Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit EL14-0941 - HORTON RESIDENCE - SOLAR PV SYSTEM ON ROOF
HORTON RESIDENCE 14415 57 AVE S EL1 4-0941 Parcel No: Address: Project Name: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov 3365900470 14415 57TH AVE S HORTON RESIDENCE ELECTRICAL PERMIT Permit Number: EL14-0941 Issue Date: 10/10/2014 Permit Expires On: 4/8/2015 Owner: Name: Address: Contact Person: Name: Address: HORTON JAMES R & BARBARA 14415 57TH AVE S , TUKWILA, WA, 98168 EVAN LEONARD 969 S NEBRASKA ST, SEATTLE, WA, 98108 Contractor: Name: ARTISAN ELECTRIC INC Address: 969 S NEBRASKA ST, SEATTLE, WA, 98108 License No: ARTISEI936L1 Lender: Name: Address: Phone: (206) 557-4215 Phone: Expiration Date: DESCRIPTION OF WORK: INSTALLING A 9.9KW SOLAR PV SYSTEM ON ROOF. USING 37 ITEK 270W MODULES WITH 3 ELTEK 2900 INVERTERS. REPLACING 200 AMP ELECTRICAL PANEL TO A NEW 200 AMP ELECTRICAL PANEL. Valuation of single family: $42,656.00 Valuation of mf/comm: $0.00 Type of Work: SERV CHNG Fees Collected: $121.48 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: 2012 2012 2012 2012 International Fuel Gas Code: WA Cities Electrical Code: WA State Energy Code: 2012 2014 2012 Permit Center Authorized Signature:. v \9 )00 Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: �y 1 ----- "3c - -- i Date: 6 ( �� This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: <NONE> PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2100 ELECTRICAL FINAL 7003 ROUGH -IN ELECTRICAL 7002 SERVICE 7001 UNDERGROUND/SLAB CITY OF TUKWL . Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** Site Address: Tenant Name: 1�q-1S S7' 4ve S To. kw,' 4, vk Suite Number: Name: �u 1p a °( O! .Ja eft es 6%i fo n Address: I"st,(S S 7 44 4 vC S City: 'ram ii . l „t State: us/if Zip: ci inG .rM � 5xrfx t r Name: E 4 n L eoet a -off Address: 9 69 S Me togas ka Si' City: Sew lit c State: t , 4. Zip: 9 frt'p 8 Phone: 2 ec - 3-S7 - v.2 t s Fax: Email: Evc. A 0 et •-t. S a rt a (eryte: c, 4 c. e • frvt King Co 4s�ret �gs Tax No.: 3 3 6 S 9O 04470 llll Floor: New Tenant: 11 Yes A..No Company Name: A,.f,sart C(ecMc:. Z-rcL• Address: C' 6 9 S' iv 6 ✓ct. s ket S t- City: s-eS f -I e State: weft Zip: C r tale Phone: 206 " S5-7^ yzis.Fax: 2.06 -S,S%'- tz i Contr Reg No.:4 R rzsEZ 93 6 z p,Date: Tukwila Business License No.; Q us _ oq ' Ise is Valuation of Project (contractor's bid price): $ 2-, 6 S6 • 0 0 Scope of Work (please provide detailed information): T t1 s �� (/ + et✓e ct I . 9 9 kW so P S ysfe•-frt ovt roof, us%et, Re �3 7 Z'fek 27O - i. I te,s w: f4 3 E1 fe lc 2 900 , .nve- �'C✓S . Reto (a.ci 01.7 �2.00A e(ec F- f p os e ( 1-o or n e t✓ 2. 00 A c ec iG✓: c.v Pc e Will service be altered? Xi Yes ❑ No Adding more than 50 amps? ❑ Yes 1Z(No Type of Use: Type of work: ❑ New ❑ Addition 0 Service Change 0 Remodel 0 Tenant Improvement ❑ Low Voltage 0 Generator 0 Fire Alarm ❑ Telecommunication ❑ Temporary Service Pro.e Served b : ►� Puget Sound Energy 0 Seattle City Light H:\Applications\Forms-Applications On Line\2014 Applications\Electrical Permit Application Revised 1-1-14.docx Revised: January 2014 bh Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings $152.85 (including an attached garage) ❑ Garages, pools, spas and outbuildings $81.90 ea ❑ Low voltage systems (alarm, furnace thermostat) $59.85 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration $81.90 (no added/altered circuits) YSl Service change with added/altered circuits $81.90 I, number of added circuits $11.55 ea ❑ Circuits added/altered without service change $54.60 (up to 5 circuits) ❑ Circuits added/altered without service change $54.60 (6 or more circuits) $7.65 ea ❑ Meter/mast repair $68.25 ❑ Low voltage systems $59.85 (alarm, furnace thermostat) MULTI -FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) $65.00 ❑ Temporary service (generator) $80.90 ❑ Manufactured/mobile home service $86.25 (excluding garage or outbuilding) ❑ Carnivals $80.60 Number of concessions $10.80 ea Each ride and generator truck $10.80 ea ***EFFECTIVE JANUARY I, 2014 EACH PERMIT WILL BE ASSESSED A 5% TECHNOLOGY FEE*** Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Signature: Print Name: Ice- /ot."4,r C (off' a �� Scr G (ec r4-, c •rC E7 .'"7 city Mailing Address: Day Telephone: — Date: Z 20G;- .S' 7''2-('S WAT 'CWiO State Zip H:\Applications\Forms-Applications On Line\2014 Applications\Electrical Permit Application Revised 1-1-14.docx Revised: January 2014 bh Page 2 of 2 DESCRIPTIONS ermatTRgk Cash Register Receipt City of Tukwila ACCOUNT QUANTITY PAID 21 14-09 dress 14415 57TH AVE n . n: 3365900470 :. ELECTRICAL PERMIT FEE SINGLE FAMILY R000.322.101.00.00 0.00 $93.45 PLAN CHECK FEE R000.345.832.00.00 0.00 $23.36 TECHNOLOGY FEE $4.67 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R3179 R000.322.900.04.00 0.00 $4.67 $121.48 Date Paid: Monday, September 29, 2014 Paid By: SARAH FLYNN ARTISAN ELECTRIC I Pay Method: CREDIT CARD 00489J Printed: Monday, September 29, 2014 2:30 PM 1 of 1 CRW YSTEMS INSPECTION�'RECORD Retain a copy with permit 6111"-0711 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 3670 Permit Inspection Request Line (206) 431-2451 Project: i," / Z ��/ j` Type of Inspection: ,/� r il�f ` Address: pisi Date Called: Special Instructions: �� { y I',r�vv VI/it'i!