Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M14-0066 - HEALTHPOINT - SPLIT SYSTEM, FANS, DUCTWORK, GRILLES/DIFFUSERS AND RANGE HOOD
HEALTHPOINT 13030 MILITARY RD S SUITE 200 M14-0066 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT Parcel No: 1623049171 Permit Number: M14-0066 Address: 13030 MILITARY RD S 200 Issue Date: 4/11/2014 Permit Expires On: 10/8/2014 Project Name: HEALTHPOINT Owner: Name: AGM INC Address: PO BOX 2039, KIRKLAND, WA, 98083 Contact Person: Name: ALEX BURKHART Phone: (206) 763-1744 Address: 727 S KENYON ST, SEATTLE, WA, 98108 Contractor: Name: EVERGREEN REFRIGERATION LLC Phone: (206) 763-1744 Address: 727 S KENYON ST, SEATTLE, WA, 98108 License No: EVERGRL954R2 Expiration Date: 1/6/2016 Lender: Name: Address: DESCRIPTION OF WORK: INSTALLATION OF ONE (1) SPLIT SYSTEM, FIVE4 (5) EXHAUST FANS, TENANT IMPROVEMENT DUCTWORK, GRILLES/DIFFUSERS AND ONE (1) RANGE HOOD. Valuation of Work: $31,242.00 Type of Work: NEW Fuel type: Fees Collected: $611.72 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: 20,125 Sewer Distric: VALLEY VIEW SEWER SERVICE Current Codes adopted by the City of Tukwila: Internations Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: 2012 International Fuel Gas Code: 2012 WA Cities Electrical Code: 2012 WA State Energy Code: 2012 2012 2012 2012 Permit Center Authorized Signature: Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit do t presume to give authority to violate or cancel the provisions of any other state or local laws re:ulat' construction or the performance of work. I am authorized to sign and obtain this development permi agree to the conditions, attached'to this permit. Signatur Print Name:af 5 C vcIe/c ✓"� This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Readily accessible access to roof mounted equipment is required. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: ***MECHANICAL PERMIT CONDITIONS*** 10: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 11: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL 0704 SMOKE CONTROL TEST CITY OF TUKWI Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. Kk4,--- 0 0 (o (O r Project No. ( Date Application Accepted: �'' "'t L.. Date Application Expires: Cl-`A (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION Site Address: ' 30 3° 1-tiIC Vjc • J Tenant Name: 14t*'( 1 Part - PROPERTY OWNER Name: C-M j: `pip , Address: , N /3•3( City: 1,Kc t lei r,,rt J State: rW A Zip: q c of 3 CONTACT PERSON - person receiving all project communication Name: h u B(�,�„r� . Address: --2`1 Sum ken,voh Si - City: c State: k(/A_ Zip: etgIA Phone: ').=1C3- (-I`(`I Fax: 206_-1G3_2.3g;,1 Email: e-,(exb e ev v,2er',htrA.t.•A„ ► King Co Assessor's Tax No.: I G 2 3 b q 1 (Z 1 Suite Number: Floor: New Tenant: ❑ Yes ❑ ..No MECHANICAL CONTRACTOR INFORMATION Company Name:-n l�✓v-5e-rxAlvh Address: 727 $oven ke,t„co' S4. City: 5 State: vi .- Zip: eig tog Phone: /0.6 73— (i'f`i Fax: Z. -143_ Z3t 1 Contr Reg No.: I.--v.Etzl.., A5 yrze,xp Date: 1'‘.. / l4.- Tukwila Business License No.: istiS ...-0k61 Zg -ri Valuation of project (contractor's bid price): $ 3 ( I1)41'647 Describe the scope of work in detail: 7v1S J- mit (() sp t `+ S-o-k 1 'e, vc ($ cs- 4- � , %e�.�� - 0,12 (wcptoi,A- ibk-,...a,k twy G ()fate) / i Q , ein, 3 orc [ t) mitt Iva .� Use: Residential: New ❑ Replacement ❑ Commercial: New RI/ Replacement ❑ Fuel Type: Electric ❑ Gas ❑ Other: H:\Applications\Fortes-Applications On Line\2011 Applications\Mechanical Permit Application Revised 8-9-1 I.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/walUfloor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct 1 Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). 1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: Date: 3 /1, `f Print Name: f'1 `tA t3. 'A— Day Telephone: ? 6 ^ 14. 