant: ❑ Yes El .. No PROPERTY OWNER Name: Address: City: State: Zip: CONTACT PERSON - person receiving all project communication Name: Address: i City:--- la(C) 4.L� State CaCe, Zip:6 -<<, / 7, f Phone: sS J is _ i),, dc ? _ 3erl '0 771 Email: ,! 1Jrerl-P ( Ore' c -T v . [->; r Ci-, (6, / GENERAL CONTRACTOR INFORMATION Company Name: re tree KOcrr 3 e r tiAf t'S Address: Ij l p • I his T c f-{f' t i y City: 7 (owl r State q Zip: l Phone:-3_3ts>.4,5 /,% Fax: Contr Reg No.: fre e. r s i3 g Exp Date: 0 leg Is' Tukwila Business License No.: C'j148\ lift ARCHITECT OF RECORD Company Name: Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Company Name: Engineer Name: Address: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: Address: City: State: Zip: H:Wpplications\Forms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 1 of 4 BUILDING PERMIT INFORMET'C- 206-431-3670 Valuation of Project (contractor's bid price): $ d /' ke) e) Describe the sco e of wor (please provide detailed information): %cydc t7Ci i'7' i7'1vle 14/r//Ce tl-'e e4s- 71 rpc (i - �G r CCi!' S Fe/O,Aeet Existing Building Valuation: $ 1 L S L6j f/ i)C; L ��`CG- P7 awe bt Jer - e c 1175 } ir`) E` 1-C N P oerr rtt- QJ� P� n►3-vlp ..No Will there be new rack storage? ❑ ....Yes ❑ yes, a separate permit and plan. f yes, a separate permit planAubmittal will be required. Provide All Building Areas in Square Footage Below Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC Pt Floor 2nd Floor — 3rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes 0 No 1f 'yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:Wpplications\Forms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 2 of 4 PUBLIC WORKS PERMIT )" T MATION — 206-433-0179 Scope of Work (please provide detailed information): Ca11 before you Dig: 811 Water District ❑ .. Tukwila ❑ .. Water Availability Provio`, d Sewer District ❑ .. Tukwila ❑ .. Sewer Use Certificate Septic System: ❑ On -site Septic System — For on -site se Please refer to Public Works Bulletin #1 for fees and estimate sheet. 0 ...Water District #125 ❑... Highline .Valley View 0...Renton ewer Availability Provided ❑... Renton 0... S r tle c system, provide 2 copies of a current septic design proved by King County Health Department. Submitted with Application (mark boxes wh'i h apply): ❑ .. Civil Plans (Maximum Paper Size — 22" 4") ❑ .. Technical Information Report (Storm Draina_• �, ❑... Geotechnical s port ❑ .. Bond 0... Insurance ❑.. ' sement(s) ❑... Maintenanc Agreement(s) Proposed Activities (mark boxes that apply): ❑ .. Right-of-way Use - Nonprofit for less than 72 hours ❑ .. Right-of-way Use - No Disturbance ❑ .. Construction/Excavation/Fill - Right-of-way ❑ Non Right-of-way 0 ❑ .. Total Cut ❑ .. Total Fill cubic yards cubic yards ❑ .. Sanitary Side Sewer ❑ .. Cap or Remove Utilities ❑ .. Frontage Improvements ❑ .. Traffic Control ❑ .. Backflow Prevention - Fire Protection Irrigation Domestic Water ❑ .. Permanent Water Meter Size (1) ❑ .. Temporary Water Meter Size (1) ❑ .. Water Only Meter Size ❑ .. Sewer Main Extension f,Public ❑ .. Water Main Extension _ : Public FINANCE INFORMATION ❑ ... Ri ❑ ... 0 .. Traffic Impact Analysis ❑ .. Hold Harmless — (SAO) ❑ .. Hold Harmless — (ROW) -of-way Use - Profit for less than 72 hours ht-of-way Use — Potential Disturbance Work in Flood Zone ❑...,, orm Drainage ❑ ... Abando ; s eptic Tank ❑... Curb ...Pav=, entCut ❑... L ern ped Fire Line 3.7 WO # WO # WO # Private 0 Private 0 ❑ ... Grease Interceptor ❑... Channelization ❑ ... Trench Excavation 0... Utility Undergrounding (2) " WO # `., (3) (2) " WO # (3) ❑ .. Deduct Watt, Meter Size Fire Line Size at Property) ine Number of Public Fire Hydrant(s) ❑ .. Water -' ❑ .. Sewer ❑ .. Sewage Treatment Monthl Service Bi, n to: Name: Mailing Add;.'ss: " WO# " WO# Day Telephone: Water iv "' 'ter Refund/Billing: Name: City State Zip Day Telephone: Mailing Address: City State Zip H:Wpplications\Forms-Applications On Line\2012 Applications\permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 3 of 4 PERMIT APPLICATION NOTT Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY :FOR THIS PERMIT. BUILDING OW>E7R AUTHH D�.��' Signature: (,,{" .f t ./j �� .dui. Print Name: t e 4 c/ J Mailing Address: J. 14 Date: 03 0 f ( o?C Day Telephone: 5t �QcoIAc City State Zip H:\Applications\Forms-Applications 0n Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 4 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT I QUANTITY PermitTRAK I PAID $667.05 D14-0289 Address: 5555 S 152ND ST COMPLEX Apn: 1157200221 $667.05 DEVELOPMENT $635.50 PERMIT FEE R000.322.100.00.00 0.00 $631.00 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $31.55 TECHNOLOGY FEE R000.322.900.04.00 0.00 TOTAL FEES PAID BY RECEIPT: R2994 $31.55 $667.05 Date Paid: Wednesday, September 03, 2014 Paid By: PREFERRED ROOF SERVICES INC Pay Method: CREDIT CARD 423326 Printed: Wednesday, September 03, 2014 12:06 1 of 1 PM CRWSYSTEMS CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 431-2451 INSPECTION RECORD Retain a copy with permit.14 '6213 INSPECTION NO. PERMIT NQ. _ O (206) 431-3670 �/� Project ^ � /) r—r Type of In pectiiont: Address: 5S .C-sS i . tl `— Date Called: Si— Special Instructions Date Wanted _- E 4 ,a. p.m.., Requester: i Phone No: ElApproved per applicable codes. ElCorrections required prior to approval. COMMENTS: r 1 � l Inspector: \v/ REINSPECTION FEE REQUIRED.. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. r Date a�( INSPECTION NO. INSPECTION RECORD Retain a copy with permit 1�1 L1- 02 SC/ PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project: L ( �� ti (,� Type of Inspection: 1 'l plt, Address: , Cc.S (S)- S.+ Date Called: cl- 3- (11 Special Instructions: rua.`f- 's,k� "b\3-0'0 p ,( A.)�,v` .