� Date Wanted: l �' Ic::-..nrk Requester: ��1JVYl s Phone No: 733 071/ ly►IApproved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: -iff ; X"1 fk Date: /afro q i ' t REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD tii'f- qIj f Retain a copy with permit vl'7 I INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project: 1 f,.h ^� Zfc • Type of Inspection: ,�"" iI /`fil is - Address: P 14141 5 7 �Cil Date Called: Special Instructions: 7 Date Wanted: .r J0 r� (p.a,tn.. m Requester: —` Phone No: 733 07,0 EiApproved per applicable codes. Corrections required prior to approval. COMMENTS: 1 fjVCI-L,G1) fok ( 1(.4 Inspector: I Date: , J /' d i t I REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 9/29/2014 14415 57th Ave S - Google Maps No changes shall 11^ made to the scope of ivorlc without prior approval of Tukwi!a Building Division. NOTE: Rzvisicns wilt require a new plar,imittal cnd may include additional plan revie fees. FILE COPY Permit No. EL /\ Plan review approval is subject to errors an c omissions. Approval of construction documents does not authorize t! is violation of any adopted code or ordinance. Receipt of approved Field Copy and conditions is acknowledged: Date: City of Tukwila BUILDING DIVISION By: EL1zo'if Imagery ©2014 Google, Map data ©2014 Google REVIEWED FOR COMPLIANCE WITH NFPA70-NEC uul 02 2014 City of Tukwila W_ BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 2 y 2014 PERMIT CENTER https://www.google.com/maps/place/14415+57th+Ave+S,+Tukwila,+WA+98168/@47.4734282,-122.2617222,194m/data=!3m1 !1 e3!4m2!3m1 ! 1 s0x549... 1/1 ARRAY SPECIFICATIONS A CONDUIT AND CONDUCTOR SCHEDULE Array Specifications PV Disconnect #1 PV Disconnect #2 PV Disconnect #3 TAG DESCRIPTION OF CONDUCTOR TYPE COND. GAUGE NUMBER OF CONDUCTORS CONDUI TYPE CONDUI SIZE 9.99 kW PV Imp 8.4 A PV Imp 8.4 A PV Imp 8.4 A 1 8 BARE (EGC) 8 AWG 1 Bare N/A N/A" 270W Itek Energy Modules PV Isc 11.4 A PV Isc 11.4 A PV Isc 11.4 A 2 PV WIRE 10 AWG 1Red, 1White EMT 3/4" 37Modules PV Vmp 416 V PV Vmp 384 V PV Vmp 384 V 3 THHN (GEC) 8 AWG 1 Green EMT 3/4" (1) String of (13) in Series Source Circuit PV Voc 573.7 V PV Voc 529.6 V PV Voc 529.6 V 4 THHN 10 AWG 3 B (L1), 3 R (L2), 3 W (NEUT), 1 G (GRND) EMT 1" (1) String of (12) in Series Source Circuit (1) String of 13 (1) String of 12 (1) String of 12 5 THHN 8 AWG 1 B (L1), 1 R (L2), 1 W (NEUT), 1 G (GRND) EMT 1" (1) String of (12) in Series Source Circuit 6 GROUNDING ELECTRODE COND 6 AWG Bare 1 CU N/A N/A 2 Inverter #1 Theia 3800 lnverte AC DC Il) 1 L 5 A Fuse Max Continous Output 16 A FILE COPY I� 4 DC Disco ." • PV Disconnect #1 Inverter #2 Theia 2900 Inverter AC DC (1) 15 A Fuse 1 DC Disco r (PV Disconnect #21 Inverter#3 ]]] Theia 2900 Inverter AC DC 1 L Module Ratings IT 270 HE Imp 8.4 A Isc 9.1 A Design Temp AC Circuit Hot 29°C 240 V Nominal Nom 24°C 40 A Max Cold -17°C Vmp 32 V Voc 38.9 V TCVoc -.32%/°C MaxVoc 44.13V 125 A 240 Volt Inverter Combiner ••• 5 LINE LOAD /5\ LOAD r (1)15 AAFusee DC Disco PV Disconnect #3 Max Continous Output 12 A (1) 20A BREAKER (1) 15A BREAKER (1) 15A BREAKER M RE14WED R pL C ITH ,NEC 200A Main OCPD 20 50 Amp Inverter OCPD r--� Max Continuous Output of Inverters 1,2,3 40 Amps a 0 2 2014 RECEIVED ITY OF TUKWILA City of Tukwila SEP 2 9 2014 BUILDING DIVISION PERMIT CENTER OEQUIPMENT SCHEDULE TAG EQUIPMENT LOCATION DESCRIPTION 1 SOLAR PV MODULE South and West Facing on House 9.99 kW System: 37 Itek Energy Modules; 270W Each; IT 270 HE 2 PV ARRAY South and West Facing on House 37 Modules: (1) String of (13) Modules on 3800 Theia Inverter; (1) String of (12) Modules on 2900 Theia Inverter; (1) String of (12) Modules on 2900 Theia Inverter 3 DC MAXIMIZER Underside of Modules (7) Tigo Energy Dual Maximizers; 18-52VDC; MC4 In-MC4 Out; 10A; MM-2ES050V300W-4W; x= Not Used 4 DC DISCONNECT Bottom of Inverter Integrated in bottom of Inverter 5a INVERTER #1 North Interior Wall (1) Theia 3800 Inverter (BY ITEK ENERGY); THEIA 3.8 HE-t• (1) 15 AMP DC Fuse 5b INVERTER #2 North Interior Wall (1) Theia 2900 Inverter (BY ITEK ENERGY); THEIA 2.9 HE-t• (1) 15 AMP DC Fuse 5c INVERTER #3 North Interior Wall (1) Theia 2900 Inverter (BY ITEK ENERGY); THEIA 2.9 HE-t• (1) 15 AMP DC Fuse 6 COMBINER PANEL North Interior Wall 240 VAC 125-A MAIN LUG PANEL W/ (1) 2-POLE 20-A BREAKER AND (2) 2-POLE 15-A BREAKERS 7 PRODUCTION METER North Exterior Wall Adjacent to Service Meter; 