3 - I - # LI Mailing Address: -1'2 5 11 kciu,0'^ 5+ SF,r~.t 11 K 1 c1 City State Zip H:\Applications\Forms-Applications On Line \2011 Applications\Mechanical Permit Application Revised 8-9-1 I.docx Revised: August 201 I bh Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT PermitTRAK QUANTITY PAID $611.72 M14-0066 Address: 13030 MILITARY RD S 200 Apn: 1623049171 $611.72 MECHANICAL $588.19 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 $32.50 PERMIT FEE R000.322.100.00.00 $438.05 PLAN CHECK FEE R000.322.102.00.00 $117.64 TECHNOLOGY FEE $23.53 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R1576 R000.322.900.04.00 $23.53 $611.72 Date Paid: Monday, March 24, 2014 Paid By: EVERGREEN REFRIGERATION LLC Pay Method: CHECK 006402 Printed: Monday, March 24, 2014 12:01 PM 1 of 1 SYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. tAN 14 -0064 CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd.,#100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project: 1_e 1( 0 0 • AT- Type of In�sp�, `.eccion: \ t�>� . t.t ` kl A-L. Address: 4 . ! "Z j -SO P ' ; Date Called: �U - c. aid 4 g �- Speciallnstructions: l Date Wanted://,, f J, a.m. -. -25 - 14 p.m. Requester -4 IW� Phone LNo: 3. > o i4 QApproved per applicable codes: L Corrections required prior to approval. COMMENTS: f)V- Me_,6 • / v6)(- 1---:Ai ,) F 11 p A� 1-,-)MALL C P s 1y,-Pe1'1C: ,, -..,A1 In pector: MusiA Date s .2 S '' [4 n REINSPECTION FEE REQ RED. Prior to next inspection, fee must be paid at 6300 Southcente( Blvd., Suite 100. Cali to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. ( 1 CITY OF`TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 A(41-dad Project: , y,a p <, Type of Inspection: Addres©,3Tylj\r Q ` . Dat aIle _ .- Special Instructions: Date Wanted: , t _ l t p.m. Requester: / �'Gtir Approved per applicable codes. t._.J Corrections required prior to approval. COMMENTS: Pt A- 1 c91< u-t2 ce) L /1 G .S u t � e_ r :' c.__74-L _ C— Li ou 1 i So1A'7. Inspector: Date;,, REINSPECTION FEE REQUIRED. Prior to .next inspection, fee must be paid at 6300 Southcent (Blvd., Suite 100. Call to schedule reinspection INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. .40(ok CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #.100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431.2451 Project:/� j(� /� /�+ Type of Insp/ection: Address: k Date Called: Special Instructions: / Date Wanted: = i�"a Grp —(9 I9. P.m - Requester: Phone Flo.` 3 5-,... 0 l & Approved per applicable codes. COMMENTS: Corrections required prior to approval. cJ(yf`7 f In*ector: Date REINSPECTION FEE REQUIRED. Prior to next inspection; fee must be paid at 6300 Southcenter Blvd:,Suite 100. Call to schedule reinspection. 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 echanicai Summary 2012 Wa : inat ME H-SUM Revised June 2013 lia ce Forms for Commercial, Group R1, and > 3 story R2 and R3 Projec >E COMPLIANti APPROVED APR 0 4 2014 . City of Tukwila 2 lect Address 13030 Military Rd. S. Date 3/21/2014 Tukwila, WA 98168 For Building Dept. Use LE COPY Aplicant Name: Alex Burkhart Pea!'R4 Rm., Ap licant Address: 727 south Kenyon St. attle, WA 98108 Ap licant Phone: 206-763-1744 ext. 247� Project Briefly describe system type Q Includes DIVISION stallation of one (1) split system, five (5) exhaust fans, and one (1 range hood. Drawings must contain notes requiring compliance with commissioning provisions per Section C408 mechanical and features. Plans Compliance Option 0 Simple System O Complex System O Systems Analysis Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Cooling Equipment Schedule Equip. ID Equip Type Brand Name1 Model No.1 Capacity2 Btu/h OSA CFM or Econo? SEER or EER IPLV3 Econmizer Option or Exceptions Heat Recovery Y/N III-1 /; 1 CU-Heating Daikin FTXN12KEVJII / Rxx12KEVJII 12000 N/A 18 N/A C403.3.1. N Equipment Schedule Equip. ID Equip Type Brand Name1 Model No.1 Capacity2 Btu/h OSA cfm or Econo? Input Btuh Output Btuh Efficiency° Heat Recovery Y/N IU-1 / CII-1 Daikin FTXNI2KEVJII / RXN12KEVJU 13500 N/A 13500 13500 3 .25 N Fan Equipment Schedule Equip. ID Equip Type Brand Name1 Model No.1 CFM SP1 HP/BHP Flow Controls Location of Service EF-1 Broan L150 130 0.375" 0.10 CV Ceiling EF-2 Broan L150 130 0.375" 0.10 CV Ceiling EF-3 Broan L100 93 0.250" 0.10 CV Ceiling EF-4 Broan QTR110 90 0.20" 0.10 CV Ceiling EF-5 Broan QTR110 90 0.20" 0.10 CV Ceiling RH-1 Proline PLFW129J 900 N/A N/A VAV Ceiling Service Water Heating Equipment Schedule Equip. ID Equip Type Brand Name1 Model No.1 Input Capacity Sub - Category EF7 Locatioryitp ,ED ie CITY OF TUKWIL MAR 2 4 2014 1 If available. 2 As tested according to Table C403.2.3(1)A thru C403.2.3(8). 3 If required. ° COP, HSPF, Combustidn i�r1� o UETg R applicable. 