-t ,O'$ l(CAN Date Wanted: (i'L-{- ILi a.m.: p.rKi. Requester: Phone No? 3 36I 6 7-77 Approved per applicable codes. Corrections required prior to approval. COMMENTS: C � AAA -NJ ('A-t�..j t p (AW r ,. ,At4 — PAL-6 k \UP i3OO ' -1 c;t' a2�c�Ur c ►l 1 1 Inspect Date: 21' /1/ REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. VERSICOPW-0420 ROOFING SYSTEMS VersiWeld® TPO/VersiFleece® TPO/VersiFlex® PVC MEMBRANE MATERIAL WARRANTY Subject to the following terms and conditions, Versico, a division of Carlisle Construction Materials Incorporated, warrants to the Buyer that the Versico membrane material (MEMBRANE) will not prematurely deteriorate to the point of failure because of weathering for a period of ten (10) or fifteen (15) years for 45-mil membrane or greater or twenty (20) years for 60-mil membrane or greater from the date of sales if properly installed, maintained and used for the purpose for which Versico intended. If upon inspection by Versico, the Membrane shows premature deterioration because of weathering within the designated warranty period stated herein, Versico's liability and Buyer's remedies are limited at Versico's option to the providing of repair material for the original Membrane or credit to be applied towards the purchase of a new Membrane, the value of these remedies being determined by Versico based upon the number of remaining months of the unexpired warranty used to pro -rate at the current prices for the Membrane. The maximum pro -rated value allowed by Versico for repair or credit shall not exceed the original Membrane purchase price. To validate this warranty, the registration information must be completed by the owner and mailed along with the copy of the invoice clearly indicating the material purchased within 10 days after the date of sale. Buyer shall give Versico notice of a claim under this warranty within thirty (30) days of discovering any premature deterioration of the membrane. Any claim under this warranty must be made in writing within the designated warranty period from the date of sale and must include a sample of the membrane for evaluation and response at the owner's expense. /IlfitE Versico shall not be responsible for the cleanliness or discoloration of the membrane material caused by envirdh'ftle -'r.JF t,VEt) conditions including, but not limited to, dirt, pollutants or biological agents. UKWv` This warranty refers to the deck membrane material only. Flashings, adhesives and other accessories contained in a membrane system are not covered by this or any other warranty, express or implied. Versico shall have no liability under any theory of law for any claims, repairs, restoration, or other damages incht'dl> ,,tl� �� limited to, consequential or incidental damages relating directly or indirectly, to the presence of any irritants, contaminants, 14 vapors, fumes, molds, fungi, bacteria, spores, mycotoxins, or the like in the building or in the air, land orPayztg the building. II]%' CENTER NO REPRESENTATIVE OF VERSICO HAS AUTHORITY TO MAKE ANY REPRESENTATIONS OR PROMISES EXCEPT AS STATED HEREIN. VERSICO DOES NOT WARRANT PRODUCTS UTILIZED IN AN INSTALLATION, WHICH IT HAS NOT FURNISHED; AND SPECIFICALLY DISCLAIMS LIABILITY, UNDER ANY THEORY OF LAW ARISING OUT OF THE INSTALLATION AND PERFORMANCE OF, OR DAMAGES SUSTAINED BY OR CAUSED BY, PRODUCTS NOT FURNISHED BY VERSICO. THERE ARE NO WARRANTIES EITHER EXPRESSED OR IMPLIED, INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, WHICH EXTEND BEYOND THE WARRANTIES CONTAINED IN THIS DOCUMENT. VERSICO SHALL NOT BE LIABLE FOR ANY INCIDENTAL, CONSEQUENTIAL OR OTHER DAMAGE, INCLUDING BUT NOT LIMITED TO, LOSS OF PROFITS OR DAMAGES TO A STRUCTURE OR ITS CONTENTS UNDER ANY THEORY OF LAW. THIS WARRANTY IS NOT TRANSFERABLE OR ASSIGNABLE. 3065779 VERSICO VERSIWELD TPO/VERSIFLEECE TPO/VERSIFLEX PVC MEMBRANE MATERIAL WARRANTY Detach here and return completed form along frith a copy of the bill of sale or invoice for the membrane to: VERSICO P.O. Box 1289 • Carlisle, PA 17013 DATE OF SALE. Attn: Warranty Services Department 7 Building Owner's Name: Building Owner's Address: ^� ��L Address and Location of Building. J S 7S �$) ncJ 5 / �1.44, `C, fjt/C,t %5'Fid Building Owner's Telephone Number: (2) ) �O 7 ~6" 73) �, Contact: e )e rJr k L., ! Date Project Completed: Roofing Contractor's Name: PY`pr`(E'/_I%k'G'Gf rUJ C Roofing Contractor's Address. l - / / -s'/ /91/4P C' Type of Membrane: (circle one) VersiWeld TPO or VersiFleece TPO VersiFlex PVC ❑45-mil ''®60-mil ❑72-mil ❑80-mil ❑ 50-mil ❑ 60-mil ❑ 80-mil Warranty Requested: 10 year 45-, 50-, 60-, 72-, or 80-mil 15 year 45-, 50-, 60-, 72-, or 80-mil 20 year 60-, 72-, or 80-mil Size of Project: 3So a St] Ft 3065779 602353 03/10 '?$ ;4v»\ Q CARE & MAINTENANCE INFORMATION The following items of maintenance information are not complete or exhaustive but are recommended for a single -ply roofing system. 1) Clogged drains should be avoided to insure equal load across your structure. 21 Ponding water that does not dry in 48 hours after a rain could cause damage to the roofing system. (The building owner is responsible for installing roof drains that meet this requirement. This includes new construction, reroofing, and structural distortion or sag requiring drain addition, relocation, or addition of tapered insulation.) 3) Petroleum products, if allowed to stand on the membrane, will have an adverse effect and may degrade the surface of the membrane. Keep all petroleum products off the membrane ;solvents, greases, oils, or any other liquid containing petroleum). 4) Kitchen waste should not be exhausted onto the roof surface. They could reduce the life of your roof. 5) Foot traffic should be kept to a minimum. Any areas which require normal maintenance during a 30-day period should have walkways to and from, as well as in the work area. 6) Under no circumstances should roofing cements be used in conjunction with the membrane. i) was such as coimterflaIhings, curlis, and pipes should be kept sealeac at 511 times. 8) If a leak occurs, don't assume that it is the membrane. Leaks are often the result of curbs skylights, hatches, metal work, or plumbing_problems. Carefully survey the_problem first. 