125A Service 8 200 AMP MAIN SERVICE PANEL North Interior Wall 240 VAC 200 AMP MAIN, 225 AMP BUS, 50 AMP OCPD 9 UTILITY METER North Exterior Wall Existing Seattle City Light Meter # 834503 System AC Size: W 0 N 01 a) 3 0 z U LL cn F— z W N N C r0 0 m i 0 E ro •J a) u a) U 240 VAC FROM INVERTER HOT HOT o- TO SERVICE PANEL INTERCONNECTION BREAKER HOT Sign for DC Disconnect Inv. 1 Photovoltaic Power Source RATED MPP CURRENT 8.4 A RATED MPP VOLTAGE 416 V MAX SYSTEM VOLTAGE 573.7 V MAX CIRCUIT CURRENT 11.4A WARNING; ELECTRICAL SHOCK HAZARD -LINE AND LOAD MAY BE ENERGIZED IN OPEN POSITION SOLAR PV SYSTEM AC DISCONNECT POINT OF CONNECTION AC OUTPUT CURRENT 16 A NOMINOL AC VOLTAGE 240 V THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) HOT 240 VAC Sign for DC Disconnect Inv. 1 Photovoltaic Power Source RATED MPP CURRENT 8.4 A RATED MPP VOLTAGE 384 V MAX SYSTEM VOLTAGE 529.6 V MAX CIRCUIT CURRENT 11.4A WARNING; ELECTRICAL SHOCK HAZARD -LINE AND LOAD MAY BE ENERGIZED IN OPEN POSITION SOLAR PV SYSTEM AC DISCONNECT POINT OF CONNECTION AC OUTPUT CURRENT 12 A NOMINOL AC VOLTAGE 240 V THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) 1.) LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATON. LOWEST EXPECTED AMBINET TEMP: -17 °C 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRATE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE: 29°C 3.) 2005 ASHRAE FUNDEMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47°C IN THE UNITED STATES. FOR LESS THAN 9 CURRENT -CARRYING CONDUCTORS IN ROOF -MOUNTED SUNLIT CONDUIT AT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURWF 47°C OR LESS (ALL OF UNITED ST1FES) �ss a.) 17AWCCON IIUCrORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68AMPS OR LESS WHEN PROTECTED BY A 12AMP OR SMALLER FUSE. b.) 10AWG, 90°C CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. Sign for DC Disconnect Inv. 1 Photovoltaic Power Source RATED MPP CURRENT 8.4 A RATED MPP VOLTAGE 384 V MAX SYSTEM VOLTAGE 529.6 V MAX CIRCUIT CURRENT 11.4A WARNING; ELECTRICAL SHOCK HAZARD -LINE AND LOAD MAY BE ENERGIZED IN OPEN POSITION SOLAR PV SYSTEM AC DISCONNECT POINT OF CONNECTION AC OUTPUT CURRENT 12 A NOMINOL AC VOLTAGE 240 V THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) #1 INVERTER RATINGS INVERTER MAKE Eltek (BY ITEK ENERGY) INVERTER Theia 3800; Theia 3.8HE-t MODEL MAX DC VOLT RATING 600 V MAX POWER @ 29°C S000W NOMINAL AC VOLTAGE 240V MAX AC CURRENT 16A MAX OCPD RATING 20A #2 INVERTER RATINGS INVERTER MAKE Eltek (BY ITEK ENERGY) INVERTER Thefa 2900; Theia 2.9HE-t MODEL MAX DC VOLT RATING 600 V MAX POWER @ 29°C 3750W NOMINAL AC VOLTAGE .. t A, l K ° `240V MAXAGCURRENT. - 12A ,�! i t ' /1 L. ..- MAX OCPD RATING 15A #3 INVERTER RATINGS INVERTER MAKE Eltek (BY ITEK ENERGY) INVERTER Theia 2900; Theia 2.9HE-t MODEL MAX DC VOLT RATING 600 V MAX POWER @ 29°C 3750W NOMINAL AC VOLTAGE 240V MAX AC CURRENT 12A MAX OCPD RATING 15A PV MODULE RATINGS @ STC MODULE MAKE ITEK ENERGY MODULE MODEL IT 270 HE MAX POWER -POINT CURRENT (Impp) 8.4A MAX POWER -POINT VOLTAGE (Vmpp) 32V OPEN CIRCUIT VOLTAGE (Voc) 38.9V SHORT-CIRCUIT CURRENT (Isc) 9.1A MAX SERIES FUSE (OCPD) 15A MAXIMUM POWER (Pmax) 270W MAX VOLTAGE (TYP 600VDC) 600V VOC TEMP COEFFICIENT (mV/°CElor%/°C �X) 32 rH N N OI to H W N 1 C to 0 E ro J W Equipment Installed According to Manuf. Gres Overall Roof Area: 2,73oFtSq PV Covers 24.4% of overall roof area Z O Square Area of PV does not exceed 1,000 q-"' vc Cn rrl 0 -nOn .gym pec 18 7 'ON 31"-u 11I L 1J /\ [1. m XI 1"' PIA View - Overhead '�lI' ' ELECTRIC IS'�� REVISIONS MM/DD/YY REMARKS 1 S/4/2ot4 9 99kW Itek Energy Solar Array 2--//-- ... Solar PV Construction 3--/--/__ ... 4 /__/__ ... 5 __/__/__ ... r-1 0 0 North Barbara Horton South East West RE IEWED FOIA COMPLIANCE WIT NFPA70 - NEC u l 0 2 2014 City of Tukwila - BUILDING DIVISION RECEIVED C Y OF TUKWILA SEP 2 9 2014 PERMIT CENTER Rarhara I-Inrtnn REVIEW OR H COMPLIANCE NFPA 70 - NEC Uu t 0 2 2(114 City of Tukwila BUILDING DIVIS1Q RECEIVED CITY OF TUKWILA SEP 2 9 2014 PERMIT CENTER o li a, Q J 02 O :.! N N u- cnW O. � ifigig U ra • • IR ea rt ei PERMIT CENTER ..bi.M.11 .2.241 mai! .... r4 C C s itek Energy HE Solar Modules The high performance, high quality and affordable solar solution • • • Made -in -Washington using Cutting Edge High Efficiency Mono Crystalline Cells • 25-Year Power Output Warranty • 10-Year Workmanship Warranty • Exceptional Power Density (watts/m2) GENERAL DATA Cell type 60 Super High Efficiency Mono crystalline cells •6 X 10 cell matrix .3 by-pass diodes Glass Ultra clear, low iron tempered solar glass with anti -glare prismatic subsurface texture Backsheet Multi layered, highly resistant polyester Frame High strength anodized aluminum frame compatible with both top -down clamps and bottom flange mounting •Numerous flange mounting holes on inch dimension centers • Mounting