5 Flow control types: variable air volume (VAV), constant volume (CV), or variable speed (VS 6 Economizer exception number per Mechanical Permit Plans Checklist - Page 1 of 3 MECH-CHK 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013 Project Address 13030 Military Rd. S. Date 3/21/2014 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on Plans Building Department Notes GENERAL PROVISIONS Equipment Sizing & Performance Yes C403.2.1 Load calculations Load calculations performed per ASHRAE Std 183 or equivalent per Chapter 3 M 1 Yes C403.2.2 Equipment and system sizing Output capacity of heating and cooling equipment and systems do not exceed calculated loads, note exceptions taken M 1 Yes C403.2.5 Minimum ventilation Ventilation (natural or mechanical) provided per IMC; indicate mechanical ventilation is capable of being reduced to minimum requirement per IMC M1 Yes C403.2.3 & C403.2.3.2 &efficiency C403.2.12.1 Equipment minimum Provide equipment schedules or complete MECH-SUM tables with type, capacity, efficiency, test standard (or other efficiency source) for all mechanical equipment M1 N/A C403.2.13 Electric motor efficiency Provide equipment schedule with hp, rpm, efficiency for all motors; note except. N/A C403.2.10 Fan power limitation Fan system motor hp or bhp does not exceed limits per Table C403.2.10.1(1) N/A C403.2.10.3 & C403.2.13 Fractional hp fan motors Indicate fan motors 1/12 to 1 hp are ECM type or meet minimum efficiency req. N/A C403.2.3 capacity Maximum air cooled chiller Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit N/A C403.2.1 Non-standard water-cooled chillers Full -load and NPLV values for water-cooled centrifugal chiller adjusted for non-standard operational conditions N/A C403.2.12.1.2 Centrifugal fan cooling towers Large capacity cooling towers with centrifugal fan(s) meet efficiency requirements for axial fan open circuit cooling towers N/A C403.2.3 Forced heatersair furnace and unit Indicate intermittent ignition or 'ID, flue/draft damper & jacket loss N A / C403.2.3.3 heating/cooling equipment Packaged electric List equipment required to be heat pumps on schedule N/A C403.2.3.4 Humidification Indicate method of humidification (note requirements for systems with economizer) HVAC System Controls & Criteria Yes C403.2.4.1 Thermostatic controls Indicate locations of thermostatic control zones on plans, including perimeter systems M1 Yes C403.2.4.1.1 Heat pump supplementary heat Indicate staged heating (compression/supplemental) & outdoor lock -out temp M1 Yes C403.2.4.2 Setpoint overlap (deadband) Indicate 5°F deadband minimum for systems controlling both heating & cooling M1 Yes C403.2.4.3 Automatic setback and shutdown Indicate zone t-stat controls with required automatic setback & manual override M1 Yes C403.2.4.3.3 Automatic (optimum) start Indicate system controls that adjust equip start time to match load conditions M1 Yes C402.4.5.2 & C403.2.4.4 Dampers Indicate location of OSA, exhaust, relief and return air dampers; include AMCA rated leakage and control type (motorized or gravity; note exceptions M 1 Yes C403.2.11 Heating outside a building Indicate radiant heat system and occupancy controls M1 N/A C403.2.4.5 Snow melt systems Indicate shut-off controls based on outdoor conditions N/A C403.2.4.6 Combustion heating i pment equi Indicate modulating or staged control N/A C403.2.4.7 Group R1 hotel/motel systems Indicate method for guest room automatic setback & set-up of 5°F minimum N/A C403.2.4.8 / g Group R2/R3 dwelling unit systems Indicate 5-2 programmable thermostats in primary spaces with minimum of two setback periods; note exceptions taken Yes C403.2.5.1 Demand controlled ventilation Indicate high-occupancys aces and s stems requiring DCV p y q g M1 Yes C403.2.5.2 Occupancy sensors Indicate spaces requiring occupancy -based system control and method; or altemate means provided to automatically reduce OSA when partially M 1 Yes C403.2.5.3 Enclosed loading dock/parking garage ventilation Indicate enclosed loading dock and enclosed parking garage ventilation system activation and control method M1 N/A C403.2.5.4.1 Kitchen exhaust hoods Indicate kitchen hoods requiring make-up air; indicate make-up air source and conditioning method N/A C403.2.5.4.2 Laboratory exhaust systems Indicate lab exhaust systems requiring heat recovery, method & efficiency; or alternative method taken (VAV, semi -conditioned makeup, or CERM calculation) N/A C403.2.6.1 Energy recovery - ventilation systems Indicate ventilation systems requiring ER, method & efficiency; note exceptions N/A C403.2.6.2 Energy recovery - condensate systems Indicate on -site steam heating systems requiring energy recovery N/A C403.2.6.3 Energy recovery - condenser systems Indicate remote refrig. condensers requiring ER and use of captured energy Mechanical Permit Plans Checklist - Page 2 of 3 MECH-CHK 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1,and > 3 story R2 and R3 Revised June 2013 Project Address 13030 Military Rd. S. Date 3/21/2014 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on Plans Building Department Notes GENERAL PROVISIONS, CONTINUED HVAC System Controls & Criteria, Continued N/A C403.2.12 Variable flow control - fans/pumps Indicate fan & pump motors requiring VF control & method (VSD or equiv controls) C403.2.12.1 VarN/A cooling towers flow control cooling Indicate cooling tower fans requiring variable flow control and method N/A C403.2.12.2 Large volume fan systems Indicate fan systems requiring airflow reduction based on heating and cooling demand; or exception taken N/A C403.2.12.2 Single zone AC systems Indicate method of cooling demand -based fan control for sys. > 110,000 btuh N/A C403.2.4.10 DDC system capabilities Identify all DDC system input/output control points and indicate capability for trending and demand response setooint adiustment Ducting Systems Yes C403.2.7.1 &Duct C403.2.7.3 construction Indicate all ductwork constructed and sealed per IMC, C402 leakage requirements and IBC vapor retarder requirements M1 N/A �403.2.7.3.1- Duct pressure classifications Identify location of low, medium and high pressure ductwork on plans N/A C403.2.7.3.3 High pressure duct leakage test Indicate high pressure duct leakage testing requirements on plans; provide test results to jurisdiction when completed Yes C403.2.7.1 / 2 Duct insulation Indicate R-value of insulation on ductwork M 1 Piping Systems N/A C403.2.8 Piping insulation Indicate R-value of insulation on piping N/A C403.2.8.1 Piping insulation exposed to weather Indicate method of protection from damage/degredation SIMPLE SYSTEMS Qualifying Systems Yes C403.3 Qualifying single zone systems Verify unitary or packaged equipment does not exceed capacity limits, does not have active humidifcation or simultaneous heating/cooling M1 N/A C403.3 systemsQuaing 2-pipe heating Verify2-pipe heating -only system does not exceed capacity limits 9 Y Y P dY N/A C403.3.2 Hydronic system controls Refer to Complex Systems Section C403.4.3 Simple System Economizers Yes C403.3.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equip sched. M1 Yes C403.3.1.1.1 Air economizer capacity Indicate modulating OSA control capability up to 100% OSA, or exception M 1 Yes C403.3.1.1.3 Air economizer high limit controls Indicate high limit shut-off control method per Table C403.3.1.1.3(2) M 1 Yes C403.1.1.2 Integrated air economizer operation Indicate capability for partial air economizer operation for systems with capacity > 65,000 btuh M 1 Yes C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exceotion(s) M 1 COMPLEX SYSTEMS Complex System Economizers Yes C403.4.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equip sched. M 1 Yes C403.4.1.4 Economizer heating system impact Verify control method of HVAC systems with economizers does not increase building heating energy usage during normal operation M1 Yes C403.4.1.3 Integrated economizer operation Indicate capability for partial economizer operation for air or water econo systems M 1 N/A Moved Water economizer capacity Indicate water econo capable of 100% cooling capacity at 50°F db/45°F wb OSA N/A C403.4.1.2 Water economizer maximum pressure drop Indicate precooling coils and heat exchangers do not exceed pressure drop limit N/A C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exceotion(s) Mechanical Permit Plans Checklist - Page 3 of 3 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 MECH-CHK Revised June 2013 Project Address 13030 Military Rd. S. Date 3/21/2014 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area In Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on Plans Building Department Notes COMPLEX SYSTEMS, CONTINUED Specific System Requirements N/A C403.4.2 C4032.12.2.12 Variable flow control - fans Indicate fans requiring variable flow control and method N/A C403.4.2.1 VAV fan static pressure sensors Indicate sensor locations on plans; include at least one sensor per major duct branch N/A C403.4.2.2 VAV fan static