HomeMy WebLinkAboutPermit M14-0073 - BOEING VAULT - 20 - PUMP WITH CONTROL PANEL AND UNIT HEATERBOEING VAULT - 20
8123 E MARGINAL WAY S
M14-0073
Parcel No:
Address:
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.gov
MECHANICAL PERMIT
3324049002
8123 E MARGINAL WAY S
Project Name: BOEING VAULT - 20
Permit Number: M14-0073
Issue Date: 4/8/2014
Permit Expires On: 10/5/2014
Owner:
Name:
Address:
Contact Person:
Name:
Address:
Contractor:
Name:
Address:
License No:
Lender:
Name:
Address:
BOEING COMPANY THE
PO BOX 3707 M/C 20-00 PROPERTY
TAX DEPT, SEATTLE, WA, 98124
CONNIE HARDIN
4600 S 134 PL, TUKWILA, WA, 98168
HOLADAY PARKS, INC.
PO BOX 69208 , SEATTLE,'WA, 98188
HOLADP1379N0
Phone: (206) 250-4530
Phone: (206) 248-9700
Expiration Date: 9/3/2015
DESCRIPTION OF WORK:
FURNISH AND INSTALL (1) P-1 SIMPLEX PUMP WITH CONTROL PANEL - WIRING TO CONTROL BY OTHERS.
FURNISH AND INSTALL (1) SIMPLEX P-2 PUMP
FURNISH AND I9NSTALL (1) UNIT HEATER
Valuation of Work: $20,000.00
Type of Work: NEW
Fuel type:
Fees Collected: $454.94
Electrical Service Provided by: SEATTLE CITY LIGHT
Water District: SEATTLE,TUKWILA
Sewer Distric: TUKWILA SEWER SERVICE,SEATTLE
SEWER SERVICE
Current Codes adopted by the City of Tukwila:
Internations Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
2012
2012
2012
2012
International Fuel Gas Code:
WA Cities Electrical Code:
WA State Energy Code:
2012
2012
2012
Permit Center Authorized Signature: R di Date: The —`if
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
developmeer+tand agee to th condiyns attached to this permit.
Signature:
Print Name:
_I c
DID ✓.it (f 4-,04c
Date:
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or
if the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
2: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
3: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector
based on satisfactory completion of this requirement.
5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the
City of Tukwila Building Department (206-431-3670).
6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the
City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or
other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
8: All mechanical work shall be inspected and approved under a separate permit issued by the City of
Tukwila Permit Center (206/431-3670).
9: Manufacturers installation instructions shall be available on the job site at the time of inspection.
10: ***MECHANICAL PERMIT CONDITIONS***
11: Manufacturers installation instructions shall be available on the job site at the time of inspection.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1800 MECHANICAL FINAL
0701 ROUGH -IN MECHANICAL
4 O V oc" 40,1-0
CITY OF TUKWILA
Community Development Department
Permit Center
6300 Southcenter Blvd, Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
MECHANICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**please print**
Site Address:
Tenant Name:
Name: 4
4,1sWei reit, I.
Address:44a S /3y", Q
77 Sty .✓�//j
Phone'/, Zsz 7J:z Fax: 241 Ze
fr4J�
Valuation of project (contractor's bid price): $
l} i
mg Assessor's Tax No.: /rs�1 /Z.S
Suite Number: Floor: /
New Tenant: ❑ Yes [ :.No
Company Name:
Addresye 1, 0 t+ /
7(GL' lJ •J wei4
State;/,A Zii e i ` // f/ 7
Pon7Z2063,,E Fax:V4 2eite •n
City`
e
Contr Reg Nq.:/. I ayr, i>]cp Date,.,/ e-
Tukwila Business License No.:
Describe the scope of work in detail:
• Furnish and install (1) P-1 Simplex Pump with control panel — wiring to control panel by others.