holes specifically for micro -inverter applications Cable 42" 90C 12 AWG PV wire Connector MC4 Grounding REVIEWED FOR COMPLIAN NFPA 70 - NEC uL I 02 2014 3 City of Tukwila BUILDING DIVISIO Certified for Wiley Electronics WEEBTM grounding clips •Eight standard grounding locations per module for reduced ground wire length 1647mm (64.8") • • Backside of Solar Module 50mm (2" thick) ELECTRICAL DATA* 25IT IT IT IT IT IT 5 HE 260 HE 265 HE 270 HE 275 HE 280 HE Maximum Power - P,,,,,, (Wp) 255 Maximum Power Voltage - V.,„ (V) 31.5 Maximum Power Current - I,,,,(A) 8.1 Open Circuit Voltage - V (V) Shod Circuit Current - I,a (A) Power Density (W/m2) 38.4 8.8 155.8 260 31.7 8.2 38.6 8.9 158.8 265 270 275 31.8 32.0 32.1 8.3 8.4 8.5 38.7 9.0 161.9 38.9 39.0 9.1 9.2 164.9 168.0 32.3 RECEIVED 3ITY OF TUKWILA 9.3 171.0 • 5ectncoi characterislia may way within ,1- 3% of Me ineectated valves of Standard Tee Conditions 15TC): inodionce of IOOOW/m! AM 1.8 specham cell temperature 25C(llfl VO4.037 I L'4O'tMl SEP 2 9 2014 PERMIT CENTER MECHANICAL DATA Dimensions 39.1" X 64.8" X 2" Weight 43 lbs MAXIMUM RATINGS Operational Temperature -40...+ 90°C Maximum System Voltage 600V Design Load (UL 1703) up to 113 lbs/ft2 Maximum Load (UL 1703) 551 kg/m2 (5400 Pa) Maximum Wind Load 113 Ibs/ft2 Max Series Fuse Rating 15A Max Reverse Current 15A NOTE: Specifications subject to change without notice TEMPERATURE RATINGS Nominal Operating Cell Temperature (NOCT) 48.20 °C Temperature Coefficient oft«. - 0.47 %t°C Temperature Coefficient of V« - 0.32 %I°C Temperature Coefficient of I, + 0.04 %/°C Temperature Coefficient of V - 0.45 %/°C QUALIFICATIONS UL Listing UL 1703 Fire Rating Class C 280 Made in Washington State •• dIP teMenergy 360.647.9531 I itekenergy.com ELTEK FILE COPY fil,,,,pmpoot No. THEIATM HE-t UL The THEIAT"' HE-t UL takes high performance and user friendliness to a new level for isolated string inverters. Suitable for all PV cell technologies, and certified to UL1741, the THEIAT"", HF- choice for anyPV installatiol�. ��D FOR perfect COMPLIANCE WITH NFPA 70 NEC u1 I 0 2 2014 City of Tukwila BUILDING DIVISION THEIATM HE-t UL SOLAR INVERTERS: 2.0 kW - 4.4 kW PERFORMANCE • Maximum efficiency 97.3 % with galvanic isolation • Suitable for use with all PV modules of any technology, with the ability to ground the positive or the negative terminal on the DC side • Compliance with the highest international safety standards • Early startup and high efficiency at low irradiation gives longer operation time and higher energy yields RELIABILITY • High quality components, with a robust design • Proprietary Maximum Power Point Tracking • Stable operation under extremely dynamic irradiation conditions • NEMA 4X protection level EASE OF USE • Lightweight and easy to install • Color screen with touch sense buttons • Intuitive user interface MONITORING AND COMMUNICATION • Complete site overview from one single inverter • Integrated webserver with easy -to -use RECEIVED monitoring software CITY OF TU K W I LA • Multitanguage display EL14-ottii1 SEP 2 9 2014 PERMIT CENTER Eltek © 2013 Find your local office at: www.eltek.com Doc No: 357116.DS3 rev 5 MODEL INPUT DATA 2.0 HE-t UL 2.9 HE-t UL 3.8 HE-t UL 4.4 HE-t UL Nominal DC power Max. PV power Max. DC voltage Voltage range MPPT Max. input current Number of PV string inputs Number of MPP trackers Input features 2100 W 3000 W 2625 Wp 600 Vdc, 230 to 500 Vdc 1, 230 to 500 Vdc } 230 to 500 Vdc 13.5A 18.0A 3750 Wp 9.5 A 3 1 4000 W 5000 Wp • 4600 W 5750 Wp 230 to 500 Vdc Reverse polarity protection Ground fault monitoring Integral DC fuses for string inputs (optional) Field configurable for positive or negative grounding. 21.O A OUTPUT DATA 2000 W 12900 W I 3800 W 4450 W 8.5 A / 10.0 A 12.0 A / 14.0 A T16.0A/18.5A L Y 18.5A/21.5A ( Nominal output power AC current (240 Vac i 208 Vac) r Mains output voltage r Mains frequency Cos Phi (power factor) 4_ 240 Vac (+13 % / -25 %) or 208 Vac (+29 % / -14 %) single or split phase 1) 4. 60 Hz (+ 5 %, - 8.3 %) ' 0.8i to 0.8c selectable -4 PERFORMANCE DATA I Maximum efficiency CEC efficiency EU efficiency t Power feed starts at _ Night mode power 97.2 % ' 97.2 % •• 972% ' 97.3 % 1 96.8 % 96.8 % j 97.0 % 97.0% t- -i 196.3 % 96.5 % ! 