9) If any new installation is required on your roof, contact your preferred roofing company for a recommendation as to how the unit is to be tied in to your existing roof. New work should be completed by an Authorized Versico Contractor familiar with membrane systems. General maintenance trades working on your rooftop units, doing plumbing, welding. soldering, and oilier work, must use care and protection oil they will could damage your roof. This type of damage is the_owner_'s responsibility and not covered by the membrane warranty. Versico P.O. Box 1289 Carlisle, PA 17013 1-800-992-7663 Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Field Copy and ditions is acknowledged: By: � 2-/- Date: 9' - 3 City of Tukwila BUILDING DIVISION La Vista Apartments 5555 S 152 Street REVIEWED FOR DE COMPLIANCE APPROVED f ukwila DIVISION REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may ins!ude additional plan review fees. " FILE COPY 2/28/2013 Preferred Roof Services Inc. Mr. Phil Ehnat, Tacoma Abatement Company, LLC Attached is the notification to Labor and industries for� enot�ficra�o� fol athe asbestos int 5555 S. 152nd ch oofiSeattle, ng As 98188 Bldg. C. LaViasta Apts. This is the only required you may not know Puget Sound Clean Air Agency does not require any notification for the removal of non friable asbestos removal, and as you know this is a built up roof with tar base_ This make this roof material non -friable for the purpose of removal, disposal and notifications. I have also included a copy of the waste profile to Republic for you records. If you have any questions please feel free to contact me, Operations Manager AHERA building Inspector Certification # BI/R-NES-11-26-12-03 Expiration date 11/26/2013 5111 S Burlington Way, Tacoma, WA 98409 Phone: 253.830.5945; Fax: 253-383-1592 REVIEWED FOR CODE COMPLIANCE APPROVED SEP_ 0 3 2014 City of Tukwila BUILDING DIVISION Fa e2of2 Address: 5555 S. 152nd. St. Building Name: LaV ista Apts. Room: Bldg. C units 114,113,112,100,99.98,85.84 City: Seattle Zip + 4: 98188 County: King Facility Type: Appt. Age: 1977 Size: 20000 Type of activity: Repair Quantity of Asbestos to Be Removed Outdoors Quantity: 5000 square feet Roofing Quantity: linear feet Control Measures Wet methods HEPA vacuum Manual methods Respiratory Protection 1/2 mask APR Comments: Date/Time Submitted 2/28/2013 12:11:22 PM http://vwww.lni.wa.gov/safety/topics/atozlasbestos/FormDataDisplay.asp?Form1D=68879%... 2/28/2013 REPUBLIC EXPRESS WASTE PROFILE SERVICES 4178 Roosevelt Regional MSW LF WA Requested Disposal Facility, Sales Rep #. , Generator Information Generator Name: Tacoma Abatement Company, LLC Generator Site Address: 5555 S. 152nd. St. County: King State ApprovallWaste Code: Generator Mailing Address (if different): 5555 S. 152nd. St. County: Tacoma Abatement Co State: Washington Email: mmiller@tacornaabatement.com State 1D/Reg No: Waste Profile # Generator Contact Name: Mike Miller Phone Number. (253) 830-5945 Ext: Ila. Transporter Information Transporter Name: Republic Fax Number. Ilb. Billing Information Bill To: Tacoma Abatement Company, LLC Billing Address: 5111 S,. Burlington Way State: WA City: Tacoma III, Waste Stream Information Name of Waste: (Petroleum products -applies only to contaminated media and debris). ❑ Diesel Fuel ❑ Horne Heating Fuel #1-6 O Kerosene ❑ Aviation Fuel ❑ Hydraulic Fluid ❑ Unleaded Gasoline (UST Corrective Action) State: Washington (if applicable) Zip: 98186 NAICS #. Zip: 98188 Fax Number. (253) 383-1592 Contact Name: State Transportation Number: Contact Name: Mike Miller Email: mmilter@tacomaabatement.com Zip: 98409 ❑ Weathered Wood ❑ RCRA Empty Containers ❑ Treated Medical Waste ❑ Animal Carcass ❑ Plant Trash ❑ Meth Contaminated Debris Phone: (253) 830-5945 Process Generating Waste: Roofing BAGGED ❑OTl-IER: Method of Shipment: Q BULK ❑ DRUM — Select Volume Type -- Estimated Annual Volume: Frequency: [ZI ONE TIME DANNUAL ❑ Friable Asbestos ® Non Friable Asbestos Cured Asphalt ❑ Tires ❑ Food Products (including Animal Food) Id, Certification herein is a L hereby certify that to the best of my knowledge er certify that by utid belief, the lizingion this profile. myself and accurate description of employee of the e waste material delieingver offdisposal fora or attempt company will deliver for disposal or attempt. to deliver for disposal any waste which is classified as toxic waste, hazardous oafull or infectious waste, or any other waste material this facility is prohibited from accepting by law. Our company hereby agreesy indemnify this disposal facility against any dthis resusheet from as providedtcertification by RepublicinSeinarvices,Inc.runtrue. !further certify that the company has not altered the form or contentprofile Tacoma Abatement Company. LLC Company Name 2-28-2013 Mike. R Miller Authorized Represent atiye Name/tdtie (Type or Print) REV 1 ©Republic Services. Aug 201 Page 1 of 2 Dept. of Labor & Industries, Division of .ccupati0llal Safety & Health Asbestos Project Notification Form Form ID: 68879##1532TAC0M063226 Notice Date: 1/4/2013 Start Date: 2/22/2013 Completion Date: 3/8/2013 Status: Amended Off Hold Site Work Hours: 8am - 3:30pm Site Work Days: Monday Tuesday Wednesday Thursday Friday Contractor TACOMA ABATEMENT CO LLC Job Site C.A.S.: Ivan Guzman Your e-mail address: mmiller2tacomaabatement.com Contractor Phone Number: 253-830-5945 Property Owner Name: Owner's Agent: Rex Nikula Company: Reeder Property Management Address: 10520 Gravelly Lk. Dr. SW State: WA Zip+4: 98499 City: Lakewood Phone: 253-584-6732 ex Job Site http://www.lni.wa.gov/safety/topics/atoz/asbestos/FormDataDisplay.asp?FormlD-68879%... 