• Furnish and install (1) P-2 Simplex Pump
• Furnish and install (1) Unit Heater
Use: Residential: New
Commercial: New
Replacement
Replacement
111
Fuel Type: Electric ❑ Gas ❑ Other:
H:\Applications\Forms-Applications On Line\2011 Applications\Mechanical Permit Application Revised 8-9-11.docx
Revised. August 2011
bh
Page 1 of 2
Indicate type of mechanical work being installed and the quantity below:
UnitT
Furnace <100k btu
Furnace >100k btu
Floor furnace
Suspended/wall/floor
mounted heater
Appliance vent
Repair or addition to
heat/refrig/cooling
system
Air handling unit
<10,000 cfm
Air handling unit
>10,000 cfm
Evaporator cooler
Ventilation fan
connected to single duct
Ventilation system
Hood and duct
Incinerator — domestic
Incinerator —
comm/industrial
Fire damper
Diffuser
Thermostat
Wood/gas stove
Emergency generator
Other mechanical
equipment
p-1 504.41
P-.) 5i4•11:4r
Rya
r/Compir
4
0-3 hp/100,000 btu
3-15 hp/500,000 btu
15-30 hp/1,000,000 btu
30-50 hp/1,750,000 btu
50+ hp/1,750,000 btu
Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the permit center to comply with current fee schedules.
Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing
and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING
Signature:
Print Name:
Mailing Address:
GENT:
•
Day Telephone:
q646) S 4 - 1, vtc
City
11)6.,ret#4.
Date: 7 -;4 / 7
trio QJ/“
State Zip
H:\ApplicationsWorms-Applications On Line\2011 Applications'Mechanical Permit Application Revised 8-9-11.docx
Revised: August 2011
bh
Page 2 of 2
DESCRIPTIONS
Cash Register Receipt
City of Tukwila
I ACCOUNT I QUANTITY I PAID
PermitTRAK
$65.00
M14-0073 Address: 8123 E MARGINAL WAY S Apn: 3324049002
$65.00
MECHANICAL
$65.00
ADDITIONAL PLAN REVIEW
TOTAL FEES PAID BY RECEIPT: R4344
R000.345.830.00.00
1.00
$65.00
$65.00
Date Paid: Wednesday, January 28, 2015
Paid By: CONNIE HARDIN
Pay Method: CREDIT CARD 02646G
Printed: Wednesday, January 28, 2015 1:44 PM 1 of 1
SYSTEMS
Cash Register Receipt
City of Tukwila
DESCRIPTIONS
PermitTRAK
I ACCOUNT
QUANTITY I
PAID
$454.94
M14-0073 Address: 8123 E MARGINAL
WAY S Apn: 3324049002
$454.94
MECHANICAL
$437.44
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00
$32.50
PERMIT FEE
R000.322.100.00.00
$317.45
PLAN CHECK FEE
R000.322.102.00.00
$87.49
TECHNOLOGY FEE
$17.50
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R1644
R000.322.900.04.00
$17.50
$454.94
Date Paid: Monday, March 31, 2014
Paid By: CONNIE HARDIN - HOLADAY PARKS
Pay Method: CREDIT CARD 04642G
Printed: Monday, March 31, 2014 2:12 PM 1 of 1
SYSTEMS
INSPECflON NO.
INSPECTION RECORD
Retain a copy with permit
'-/ -0 073
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
. -
PQjec ,
Fe e_..( fry CC(Vt (1- —210
Type of Inspection:
bterJ,t,_ r7 kkg
Address:
0(7;3 ma:1611,v i ookys,).
Date Called:
Special Instructions:
fr•fil
a if rrtvIr‘14446e--FCre
(0:50
Date Wanted: a,rn.
Requ t •
fj1('-di felt 0 Ay ectricx
Phone2_,t6No• _ 7,07 _ 6 a Q,s_
Approved per applicable codes. Corrections required prior to approval.
OMMENTS:
2r.....c., Inspector:
-Date:3 _3 / 5_
REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
AA? - 0073
Functional Test Procedure
Sump Pump
Boeing Plant 2
Project:
System:
Test Performed By:
Date:
Retest Date:
Boeing Plant 2
Man Hole 130SE - Sump Pump
D. Young \ B. Mattis
3\1\2015
System Description
Sump pump removes storm water from below grade. Pump system is simplex packaged configuration with
integral controls.
Components
Equipment ID
Description — Sump Pump
Area Served
Man Hole 130SE — vault 20
Sump Pump Installation / Operation Verification
Verify the following:
MH-
130SE
Notes
Yes
No
Install Complete
X
Power complete
X
CMCS wiring labels match controls drawings.