96.7 % ' 96.9 % <7W < 1 W i -11 MECHANICAL DATA Protection degree Dimensions I Weight Cable access (conduit knockouts) Input cable connection r - Output cable connection NEMA 4X or 3R 720 Hx 353 Wx 165Dmm / 28.35 Hx 13.90 Wx 6.50 Dinches -r 1 <22kg/491bs i <22kg/491bs <23kg/51lbs <23kg/511bs 2x3/4"+2x1"base. 1 x 3/4" + 1 x 1" sides and back Screw terminals / Cable clamp Screw terminals / Cable clamp DESIGN STANDARDS EM compatibility i• , UL marking t • Other standards FCC Level 8, EN 61000-6-2 , EN 61000-6-3 i Yes UL 1741, IEEE 1547, IEC 61000-3-2/11, IEC 61000-3-3/12 ENVIRONMENTAL DATA Operating temperature 1 Storage temperature r Ventilation Topology Protection class / Overvoltage 1 I / III catergory Noise emission ' Communication Warranty v High frequency transformer, galvanic isolation < 37 dB (A) Graphical. color display with touch sense buttons, Embedded web -server, Ethernet, CAN and RS485 bus interface, 3x LEDs for visual status indication 4- 10 years, 15 years. and 20 years options - 25 °C to + 60 °C / -13 to + 149 °F (possible power derating above + 45 °C / + 113 °F) s , 40°Cto+80°C/-22to+176°F ' Convection cooling a Average overall efficiency Vmpp=480V Vmpp=361.6V Eltek © 2013 Find your local office at: www.eltek.com Doc No: 357116.DS3 rev 5 FILE COPY /Ak IRONRIDG FILE COPY PPrrrit Pin. City of Tukwila BUILDING DIVISION Built for solar's toughest roofs. Roof Mount System RECEIVED CITY OF TUKWILA SEP 2 9 2014 PERMIT CENTER Anchored by the strongest rails in solar, the IronRidge Roof Mount System provides the durability and versatility to handle virtually any residential or commercial rooftop. The unique curved profile of the XRS Rail increases its strength while also giving it an attractive look, making it very customer -friendly. In addition, IronRidge Rails are certified for integrated grounding, which eliminates separate module grounding components and procedures, making it very installer -friendly. Strongest Rails Longer spans between attachments, fewer roof penetrations. Simple Assembly Versatile and adjustable components simplify any array design. Integrated Grounding UL 2703 system eliminates separate module grounding components. . PE Certified Pre -stamped engineering letters available in most states. Design Software Online tool generates a complete bill of materials in minutes. 20 Year Warranty Twice the protection offered by competitors. L1'4O'1'1 1 — Rails Standrard Rails (XRS) Curved rails increase spanning capabilities and aesthetics. • Available in clear and black anod. • Multiple sizes between 12' and 18' • Made of corrosion resistant alum. — Attachments Flashings Light Rails (XRL) Lightweight rails reduce cost for lighter load conditions. • Available in clear and black anod. • Multiple sizes between 12' and 18' • Made of corrosion resistant alum. Rail -Splices Internal splices seamlessly connect rails, allowing easy L-foot installation. • Different versions for XRS and XRL • Includes self -tapping screws • Available with grounding straps ANIL FlashFootTM is an all -in -one mounting product for composition shingle roofs. • Integrated L-Foot and hardware • Certified compliant with IBC & IRC. • PE certified with IronRidge Rails Clamps & Accessories End Clamps Secure modules to the end of the rails. • Clear and black anod. • Sizes from 1.22" to 2.3" • Optional bottom clamps Online Software Adjustable L-Feet 1 Slotted'L-feet provide adaptable attachment to standoffs and flashings. • Available in clear and black anod. • Works with XRS and XRL rails Compatible with third -party parts Tilt Leg Kits Fixed and adjustable tilt legs allow adjustment in all three axes. • Attaches directly to XRS and XRL • Ships with all required hardware • Multiple sizes for 5-45 deg. tilts Mid Clamps Q End Caps Fasten modules in the middle of the rails. • Clear and black anod. • T-bolt or hex nut designs • Grounding clamp offered Provide a finished look for rails. • Keeps out debris • Black polycarbonate • UV protected Wire Clips Organize both DC and AC wiring along the rails. • Attaches to both rails • Supports ten 5mm wires • UV protected The IronRidge Design Assistant helps you go from rough layout to fully engineered system. For free. Go to ironridge.com/rm Available with Integrated Grounding IronRidge offers UL 2703 certified components that automatically bond modules and rails to ground. Go to ironridge.com/ig i FILE COPY ZAik. IR61TbGE Solar Mounting Made Simple® Roof Mounting System Light Rail (XRL) 2013 Edition v1.3 I'-oq''i A complete Manual for the installation of IronRidge's Light Rail system. Installation Manual REVIEWED FOH COMPLIANCE WITH NFPA70-NEC / i Ut;I 02 2014 City of Tukwila BUILDING DIVISI RECEIVED CITY OF TUKWILA SEP 2 9 2014 PERMIT CENTER fI IRON RIDGE Solar Mounting Made Simple' This Installation Manual was created to help with the assembly of the IronRidge Light Rail Mounting System. Light Rail 1 Introduction Installer Responsibility Customer Support Tools Required For Assembly Torque Values For Dry Bolts 2 Module Clamp Table Grounding Setup 4 Component List 5 Assembly: Step 1 Assembly: Step 2 6 Assembly: Step 2 7 Assembly: Step 3 8 Assembly: Step 3 9 Warranty Information i InstallationManual Table of Contents support@ ; ironridge com l (800) 227-9523 TOC 2013 v1.3 /lr I RON RI DGE Solar Mounting Made Simple° Installation Manual Light Rail Introduction The IronRidge Light Rail System is a flexible and straightforward roof mounting solution