Loading...
HomeMy WebLinkAboutPermit M14-0034 - SUMMIT HOMES - HVAC ZONES, DUCTING AND INTERIOR FTUSUMMIT HOMES 16000 CHRISTENSEN RD SUITE 303 M14-0034 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 2523049077 Permit Number: M14-0034 16000 CHRISTENSEN RD 303 Issue Date: 2/21/2014 Permit Expires On: 8/20/2014 Project Name: SUMMIT HOMES Owner: Name: Address: BRCP RIVERVIEW PLAZA LLC 248 HOMER AVE , PALO ALTO, WA, 94301 Contact Person: Name: JEFF SAETHER Address: PO BOX 789 , MONROE, WA, 98272 Contractor: Name: Address: License No: Lender: Name: Address: TEAM MECHANICAL INC 17150 TYE ST SE STE K , MONROE, WA, 98272 TEAMMI*030J8 I II Phone: (360) 805-1835 Phone: Expiration Date: 4/23/2014 DESCRIPTION OF WORK: SEPARATE TENANT HVAC ZONES. MODIFY PERIMETER DUCTING. ADD NEW INTERIOR FTU AND MODIFY DUCTING. Valuation of Work: $4,200.00 Type of Work: NEW Fuel type: ELECT Fees Collected: $258.96 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer Distric: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: Internations Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: 2012 2012 2012 2012 International Fuel Gas Code: WA Cities Electrical Code: WA State Energy Code: 2012 2012 2012 Permit Center Authorized Signature: calf, -4t Date: ��— I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Date: ahZ///Y Print Name: �-�, L SG��r This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***MECHANICAL PERMIT CONDITIONS*** 2: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1800 MECHANICAL FINAL 0701 ROUGH -IN MECHANICAL CITY OF TUKW._ _ Community Development Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. tl 1 q- C) 3 / Project No. Date Application Accepted: Q 0°114i Date Application Expires: 07 /3U I/ (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print* * SITE LOCATION Site Address: /6(00 eSCE Rd Tenant Name: .cli//11 7 7L HDfril✓S PROPERTY OWNER Name: t� `/il %t7gr.,f[l..a Address: oy0 dlT/'/SEh/ leo .vi4 IUt, City:���wi ,j State: AmZip5ves CONTACT PERSON — person receiving all project communication Name: e cater s J,lir Address p8 4c2X .7 f9q Cityen ate_ State:4)4 Zip.9,727'e Phone: g60.8dx /f5,?S Fax:26, _roc. 50... ' Email: �'p/n/i'1 1Gh fee-, to confif/t , GO./'1 King Co Assessor's Tax No.: a SZ ?O1 '757L3 Suite Number: 3 03 Floor: 3 New Tenant: ❑ Yes ,Ej..No MECHANICAL CONTRACTOR INFORMATION Company Name:7 , I Medlar) C TId1i L . Address:p0 gox 7(99 City:4,70nr�, (,aj, tate: 9g7 J _ Phone: .76arUS-/(33 C Fax: w _ et, S __5. Contr Reg N%IM' J t 0305'f�3 Exp Date: v/,-3/��/ / 7 Tukwila Business License No.: Valuation of project (contractor's bid price): $ 2°0, On Describe the scope of work in detail: of r H a 1t /* NC_ zo v!L S AO,y/r 6pervreuzizi dti eMiy 401a./ /144,) Frcc ef vp,-'Fy Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement ❑ Fuel Type: Electric 21 Gas ❑ Other: H: Applications\Forms-Applications 0n Line\2011 Applications\Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace > 100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWC AUTTHORI�;AG2 ' U"- Signature: / a' Date: V2 g/ Print Name: ....1—ErPREY D. . — 1 /1i Day Telephone: &12 rS'Og/lg?� Mailing Address: / d ee9X. 7679 "%i�l'1rit-e 61/1 / 32° City State Zip H:\Applications\Forms-Applications On Line\2011 Applications\Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS I ACCOUNT I QUANTITY PermitTRAK I PAID $258.96 M14-0034 Address: 16000 CHRISTENSEN RD 303 Apn: 2523049077 $258.96 MECHANICAL $249.00 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 $32.50 PERMIT FEE R000.322.100.00.00 $166.70 PLAN CHECK FEE R000.322.102.00.00 $49.80 TECHNOLOGY FEE $9.96 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R1008 R000.322.900.04.00 $9.96 $258.96 Date Paid: Thursday, January 30, 2014 Paid By: TEAM MECHANICAL INC Pay Method: CREDIT CARD 310364 Printed: Thursday, January 30, 2014 11:45 AM 1 of 1 CPWSYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. Iv\j4.D}3. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pro'ect: A�J) �?(.)tiliAl,, i 00i'Lc C 1 Type of Inspection: A ! ` I" - l !v �L\ Address: 1(0&cad jr, (eA 1 r/V Date Called: 'Special Instructions: 3 6,3 / 310 Date Wanted: ,., 1- Ca - (� < a,m. Requester: Phone )ne - 31 -566.4 Approved per applicable codes. Corrections required prior to approval. COMMENTS: op 3 ( ("obi if-Te inspector: Date: -1; REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Btvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit 4 3L PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project: 1 :tit r Typedof Inspection: R G\ic(.11 — I t./ Address: I(000r) Ct+lsfk)NPJ) Date Called: --. Special Instructions: CM t f Ao c1 . Date Wanted:-m */7— G 5 _' ((I 'a:,- p.m. Requester• Phone No: gq(0 _SO u Approved per applicable codes. COMMENTS: tl Corrections required prior to approval. Inspe; tor: 11. A )CA 1. RE1NSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid, at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date' r (-1`") LZ COP mit No. plan review approval is subject to e r:o` struCtian d+ E`!y adopted HVAC PLAN KEY PLAN / FLOOR PLATE — ":25' SUMMIT HOMES R1VERVIEW PLAZA, BUILDING 11 16040 CHRISTENSEN ROAD, SUITES 303 TUKWILA, WA 98188 THIRD FLOOR NO CHANGE TO EXITING SE'ARATE 2QUIRED ❑ Mechanic ligoElectrica9 l 'lumbug r. as Piplrtti of Tukwila ":'!(..1 DIVISION f--- REVISIONS No chances shall be made to the scope of r'ork without prior approval of ' kw';ia Building Divisio n. — •., . 'T6.c c. will require a new plan submittal i and rnLy ir: ude additional an review f^a5, LONGEST COMMON PATH OF EGRESS TRAVEL 45' SUITE 303 LONGEST COMMON PATH OF EGRESS TRAVEL, 21' AREA OF WORK SUITE 310 STREET MAP Y a f5 z 11 rs and omissions. does not authcTi ordinance. R9cci ,}I is at:am:gadget SC�iE 303 City of Tukwila cu 1tl niNG DIVISION RECEI CITY OF TUKWILA JAN3023t SCOPE OF WORK- Suite 303/310 Cap 1 diffuser branch from VAV-305 Install new branch duct from VAV-304 Relocate 1 existing temp. sensor Cap duct from VAV-311 Install new FTU-311A Connect existing duct to FTU-311A Air balance to design CFMs APN Number: 2523049078 New Equipment: FTU-311A Trane VSEF08, 8" inlet, -ECM motor 2kW, 600 CFM cooling, 250 CFM heating, 277v.1PH, FLA 9.62A, MCA 12.03A MOCP 15.0A YooL (NP /Jtlkc, 5 s ,ccy„- v1 1`Y 4-0 o S-.C‘GeA VAc W Y SurrE 3/o CENTER M1Lk OO TRANS Prepared For: Team Mechanical Sold To: Team Mechanical Submittal Date: January 22, 2014 Customer P.O. Number: Customer Project Number: Job Number: Job Name: Riverview Building - Tukwila CABLE COPY Permit No. Trane U .S. Inc. dba Trane is pleased to provide the enclosed submittal for your review and approval. Product Summary Qty Product 1 Fan Powered VAV Box Mike Eiger Trane 2333 15 8th Court NE Bellevue, WA 98008 Phone: (425) 586-1672 Cell: (2156) 437-7250 Fax: (42 5) 643-4314 REVIEWED FOR CODE COMPLIANCE APPROVED FEB 19 2014 City of Tukwila BUILDING DIVISION The attached information describes the equipment we propose to fumish for this project, and is submitted for your approval. RECEIVED C►Tv OF 1 UKWILA JAN 3 0 2014 PERMIT CENTER J:IJOBS1125182471121Riverview Building - Submittal doc kA1L (jJ214 Table Of Contents Product Summary 1 Variable Air Volume Fan Powered Terminal Units (Item Al) 3 Tag Data .. 