X
Disconnect switch complete
X
Electrical labeling complete
X
Electrical GFCI trip works correctly
NA
Install matches detail
X
Pump enable depth (fill sump with water to confirm
level, Disable after pump starts)
X
9"
Sump run status received at DDC
X
Sump High Level Alarm Local and DDC
(disable pump and fill to alarm level)
X
29" \ 24"
Pump disable depth (confirm level when pump is off)
X
3"
RECEIVED
CITY OF TUKWILA
MAR 31 2015
PERMIT CENTER
Engineering Economics Inc.
www.eeiengineers.com
Project #: 03-13631
Functional Test Procedure
Sump Pump
Boeing Plant 2
CMCS Graphics Screenshot
L°1
r
(1,
/\19
A►/
'•�
•
j�
sari,
-.�,- ,' ..0
�
Page 2 of 3
Functional Test Procedure
Sump Pump
Boeing Plant 2
Completion of Functional Test
Release any overrides and return all systems to automatic control condition.
Final Acceptance
This certifies that this system has been tested and accepted with any exceptions noted.
David Young Engineering Economics Inc. 3\1\2015
Commissioning Engineer Signature Company Date
Page 3 of 3
Functional Test Procedure
Sump Pump
Boeing Plant 2
Project:
System:
Test Performed By:
Date:
Retest Date:
Boeing Plant 2
Man Hole 130SW - Sump Pump
D. Young \ B. Mattis
3\1\2015
System Description
Sump pump removes storm water from below grade. Pump system is simplex packaged configuration with
integral controls.
Components
Equipment ID
Description — Sump Pump
Area Served
Man Hole 130SW — Vault 20
Sump Pump Installation / Operation Verification
Verify the following:
MH-
130SW
Notes
Yes
No
Install Complete
X
Power complete
X
CMCS wiring labels match controls drawings.
X
Disconnect switch complete
X
Electrical labeling complete
X
Electrical GFCI trip works correctly
NA
Install matches detail
X
Pump enable depth (fill sump with water to confirm
level, Disable after pump starts)
X
11"
Sump run status received at DDC
X
Sump High Level Alarm Local and DDC
(disable pump and fill to alarm level)
X
25" \ 20"
Pump disable depth (confirm level when pump is off)
X
3"
Engineering Economics Inc.
www.eeiengineers.com
Project #: 03-13631
Functional Test Procedure
Sump Pump
Boeing Plant 2
CMCS Graphics Screenshot
risig(tnr
e .1Q,
,..
..
i.).
_
•4
....-
/'
0
Page 2 of 3
Functional Test Procedure
Sump Pump
Boeing Plant 2
Completion of Functional Test
Release any overrides and return all systems to automatic control condition.
Final Acceptance
This certifies that this system has been tested and accepted with any exceptions noted.
David Young Engineering Economics Inc. 3\1\2015
Commissioning Engineer Signature Company Date
Page 3 of 3
Functional Test Procedure
Sump Pump
Boeing Plant 2
Project:
System:
Test Performed By:
Date:
Retest Date:
Boeing Plant 2
Vault 20 - Sump Pumps
D. Young \ B. Mattis
3\1\2015
System Description
Sump pump removes storm water from below grade portions of Vault 20. Pump system is simplex packaged
configuration with integral controls.
Components
Equipment ID: P-1
Description — Sump Pump
Area Served
Cable Gallery (P-1)
Sump Pump Installation / Operation Verification
Verify the following:
P-1
Notes
Yes
No
Install Complete
X
Power complete
X
Disconnect switch
X
Electrical labeling
X
Install matches detail
X
Pump enable depth
X
19"
Pump disable depth
X
17"
Local Sump Panel Alarm Functions
X
21" above sump floor
Redundant Float High Level Alarm Received at DDC
X
32"
Sump run status received at DDC
X
Engineering Economics Inc. Project #: 03-13631
www.eeiengineers.com
Functional Test Procedure
Sump Pump
Boeing Plant 2
CMCS Graphics Screenshots
ma*
Page 2 of 3
Functional Test Procedure
Sump Pump
Boeing Plant 2
Completion of Functional Test
Release any overrides and return all systems to automatic control condition.