pressure setpoint Indicate fan system static pressure setpoint based on zone requiring most pressure N/A C403.4.5 VAV systems serving multi- zones Indicate supply air systems serving multiple zones that are required to be VAV, method of primary air control, and zones served; note exceptions taken N/A C403.4.5.4 VAV system supply air reset Indicate controls that automatically reset supply air temp in response to loads N/A C403.4 Large capacity cooling systems Indicate method of multi -stage or variable control for building cooling system capacity > 300 tons N/A C403.4.7 Hot gas bypass limitation Indicate cooling equipment unloading or capacity modulation method N/A C403.4.3 Large capacity boiler systems Indicate multi -stage or modulating burner for single boilers > 500,000 btuh N/A C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers N/A C403.4.3.5 Chiller / boiler plant pump isolation Indicate capability to automatically reduce overall plant flow and shut-off flow through chillers & boilers when not in use N/A C403.4.2 & C403.4.3.6 Variable flow control - pumps Indicate pumps requiring variable flow control & method / A CN & C403 2.14.4 & C403.4.4 Varcooling towers flow control - cooling Indicate cooling tower fans requiring variable flow control and method N/A C403.4.3.4 Hydronic system part load controls Indicate heating & chilled water systems have the capability to automatically reset supply water temp AND reduce flow by >_ 50% for systems > 300,000 N/A C403.4.3.2 Two -pipe changeover systems Indicate deadband, heating/cooling mode scheduling and changeover temperature range N/A C403.4.3.3.1 Water loop heat pump - deadband Indicate capability of central equipment to provide min. 20°F water supply temp deadband between heat rejection and heat addition modes N/A C403.4.3.3 Water loop heat pump - heat rejection Provide heat exchanger that separates cooling tower and heat pump loop in Climate Zone 5 N/A C403.4.3.3.3 Water loop heat pump - isolation Indicate 2-way isolation valve on each heat pump and variable flow control for systems with total pump power> 10 hp N/A C403.4.6 recovery Condenser water heat Indicate system provided to pre -heat service water and efficiency N/A C403.5 Cooler / freezer - anti -sweat heaters Indicate w/sf & control method for walk-in cooler/freezer door anti -sweat heaters N/A C403.5 / 6 Cooler / freezer -evaporator and condenser fans Indicate motor type for evaporator and condenser fans < 1 hp SERVICE WATER HEATING Service Water Systems N/A C404.2 Water -heating equip min. efficiency Provide equipment schedule or complete MECH-SUM table with type, capacity, efficiency, test standard (or other efficiency source) N/A C404.3 Temperature controls Indicate temperature controls have required setpoint capability N/A C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply & discharge N/A C404.5 heater Insulation under water Indicate R-10 insulation under tank N/A C404.6 Service water piping insulation Indicate R-value of insulation on piping; note exceptions taken N/A C404.7 / g Circulation systems and heat trace shut-off Indicate shut-off capability based on occupancy and periods of limited demand N/A C404.9 Group R-2 service hot water meters Indicate method of usage metering for dwell. units served by central HW system Pools & In -Ground Permanently Installed Spas N/A C404.10.1 Pool heating equip min. efficiency Provide equipment schedule or complete MECH-SUM table with type, capacity, efficiency, test standard (or other eff. source); heat pump heaters > 4 COP N/A C404.10.1 / 2 Pool heater on / off controls Indicate automatic on/off control based on scheduling & accessible on/off switch on heater that operates independent of thermostat setting; or N/A C404.10.3 Pool covers Indicate vapor retardant cover and insulation rating as required N/A C404.10.3 Pool assembly insulation Indicate rating of insulation on sides and bottom of pools heated to > 90°F N/A C404.10.4 Heat recovery Indicate method, exhaust air temperature reduction and recovered energy use PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M14-0066 PROJECT NAME: HEALTHPOINT SITE ADDRESS: 13030 MILITARY RD S X Original Plan Submittal Response to Correction Letter # DATE: 03/24/14 Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: ArA1,('c Building Division Public Works Poiv\ Ci1.02-.rui Fire Prevention Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 