for a wide variety of solar photovoltaic (PV) needs. Due to its modular design, it can easily handle a wide variety of panel sizes and quantities. Installer Responsibility The installer is solely responsible for: i. Complying with all applicable local or national building codes, including any that may supersede this manual; ii. Ensuring that IronRidge and other products are appropriate for the particular installation and the installation environment; iii. Ensuring that all structural support members, including the roof, its rafters, and connections, can support the array under all code level loading conditions; iv. Using only IronRidge parts and installer -supplied parts as specified by IronRidge. Substitution parts may void the warranty; v. Ensuring that anchoring devices including lag screws have adequate pullout strength and shear capacities as installed; vi. Maintaining the waterproof integrity of the structural support or roof, including selection of appropriate flashing; vii. Ensuring safe installation of all electrical aspects of the PV array; and viii. Ensuring that PV module is UL or CE listed and verification of PV Module's capacity to support the loads associated with the given array; and ix. Ensuring correct and appropriate design parameters are used in determining the design loading used for the specific installation. Parameters, such as snow loading, wind speed, exposure and topographic factor should be confirmed with the local building official or a licensed professional engineer. Customer Support IronRidge makes every effort to ensure your mounting kit is easy to install. If you need assistance at any point with your installation or have suggestions on how we can improve your experience, call IronRidge customer support: (707) 459-9523 Tools Required For Assembly Wrenches are required to assemble the IronRidge Light Rail System. An open-end wrench, box -end wrench, or socket drive with sockets will suffice. The sockets will need to support the following size hex heads: Hex Head Size Component 5/16" #12 Self Drilling/tapping screws 7/16" 1/4 cap -end screws and bolts 9/16" 3/8 cap -end screws and bolts Torque Values For Dry Bolts Use the following torque values in this assembly. Bolt Size Required Torque Value 1/4-20 120 in-Ibs. (dry), 100 in-Ibs. (wet), 65 in-Ibs. on End Clamps (wet or dry) 3/8-16 236 in-Ibs. support@ 1 ° ironridge.com I (800) 227-9523 Page 1 2013v13 /f IRONRIDGE Solar Mounting Made Simple` Installation Manual Light Rail Module Clamp Table Module Thickness Clamp Info Part Numers Mm Inches Clamp Type Bolt Height End Clamp Mid Clamp (hex) Mid Clamp (tbolt) 31.0 - 32.5 1.22 -1.28 I 2.00" 29-7000-125 29-7000-105 29-70TB-105 33.3 - 34.8 1.31 -1.37 A 2.00" 29-7000-134 29-7000-105 29-70TB-105 34.8 - 36.8 1.37 -1.45 B 2.00" 29-7000-224 29-7000-105 29-70TB-105 39.0 - 41.0 1.53 - 1.61 C 2.25" 29-7000-157 29-7000-101 29-70TB-101 41.1 - 42.7 1.62 -1.68 1 2.25" 29-7000-165 29-7000-101 29-70TB-101 42.7 - 44.2 1.68 -1.74 E 2.25" 29-7000-171 29-7000-101 29-70TB-101 45.0 - 47.0 1.77 -1.85 F 2.50" 29-7000-214 29-7000-108 29-70TB-108 46.7 - 48.3 1.84 -1.90 K 2.50" 29-7000-187 29-7000-108 29-70TB-108 49.0 - 51.1 1.93 - 2.01 G 2.50" 29-7000-204 29-7000-108 29-70TB-108 57.4 - 58.9 2.26 - 2.32 H 2.75" 29-7000-230 29-7000-104 29-70TB-104 Grounding Setup All electrical installation and procedures should be conducted by skilled, licensed and bonded electricians. All work must comply with all national, state and local installation procedures, product and safety standards. These standards include but are not limited to applicable National Electrical Code (NEC®), National Electrical Installation Standards (NETS'"'), UL Standards, and OSHA Regulations. Note: For installations that utilize WEEBs, WEEB Lugs and WEEB Bonding Jumpers, please refer to Wiley/Burndy installation manual for "lronRidge Light and Standard Series Rail" for proper installation procedures. support@ 1 ironridge.com 1 (800) 227-9523 Page 2 2013.v1.3 dAk IRONRIDGE Solar Mounting Made Simple° Component List The IronRidge Light Rail System contains the following parts: L-Foot Attaches to the roof and is the anchor point for the rest of the panel assembly. Light Rail Attaches to the foot via foot clamp and provides support for the PV modules. Mid Clamp Clamps the inside edges of the PV modules to the rails. Installation Manual Light Rail Internal Splice Ties the extrusion rails together, extending their length. End Clamp Clamps the outside ends of the PV modules to the rails. End Cap Caps off the end of the rail and prevents the collection of debri inside rail. support@ 1 'ironridge.com (800) 227-9523 Page 3 2013v1.3 Alk. IRONRIDGE Solar Mounting Made Simple® Assembly Step 1. Mounting the feet and the first piece of rail. A. Mount all of the feet to the roof in the desired locations. Note: Determine