Final Acceptance
This certifies that this system has been tested and accepted with any exceptions noted.
141
David Young Engineering Economics Inc. 3\1\2015
Commissioning Engineer Signature Company Date
Page 3of3
Engineering Economics, Inc.
1201 Western Avenue, Suite 325
Seattle, Washington 98101
telephone: 206.622.1001
facsimile: 206.622.5747
Project Communication Report (PCR-22)
X
Daily Report
Construction
Test Report
Agenda
Document Examination
Observation
Meeting Minutes
To:
Nick Losh
From: Brendon Mattis
Project:
Boeing Plant 2 Electrical Upgrades
Project No.
03-13631
Activity Date(s): 03-01-15
Item:
V35 Functional Testing
Location:
Vault 35
Attendees: BOLD indicates attendance
BusinM/Or,,gan_ ization }
w
".. Email, Address
Brendon.mattis@eeiengineers.com
Rhone
206 920.1744
Name ..
Brendon Mattis
EEI
Jeff Chriest
Sequoyah
Jeff.chriest@sequoyah.com
Jan Bloch
Sequoyah
Jan.bloch@sequoyah.com
425 814.5830
Brian Bashaw
Prime Power
Brian.e.bashaw@boeing.com
Rich Turner
Coffman
Judson Smith
Eaton
Chuck Duncan
Eaton
Andrew Wick
Eaton
Justin Wing
Siemens
Al Turnbull
Boeing
EEI was on site to functionally test the HMI and CMCS systems at both Vault 20 and vault 35, due to trouble
shooting during testing we were only able to functionally test the HMI and CMCS at Vault 35.
The following items were noted during demonstration and testing of Vault 20.
1. V35 Controls network was lost when V35 transformer A was de -energized. Controls network would
need a UPS to maintain control power during a main power outage. This will become a monitoring
issue for the switchgear during a normal power outage. Visibility of the substation will be lost through
the CMCS. Boeing / Coffman to provide direction.
2. V35 When a transformer is re -energized after being de -energized, there is a temporary high
temperature alarm and transformer fan output status seen by the CMCS. Should not be an operational
issue. Boeing / Coffman to provide direction.
3. V35 HMI cannot detect feeder switch positions or transformer information when both MV switches are
in the off position or at a loss of power to the transformer. The SEK transformer monitor does not have
any power when both switches are off. Recommend powering the SEL transformer monitor from the
substation CPT circuits with generator power backup. Boeing / Coffman to provide direction.
4. The CMCS calls out for a Fan Fault point, a fan fault is not possible without having some sort of fan
status feedback. The fan status feedback does not exist. We changed that to a fan command status.
If the desire is to have a fan fault we will have to add sensors to provide fan status... (how many? One
for each fan?) Boeing / Coffman to provide direction.
5. During testing there were several minor HMI graphical issues corrected as found.
6. Extensive trouble shooting of the switch position monitoring of the MV switches caused delay in testing.
March 2, 2015
Page 2
7. All other Siemens monitoring worked out well, there were a few minor wiring issues worked out during
testing. Al Turnbull confirmed all points tested during testing.
8. SEL transformer monitoring package was programmed to display LED's and fan start / stop, labeling is
needed for those LED's.
9. SEL time was set for local time as directed by Boeing.
10. All three sump pumps were filled with water by LCL and tested. Sump pump operation worked well.
11. No functional testing in Vault 20 was performed, trouble shooting of V35 took much longer than
expected.
12. Building 02-10 Panel upgrades were walked as well. There were a few panel schedules to update and
some adjustable breakers need trip settings. There were a few existing panels schedules that Prime
Power will provide to Sequoyah for installation.
By:
Brendon Mattis
3.2.15
Commissioning Representative
Date
City of Tukwila Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
September 30, 2014
Connie Hardin
Holaday Parks, Inc.
4600 S 134 Place
Tukwila, WA 98168
RE: Request for Extension
Permit Numbers M14-0073 through M14-0075
Dear Ms. Hardin,
This letter is in response to your written request for an extension to Permits M14-0073, M14-0074, and
M14-0075. The Building Official, Jerry Hight, has reviewed your letter and considered your request to
extend the above referenced permit. It has been determined that the City of Tukwila Building Division
will be granting an extension to the permit for an additional 180 days, through April 3, 2015.
