Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit EL14-0426 - IVANEK RESIDENCE - 200 AMP SERVICE
IVANEK RESIDENCE 11928 INTERURBAN PL S EXPIRED 06/11/17 ELI 4-0426 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov ELECTRICAL OTC PERMIT 7340600022 11928 INTERURBAN PL S Project Name: IVANEK RESIDENCE Permit Number: EL14-0426 Issue Date: 5/1/2014 Permit Expires On: 10/28/2014 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: IVANEK BENJAMIN 6004 12TH AVE S #4 , SEATTLE, WA, 98108 BENJAMIN IVANEK 11928 INTERURBAN PL S ,TUKWILA, WA, 98168 OWNER AFFIDAVIT ON FILE Phone: (206) 228-7368 Phone: License No: Expiration Date: Lender: Name: Address: DESCRIPTION OF WORK: REPLACEMENT PERMIT FOR EXPIRED PERMIT EL10-0347. INSTALL NEW 200 AMP SERVICE. REROUTE TWO SMALL APPLIANCE CIRCUITS, INSTALL ONE NEW SMALL APPLIANCE CIRCUIT IN KITCHEN, RELOCATE DISHWASHER CIRCUIT, INSTALL FAN CIRCUIT, RELOCATE RANGE RECEPTACLE, INSTALL NEW COOKTOP RECEPTACLE/CIRCUIT, RELOCATE LIGHTING/SWITCHING IN KITCHEN, INSTALL NEW LIGHTING/SWITCHING AND GENERAL PURPOSE CIRCUIT IN NEW S ROOM, INSTALL NEW EXTERIOR CIRCUIT FOR YARD LIGHTING Valuation of single family: $1,500.00 Valuation of mf/comm: $0.00 Type of Work: ADDITION Fees Collected: $158.76 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer Distric: VALLEY VIEW SEWER SERVICE Current Codes adopted by the City of Tukwila: Internations Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: 2012 2012 2012 2012 International Fuel Gas Code: WA Cities Electrical Code: WA State Energy Code: 2012 2012 2012 Permit Center Authorized Signature: (--}W Date: V ±( I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the perfo •- •nce of ork. I am authorized to sign and obtain this development permit and agree to the conditions d to is permit. Signatur " Pri This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***ELECTRICAL PERMIT CONDITIONS*** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-46B WAC. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2100 ELECTRICAL FINAL 7003 ROUGH -IN ELECTRICAL 7002 SERVICE 7001 UNDERGROUND/SLAB CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Electrical Permit No. E. Li L ' 0 1101-4 Project No. Date Application Accepted: Date Application Expires: (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: 11926 Interurban P1 S, Tukwila, 98168 Tenant Name: Benjamin and Lenora Ivanek PROPERTY OWNER Name: Benjamin and Lenora Ivanek Address: 11926 Interurban P1 S City: Tukwila State: WA Zip: 98168 CONTACT PERSON — person receiving all project communication Name: Benjamin Ivanek Address: 11926 Interurban P1 S City: Tukwila State: WA Zip: 98168 Phone: (206) 228-7368 Fax: Email: King Co Assessor's Tax No.: 7340600022 Suite Number: Floor: New Tenant: ❑ Yes ® ..No ELECTRICAL CONTRACTOR INFORMATION Company Name: Owner ( license #IVANEBE900DN) Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.; Valuation of Project (contractor's bid price): $ 1,500 Scope of Work (please provide detailed information): Install new 200 A service. Reroute two small appliance circuit; install one new small appliance circuit in kitchen, relocate dishwasher circuit, install fan circuit, relocate range receptacle, install new cooktop receptacle/circuit, relocate lighting/switching in kitchen, install new lighting/switching and gen purpose circuit in new S room, install new exterior circuit for yard lighting Will service be altered? m Yes ❑ No Adding more than 50 amps? I3 Yes ❑ No Type of Use: Residential Type of work: ❑ New m Addition 0 Service Change ❑ Remodel ❑ Tenant Improvement ❑ Low Voltage ❑ Generator ❑ Fire Alarm ❑ Telecommunication ❑ Temporary Service Property Served by: ❑ Puget Sound Energy 0 Seattle City Light H: Applications\Forna-Applications On Linc\2014 Applications\Electrical Permit Application Revised I-1-14.docx Revised: January 2014 bb Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings $152.85 (including an attached garage) ❑ Garages, pools, spas and outbuildings $81.90 ea ❑ Low voltage systems (alarm, furnace thermostat) $59.85 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration $81.90 (no added/altered circuits) m Service change with added/altered circuits $81.90 6 number of added circuits $11.55 ea 0 Circuits added/altered without service change $54.60 (up to 5 circuits) ❑ Circuits added/altered without service change $54.60 (6 or more circuits) $7.65 ea ❑ Meter/mast repair $68.25 ❑ Low voltage systems $59.85 (alarm, furnace thermostat) MULTI -FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) $65.00 ❑ Temporary service (generator) $80.90 O Manufactured/mobile home service $86.25 (excluding garage or outbuilding) ❑ Carnivals $80.60 Number of concessions $10.80 ea Each ride and generator truck $10.80 ea * * *EFFECTIVE JANUARY 1, 2014 EACH PERMIT WILL BE ASSESSED A 5% TECHNOLOGY FEE*** PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND. EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE ( WASHINGTOIN, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRAC Signature: Prin Mailing Address: 11926 Interurban PI S, Tukwila, WA 98168 H:Wpplications\Forms-Applications On Line\2014 ApplicationslElectrical Permit Application Revised I-1-14.docx Revised: January 2014 