03/25/14 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 04/22/14 Approved Corrections Required n Approved with Conditions X/' Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 EVERGREEN REFRIGERATION I T C Page 1 of 4 inWashington State' Department of Labor & Industries EVERGREEN REFRIGERATION LLC Owner or tradesperson PATTON, RODGER Principals PATTON, RODGER PATTON, MATTHEW Patton, Adam Patton, Douglas EVERGREEN REFRIGERATION LLC PATTON, DAVID (End: 01/21/2014) Doing business as EVERGREEN REFRIGERATION LLC WA UBI No. 602 512 953 727 S KENYON ST SEATTLE, WA98108 206-763-1744 KING County Business type Limited Liability Company Governing persons DAVID A PATTON MATTHEW PATTON; RODGER PATTON; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. EVERGRL954R2 Effective — expiration 01/06/2006 — 01/06/2016 Bond Merchants Bonding Co (Mutual) Bond account no. WA15097 $12, 000.00 Received by L&I Effective date 12/15/2011 01 /01 /2012 https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602512953&LIC=EVERGRL954R2&SAW= 04/11/2014 VICINITY MAP SCALE : NONE SEPARATE F EI ,MIT REQUIRED FOR: ❑ Mechanical Electrical Plumbing Gas Piping City of Tukwila BUILDING DIVISION REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. COMMISSIONING PLAN ALL C❑MMISSI❑NING OF HEATING, VENTILATI❑N AND AIR C❑NDITI❑NING SYSTEMS AS REQUIRED BY SECTI❑N C408 'SYSTEM C❑MMISSI❑NING' OF THE 2012 WASHINGTON STATE ENERGY CODE (WSEC) SHALL BE PERFORMED BY EVERGREEN REFRIGERATI❑N, LLC. THE ACTIVITIES TO BE ACC❑MPLISHED ARE PER THE SECTI❑NS LISTED IN THE 'C❑MMISSI❑NING COMPLIANCE CHECKLIST' SHOWN BELOW. AT THE COMPLETION OF THE ACTIVITIES REQUIRED FOR C❑MMISSI❑NING AS DEFINED BY SECTION C408 OF WSEC THE 'COMMISSIONING C❑MPLIANCE CHECKLIST' WILL BE REVIEWED WITH THE BUILDING OWNER OR THE OWNER'S REPRESENTATIVE AND THIS CERTIFICATION WILL BE SIGNED AND DATED. THIS WILL SATISFY TO THE CODE OFFICIAL THAT THE REPORT HAS BEEN ACCEPTED AS REQUIRED BY SECTION C408.1.2,1 OF WSEC. Project Information COMMISSIONING COMPLIANCE CHECKLIST Protect Name: Protect Address: Commissioning Authority: Commissioning Plan (Section C408,1,1) la Commissioning Plan was used during construction and included items below • A narrative description of activities and the personnel Intended to accorsUsh each one • Measurable criterin for performance • Functions to be tested Systems Balancing (Section C408.2.2) ❑ Systems Balancing has been completed • Air and Hydrordc systems ore proportionately balanced in a Homer to first nMnize throttling losses • Test ports ore provided on each puts for measuring pressure across the pump Functional Testing (Sections C408.2.3> ❑ HVAC Equipment Functional Testing has been completed (Section C408.2.3.1) HVAC equipment has been tested to demonstrate the Installation and operation of components, systems and system -by -system Interfacing relationships In accordance with approved plans and speclflcatlons ❑ HVAC Controls Functional Testing has been completed (Section C408.2.3.2) HVAC controlshave beentested to ensure that control devices are calibrated, adjusted and operate property. Sepaueateees oac� pec4"a cenwittiv n been eounctlonally tested to ensure they plans an spec Ica one pp ❑ Economizers Functional Testing has been completed (Section C408.2.3.3) Economizers operate In accordance with manufacturer's specifications Supporting Documents (Section C408.1.3.2) ❑ Manuals, record documents and training have been completed mare scheduled • hem documentation has been provided to The owner or scheduled date. • Record daorents have been submitted to owner or scheduled date. • Trabdig has been capleted or scheduled dote Commissioning Report (Section C408.1.2) ❑ Preliminary Commissioning Report submitted to Owner and Includes Items below • Deficiencies found durbg testing required by this section which have not been corrected at the the of report preparation • Deferred tests, which cannot be performed at the time of report preperotion due to climatic cawaklons. Certification ❑ I hereby certify that all requirements for Commissioning have been completed In accordance with the Washington State Energy Code, Including all Items above. Building Omer or Owner's Representative Date SPLIT SYSTEM EQUIPMENT SCHEDULE MARK MANF. MODEL TONNAGE COOLING HEATING ELECTRICAL WEIGHT NOTES TOTAL SEER EER TOTAL COP VOLTS PHASE - M.C.A. BTUH BTUH (V) (A) LBS