the maximum distance between feet according to engineering specifications. B. On the first piece of rail, slide 3/8-16" bolts into the side facing t-slot on the rail. Space the bolts out to match the foot spacing. C. On this same piece of rail, slide 1 /4-20" bolts into the top facing t-slot on the rail. Space the bolts out to match the panel spacing. D. Attach this first piece of rail to the feet mounted on the roof. Mount the rail to each foot with a flange nut and hex bolt. Hand tighten the nuts and check the level of the rail. Tighten 3/8-16 hardware to 236 in-Ibs. Step 2. Mounting the next pieces of rail. B. On the next piece of rail, slide 3/8-16" bolts into the side facing t-slot on the rail. Space the bolts out to match the foot spacing. C. On this same piece of rail, slide 1/4-20" bolts into the top facing t-slot on the rail. Space the bolts out to match the panel spacing. J Installation Manual Light Rail J IL IL support@ I ironridge.com I (800) 227-9523 Page 4 2013 v1.3 Ali. IRONRIDGE Solar Mounting Made Simple° C. Lay the rail on its side, with the slotted side down as shown. D. Slide the internal splice half way into the internal cavity in the rail. It should extend approximately three (3) inches into the cavity. E. Using one (1) self -drilling, self -tapping screw, one (1") inch from the edge of the rail, secure the internal splice into the rail as shown on the right. Note: For installations that utilize WEEB Bonding Jumpers, please refer to Wiley/Burndy installation manual for "!ronRidge Light and Standard Series Rails" for proper installation procedures. F. Loosely mount this piece of rail onto its footings. G. By moving this second rail along its footings, the internal splice should slip into the cavity on the first rail, with the rails butting tightly and evenly together. H. Maintain rail alignment while following the next steps. I. You should mark off approximately three (3) inches from the end of the first rail (where the internal splice should end). Drive one (1) self - tapping screws through the second rail, one (1") inch from the edge utilizing the same horizontal location as the first rail. J. Repeat this procedure for the remaining rails. 711:=] support@ I ironridge.com I (800) 227-9523 Page 5 2013 v1.3 / l IRONRIDGE Solar Mounting Made Simple° Step 3. Clamping the panels to the rails. A. Lay the first PV module in position on the rails. Note: For installations that utilize WEEBs, please refer to Wiley/Burndy installation manual for'IronRidge Light and Standard Series Rails" for proper installation procedures. B. Then slip the end clamp over the bolt, making sure it is firmly hooked over the side of the module. C. Complete the clamp assembly with a flange nut as shown. Tighten end clamp to 65 in-Ibs. D. Repeat with the other clamp. E. Working from the opposite side of the PV module. Assemble the mid clamps by putting a damp on the bolt, followed by the flange nut. Installation Manual Light Rail support@ ironridge.com 1 (800) 227-9523. Page 6 2013 v1.3 /lr IRONRIDGE Solar Mounting Made Simple° F. Place the second PV Module into position on the rails, sliding it against the first so the mid clamps are in contact with the edges of both panels. Note: For installations that utilize WEEBs, please refer to Wiley/Burndy installation manual for "IronRidge Light and Standard Series Rails" for proper installation procedures. G. Tighten to 120 in-Ibs. (dry), 100 in-Ibs. (wet). H. Repeat the procedure using mid damps to secure each successive module. I. Secure the last module at the end of the rails using the other set of end clamps.Tighten to 65 in-lbs. Installation; Manual Light Rail support@ ironridge.com r (800) 227-9523' Page 7 2013 v1.3 /Arab.IRONRIDGE Solar Mounting Made Simple* Installation Manual, Light Rail Warranty Information Effective for IronRidge, Inc. ("IronRidge") mounting structure components ("Products") manufactured after April 1st, 2012, IronRidge provides the following warranties, for Products installed properly and used for the purpose for which the Products are designed: • finishes shall be free of visible defects, peeling, or cracking, under normal atmospheric conditions, for a period of three (3) years from the earlier of (i) the date of complete installation of the Product or (ii) thirty days after the original purchaser's date of purchase of the Product ("Finish Warranty"); • components shall be free of structurally -related defects in materials for a period of ten (10) years from the earlier of (i) the date of complete installation of the Product or (ii) thirty days after the original purchaser's date of purchase of the Product; • components shall be free of functionally -related manufacturing defects for a period of twenty (20) years from date of manufacture. The Finish Warranty does not apply to: (a) surface oxidation of the