2/28/2013 MANUSG m 2003 PILE co»v BUILDING INSULATION 07210 molders`Association EPS Molders Association 1298 Cronson Blvd. Crofton, MD 21114 Phone: (800) 607-3772 Fax: (410) 451-8343 www.easmolders.orq This MANU-SPECK utilizes the Construction Specifications Institute (CSI) Manual of Practice, including MasterFormafM, SectionFormaPf1 and PageFormafM. A MANU-SPEC is a manufacturer -specific proprietary product specification using the proprietary method of specifying applicable to project specifications and master guide specifications. Optional text is indicated by brackets ( ); delete optional text in final copy of specification. Specifier Notes typically precede specification text; delete notes in final copy of specification. Trade/brand names with appropriate symbols typically are used in Specifier Notes; symbols are not used in specification text. Metric conversion, where used, is soft metric conversion. This MANU-SPEC specifies Expanded Polystyrene Insulation (EPS) for use in a variety of construction applications. This product is manufactured by a variety of manufacturers and is represented by the EPS Molders Assocation. For applications other than conventional building insulation, this document should be edited to suit project requirements. Revise MANU-SPEC section number and title below to suit project requirements, specification practices and section content. Refer to CSI MasterFormat for other section numbers SECTION 07210 BUILDING INSULATION (EXPANDED POLYSTYRENE INSULATION) PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Expanded Polystyrene (EPS) Insulation used as building insulation. °n' EVIEW'ED FOR CODE COMPLIANCE APPROVED SEP 0 3 2014 City of Tukwila BUILDING DIVISION Specifier Note: Article below may be omitted when specifying manufacturer's proprietary products and recommended installation. Retain References Article when specifying products and installation by an industry reference standard. If retained, list standard(s) referenced in this section. Indicate issuing authority name, acronym, standard designation and title. Establish policy for indicating edition date of standard referenced. Conditions of the Contract or Division 1 References Section may establish the edition date of standards. This article does not require compliance with standard. It is a listing of all references used in this section. 1.02 REFERENCES A. General: Standards listed by reference, including revisions by issuing authority, form a part of this specification section to the extent indicated. Standards listed are identified by issuing authority, authority abbreviation, designation number, title or other designation established by issuing authority. Standards subsequently referenced herein are referred to by issuing authority abbreviation and standard designation. B. American Society for Testing and Materials (ASTM): 1. ASTM C578 Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation. 2. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials. C. Factory Mutual Research Corporation (FMRC): 1. Factory Mutual Research Corporation Approval Guide (current edition). Contact manufacturer for approval standard and number. 1.03 DEFINITIONS A. Spedal definitions that apply to this section include: 1. EPS Board: Expanded polystyrene board insulation product specifically manufactured and recommended by its SPEC -DATA' and MANU-SPEC" are registered trademarks of Reed Elsevier Inc. The three part MANU-SIT-C format conforms to the editorial style of the Construction Specifications Institute and is used with their permssion.1�manufacturer s responsible for technical accuracy. 02003 CMD First Source AD Rights Reserved. CMD11 M 2003 q BUILDING INSULATION 07210 EPS Molders Association manufacturer for building insulation applications, based on its R-value and other physical properties when tested in accordance with ASTM C578. Specifier Note: Article below should be restricted to statements describing design or performance requirements and functional (not dimensional) tolerances of a complete system. Limit descriptions to composite and operational properties required to link components of a system together and to interface with other systems. 1.04 SYSTEM DESCRIPTION A. Design Requirements: Provide products and systems that have been manufactured, fabricated and installed to meet the following criteria: 1. (Specify system design criteria.). B. Performance Requirements: Provide products and systems that have been manufactured, fabricated and installed to meet the following criteria: 1. (Specify system performance criteria.). Specifier Note: Article below includes submittal of relevant data to be furnished by Contractor before, during or after construction. Coordinate this article with Architect's and Contractor's duties and responsibilities in Conditions of the Contract and Division 1 Submittal Procedures Section. 1.05 SUBMITTALS A. General: Submit listed submittals in accordance with Conditions of the Contract and Division 1 Submittal Procedures Section. B. Product Data: Submit manufacturer's product data and installation instructions. C. Shop Drawings: Provide drawings indicating (Specify requirements for shop drawings.). D. Quality Assurance/Control Submittals: Submit the following: 1. Certificates: Submit manufacturer's certificate that products meet or exceed specified requirements. E. Closeout Submittals: Submit the following: 1. Warranty documents specified herein. Specifier Note: Article below should include statements of prerequisites, standards, limitations and criteria that establish an overall level of quality for products and workmanship for this section. Coordinate article below with Division 1 Quality Assurance Section. 1.06 QUALITY ASSURANCE A. Installer Qualifications: Utilize an installer having demonstrated experience on projects of similar size and complexity. Specifier Note: Paragraph below should list obligations for compliance with specific code requirements particular to this section. General statements to comply with a particular code are typically addressed in Conditions of the Contract and Division 1 Regulatory Requirements Section. Repetitive statements should be avoided. B. Regulatory Requirements and Approvals: (Specify applicable requirements of regulatory agencies.). 1. (Code agency name). a. (Report or approval number). C. Certifications: 1. Provide third party certification for testing, inspection and review of product production practices for compliance with ASTM C578. Specifier Note: Delete subparagraph below if not applicable to project. 