bh Date: 04/12/2014 Day Telephone: (206) 228-7368 City State Zip Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $158.76 EL14-0426 Address: 11928 INTERURBAN PL S Apn: 7340600022 ` $158.76 ELECTRICAL $151.20 PERMIT FEE SINGLE FAMILY R000 322 101 00.00 $151.20 TECHNOLOGY FEE $7.56 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R2002 R000 322 900 04.00 $7.56 $158.76 Date Paid: Thursday, May 01, 2014 Paid By: BENJAMIN IVANEK Pay Method: CHECK 4657 Printed: Thursday, May 01, 2014 2:55 PM 1 of 1 CRWSYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. P RMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-367 Project: Wiskx., ges Type of Inspection: 04H- a Address: ��26fJ v e A., Date Called: Special Instru tions: Date Wanted: pm 3 C...j� Requester: Phone No: L - 73V? Approved per applicable codes. Corrections required prior to approval. COMMENTS: PeNdet— kpoi 0,44- of 6t111,61---6 Inspector: ( ® ' 11(a REINSPECTION E REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. Date: 7 INSPECTION NO. INSPECTION RECORD Retain a copy with permit RMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspectign Request Line (206) 438-9350 Project: (j, d" %_ Type of Inspection: kir. Address: Uti pis. Date Called: Special Instru tions: Date Wanted: f Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: U417? e-tui/2 Inspector: Date: O _ 'Q REINSPECTION(FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 So thcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PHRMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: �" ' gzi, s Type of Inspec> : l Address: l( l O N nj J Date Called: Special Instru Lions: Date Wanted: ,i 0 5 . •- . Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: 1ovrGtA- G1 Cbt1P1-e16 4-746 Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fie must be paid at 6300 Southcenter Blvd., Suite 100. Calf to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO, PERMIT NO, CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: 'Type I eV. . /VW of inspection: /- 4/ 6(1441-r. Address: i i7n Ai 11 GA /AN 0.6 Date Called: Special Instructions: ACIM- i30 Date Wanted: 2 P.m.. Requester: 'Phone No: 73 4‘,e, EjApproved per applicable codes. DCorrections required prior to approval. COMMENTS: tKA - if) t1 Apt, A1 tho 1,0 14,A-Q.N.o5 tkaP —64-e-4- (-74-sr frtuk‘i tAili inspector: 6(41K Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcetiter'Blvd.. Suite 100.taticto schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila.. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 Project: i f R Type of Inspection: Address; h3Date Calked: Special Instructions: P Date Wanted: 2!13 kilt. Ikequester: i Aone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: t 6aa)r- RAC14- L/ JDrrit i t % (bie&.- KIDS C_JR7 Inspector: (..1'6_ -Date: /3/i 5 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO, PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: 1446K k • Type of Inspection: .' odA‘Ii- iri N Address: A I II 2.—g lartp26 rt.. Date Called: Special Instructfons: Date Wanted: I tizc km. alr., Requester: Phone No: EJApproved per applicable codes. Corrections required prior to approval, COMMENTS: KrctkJ 5d4gcbrl 4-(415 L._141 - dAA)L-1 (V4e9 WA -US A-r-itt eriLtAik /Ai Roorl nspector: T REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100, Call to schedule reinspection. INSPECTION RECORD L, ��� I , Retain a copy with permit Get INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project: iti * Type of inspection! t4 � j �,l I1/ Address: 11/71 ` ! k a PG. Date Called: Special Instructions: Date Wanted: ��� Cull; p.m. Requester: t f Phone No: rg 7301 Approved per applicable codes. O Corrections required prior to approval. COMMENTS: el3A n / O F . - co./c4c,Rfro.kie Rt a ni c-i`1 '+4-QD t10 4r PC -An 4/T' Inspector: 311,6 Date: Ogji Y ri & We i t REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project: �` Type of Inspection: l` fO V4 t{ /A) Address: ' rI?2 14rVI Date Called: Special Instructions: yrogk rO; 3 Z Date Wanted: trio/ Pam' Phone No: 22s m3 LjApproved per applicable codes. El Corrections required prior to approval. COMMENTS: rR (t r c€ (Ai Au,S Ai '_ et) e/A( Q-5 Inspector: P Date: �v rr REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. nit City of Tukwila Department of Community Development 5/1/2017 BENJAMIN IVANEK 11928 INTERURBAN PL S TUKWILA, WA 98168 RE: Permit No. EL14-0426 IVANEK RESIDENCE 11928 INTERURBAN PL S Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 6/11/2017. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 6/11/2017, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: EL14-0426 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 City of Tukwila Department of Community Development 12/1/2016 BENJAMIN IVANEK 11928 INTERURBAN PL S TUKWILA, WA 98168 RE: Permit No. EL14-0426 IVANEK RESIDENCE 11928 INTERURBAN PL S Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 1/13/2017. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 1/13/2017, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Rache le l�iple Permit Technician File No: EL14-0426 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director July 6, 2016 Benjamin Ivanek 11926 Interurban P1 S Tukwila, WA 98168 RE: Request for Extension Permit Number EL14-0426 Dear Mr. Ivanek This letter is in response to your written request for an extension to EL14-0426. The Building Official, Jerry Hight, has reviewed your letter and considered your request to extend the above referenced permit. It has been determined that the City of Tukwila Building Division will be granting an extension to the permit for an additional 180 days, through January 13, 2017. If you should have any questions, please contact our office at (206) 433-7165. Sincerely, )rs__,k Bill Rambo Permit Technician File: Permit No. ELI4-0426 W.\Permit Centel\Extension Letters\Permits\2014\EL14-0426 Permit Extension #2.docx 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 7/1/2016 Building Official Department of Community Development City of Tukwila RE: Permit No. EL14-0426 To whom it may concern, I would like to request an extension to my permit, no. EL14-0426. While we are still moving the project forward, circumstances have not allowed for the completion of enough work to pass the next inspection. I do not wish to waste the inspectors time by scheduling an inspection that I know we will not pass. The summer months should provide us with the time needed to move forward enough to schedule another inspection. Please let me know what I may do to facilitate any thing else that may be necessary to continue. Thank you, Request for Extension # Current Expiration Date: 7 -13-1 V0 Extension Request: cgApproved for ) days Denied (provide explanation) Signature/Initialst/V City of Tukwila Department of Community Development 6/ 1 /2016 BENJAMIN IVANEK 11928 INTERURBAN PL S TUKWILA, WA 98168 RE: Permit No. EL14-0426 IVANEK RESIDENCE 11928 INTERURBAN PL S Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 7/13/2016. Based on the above, you are hereby advised to: 1) Ca11 the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 7/13/2016, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Mel 11011 Rachelle Ripley P Y Permit Technician File No: EL14-0426 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 City of Tukwila Department of Community Development 1/4/2016 BENJAMIN IVANEK 11928 INTERURBAN PL S TUKWILA, WA 98168 RE: Permit No. EL14-0426 IVANEK RESIDENCE 11928 INTERURBAN PL S Dear Permit Holder: Jim Haggerton, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 2/19/2016. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 2/19/2016, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: EL14-0426 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director August 19, 2015 Benjamin Ivanek 11926 Interurban P1 S Tukwila, WA 98168 RE: Request for Extension Permit Number EL14-0426 Dear Ms. Caudill This letter is in response to your written request for an extension to EL14-0426. The Building Official, Jerry Hight, has reviewed your letter and considered your request to extend the above referenced permit. It has been determined that the City of Tukwila Building Division will be granting an extension to the permit for an additional 180 days, through February 19, 2016. If you should have any questions, please contact our office at (206) 433-7165. Sincerely, q./ Rachelle Ripley Permit Technician File: Permit No. EL14-0426 W:\Permit Center\Extension Letters\Permits\2014\EL14-0426 Permit Extension.docx 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 Department of Community Development City of Tukwila 6300 Southcenter Blvd., #100 Tukwila, WA 98188 To whom it may concern, h 3 G ` Z4i5 ommunity pevelopment — O4-2Cv I am writing in regards to electrical permitEL 14- . The permit is set to expire on April 17th, 2015. I would like to request an extension to that deadline. I am unable to schedule any inspection at this time due to family matters. However, we are still progressing on the project, and should be able to request an inspection during the month of September. Please do not hesitate to contact me if there are any questions or information that would be of service. Thank you for your consideration, e amin Ivanek 11926 Interurban P1 S Tukwila, Wa 98168 206-763-3299 (H) 206-228-7368 (C) Request for Extension # I Current Expiration Date: VI1616l'�% Extension Request: Approved for pro' days Denied (provide explanation) Signature/Initials J City of Tukwila Department of Community Development 7/1/2015 BENJAMIN IVANEK 11928 INTERURBAN PL S TUKWILA, WA 98168 RE: Permit No. EL14-0426 IVANEK RESIDENCE 11928 INTERURBAN PL S Dear Permit Holder: Jim Haggerton, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 8/19/2015. Based on the above, you are hereby advised to: 1) Ca11 the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 8/19/2015, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: EL14-0426 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 CITY OF TUKWILA Department of Community Development 630o Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-367o FAX (206) 431-3665 Permit Center/Building Division 206 431-367o Public Works Department 206 433-0179 Planning Division 206 431-367o AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION PERMIT NO: -A)G 007 L/ STATE OF WASHINGTON) ) ss. COUNTY OF KING ) , states as follows: [please print name] 1. I have made application for a permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have read or am familiar with RCW 18.27.090. 