3 Product Data 3 Performance Data 3 Mechanical Specifications 4 Unit Dimensions 5 Accessory 6 Field Wiring 7 Riverview Builaina - Tukwila January 22, 2014 Taco Data - Variable Air Volume Fan Powered Terminal Units (Qty: 1 Item Tag(s) Qty Description Model Number Al VAV-1 1 Fan Powered VAV Box VSEF08 Product Data - Variable Air Volume Fan Powered Terminal Units Item: Al Qty: 1 Tag(s): VAV-1 Series with electric heat 8" Inlet Diameter 03 super quiet fan 1/2" matte faced insulation Flanged connection ECM Motor Shaft only - with controls enclosure Customer provided actuator Left hand connection Disconn ect switch 277 volt, 1 phase 2.0 kW, 1 stage 24 volt magnetic contactors Electric heater air flow switch Performance Data - Variable Air Volume Fan Powered Terminal Units Tags VAV-1 Design cooling airflow (cfm) 600 Min cooling airflow (cfm) 250 Valve heating airflow (cfm) 250 Cooling inlet diameter (in) 8.000 Cooling inlet velocity (ft/min) 1719 APD © cooling airflow (in H2O) 0.230 Fan airflow (cfm) 600 Downstream SP (in H2O) 0.250 Fan TSP (in H2O) 0.251 % of fan range (%) 56.00 Fan power (hp) 0.333 Plenum EAT (F) 70.00 Primary EDB (F) 55.00 Operating weight (lb) 106.0 Max inlet SP (in H2O) 0.750 Unit heating airflow (cfm) 600 Coil heating capacity (MBh) 6.83 Room heat Toss (MBh) 4.06 Room heating setpoint (F) 68.00 Coil EAT (F) 63.75 Unit LAT (F) 74.24 Coil LAT (F) 74.24 Full Toad amps (A) 9.62 Min circuit ampacity (A) 12.03 Max overcurrent protection (A) 15.00 Electric heater kW (kW) 2.00 FLD = Famished by Trane U.S. Inc. dba Trane / Equipment Submittal Page 3 of 7 Installed by Others Riverview Building - Tukwila Mechanical Specifications - Variable Air Volume Fan Powered Terminal Units Item: Al Qty: 1 Tag(s): VAV-1 General Unit Information Casing - The unit casing is 22 gauge galvanized steel. Outlet duct connection is flanged. Total metal encapsulation of all insulation edges. Hanger Brackets provided. Side access is provided. Filter - A filter is provided on the plenum inlet. Agency Listing - UL and Canadian UL listed as environmental air terminal unit. UL Control #9N65. All Trane terminal units are AHRI 880 -98 certified. -General Unit Clearance Leave a minimum of 36" on control box side of unit for adequate service access. Allow at least 12" on remaining sides for unit clearance. A minimum of one and one half duct diameters of straight duct work, upstream of the air inlet connection, should be present for optimum airflow measurement performance. Upstream duct work should be the same diameter as the primary inlet connection. Electrical Installation Information For electrical connections, consult field wiring section & equipment IOM. 1/2" Matte - Faced Insulation The interior surface of the unit casing is acoustically and thermally lined with 1/2", 1.8 lb/cu. ft composite density glass fiber with high density facing. The insulation is UL listed and meets NFPA-90A and UL 181 standards. All insulation options will meet the 25/50 smoke developed and flame spread rating (per ASTM E 84 and UL 723 and CAN/ULC S102-M88) Meets NFPA- 90B. The insulation R-value is 1.9. All cut edges of insulation are completely encapsulated in metal to prevent erosion. 0803SQ Air Valve/Fan Combination Size (Series) 8" Inlet designed for up to 900.0 cfm. Fan is 1200.0 cfm for Std Motor and 1100.0 cfm for ECM Motor. Air Valve & Fan Description (Parallel) (Series) The air inlet connection is an 18 gauge galvanized steel cylinder sized to fit standard round duct. A multiple point, averaging flow sensing ring is provided with balancing taps for measuring airflow within +/- 5% of unit cataloged airflow. Also provided with each unit is a calibration chart indicating airflow versus flow sensor pressure differential. The damper blade is constructed of a closed cell foam seal mechanically locked between two 22 gauge galvanized steel disks. The damper blade assembly is connected through a composite nylon stub axle to a cast zinc shaft supported by self Lubricating