2. Underwriters Laboratories, Inc. (UL): SPEC -DATA'" and MANU-SPEC'" are registered trademarks of Reed Ekevier Inc. The Three part MANU-SPEC format conforms to the editorial style of the Construction Specifications Institute and is used with their permission. The manufacturer is responsible for technical accuracy. 02003 CMD Rrst Source All Rights Reserved. CMD vt BUILDING INSULATION 07210 EPS Molders Association a. UL Building Materials Directory. b. UL Roofing Materials & Systems Directory. 3. Factory Mutual Research Corporation (FMRC) Approval: Comply with FMRC Approval Guide. Contact manufacturer for approval standard and number. Specifier Note: Retain paragraph below if mock-up is required. D. Mock -Ups: (Specify requirements for mock-up.). 1. Subject to acceptance by owner, mock-up may be retained as part of finish work. 2. If mock-up is not retained, remove and properly dispose of mock-up. Specifier Note: Retain paragraph below if preinstallation meeting is required. E. Preinstallation Meetings: (Specify requirements for meeting.). Specifier Note: Article below should include specific protection and environmental conditions required during storage. Coordinate article below with Division 1 Product Requirements Section. 1.07 DELIVERY, STORAGE & HANDLING A. General: Comply with Division 1 Product Requirement Section. B. Comply with manufacturer's ordering instructions and lead time requirements to avoid construction delays. C. Delivery: Deliver materials in manufacturer's original, unopened, undamaged containers with identification labels intact. D. Storage and Protection: Store materials protected from exposure to harmful environmental conditions and at temperature and humidity conditions recommended by the manufacturer. 1. Prolonged exposure to sunlight will cause slight discoloration and surface dusting of EPS insulation. 2. EPS insulation exposed to moisture should be replaced or thoroughly dried prior to application of finish or covering materials. Specifier Note: Coordinate article below with Conditions of the Contract and with Division 1 Closeout Submittals (Warranty) Section. Use this article to require special or extended warranty or bond covering the work of this section. 1.08 WARRANTY A. Project Warranty: Refer to Conditions of the Contract for project warranty provisions. B. Manufacturer's Warranty: Submit, for Owner's acceptance, manufacturer's standard warranty document executed by authorized company official, for insulation R-value when tested according to ASTM C578. Manufacturer's warranty is in addition to, and not a limitation of, other rights Owner may have under contract documents. Specifier Note: Coordinate subparagraph below with manufacturer's warranty requirements. 1. Warranty Period: (Insert years.) beginning with date of substantial completion. PART 2 PRODUCTS Specifier Note: Retain article below for proprietary method specification. Add product attributes, performance characteristics, material standards and descriptions as applicable. Use of such phrases as "or equal" or "or approved equal" or similar phrases may cause ambiguity in specifications. Such phrases require verification (procedural, legal and regulatory) and assignment of responsibility for determining "or equal" products. 2.01 EPS INSULATION BOARD SPEC -DATA" and MANU-SPEC" are registered trademarks of Reed Ekevier Inc. The three part MANUSPEC format conforms to the editorial style of the Construction Specifications Institute and is used with their permission. The manufacturer is responsible for technical accuracy. 02003 CMD Rrst Source All Rights Reserved, CMD�t BUILDING INSULATION 07210 2003 q EPS Molders Association Specifier Note: Paragraph below is an addition to CSI SectionFormat and a supplement to MANU-SPEC. Retain, edit or delete paragraph below to suit project requirements and specifier practice. A. Manufacturer: EPS Molders Association. 1. Contact: 1298 Cronson Blvd., Crofton, MD 21114; Telephone: (800) 607-3772; Fax: (410) 451-8343; website: www.epsmolders.orq. B. Proprietary Products/Systems: EPS insulation boards, including the following: 1. Flat Stock Board: a. Material Description: Rigid, dosed cell, expanded polystyrene (EPS) board stock. b. Material Standard: Comply with ASTM C578. c. Thickness: (Specify thickness.). d. Nominal Density: (1.0 pcf (Type I)) (1.25 pcf (Type VIII)) (1.5 pcf (Type II)) (2.0 pcf (Type IX)). e. Flamespread Index (ASTM E84): Contact manufacturer for test results. f. Smoke Development Index (ASTM E84): Contact manufacturer for test results. g. Faring: (Unfaced) (Foil faced (aluminum kraft paper laminate)) (Poly faced (polyethylene skin kraft paper laminate)). Spedfier Note: Edit Article below to suit project requirements. If substitutions are permitted, edit text below. Add text to refer to Division 1 Project Requirements (Product Substitutions Procedures) Section. 2.02 PRODUCT SUBSTITUTIONS A. Substitutions: No substitutions permitted. Specifier Note: Specify subordinate or secondary items that aid and assist primary products specified above or are necessary for preparation or installation of those items. Retain, edit or delete to suit project and specifier practice. 2.03 ACCESSORIES A. Provide installation accessories as follows: 1. Adhesive: 2. Wall Ties: a. Material, Type and Manufacturer: (Compatible with EPS insulation board board manufacturer) (Specify material, type and manufacturer.). 3. Mechanical Fasteners: a. Material Type and Manufacturer: (Compatible with EPS insulation board board manufacturer) (Specify material, type and manufacturer.). 4. Furring Channels: a. Material, Type and Manufacturer: (Compatible with Eta insulation board and acceptable to EPS insulation board manufacturer) (Specify material, type and manufacturer.). a. Material, Type and Manufacturer: (Compatible with EPS insulation board board manufacturer) (Specify material, type and manufacturer.). PART 3 EXECUTION and acceptable to EPS insulation and acceptable to EPS insulation and acceptable to EPS insulation Specifier Note: Article below is an addition to the CSI SectionFormat and a supplement to MANU-SPEC. Revise article below to suit project requirements and specifier's practice. 