3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the City of Tukwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this permit to be exempt under number 12 , and will therefore not be performed by a registered contractor. 5. I understand that the licensing provision of RCW 19.28.161 through 19.28.271 shall not apply to persons making electrical installations on their own property or to regularly employed employees working on the premises of their employer. The proposed electrical work is not for the construction of a new building for rent, sale or lease. I understand that I may be waiving certain rights that I might otherwise have under st a la in any decision to engage an unregistered contractor to perform construction work. er's Agent* Signed and sworn to before me this day of ,201�( . NOTARY PUBLIC in and for the State of Washington Residing at d Name as commissioned: , County My commission expires: 1 ©- \ - 1 ' d-O I C 18.27.ogo Exemptions. The registration provisions of this chapter do not apply to: 1. An authorized representative of the United States government, the state of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; 2. Officers of a court when they are acting within the scope of their office; 3. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 4. Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 5. The sale of any finished products, materials, or articles of merchandise that are not fabricated into and do not become a part of a structure under the common law of fixtures; 6. Any construction, alteration, improvement, or repair of personal property performed by the registered or legal owner, or by a mobile/manufactured home retail dealer or manufacturer licensed under chapter 46.7o RCW who shall warranty service and repairs under chapter 46.7o RCW; 7. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 8. Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; 9. Any work or operation on one undertaking or project by one or more contracts, the aggregate contract price of which for labor and materials and all other items is less than five hundred dollars, such work or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into contracts of amounts less than five hundred dollars for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he or she is a contractor, or that he or she is qualified to engage in the business of contractor; io. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed by a registered contractor; 11. An owner* who contracts for a project with a registered contractor, except that this exemption shall not deprive the owner of the protections of this chapter against registered and unregistered contractors. The exemption prescribed in this subsection does not apply to a person who performs the activities of a contractor for the purpose of leasing or selling improved property he or she has owned for less than twelve months; 12.* Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person who performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, or leasing the property; 13. An owner* who performs maintenance, repair, and alteration work in or upon his or her own properties, or who uses his or her own employees to do such work; 14. A licensed architect or civil or professional engineer acting solely in his or her professional capacity, an electrician certified under the laws of the state of Washington, or a plumber certified under the laws of the state of Washington or licensed by a political subdivision of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the person certified is operating within the scope of his or her certification; 15. Any person who engages in the activities herein regulated as an employee of a registered contractor with wages as his or her sole compensation or as an employee with wages as his or her sole compensation; 16. Contractors on highway projects who have been prequalified as required by RCW 47.28.070, with the department of transportation to perform highway construction, reconstruction, or maintenance work; 17. A mobile/manufactured home dealer or manufacturer who subcontracts the installation, set-up, or repair work to actively registered contractors. This exemption only applies to the installation, set-up, or repair of the mobile/manufactured homes that were manufactured or sold by the mobile/manufactured home dealer or manufacturer; 18. An entity who holds a valid electrical contractor's license under chapter 19.28 RCW that employs a certified journeyman electrician, a certified residential specialty electrician, or an electrical trainee meeting the requirements of chapter 19.28 RCW to perform plumbing work that is incidentally, directly, and immediately appropriate to the like -in -kind replacement of a household appliance or other small household utilization equipment that requires limited electric power and limited waste and/or water connections. An electrical trainee must be supervised by a certified electrician while performing plumbing work. Per Washington State Department of Labor and Industries lessee has been interpreted to be equivalent to owner for purposes of exemptions.