bearings. The shaft is cast with a damper position indicator. The valve assembly includes a mechanical stop to prevent over stroking. Air valve leakage <1 % at 4". ECM Motor The ECM motor is a single speed DC "brush less" motor with integrated controller. Motor and fan assembly are isolated from terminal unit. Transformer The 50 VA transformer is factory mounted in the fan control box to January 22, 2014 provide 24 VAC for controls. Fuse Any electric heat unit with a calculated MCA greater or equal to 30 will have a fan fuse provided. Electric Heat Coil Factory provided and mounted. Resistance open -type heater, a disc -type automatic thermal primary safety device and manual reset load thermal secondary device. Heater element material is nickel -chromium. The heater terminal box is provided with knockouts for customer power supply. Terminal connections are plated steel with ceramic or phenolic insulators. All fan -powered units with electric reheat are single -point power connections. Magnetic Contactor An electric heater 24 volt contact for use with Direct Digital Control (D.D.C.) or Analog Electronic VAV Controls. Power Disconnect Switch (for VSEF & VPEF) A factory provided interlocking door disconnect switch located on the electric heater control panel. Airflow Switch An air pressure device designed to disable the heater when the unit fan is off. Flanged Connection A rectangular opening on the unit discharge to accept a 90 degree flanged duct work connection. Controls Transformer The 50 VA transformer is factory mounted in the fan control box to provide 24 VAC for customer supplied controls. FLD = Famished by Trane U.S. Inc. dba Trane / Equipment Submittal Page 4 of 7 Installed by Others Riverview Building - Tukwila nit Dimensions - Variable Air Volume Fan Powered Terminal Units Item: Al Qty: 1 Tag(s): VAV-1 January 22, 2014 Unit Size Nominal 8" Dia. x 4" Depth Valve Size & Depth Nominal 03SQ Fan Fan Size Filter Size 16" x 20" x 1" (QTY 1) 1612" AIRFLOW PLENUM INLET FILTER 11 5/16" 24" AIRFLOW 6" DISCHARGE OUTLET 18" 40" PANEL SLIDES 18 1/2" FOR MOTOR ACCESS I TOP VIEW r 1 1/2" 12- 171/ �� 12" 8" f DISCHARGE VIEW NOTES: 1. Allow a minimum 6" plenum inlet clearance for un-ducted installations. 2. Filter is secured in filter frame located in unit Airflow Plant tn1 inlet. NOTES: 3 Fnr Mntnr arr.cc ramnva hnttnm crrwrc no 1. Allow a minimum 6" plenum inlet clearance „win9 for un-ducted installations. 4 Caa lnetallatinn flnn rcnanto fnr Arad hannar 2. Filter is secured in filter frame located in unit Airflow Plenum inlet 5 Air valvo nontarol fvatwann tnn R hnftnm naval. 3. For Motor access, remove bottom screws on 6.. hanger txackets to slide panel as shown in drawing. hn finiA <imnluul Anti incfallM ac ram iira.1 �_ . � 4. See Installation Doaments for exact hanger 7 bracket locafion.age controls have same -side NFC iumnhark daaranrw 5. Air valve centered between top & bottom panel. 8 A Ilnw AR" of efrainht r5 trf rImovn<framrn of 6. All high & low voltage controls have same-ide uld NEC'um bade dearance." ' -. 97. Allow 48" of straight duct downstream °fullnw fnr unit before first runout and inside of the duct should be equal discharge size. 1n A d wirn nnwar cimnly ramtirarl fnr ARM R Fi7F\'{ 8. Attenuator option not available with this unit layout 11. Attenuator option not available with this unit layout Approximate Dry Weight 106.0 Ib Weights reflected may vary ±5.0 Ib based upon options selected. FLD = Furnished by Trane U.S. Inc. dba Trane / Equipment Submittal Page 5 of 7 Installed' by Others Riverview Building - Tukwila Accessory - Variable Air Volume Fan Powered Terminal Units Item: Al Qty: 1 Tag(s): VAV-1 Notes: 1. When attenuator is required, add inlet attenuator pressure to discharge static pressure for final fan performance. 