3.01 MANUFACTURER'S INSTRUCTIONS SPEC -DATA" and MANU-SPEC" are registered trademarks of Reed Elsevier Inc. The three part MANU-SFEC format conforms to the editorial style of the Construction Spedfications Institute and is used with their permission. The manufacturer is responsible for technical accuracy. e2003 CMD Frst Source All Rights Reserved. CMD As, MAN Uc BUILDING INSULATION 07210 2003 EPS Molders Association A. Comply with the instructions and recommendations of the EPS insulation board manufacturer. Spedfier Note: Specify actions to physically determine that conditions are acceptable to receive primary products of the section. 3.02 EXAMINATION A. Site Verification of Conditions: 1. Verify that site conditions are acceptable for installation of EPS insulation board. 2. Do not proceed with installation of EPS insulation board until unacceptable conditions are corrected. Spedfier Note: Coordinate article below with manufacturer's recommended installation requirements. 3.03 INSTALLATION A. General: 1. Install EPS board insulation in a (Single) (Double) layer to achieve required R-value(s) as indicated in drawings. Cut and fit tightly around projections and penetrations. 2. Secure insulation to substrate with (Mechanical fasteners) (Or) (Spot adhesive applied to back of board) using quantity and pattern recommended by manufacturer. B. Insulation Board Joints: Stagger EPS insulation board joints in one direction for each course. Butt edges and ends tightly to adjacent EPS boards. Specifier Note: Retain, edit or delete articles below to suit project and specifier practice. C. Sheathing and Underlayment Installation: On exterior side of stud framing, install EPS insulation board (Vertically) (Horizontally). Fasten vertically 12" (300 mm) maximum on centers using fasteners recommended by manufacturer. On interior side of stud framing, install minimum 1/2" (12,7 mm) thick gypsum wallboard over EPS board. D. Concrete and Masonry Walls: Install EPS insulation board over furring channels attached to concrete and unit masonry substrates. Fasten vertically 12" (300 mm) maximum on centers using fasteners recommended by manufacturer. E. Cavity Walls: Install EPS insulation board on exterior surface of interior wythe of cavity wall, fitting board between wall ties and other projections and penetrations. F. Perimeter Foundation: Install EPS insulation board on exterior surface of perimeter foundation walls. Secure board with spot adhesive applied to back of board using quantity and pattern recommended by manufacturer. G. Slab -On -Grade: Install EPS insulation board under slab -on -grade and over properly prepared subgrade of compacted fill and vapor retarder. Place EPS board with sides and ends butted. Spedfier Note: Specify the final actions required to clean installed equipment or other completed work to properly function or perform. Coordinate article below with Division 1 Execution Requirements (Cleaning) Section. 3.04 CLEANING A. Remove and legally dispose of trash and debris resulting from the work. Specifier Note: Specify provisions for protecting work after installation but prior to acceptance by the owner. Coordinate article below with Division 1 Execution Requirements Section. 3.05 PROTECTION A. Protect installed work from damage due to subsequent construction activity on the site. END OF SECTION SPEC -DATA" and MANU-SPEC' are registered trademarks of Reed Ekevier Inc. The three part MANU-SPEC format conforms to the editorial style of the Constriction Speafications Institute and is used with their permission. The manufacturers responsible for technical accuracy. 02003 CMD Frst Source All Rights Reserved. CMD to r• FIRE RETARDANT SLIPSHEETS ATLAS® FIRE RETARDANT SLIPSHEETS FR-10 and FR-50 fire resistant slipsheets enhance the overall fire performance of many conventional commercial roof systems, including metal roofs. FR-10 and FR-50 are coated -glass fiber mats specifically designed for installation over wood decks or certain combustible insulation. FR-50 incorporates a heavier glass mat than FR-10 to provide enhanced fire performance. • Superior protection against flame spread and penetration. • A lightweight and easy -to -install roof system component. • Part of a "Class A" assembly over noncombustible decks and expanded polystyrene • Part ofa Class A" assembly over combustible and noncombustible decks and extruded polystyrene 4 FIRE —RETARDANT SLIPSHEETS RECOMMENDED USES FR-10 and FR-50 are specifically formulated for use over wood decks or polystyrene insulation. The proprietary flame-retardant coating and glass -fiber mat provide protection against flame spread and flame penetration through the roof system. The slipsheet can also act as a barrier between chemically incompatible insulation and roof membranes. In addition, the sheet may be used in multiple layers to achieve certain Gass A fire resistance ratings. - INSTALLATION Atlas Fire Retardant5lipsheets are lightweight, easy to handle and, therefore, quicker to install than thermal barriers or coverboards. The slipsheet should be rolled out, overlapping the side and end of the preceding sheet a minimum of two (2) inches. Consult the membrane manufacturer for specific application recommendations (e.g., slipsheet roll direction perpendicular to membrane roll). Mechanical attachment of the slipsheet is not needed in most applications. The patented coating generally provides enough weight to anchor the sheet until the membrane is installed. Mechanical or adhesive attachment may be necessary under windy conditions. Install only as much slipsheet as can be covered by the end of the day. > STORAGE Factory -applied packaging is intended solely for protection during transit. When stored outdoors or on the job site, the slipsheet rolls should be stacked on pallets at least four inches above ground level and completely covered with a weatherproof covering such as a tarpaulin. 4 WARRANTY AND LIMITATION OF LIABILITY Other than the aforementioned representations and descriptions, Atlas Roofing Corporation (hereaf ter, 'Seller") makes no other representations or warranties as to the product sold herein. The Seller disclaims all other warranties, express or Implied, Including the warranty of merchantability and the warranty of fitness for a particular purpose. The Seller shall not be liable for any incidental or consequential damages including the cost of installation, removal, repair or replacement of this product, insulation and/or roof membrane, etc. The Buyer's remedies shall be limited exclusively to, at Seller's option, the repayment of the purchase price or resupply of product manufactured by Atlas In a quantity equal to that of the nonconforming product. Atlas distributors, agents, salespersons, or other independent representatives have no authority to waive or alter the above limitation of liability and remedies. ©AT Ci REVIEWED FOR CODE COMPLIAN( APPROVED MAR 1 3 2013 City of Tukwila BUILDING DIVISIOI This product is covered by one or more US and foreign patents. Slipsheet for Roofing Systems as to an External Fire Exposure only. See us UL Directory of Products Cenllled for Canada and UI Roofing Materials & Systems Directory. Miami -Dade County, Florida , NOA No.05-0602.03, 10/20/10 MIAMI•DADE COUNTY APPROVED EIVED CITY OF TUKWILA MAR 0 1 2013 PERMIT CENTER ATL-080450-00 FR10 FR50 DataSSeet V11.rndd 1 tO7O 521/09 2:54:28 PM - FIRE RETARDANT SLIPSHEETS • —+APPLICATIONS TYPICAL COMBUSTIBLE DECK/METAL ROOF APPLICATION TYPICAL COMBUSTIBLE DECK APPLICATION • MEMBRANE FASTENER SINGLE -PLY MEMBRANE _ — WOOD — --- / DECK FR SLIPSHEETS TYPICAL NON-COMBUSTIBLE DECK APPLICATION SINGLE -PLY MEMBRANE EXPANDED OR EXTRUDED POLYSTYRENE INSULATION MEMBRANE FASTENER _ — .. - FR SLIPSHEETS ----_0!r- THERMAL _. BARRIER (GYPSUM 41x BOARD) J +TECHNICAL DATA STANDARD SIZES SLIP SHEET SQUARES PER ROLL COVERAGE W/2" LAP ROLL SIZE ROLL WEIGHT (APPROX.)-: fR 10 10 Squares (1000 sq. ft.) 9.64 Squares (964 sq. ft.) 48.25" x 250' (1225.55 mm x 76.2 m) 961bs. FR SO 4.2 Squares (420 sq. ft.) 4.02 Squares (402 sq. ft.) 48" x 105' (1219.2 mm x 32 m) 80Ibs. J TENSILE PROPERTIES 1 {,, PROPERTY' TEST METHOD 'FR 10 ' :`FR-50 Machine Direction TAPPI T 1009 om-06 371bsTiin. 641bs/in. Cross Machine Direction TAPPI T 1009 om-06 27 Ibs/in. 46 Ibs/in. ATL-080450-00 FR10 FR50 DataSheet V11.indd 2 SALES Camp Hill, PA (800) 688-1476 Fax: (717) 975-6957 East Moline, IL (800) 677-1476 Fax: (309) 752-7127 Northglenn,CO (800) 288-1476 Fax: (303) 252-4417 OFFICES Toronto, ONT (888) 647-1476 Fax: (877)909-4001 Diboll, TX (800) 766-1476 Fax: (936) 829-5363 Phoenix, AZ (800) 477-1476 Fax: (480) 6554209 LaGrange, GA (800)955-1476 Fax: (706) 882-4047 1+1 CORPORATE SALES & MARKETING 2000 RiverEdge Parkway, Suite 800 Atlanta, GA 30328 GREENNE" www.greenzone.com ATLAS 521/09 2:5430 PM wag VERSIWEL TPO ROOFING SYSTEMS VERSICO ROOFING SYSTEMS REVIEWED CODE -, �'tD F0 COMPLIAA APPROVED A SINGLE SOURCE FOR SINGLE -PLY ROOFING Versico, PO Box 1289, Carlisle, PA 17013 Tel: 800.992.7663 Fax: 717.960.4036 Web: www.versico.com ,1 VERS6 LD VERSIWELD ROOFING SYSTEMS The VersiWeld® Roofing Systems incorporate 45-mil, 60-mil or 80-mil (TPO) Thermoplastic Polyolefin membrane. Versico's VersiWeld membrane is comprised of three layers - a TPO polymer base; a strong, polyester -reinforced fabric center (scrim) and a tough thermoplastic polyolefin compounded top ply. Because top ply is the most vital membrane component for long-term weathering characteristics, Versico manufacturers its membranes with an industry leading "thicker" and "smoother" top ply over scrim. The smooth surface resists dirt pick-up and biological growth compared to other thermoplastic membranes. MEMBRANE BENEFITS ENVIRONMENT VersiWeld membranes are ideally suited when environmental issues are of concern because the membrane is produced without the use of any chlorinated ingredients or plasticizers. VersiWeld membranes are 100% recyclable. MEMBRANE FLEXIBILITY Membrane formulation contains no plasticizers or chlorine so it will not dry out or become brittle with age. This sheeting easily accommodates the building's normal expansion and contraction. CHEMICAL RESISTANCE VersiWeld membrane is highly chemical and contaminant resistant. Most liquids and chemicals normally exhausted onto the roof have no effect on the membrane, OCTREUARD XT FIRE RESISTANCE WEATHERING PACKAGE Versico's VersiWeld membranes are enhanced with Versico's OctaGuard XT' Weathering Package resulting in the most dependable, long-term performance characteristics in the industry. VersiWeld TPO membranes carry the ENERGY STAR`* qualification having exceeded the stringent program guidelines based upon solar reflectance and heat emittance. Additionally, VersiWeld is listed as a CRRC (Cool Roof Rating Council) certified product meeting the Title 24 mandates for the state of California. Versico's ENERGY STAR -qualified VersiWeld membranes with their high reflectivity ratings help reduce the amount of energy required to maintain cool building environments. Less energy consumed results in less pollutants generated back into the atmosphere (lessening the Urban Heat Island Effect) and directly contributes to a cleaner, cooler environment. VersiWeld roofing meets UL 790 requirements for external fire Class A ratings and UL P assemblies for internal, hourly fire ratings. Consult the UL Building Material Directory for specific assemblies. WIND RESISTANCE VersiWeld roofing has surpassed Factory Mutual's 1-90 wind resistance classification, one of the most stringent standards in the industry, as listed in the FM Approval Guide. INSTALLATION Heat -welded systems are easy to install since minimal labor and few components are required. VersiWeld membrane