Loading...
HomeMy WebLinkAboutPlanning 2011-09-22 Item 6 - Southcenter Plan - Attachment B - Tukwila Urban Center Plan ProcessAttachment B Southcenter Subarea Planning Process 2002 -2004 Development of the Vision for the Urban Center Council Briefing 6 Public Workshops See 9118108 Memo for Summaries 2 Joint PC /CC Worksessions Multiple Team Meetings with City Staff Consultants 2004 Endorsement of the Vision by CC and PC Joint PC /CC Meeting Directed Team to prepare regulations that implement the Vision Adoption of Updated Comprehensive Plan Policies 2005 -2008 Development of the Plan to Implement the Vision Staff review of Draft Plan by Freedman, Tung Bottomley (FTB Urban Land Institute Technical Advisory Panel Worksession on the Implementation Aspects of the Draft Plan Meetings with Local and Regional Developers to Review Plan Direction "Testing" draft regulations on Proposed Developments (Mall expansion, Baker Blvd Retail, Fidelity Bank of A merica, other office retail projects Grant Funding for Pedestrian Bridge Study Sounder Station Review Coordination on Tukwila Pond Park Master Plan Grant and Developer Funding for Transit Center Design and Construction 2008 Affirmation of the Vision and Introduction to the Plan Public Open House with FTB 10123108 Joint PC /CC Worksession with FTB 10123108 2008 -2009 Public Outreach for the Plan Presentation to the SWKC Chamber of Commerce 1017108 Presentation to the Parks Commission 11119108 Mailings Emailings to 1400 Property Owners, Tenants, Interested Parties Public Open House 314109 Meetings with Multiple Property Owners Hazelnut Article 2009 Review of the Plan Specifics by PC Presentation by FTB 3112109 Public Hearings 3126109, 4123109, 5128109 H: X, attachment B Plan Process Attachment B 95 3 Worksessions Meetings with Fire Department 3125, 518, 5120 Plan remanded to staff for revisions to address the public comments Staff to Review Public Comments and Revise Draft Plan Meeting and PC work session with EcoNW to discuss additional economic analysis 718109 Meetings with Fire Department and PW Individual meetings with Property Owners EcoNW led Focus groups 9 /29/09 Local and Regional Developers Local Property Owners and Managers Westfield Mall Representatives Presented EcoNW TUC Implementation Analysis to PC 12/10/09 2010 Internal Departmental Review Process on Street Cross sections Meetings with DCD, Public Works Fire 315110, 4120110, 514110, 5118110 Presented EcoNW TUC Implementation Analysis to CAP 3/22/10 Proposed Stakeholder Review Process to CAP 9 106110 to CC 9/27/10 to CAP 2128111 Council Directs Staff to Reduce Project Scope 3114111 Future Staff Revises Draft Southcenter Plan Review of the Revised Plan by PC Public Hearings Public Open House Work Sessions Forward PC Recommended Draft Plan to CC Review of the PC Recommended Plan by CC Review of Supplemental Environmental Impact Statement for the Plan Open House Public Hearing Worksessions Adoption of Plan, Implementing Ordinances and SEIS by CC 97