IU-1 DAIKIN FTXNI2KEVJU 1 --- ---- --- ___ ____ 208-230 10 7.0 16,0 OU-1 DAIKIN RXNI2KEVJU 1 12,000 18.0 9.9 13,500 3.25 208-230 10 7.0 68.0 AIR TERMINAL UNIT SCHEDULE ITEM MARK MANUFACTURER MODEL MATERIAL MOUNTING FINISH SIZE REMARKS CEILING DIFFUSER CD-1 TITUS MCD STEEL SURFACE WHITE SEE SCHEDULE BORDER TYPE 1 CEILING GRILLE CG-1 TITUS 50F ALUMINUM SURFACE WHITE = NECK SIZE SQ BORDER TYPE 1 EXHAUST FAN SCHEDULE MARK MANF. MODEL CFM S.P. VOLTS PHASE Hp/A LOCATION NOTES EF 1,2 BROAN L150 130 0.375" 115 1 1.4 A LOCATED ON CEILING 1 EF 3 BROAN L100 93 0.250" 115 1 1.1 A LOCATED ON CEILING 2 EF 4,5 BROAN QTR110 90 0.2" 115 1 71 W LOCATED ON CEILING 3 ELECTRICAL NOTES: 1. ERL PROVIDED 30 MINUTE TIMER WIRED BY ELEC. CONTR. 2. WIRED FOR CONTINUOUS OPERATION BY ELEC. CONTR. 3. SWITCH W/LIGHTS BY ELEC. CONTR. RANGE HOOD SCHEDULE MARK MANF. MODEL CFM SONE VOLTS PHASE SPEEDS MATER. SIZE RH-1 PROLINE PLFW 129J 900 7.0 115 1 6 430 STAINLESS 30"Wx20.5"Dx12.5H NOTE: (2) LIGHTS, EXTENSIONS THRU CEILING REVIEWED FOR CODE COMPLIANCE APPROVED APR 0 4 2014 City of BUILDING`QtSY!SION SUPPLY DIFFUSER SIZE SIZE RANGE 6"X6" 0-100CFM 8"X8" 101-250CFM 10" X 10" 251 - 425 CFM 12" X 12" 426 - 650 CFM FILL ceoch" Permit No. Plan review approval is subject to errors and omissions. Approval of construction docu does not authorize the violation of an of approved F,iettl"" or ordinance. Receipt iiadmowledged: Date i t ) � �► City Of Tukwila BUILDING DIVISION GENERAL NOTES DUCTWORK 1.1 ALL DUCT DIMENSIONS ON PLAN ARE CLEAR INSIDE DIMENSIONS, ADD 2" TO EACH DIMENSION TO OBTAIN OUTSIDE DIMENSION. ADD 4"TO EACH DIMENSION IF DUCTWORK IS ON THE EXTERIOR OF BUILDING. 1.2 THE FIRST NUMBER ON ALL DUCT DIMENSIONS IS THE WIDTH AND THE SECOND NUMBER IS THE HEIGHT. 1.3 MATERIALS WITHIN DUCTS OR PLENUMS SHALL HAVE A FLAME SPREAD RATING LESS THAN 25 AND A FLAME SMOKE DEVELOPMENT RATING LESS THAN 50, PER IMC 602.2.1. 1.4 SEAL ALL TRANSVERSE JOINTS FOR DUCTWORK WITH STATIC PRESSURE BETWEEN 1/2 INCHES AND 2 INCHES. DUCTWORK WHICH IS DESIGNED TO OPERATE AT PRESSURES ABOVE 1/2 INCH WATER COLUMN STATIC PRESSURE SHALL BE SEALED IN ACCORDANCE WITH STANDARD RS-7. 1.5 ALL DUCT GAUGES PER SMACNA, IMC 603-4. 1.6 ALL DUCT SUPPORTS PER SMACNA, IMC 603-10. 1.7 ATTACH DIFFUSERS AND GRILLES TO T-BAR GRID PER WA STATE & LOCAL CODES. 1.8 BALANCING DAMPERS ARE TO BE INSTALLED ON ALL BRANCH DUCTS OR DIFFUSERS. INSULATION 2.1 INSULATE OR LINE DUCTWORK PER WA. STATE ENERGY AND MECHANICAL CODES. 2.2 INSULATE REFRIGERANT & CONDENSATE PIPING PER STATE & LOCAL ENERGY CODES. GENERAL CONTRACTOR 3.1 GENERAL CONTRACTOR TO PROVIDE AND CUT OPENINGS FOR ALL ROOFTOP, CEILING, FLOOR, AND WALL PENETRATIONS, INCLUDING WEATHERPROOF SEALING AND FIRE PROOF LINING PER IMC & IBC. 3.2 GENERAL CONTRACTOR TO VERIFY PENETRATION LOCATION AND DIMENSIONS WITH ERL BEFORE FRAMING OPENINGS. 3.3 GENERAL CONTRACTOR TO PROVIDE ALL DEMOLITION, PATCHING, AND PAINTING AS REQUIRED FOR MECHANICAL WORK. 3.4 GENERAL CONTRACTOR TO PROVIDE ADEQUATE STRUCTURAL SUPPORT AS REQUIRED FOR MECHANICAL WORK. 3.5 GENERAL CONTRACTOR TO PROVIDE ADEQUATE ENGINEERING AS REQUIRED FOR MECHANICAL WORK. 3.6 GENERAL CONTRACTOR TO PROVIDE SERVICE ACCESS PER CODE TO ALL MECHANICAL EQUIPMENT. 3.7 GENERAL CONTRACTOR TO LEVEL ALL FACTORY CURBS PROVIDED BY ERL PROVIDE ALL CANT STRIPS AND CURB INSULATION, AND SEAL AGAINST LEAKS. 3.8 GENERAL CONTRACTOR TO PROVIDE ALL CUTTING AND PATCHING OF T-BAR CEILING AS REQUIRED FOR HVAC INSTALLATION. 3.9 GENERAL CONTRACTOR TO PROTECT ALL OPENINGS THROUGH FLOORS PROVIDED FOR DUCTWORK INSTALLATION IN ACCORDANCE WITH TABLE 601 OF INTERNATIONAL BUILDING CODE, WHERE REQUIRED BY SECTION 707 OF IBC. ELECTRICAL 4.1 ERL TO INSTALL ALL LOW VOLTAGE CONTROL WIRING, CONDUIT WILL BE PROVIDED BY ELECTRICAL CONTRACTOR. 4.2 ELECTRICAL CONTRACTOR TO PROVIDE ALL ELECTRICAL CONNECTIONS, DISCONNECTS, AND STARTERS FOR MECHANICAL EQUIPMENT. 4.3 ELECTRICAL CONTRACTOR TO VERIFY EQUIPMENT SIZES, LOADS AND LOCATIONS WITH ERL MECHANICAL PLAN AND WITH FIELD CONDITIONS. 4.4 ELECTRICAL CONTRACTOR TO INTERLOCK BATHROOM EXHAUST FANS WITH LIGHT SWITCH. 4.5 ERL TO PROVIDE 7-DAY NIGHT SETBACK, PROGRAMMABLE TYPE T-STAT WITH CAPABILITY OF 5°F DEADBAND. 4.6 ERL TO VERIFY FINAL LOCATION OF THERMOSTAT WITH CUSTOMER. 