galvanized steel components or any foreign residue deposited on Product finish; and (b) Products installed in corrosive atmospheric conditions, as defined solely by IronRidge; corrosive atmospheric conditions include, but are not limited to, conditions where Product is exposed to corrosive chemicals, fumes, cement dust, salt water marine environments or to continual spraying of either salt or fresh water.The Finish Warranty is VOID if (c) the practices specified by AAMA 609 & 610-02 -"Cleaning and Maintenance for Architecturally Finished Aluminum" (www.aamanet.org) are not followed by Purchaser for IronRidge's aluminum based components; and (d) if the practices specified by ASTM A780 / A780M - 09 "Standard Practice for Repair of Damaged and Uncoated Areas of HotDip Galvanized Coatings"are not followed by Purchaser for IronRidge's galvanized steel -based components. The warranties above do not cover any parts or materials not manufactured by IronRidge, and exclude nonfunctionally-related defects, as defined solely by IronRidge. The warranties do not cover any defect that has not been reported to IronRidge in writing within twenty (20) days after discovery of such defect. In the event of breach of or non-compliance with the warranties set forth above, IronRidge's sole obligation and liability, and the sole and exclusive remedy for such breach or non-compliance, shall be correction of defects by repair, replacement, or credit, at IronRidge's sole discretion. Such repair, replacement or credit shall completely satisfy and discharge all of IronRidge's liability with respect to these warranties. Refurbished Product may be used to repair or replace the defective components. Transportation, installation, labor, or any other costs associated with Product replacement are not covered by these warranties and are not reimbursable. These warranties additionally do not cover (a) normal wear, or damage resulting from misuse, overloading, abuse, improper installation (including failure to follow professional instruction and certification), negligence, or accident, or from force majeure acts including any natural disasters, war or criminal acts; and (b) Products that have been altered, modified or repaired without written authorization from IronRidge or its authorized representative; and (c) Products used in a manner or for a purpose other than that specified by IronRidge. A formal document proving the purchase and the purchase date of the Product is required with any warranty claim. Except as set forth above, IronRidge sells the Products on an "AS IS" basis, which may not be free of errors or defects, and ALL EXPRESS OR IMPLIED REPRESENTATIONS AND WARRANTIES, INCLUDING ANY WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, QUALITY, WORKMANLIKE EFFORT, CORRESPONDENCE TO DESCRIPTION, DESIGN, TITLE OR NON -INFRINGEMENT, OR ARISING FROM COURSE OF DEALING, COURSE OF PERFORMANCE OR TRADE PRACTICE, ARE HEREBY DISCLAIMED. support@ I ironridge.com I (800) 227-9523 Page 8 2013 v1.3 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: EL14-0941 PROJECT NAME: HORTON RESIDENCE SITE ADDRESS: 14415 57 AVE S X Original Plan Submittal Response to Correction Letter # DATE: 09/29/14 Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Ci Building Division Public Works Fire Prevention Structural Planning Division Permit Coordinator n a PRELIMINARY REVIEW: Not Applicable n (no approval/review required) DATE: 09/30/14 Structural Review Required REVIEWER'S INITIALS: DATE: n APPROVALS OR CORRECTIONS: DUE DATE: 10/28/14 Approved Corrections Required (corrections entered in Reviews) Approved with Conditions Denied (ie: Zoning Issues) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 ARTISAN ELECTRIC INC Page 1 of 2 CpWashington State Department of Labor & Industries ARTISAN ELECTRIC INC Owner or tradesperson WILLIAMS, JASON P Principals WILLIAMS, JASON P, PRESIDENT Williams, Jennifer S, SECRETARY WILLIAMS, JASON P, AGENT Doing business as ARTISAN ELECTRIC INC WA UBI No. 602 729 270 969 S NEBRASKA ST SEATTLE, WA98108 206-313-5863 KING County Business type Corporation License Verify the contractors active registration / license / certification (depending on trade) and any past violations. Electrical Contractor Active. Meets current requirements. License specialties GENERAL License no. ARTISEI936L1 Effective — expiration 06/21/2007— 06/24/2015 Designated administrator WILLIAMS, JASON License type Electrical Administrator Bond American Contractors Indem CO Bond account no. 100242683 Received by L&I 03/07/2014 Bond history Savings Active. Meets current requirements. License no. WILLIJ*931 KU $4,000.00 Effective date 03/13/2014 Expiration date Until Canceled No savings accounts during the previous 6 year period. https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602729270&LIC=ARTISEI936L 1 &SAW= 10/10/2014