2. ECMs (Electrically Commutated Motors) are ideal for systems seeking maximum motor efficiency. VSCF and VSEF maximum Minimum 1-row coil maximum -•-•-•-•- •-• 2-row coil maximum Discharge Static Pressure Pa In. wg 125 0.50 100 0.40 75 0.30 50 0.20 25 0.10 0 0.00 VSxF Size 03SQ—ECM E� 0 N January 22, 2014 100 200 300 400 500 600 700 800 900 1000 1100 1200 cfm 47 94 142 189 236 283 330 378 425 472 519 566 Us Airflow FLD = Fumished by Trane U.S. Inc. dba Trane / Equipment Submittal Installed by Others Page 6 of 7 . Riverview Building - Tukwila Field Waring - Variable Air Volume Fan Powered Terminal Units Item: Al Qty: 1 Tag(s): VAV-1 277 Volt, 1 Phase L1 N I I I I I I I I I FIG] Heater Control Wiring A WARNING HAZARDOUS VOLTAGE! DISCONNECT ALL ELECTRIC POWER INCLUDING REMOTE DISCONNECTS BEFORE SERVICING. FAILURE TO DISCONNECT POWER BEFORE SERVICING CAN CAUSE SEVERE PERSONAL INJURY OR DEATH CAUTION USE COPPER CONDUCTORS ONLY! UNIT TERMINALS ARE NOT DESIGNED TO ACCEPT OTHER TYPES OF CONDUCTORS. FAILURE TO DO SO MAY CAUSE DAMAGE TO THE EQUIPMENT. Customer Notes: Factory Installed. — — — — Optional or Installed by others. January 22, 2014 FLD = Furnished by Trane U.S. Inc. dba Trane / Equipment Submittal Installed by Others Page 7 of 7 City of Tukwila Department of Community Development 12/1/2014 JEFF SAETHER PO BOX 789 MONROE, WA 98272 RE: Permit No. M14-0034 SUMMIT HOMES 16000 CHRISTENSEN RD, STE 303 Dear Permit Holder: Jim Haggerton, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 1/11/2015. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 1/11/2015, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: M14-0034 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 City of Tukwila Department of Community Development 7/1/2014 JEFF SAETHER PO BOX 789 MONROE, WA 98272 RE: Permit No. M14-0034 SUMMIT HOMES 16000 CHRISTENSEN RD, STE 303 Dear Permit Holder: Jim Haggerton, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 8/20/2014. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 8/20/2014, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: M14-0034 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M14-0034 PROJECT NAME: SUMMIT HOMES DATE: 01/30/2014 SITE ADDRESS: 16000 CHRISTENSEN RD, STE 303 X Original Plan Submittal Response to Correction Letter # Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: Building Division pg Public Works n Fire Prevention Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 02/04/14 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required n Approved with Conditions Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: 03/04/14 g Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 TEAM MECHANICAL INC Page 1 of 2 Washington State Department of Labor & Industries TEAM MECHANICAL INC Owner or tradesperson SAETHER, JEFFREY DAVID Principals SAETHER, JEFFREY DAVID MCDIVITT, STEVEN DEAN Doing business as TEAM MECHANICAL INC WA UBI No. 601 783 505 PO BOX 789 MONROE, WA98272 360-805-1835 SNOHOMISH County Business type Corporation Governing persons JEFFREYDAVIDSAETHER License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties GENERAL License no. TEAMMI*030J8 Effective — expiration 04/28/1997 — 04/23/2014 Bond Active. Meets current requirements. OLD REPUBLIC SURETY CO $12,000.00 Bond account no. YLI233630 Received by L&I Effective date 01/14/2002 04/23/2002 Insurance American Fire & Casualty Co $1,000,000.00 Policy no. BKA53631001 Received by L&I Effective date 03/27/2013 04/23/2013 Expiration date 04/23/2014 Savings No savings accounts during the previous 6 year period. https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601783505&LIC=TEAMMI*030J8&SAW= 02/21/2014