welds at fast speeds — 10- to 15-feet per minute at moderate temperature settings. VERSICO TOTAL SYSTEM WARRANTIES 5-year to 30-year No Dollar Limit Total System Warranty coverage is available. ACCESSORIES ertified Fabricated Accessory The most critical and time consuming portion of VersiWeld roofing installation is made easier and faster with VersiWeld Certified Fabricated Accessories. VersiWeld accessories provide exceptional durability and weatherability with the added benefit of being heat weldable. VersiWeld TPO accessories greatly reduce job time, in turn, reducing labor time. All VersiWeld TPO accessories carry the Certified Fabricated Accessory (CFA) seal of approval meaning they adhere to the most stringent quality tolerances required to be included in a Versico warranted roof system. TPO PS RUSS TPO Non -Reinforced Flashing TPO Molded Sealant Pockets TPO T-Joint Covers PS Coverstrip TPO Split Pipe Seals Please see VersiWeld accessories literature fora more complete listing of accessories. TPO ROOFING SYSTEMS VersiWeld Fully Adhered Roofing System begins with insulation mechanically attached 10 the roof deck. The membrane and substrate are then coated with VersiWeld bonding adhesive. The membrane is rolled into place and seams are then hot-air welded. VersiWeld Mechanically Attached Roofing System starts with insulation fastened to the substrate. VersiWeld membrane is then fastened through the insulation with fasteners and plates. (Consult the Versico Fastener Sell Sheet) Adjoining membrane sheets are overlapped and joined together by hot-air welding. VERSI , E L VERSIWELD 45- & 60-MIL THICK REINFORCED TPO Basic Properties and Characteristics (Standard and HS) Physical Property ASTM D6878 Requirement 45-mil 60-mil 80-mil Tolerance on nominal thickness, ASTM D751 test method +15, -10 ± 10 ±10 ± 10 Thickness over scrim, in. (mm) ASTM D6878 optical method, average of 3 areas 0.012 min (0.305) 0.018 typ (0.457) 0.024 lyp (0.610) 0.034 typ (0.864) Breaking srength, Ibf (kN) ASTM D751 grab method Elongation break of reinforcement, % ASTM D751 grab method Tearing strength, Ibf (N) ASTM D751 proc. B 8 in. x 8 in. Brittleness point, °F (°C) ASTM D2137 Linear dimensional change, To ASTM D1204, 6 hours at 158°F Ozone Resistance, no cracks 7X ASTM D1 149, 100 pphm, 168 hrs 220 (976 N) min 15 min 55 (245) min -40 (-40) max ± 1 max PASS 225 (1.0) min 320 (1.4) typ 15 min 25typ 55 (245) min 130 (578) typ -40 (-40) max -50 (-46) typ ± 1 max -0.2 lyp PASS 250 (1.1) min 360 (1.6) typ 15 min 25typ 55 (245) min 130 (578) typ -40 (-40) max -50 (-46) typ ± 1 max -0.2 typ PASS 350 (1.6) min 425 (1.9) typ 15 min 25 typ 55 (245) min 130 (578) typ -40 (-40) max -50 (-46) typ ± 1 max -0.2 typ PASS Water absorption resistance, mass % ASTM D471 top surface only 166 hours at 158°F water ± 3.0 max ± 3.0 max 2.0 typ ± 3.0 max 2.0 typ ± 3.0 max 2.0 typ Factory seam strength, Ibf/in (kN/m) ASTM D751 grab method Field seam strength, Ibf/in (kN/m) ASTM D1876 tested in peel Water vapor permeance, Perms ASTM E96 proc. B 66 (290) min No requirement No requirement 66 (290) min 25 (4.4) min 50 (8.8) typ 0.10 max 0.051yR 66 (290) min 25 (4.4) min 60 (10.5) typ 0.10 max 0.05 typ 66 (290) min 40 (7.0) min 70 (12.3) typ 0.10 max 0.05 typ Puncture resistance, Ibf (kN) FTM 101C, method 2031 (see supplemental section) No requirement 250 (1.1) min 325 (1.4) typ 300 (1.3) min 350 (1.6) typ 400 (1.8) min 450 (2.0) typ Properties after heat aging ASTM D573, 670 hours @ 240°F Breaking strength, % retained Elongation reinf., % retained Tearing Strength, % retained Weight change, % 90 min 90 min 60 min ± 1.0 max 90 min 90 min 60 min ± 1.0 max 90 min 90 min 60 min ± 1.0 max 90 min 90 min 60 min ± 1.0 max Typical Weights 0.23 lb/ft2 (1.1 kg/m2) 0.29 (1.4) 0.40 (2.0) * Typical properties and characteristics ore based on samples tested and are not guaranteed for all samples of this product. This data and information is intended as a guide and does not reflect the specification range for any particular property of this product. APPROVED 4�$SIp4 Radiative Properties for ENERGY STAR® Cool Roof Rating Council (CRRC) & LEED® Physical Property Test Method White TPO Tan TPO Gray TPO ENERGY STAR initial solar reflectance Solar Spectrum Reflectometer 0.87 0.68 n/a ENERGY STAR solar reflectance offer 3 years Solar Spectrum Reflectometer (after cleaning) CCRC initial solar reflectance CCRC solar reflectance after 3 years CCRC initial thermal emittance CCRC thermal emittance after 3 years LEED thermal emittance SRI (Solar Reflectance Index) ASTM C 1549 ASTM C 1549 (uncleaned) ASTM C 1371 ASTM C 1371 (uncleaned) ASTM E 408 ASTM E 1980 0.83 0.79 0.70 0.90 0.86 0.95 110 0.64 0.71 0.64 0.86 0.87 0.95 88 n/o 0.46 0.43 0.90 0.88 0.95 55 20I1VEJersicos Up latoi t1O/111 tPrlOed Ian it4,5 AY '1014 REPRINTwREOIIESTfCODE;601 /33, L Vot IVVe 4hpags Brootiuro� H y t . l ri,{try ilOinarji of the 051 GtmenBLIIIdlgg1Col7ncl yEhl i ey TAR 16. aVets ca voYsiwiii8;;0 hodliratlairgrii. w, fit. roAiac . <qi 7 4: • ' o aro iraca<nutks ai�Je/slco;}LEf�D�is a�idgglslstad NxRay'SA guaiflao of Istionlywoll�lIn'.thoU'S; PREFERRED ROOF SERVICES ITT" Page 1 of 3 Washington State Department of Labor & Industries PREFERRED ROOF SERVICES INC Owner or tradesperson EHNAT, PHILIP JENNINGS Principals EHNAT, PHILIP JENNINGS, PRESIDENT EHNAT, PEGGY MAY, SECRETARY EHNAT, ED, VICE PRESIDENT (End: 11/14/2013) Doing business as PREFERRED ROOF SERVICES INC WA UBI No. 602 780 822 15413 1ST AVE CT S #H-11 TACOMA, WA98444 253-318-8918 PIERCE County Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. PREFERS936QT Effective — expiration 11 /30/2007-11 /30/2015 Bond American States Insurance Co Bond account no. 32s209557 Received by L&I 05/11/2012 Bond history Insurance United Specialty Insurance Com Policy no. BTO1416860 Received by L&I $12,000.00 Effective date 04/20/2012 Expiration date Until Canceled $1,000,000.00 Effective date https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602780822&LIC=PREFERS936QT&SAW= 09/03/2014