If you should have any questions, please contact our office at (206) 431-3670.
Sincerely,
kNON
enn\fer Marshall
erm t Technician
File: Permit No. M14-0073
W:\Permit CenteAExtension Letters\Permits\2014\M14-0073 Permit Extension.docx
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
Jennifer Marshall
From:
Sent:
To:
Cc:
Subject:
Connie Hardin <connieh@holadayparks.com>
Wednesday, September 17, 2014 12:57 PM
Jennifer Marshall
Doug Brown
FW:4:Qi�7„t3Mmpp74;aiidp14,0075
Jennifer,
Can you please extend these for me with the explanation provided below? Thank you.
Connie
From: Doug Brown
Sent: Wednesday, September 17, 2014 12:54 PM
To: Connie Hardin
Subject: RE: M14-0073, M14-0074, and M14-0075
Connie, we need an extension due to the work not being
control. We will be starting in the 2-10 building soon but i
work is coming (next couple of months)but no definite d
Please consider this our request for an extension.
Thanks
Doug Brown
Project Manager
Holaday-Parks, Inc.
206.248.9700 main
206.852.1483
dough@holadayparks.com
From: Connie Hardin
Sent: Tuesday, September 09, 2014 9:29 AM
To: Doug Brown
Subject: FW: M14-0073, M14-0074, and M14-0075
Let me know what you want to do about this.
r
dy. There have been numerous delays that are out of our
will not be before the expiration of the permit. The other
to yet.
From: Jennifer Marshall [mailto:Jennifer.Marshall@TukwilaWA.gov]
Sent: Monday, September 08, 2014 11:24 AM
To: Connie Hardin
Subject: RE: M14-0073, M14-0074, and M14-0075
11 10 ciC`tr-1N 56p
-C�CTENI-P. 19A1
mto
If you are unable to schedule inspections then a written request for extension is required. You can request a 180
day extension but need to provide an explanation/reason for the extension request.
1
City of Tukwila
Department of Community Development
9/2/2014
CONNIE HARDIN
4600 S 134 PL
TUKWILA, WA 98168
RE: Permit No. M14-0073
BOEING VAULT - 20
8123 EAST MARGINAL WAY S
Dear Permit Holder:
Jim Haggerton, Mayor
Jack Pace, Director
In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National
Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and
become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of
such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun
for a period of 180 days. Your permit will expire on 10/5/2014.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each
inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire.
Address your extension request to the Building Official and state your reason(s) for the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 10/5/2014, your permit will become null and void
and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
er Marshall
Technician
Fi1hNo1M14-0073
6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
PERMIT COORD COPY
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: M14-0073 DATE: 01/12/15
PROJECT NAME: BOEING VAULT - 20
SITE ADDRESS: 8123 E MARGINAL WAY S
Original Plan Submittal Revision #
before Permit Issued
Response to Correction Letter # X Revision # 1 after Permit Issued
DEPARTMENTS:
I
�� P./
Buil ing ivision
Public Works
MA AO- htS=13"
1111
Fire Prevention
Structural
Planning Division
Permit Coordinator
s
PRELIMINARY REVIEW:
Not Applicable
(no approval/review required)
DATE: 01/13/15
Structural Review Required
REVIEWER'S INITIALS: DATE:
n
APPROVALS OR CORRECTIONS:
Approved
Corrections Required
n
Approved with Conditions
Denied
(corrections entered in Reviews) (ie: Zoning Issues)
DUE DATE: 02/10/15
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
12/18/2013
PERMIT COORD COPY
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: M14-0073 DATE: 03/31/14
PROJECT NAME: BOEING VAULT 20
SITE ADDRESS: 8123 EAST MARGINAL WAY S
X Original Plan Submittal
Response to Correction Letter #
Revision # before Permit Issued
Revision # after Permit Issued
DEPARTMENTS:
PC\IV(/ OBI l t)
Building Division
Public Works
ATP NIA
Fire Prevention
Structural
Planning Division
Permit Coordinator 1111
PRELIMINARY REVIEW:
Not Applicable
(no approval/review required)
DATE: 04/01/14
Structural Review Required
REVIEWER'S INITIALS: DATE:
n
APPROVALS OR CORRECTIONS:
Approved
Corrections Required Denied
(corrections entered in Reviews) (ie: Zoning Issues)
Approved with Conditions
DUE DATE: 04/29/14
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
12/18/2013
PROJECT NAME: e\ -
SITE ADDRESS: 5 Y ,,„( fill $
a I
PERMIT NO: 41-t - (07 3
ORIGINAL ISSUE DATE: 4-9-[2(
REVISION LOG
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
STAFF
INITIALS
I
I— 12-
w,e-
�, �+ r
Summary of Revision: C e &cp p f (Cvk, - �d (1 )- Sv vno
_
Received by: 0 jt, an , ;P � � (
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
STAFF
INITIALS
Summary of Revision: -
Received by:
please print)
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
STAFF
INITIALS
Summary of Revision:
Received by:
(please print)
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
STAFF
INITIALS
Summary of Revision:
Received by:
(please print)
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
STAFF
INITIALS
Summary of Revision:
Received by:
(please print)
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
STAFF
INITIALS
Summary of Revision:
Received by:
(please print)
,.�3s3a Vim- z�
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Web site: http://www.TukwilaWA.gov
REVISION
SUBMITTAL
Revision submittals must be submitted in person at the Permit Center.
Revisions will not be accepted through the mail, fax, etc.
Date: 1 — k Z.' H Plan Check/Permit Number:
❑ Response to Incomplete Letter #
❑ Response to Correction Letter
[Revision # 1 after Permit is Issued
❑ Revision requested by a City Building Inspector or Plans Examiner
MI IA --Oo��
Project Name: Jc 2„D`f — n r (• D-rio
Project Address: g � S z (\ ! ,iJ
Contact Person: m t e kianitin one Number: 7,1)(6 '2 Sd--1s 3o
Summary of Revision:
teekI t .1.l, j\� ?
titMa �Al/, •
f Piwt.avl ✓-
fillitefeb
IJAN12
PERMtIT CENTER
Sheet Number(s): Cr() y— e;-) oz. ..-2i'
"Cloud" or highlight all areas of revision including date of revi' idn
Received at the City of Tukwila Permit Center by: {/L .,/
t,\)_.- \,
Entered in TRAKiT on
C:\Users\Jennifer-m\ ppData'Loca1\Microsoft\Windows\Temporary Internet Files\Content.Outlook\DSTRCME6\Revision Submittal Form.doc
Revised: March 2014
HOLADAY PARKS INC
Washington State Depart, ent of
Labor & Industries
LHOLADAY PARKS INC
Page 1 of 4
Owner or tradesperson
PARKS, GERALD T JR
Principals
PARKS, GERALD T JR NAILON, JUNE
ANNETTEO'CONNOR, BONNY KBECK, DAVID
CLARENCEVAN DER VEEN, ERIC
M (End: 08/14/2013)PIZZEY, GRACE
KATHERINE (End: 08/14/2013)VAN DER VEEN,
JULIE ELIZABETH (End: 08/14/2013)
CONNELL, DANIEL AARON (End: 08/14/2013)
GIRI, BUIT (End: 08/14/2013)KIEL, RINALD
HOWARD (End: 08/14/2013)WHITMYRE,
CHRISTIAN (End: 08/14/2013)NELSON,
MICHAEL (End: 11/04/2010)PARKS, DAVID
L (End: 11/04/2010)TALBOT, PAUL
(End: 11/04/2010)
Doing business as
HOLADAY PARKS INC
WA UBI No.
578 004 089
4600 S 134TH PL
SEATTLE, WA98168
206-248-9700
KING County
Business type
Corporation
Governing persons
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor Active.
Meets current requirements.
License specialties
GENERAL
License no.
HOLADPI379NO
Effective — expiration
01 /21 /1983 — 09/03/2015
Bond
LIBERTY MUTUAL INS CO
Bond account no.
23000452
$12,000.00
Received by L&I Effective date
08/23/2002 09/01/2002
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 04/08/2014