4.7 ELECTRICAL CONTRACTOR TO PROVIDE ELECTRICAL GCFI OUTLET WITHIN 25 FT OF EACH PIECE OF MECHANICAL EQUIPMENT. PLUMBING 5.1 PLUMBING CONTRACTOR TO FURNISH AND INSTALL ALL GAS PIPING FOR MECHANICAL EQUIPMENT PER CODE. 5.2 PLUMBING CONTRACTOR OFFSET VENTS 10 FEET MINIMUM FROM ALL HVAC FRESH AIR INTAKES OR 2' ABOVE HIGHEST POINT OF INTAKE, IMC 401.4.1. 5.3 CONDENSATE DRAINS FROM RTU BY ERI TO DRAIN WITHIN 12" OF UNIT. CONDENSATE DRAINS FOR AIR HANDLERS BY PLUMBER. ENERGY CODE COMPLIANCE 6.1 AT A MINIMUM, EACH FLOOR IS TO BE CONSIDERED A SEPARATE ZONE. VERIFY THERMOSTATIC CONTROL FOR EACH ZONE AS INDICATED ON PLANS. 6.2 OUTSIDE AIR INTAKES, EXHAUST OUTLETS, AND RELIEF OUTLETS SERVING CONDITIONED SPACES SHALL BE EQUIPPED WITH DAMPERS WHICH CLOSE AUTOMATICALLY WHEN THE SYSTEM IS OFF OR UPON POWER FAILURE, PER WEC SEC. C402.4.5.4 6.3 AIR ECONOMIZERS WHERE REQUIRED BY CODE ARE INDICATED BY THE EQUIPMENT SCHEDULE AT 100% CAPABILITY, CONTROL AND OPERATION OF THE ECONOMIZER SHALL COMPLY WITH WSEC SEC. C403.4.1 MECHANICAL CODE COMPLIANCE 7.1 WHERE REQUIRED PROVIDE AUTOMATIC SHUTOFF ACTIVATED BY SMOKE DETECTORS IN EACH SYSTEM DELIVERING HEATING OR COOLING AIR IN EXCESS OF 2000 CFM. DETECTORS SHALL BE LOCATED IN THE MAIN RETURN AIR PER IMC 606. WA2D12 SYMBOL LEGEND SYMBOL ABBV. DESCRIPTION 0 DUCT SECTION SUPPLY ral DUCT SECTION - RETURN/EXHAUST RECTANGULAR DUCT 14"x8" ROUND DUCT 14" FLEXIBLE DUCT MVD MANUAL VOLUME DAMPER I 1 l BDD BDD BACKDRAFT DAMPER t M MD MOTORIZED DAMPER 1 1 FD FIRE DAMPER _4 -410. FSD FIRE/SMOKE DAMPER (120V POWER REQ.) -EH CEILING RADIATION DAMPER sun SD SMOKE DETECTOR 0 T THERMOSTAT OS S SENSOR R REFRIGERANT LINES -R- - - -R --G- - G NATURAL GAS LINES - -G FA>I CEILING DIFFUSER (SUPPLY) Z CEILING DIFFUSER (RETURN/EXHAUST) NI EXHAUST FAN (CEILING MOUNTED) INLINE FAN D8 VI PROPELLER FAN Nit SIDEWALL DIFFUSER 1 I 4E- UC FITTING ZD ON D P �,,,r 6bk) ZakNI TAG v o DUCT RISER FAX (206) 763 - 2389 cl' CO CO 727 SOUTH KENYON EVERGRL954R2 NOT PUBLISHED. ALL RIGHTS RESERVED. THE DRAWING AND SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF EVE- RGREEN REFRIGERATION INC. NO PART THEREOF SHALL BE REPRODUCED, COPIED, ADAPTED, DISC- LOSED OR DISTRIBUTED TO OTHERS, SOLD, PUB- LISHED OR OTHERWISE USED WITHOUT THE PRIOR WRITTEN CONSENT OF AND APPROPRIATE COMPEN- SATION TO EVERGREEN REFRIGERATION INC. VISUAL CONTACT WITH THE ABOVE DRAWINGS OR SPECIFIC- ATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS, 4 N re) 0 UJ DEVELOPMENT Z 0 W 0 4 0 N M 0 0 FOR CONSTRUCTION 0 W D (/) (n 0 AS BUILT DRAWINGS ■ I ❑ HVAC COVER SHEET REVISIONS NO DATE ITEM RECEIVED CITY OF TUKWILA MAR 2 4 2014 PERMIT .CENTER DWG. BY: GN C H K . BY: MG/CS JOB NO.: 514094 SHEET: Mi NOT PUBLISHED. ALL RIGHTS RESERVED. THE DRAWING AND SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF EVE- RGREEN REFRIGERATION INC, NO PART THEREOF SHALL BE REPRODUCED, COPIED, ADAPTED, DISC- LOSED OR DISTRIBUTED TO OTHERS, SOLD, PUB- LISHED OR OTHERWISE USED WITHOUT THE PRIOR WRITTEN CONSENT OF AND APPROPRIATE COMPEN- SATION TO EVERGREEN REFRIGERATION INCH VISUAL CONTACT WITH THE ABOVE DRAWINGS OR SPECIFIC- ATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. 4 3 8' EAK 00v 5 \RH> 1 MOUNT @72" BOTTOM OF HOOD EF (E) N Ef\;;� PU3LIC 3AT (E) TE 210 00 v <ou> ON ROOF ALLWAY (E) ELEC. (E) STAR 150 CFM 10" STAFWC 101 T 50 CFM A I WAY C10 OFFICE 3 150 CFM 150 CF 8" 8" 8" 8" P A� vACY 150 CFM HOODAWOTORIZED DAMPER OPEN W/PHARMACY 101 UNIT ON TE 205 A 150 CF IRI • • • • • • • • • • / • �/ Lg,3"3Y. 9ELOW / / / / / / / • • • • • • • • Iu 1 1 TON SU TE 208 DOD (E) WOvE\'S PU3LIC 3AT—SOON REVI FOR CODE COMPLIANCE APPROVED j APR O 4 2014 r __City of Tukwila BUILDING DIVISION (E) ELEC./ UTILTY (E) ELEV. (E) STAR (E) o" 150 CFM ECAvI 1 10" 0 ALL 0 2 8" 150 CFM 10" AL 013 20C 10' P 10" n 0 1 22 EF ALLWAY 175 CFM SUIT TI I 200 HVAC FLOOR PLAN SCALE : 1/8" = 1'-0" 400-CFM 6 O E\ C 125 0" 4. 6" v 400 CFM DICA L POD - HAL 11 8" 11 10" 175 CFM EPT D\ 109 WAIT 10$ • • • • TO" 10" 175 CFM 8" 10" EXAM 00N 116 8" XAV O0P/ 12"x12" OSA HOOD MOTORIZED DAMPER OPEN W/WA TING 108 6" UNIT N� 10" 10" v NN-10„ EXAv 12" 00P/1 1 8" 8" s'**** OFFICE 150 CFM 0 H 8" ICE 1 0 150 CFM NOTE: ALL EXISTING HEAT PUMPS TO BE CONTROLLED BY NEW PROGRAMMABLE THERMOSTATS MODEL: TH21100-1009 1 , INGTON 98108 7 SOUTH KENY EVERGRL9 4 N M) O w 0 DESIGN DEVELOPMENT 4 0 N7 0 w 0 FOR CONSTRUCTION 0 AS BUILT DRAWINGS F— z C7 a. J TW 1 HVAC FLOOR PLAN REVISIONS NO DATE ITEM RECEIVED CITY OF TUKWILA MAR 2 4 2014 PERMIT CENTER DWG. BY: GN CHK. BY: MG/CS JOB NO.: 514094 SHEET: