HomeMy WebLinkAboutPermit M14-0074 - BOEING #2-10 - SUBSTATIONBOEING #2-1O
8123 EAST MARGINAL WY S
M14-0074
Parcel No:
Address:
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.gov
MECHANICAL PERMIT
3324049002
8123 E MARGINAL WAY S
Project Name: BOEING #2-10
Permit Number: M14-0074
Issue Date: 4/8/2014
Permit Expires On: 10/5/2014
Owner:
Name:
Address:
Contact Person:
Name:
Address:
Contractor:
Name:
Address:
License No:
Lender:
Name:
Address:
BOEING COMPANY THE
PO BOX 3707 M/C 20-00 PROPERTY
TAX DEPT, SEATTLE, WA, 98124
CONNIE HARDIN
4600 S 134 PL, TUKWILA, WA, 98168
HOLADAY PARKS, INC.
PO BOX 69208 , SEATTLE, WA, 98188
HOLADP1379NO
11I
Phone: (206) 250-4530
Phone: (206) 248-9700
Expiration Date: 9/3/2015
DESCRIPTION OF WORK:
BUILDING #2-10 NEW SUBSTATION 35
DUCTWORK AS SHOWN ON DRAWINGS
FURNISH AND INSTALL (2) EXHAUST FANS WITH FILTER ASSEMBLIES
FURNISH AND INSTALL (1) DUCT HEATER
FURNISH AND INSTALL (2) INTAKE LOUVERS WITH MOTORIZED DAMPERS
FURNISH AND INSTALL (1) ROOF VENTILATION HOOD
Valuation of Work: $20,000.00
Type of Work: NEW
Fuel type:
Fees Collected:
$454.94
Electrical Service Provided by: SEATTLE CITY LIGHT
Water District: SEATTLE,TUKWILA
Sewer Distric: TUKWILA SEWER SERVICE,SEATTLE
SEWER SERVICE
Current Codes adopted by the City of Tukwila:
Internations Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
2012
2012
2012
2012
International Fuel Gas Code:
WA Cities Electrical Code:
WA State Energy Code:
2012
2012
2012
Permit Center Authorized Signature:
(,),a R_,/{
Date:
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
developmen permit and a ee to t e conditi s attached to this permit.
Signature: Date: g_s_(c(
Print Name: 0•o rk it c
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or
if the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
2: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
3: Readily accessible access to roof mounted equipment is required.
4: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector
based on satisfactory completion of this requirement.
6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the
City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or
.other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
8: ***MECHANICAL PERMIT CONDITIONS***
9: All mechanical work shall be inspected and approved under a separate permit issued by the City of
Tukwila Permit Center (206/431-3670).
10: Manufacturers installation instructions shall be available on the job site at the time of inspection.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1800 MECHANICAL FINAL
0701 ROUGH -IN MECHANICAL
v Josatfas
CITY OF TUKWILA
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
MECHANICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**please print**
Site Address:
Tenant Namer t)
5 Ectsk- ;biJ
D-10 �)�,�� ,`, L
Name: �..�-`
n r,
t t..�. 'Hord,
d
Address: Li (,paid S P,/(
City: S State: Li_ Zin' LA(
Phone: Tot, in Ise -Wax: 20t, 241 f70C)
Email: et) &K� ��( �'`�It���Si�00*-
Valuation of project (contractor's bid price): $
Describe the scope of work in detail:
Use: Residential: New
Commercial: New
King Co Assessor's Tax No.: Z'gt DODO
S•
35"
Suite Number: Floor: /
New Tenant: ❑ Yes
4o
Company Name:Nt'� n
f it„rtS
Address: r U ^ )
- _ $ n Q
City: Stoi:State;`)v Zip:%11*V
Phone7.i�&'Z SU.'�(S.O Faxii)(0 .. z 4v. s 700
Contr Reg Nor.i J sv � ,�%� �O Exp Date _47.2015-
Tukwila Business License'•No.:
Building 2-10 - new substation 35
• Ductwork as shown on drawings
• Furnish and Install (2) Exhaust fans with filter assemblies
• Furnish and install (1) duct heater
• Furnish and install (2) Intake louvers with motorized dampers
Replact • Furnish and install (1) Roof Ventilation Hood
Replacement ❑
Fuel Type: Electric ❑ Gas ❑ Other:
14:1Applications\Forms-Applications On Line \2011 Applications\ Mechanical Permit Application Revised 8-9-11.docx
Revised. August 2011
bh
Page 1 of 2
Qty
0-3 hp/100,000 btu
3-15 hp/500,000 btu
15-30 hp/1,000,000 btu
30-50 hp/1,750,000 btu
50+ hp/1,750,000 btu
Indicate type of mechanical work being installed and the quantity below:
'Or'ypi
Furnace <100k btu
Furnace >100k btu
Floor furnace
Suspended/wall/floor
mounted heater
Appliance vent
Repair or addition to
heat/refrig/cooling
system
Air handling unit
<10,000 cfm
Air handling unit
>10,000 cfm
Evaporator cooler
Ventilation fan
connected to single duct
Ventilation system
Hood and duct
Incinerator - domestic
Incinerator -
comm/industrial
Fire damper
Diffuser
Thermostat
Wood/gas stove
Emergency generator
Other mechanical
equipment
Z
Value of construction - in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the permit center to comply with current fee schedules.
Expiration of plan review - applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing
and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING
Signature:
AUT I,S RIZ .] GENT:
Date:
3-zg1L/
�
Print Name: CD r 1,r1 o'L. '1 1 �,(� •Ire Day Telephone: U(0' 2_� S-6 _, 3
Mailing Address: l 6D° S 3 L P� 47, t (1 L'
City State Zip
H:\Applications\Forms-Applications On Line\2011 Applications\Mechanical Permit Application Revised 8-9-11.docx
Revised: August 2011
hh
Page 2 of 2
Cash Register Receipt
City of Tukwila
DESCRIPTIONS I
PermitTRAK
ACCOUNT I QUANTITY
PAID
$454.94
M14-0074 Address: 8123 E MARGINAL WAY S Apn: 3324049002 $454.94'
MECHANICAL $437.44
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00
$32.50
PERMIT FEE
R000.322.100.00.00
$317.45
PLAN CHECK FEE
R000.322.102.00.00
$87.49
TECHNOLOGY FEE $17.50
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R1645
R000.322.900.04.00
$17.50
$454.94
Date Paid: Monday, March 31, 2014
Paid By: CONNIE HARDIN - HOLADAY PARKS
Pay Method: CREDIT CARD 02173G
Printed: Monday, March 31, 2014 2:17 PM 1 of 1
SYSTEMS
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 5outhcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 431-2451
INSPECTION RECORD
Retain a copy with permit
Project:.
!3)^«- 2—f0
Type of Inspection:
; ef1,..
tt
, A/AV
Address: ) + // _ . f 1
Date Called:
/
�/
_
Special Instructions:
f (X
? .-� tl'1 tcrS tAi l) ' 7'.(/-a
♦ {`1r
4 �.?.tq )YJ ( ( 1 _.
Date Wanted:
/ ,y a:m.
Requester:
Phone No:
{Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
�v
t
Inspector:�
Date:
REINSPECTIQN FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
SERAECE .iV09y CODE
NOV 1 8 2gai
PERMIT CENTER
Project
Information
Commissioning
Plan
(Section 1416.3.1)
Systems
Balancing
(Section 1416.3.2)
Functional
Testing
(Section 1416.3.3)
(V4 , mo74
FIGURE 14B
COMMISSIONiNG COMPLIANCE CHECKLIST
Project Name: Boeing Building 2-10
Project Address: 9725 E Marginal Way S. Building 2-10
Commissioning Authority: Holaday-Parks Inc.
® Commissioning Plan was used during construction and included items below
• A written schedule including Systems Testing and Balancing, Functional Testing, and
Supporting Documentation
• Roles and Responsibilities of the commissioning team
• Functional Test procedures and forms
Systems Balancing has been completed
• Air and Hydronic systems are proportionately balanced in a manner to first minimize throttling
losses
• Test ports are provided on each pump for measuring pressure across the pump.
• HVAC Systems Functional Testing has been completed (Section 1416.3.3)
HVAC systems have been tested to ensure that equipment, components, and sub -systems are
installed, calibrated, adjusted and operate in accordance with approved plans and specifications
• HVAC Controls Functional Testing has been completed (Section 1416.3.3)
ongoing HVAC controls have been tested to ensure that control devices are calibrated, adjusted and
operate properly. Sequences of operation have been functionally tested to ensure they operate in
accordance with approved plans and specifications
Lighting Controls Functional Testing has been completed (Section 1513.8)
Lighting controls have been tested to ensure that control devices, components, equipment, and
systems are calibrated, adjusted and operate in accordance with approved plans and
specifications
Supporting
Documents
(Section 1416.3.4)
Systems documentation, record documents and training have been completed or
are scheduled
• System documentation has been provided to the owner or scheduled date: Submit by 11/21
• Record documents have been submitted to owner or scheduled date: Submit by 11/21
• Training has been completed or scheduled date: Not scheduled yet
Commissioning
Report
(Section 1416.3.5)
Certification
❑ 'Commissioning Report submitted to Owner and includes items below
• Completed Functional Tests documentation By Commissioning Agent
• Deficiencies found during testing required by this section which have not been corrected at the
time of report preparation and the anticipated date of correction
• Deferred tests, which cannot be performed at the time of report preparation due to climatic
conditions or other circumstances beyond control of Commissioning Authority.
® I hereby certify that all requirements for Commissioning have been completed in accordance with
(( hingten-State))Seattte Energy Code, including all items above.
11/17/14
Building Owner or Owner's Representative Keith Slack / Lease Crutches Lewis Date
Seattle amendments do not apply to residential spaces, except that procerhiral requirements and infarrnative notes in
hosed text or brackets, and amendments to administrative and enforcement provisions, apply to all projects.
104
Effective November 23, 2010/January 1, 2011
Y-
SMART Mechanical Solutions'
Project:
Job #:
2/10/2014
EQUIPMENT PRE -START & START-UP CHECKLIST
BELT DRIVEN FAN
Fan Number:
SF-RF-C.10.1 (Area:
ate:
Design Data
Make
Model
Serial #
Greenheck
BSQ-160-15-X
13630-69
Name Plate Data
HP
Volts/Phase
Full Load Amps (FLA)
Design Data
Name Plate Data
1/2 hp
120
2.08
PRE -START-UP INSPECTION
Yes
NA
Mountings Checked (Shipping Bolts Removed)
Vibration Isolators Installed
Equipment Guards Installed
Pulleys Aligned and Belt Tension Correct
Plenums Clear and Free of Loose Material
Fans Rotate Freely
Fans, Motors & Linkages Lubricated
Fire & Balance Dampers Positioned
Electrical Connections Complete
Disconnect Switch Installed
Overload Heaters in Place (Sized Correctly) Heater drew 2.3 amps
Fan Belts (Qty/Size):
1- a49 I1ATR PF:
MTR EFF
Fan Pulley/Hub:
Cant see
Motor Pulley/Hub
START-UP INSPECTION
Cant see
NA
Fan Rotation Correct
Electrical Interlocks Verified
Supply Fan Interlock Verified
Vibration & Noise Level Acceptable
MEASURED VALUE
Motor Volts
L 1
489
L2
489
L3
490
Motor Amps
L 1
1.7
L2
1.7
L3
1.6
Pre -Start -Up By:
Aaron
Date:
11/10/2014
Start -Up By:
Aaron
Date:
11/10/2014
HOLADAY-
SMART Mechanical Solutions®
I
INC
I
I
1
Project:
2/10/2014
Job #:
EQUIPMENT PRE -START & START-UP CHECKLIST
BELT DRIVEN FAN
Fan Number:
sf-rd-c-2
Area:
Date:
Make
Model
Serial #
Design Data
Greenheck
BSQ-70-X
13630-69
Name Plate Data
HP
Volts/Phase
Full Load Amps (FLA)
Design Data
1/2 hp
120
4.6
Name Plate Data
PRE -START-UP INSPECTION
Yes
NA
Mountings Checked (Shipping Bolts Removed)
X
Vibration Isolators Installed
X
Equipment Guards Installed
X
Pulleys Aligned and Belt Tension Correct
X
Plenums Clear and Free of Loose Material
X
Fans Rotate Freely
X
Fans, Motors & Linkages Lubricated
X
Fire & Balance Dampers Positioned
X
Electrical Connections Complete
X
Disconnect Switch Installed
X
Overload Heaters in Place (Sized Correctly)
X
Fan Belts (Qty/Size):
1- a43
vITR PF:
MTR EFF
Fan Pulley/Hub: Cant see
START-UP INSPECTION
Motor Pulley/Hub Cant
see
Yes
NA
Fan Rotation Correct
X
Electrical Interlocks Verified
X
Supply Fan Interlock Verified
X
Vibration & Noise Level Acceptable
X
MEASURED VALUE
Motor Volts
L 1
121
L2
L3
Motor Amps
L1
4.6
L2
L3
Pre -Start -Up By:
Aaron
Date:
11/10/2014
Start -Up By:
Aaron
Date:
11/10/2014
NOLIDAY-PARkS INC
SMART Mechanical Solutions®
Boeing 2-10 Vault Supply
Final TAB Report
FIRM: Holaday-Parks, Inc.
4600 S. 134th PI.
Tukwila, WA 98168
PHONE: (206) 248-8705
FAX: (866) 745-0799
PROJECT: Boeing 02-10 Vault Supply
Job # 59708
DATE: 11/14/2014
CONTACT: Brian Clement
NOTES:
Holaday-Parks, Inc.
HOLADAY-PARkS, INC
SMART Mechanical Solutions'
Fan Unit
PROJECT: Boeing 02-10 Vault Supply
LOCATION: ,
PROJECT #:
DATE: 11/14/2014
CONTACT: Brian Clement
SYSTEM/UNIT: AF-RD-C-02
AREA: Vault
Unit Data
Unit Location Ceiling
Unit Serves Vault
Fan Manufacturer Greenheck
Fan Model Number BSQ-70-X
Fan Serial Number 13630-69
Fan Type/Class
Motor Adjustment in.
Sheave Adjustment
Starter Data
VFD Manufacturer
VFD Model No.
Test Data
Fan RPM Design RPM
Fan RPM Actual RPM
Motor Volts T1-T2 121 Volts
Motor Volts T2-T3 Volts
Motor Volts T1-T3 Volts
Motor Amps T1 4.6 Amps
Motor Amps T2 Amps
Motor Amps T3 Amps
Operating Hertz Hertz
AF-RD-C-02 Supply Outlet Summary
Tested By: Brian Clement
Test Date: November 13, 2014
Motor Data
Motor Manufacturer
Motor Frame
Motor HP 1/2 HP
Motor RPM RPM
Motor Rated Volts 120 Volts
Motor Phase 1
Motor Hertz 60 Hz
Motor FL Amps 4.6 Amps
Motor Service Factor 1.15
Power Factor
Efficiency
Sheave Data
Drive Type Belt Drive
Motor Sheave Size
Motor Sheave Bore in.
Fan Sheave Size
Fan Sheave Bore in.
Number of Belts 1
Belt Size A43 in.
Sheave Center Line in.
Test Pressures
SP Inlet Actual in. wc
SP Discharge Actual in. wc
Total SP Design in. wc
Total SP Actual in. wc
ESP Design in. wc
ESP Actual in. wc
Air Test Data
Total Fan Design Airflow 2850 CFM
Total Fan Actual Airflow 2790 CFM
Total Outlet CFM Design CFM
Total Outlet CFM Actual CFM
System / Unit
Area Served
Outlet Type
Outlet Size
Design
Reading
Prelim
Reading
Final
Reading
% Final
Deviation
Type of
Reading
Outlet-01
Vault
SSG
18x12
950
920
920
97
Velgrid
Outlet-02
Vault
SSG
18x12
950
910
910
96
Velgrid
Outlet-03
Vault
SSG
18x12
950
960
960
101
Velgrid
Totals :
-
-
2,850
2,790
2,790
98 %
-
* Notes
AF-RD-C-02
13-Nov-14 Brian Clement No balancing dampers
TESTING, ADJUSTING AND BALANCING BUREAU
'THE PROFESSIONAL'S CHOICEE'
1-#111ier.nationa� Certfi!catj07z 04QP722c.
Sfeet Meta1 and .fir Conditioning Industry
76is certifies that
TB1090873S
David S Petrie
ANSI Accredited Program
PERSONNEL CERTIFICATION
0728
Yfas successfully completed the requirements for ZABB Supervisor
January 31, 2014
Certification #
January 31, 2014
Valid Date
December 31, 2016
Expiration Date
Valid during qualified employment
ott,c
Labor Cochairman
.ti
David Petrie
Holaday Parks Inc
TABB Supervisor
TB1090873S
December 31, 2016
Printed: 02,24/2014
City of Tukwila Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
September 30, 2014
Connie Hardin
Holaday Parks, Inc.
4600 S 134 Place
Tukwila, WA 98168
RE: Request for Extension
Permit Numbers M14-0073 through M14-0075
Dear Ms. Hardin,
This letter is in response to your written request for an extension to Permits M14-0073, M14-0074, and
M14-0075. The Building Official, Jerry Hight, has reviewed your letter and considered your request to
extend the above referenced permit. It has been determined that the City of Tukwila Building Division
will be granting an extension to the permit for an additional 180 days, through April 3, 2015.
If you should have any questions, please contact our office at (206) 431-3670.
Sincerely,
fer Marshall
t Technician
File: Permit No. M14-0073
WAPermit Cente,\Extension Letters\Permits\2014\M14-0073 Permit Extension.docx
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
Jennifer Marshall
From:
Sent:
To:
Cc:
Subject:
Connie Hardin <connieh@holadayparks.com>
Wednesday, September 17, 2014 12:57 PM
Jennifer Marshall
Doug Brown
FW: M 0.0713; N1MOQ7,4rabd;M14 0075
Jennifer,
Can you please extend these for me with the explanation provided below? Thank you.
Connie
From: Doug Brown
Sent: Wednesday, September 17, 2014 12:54 PM
To: Connie Hardin
Subject: RE: M14-0073, M14-0074, and M14-0075
Connie, we need an extension due to the work not being
control. We will be starting in the 2-10 building soon but i
work is coming (next couple of months)but no definite d
Please consider this our request for an extension.
Thanks
Doug Brown
Project Manager
Holaday-Parks, Inc.
206.248.9700 main
206.852.1483
dougb@holadayparks.com
From: Connie Hardin
Sent: Tuesday, September 09, 2014 9:29 AM
To: Doug Brown
Subject: FW: M14-0073, M14-0074, and M14-0075
Let me know what you want to do about this.
r
dy. There have been numerous delays that are out of our
will not be before the expiration of the permit. The other
to yet.
From: Jennifer Marshall (mailto:Jennifer.Marshall@TukwilaWA.gov]
Sent: Monday, September 08, 2014 11:24 AM
To: Connie Hardin
Subject: RE: M14-0073, M14-0074, and M14-0075
L5 iv 0 C-1Acetr-- Si,o
)a -50-too PA-1
If you are unable to schedule inspections then a written request for extension is required. You can request a 180
day extension but need to provide an explanation/reason for the extension request.
1
City of Tukwila
Department of Community Development
9/2/2014
CONNIE HARDIN
4600 S 134 PL
TUKWILA, WA 98168
RE: Permit No. M14-0074
BOEING #2-10
8123 EAST MARGINAL WAY S
Dear Permit Holder:
Jim Haggerton, Mayor
Jack Pace, Director
In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National
Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and
become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of
such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun
for a period of 180 days. Your permit will expire on 10/5/2014.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each
inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire.
Address your extension request to the Building Official and state your reason(s) for the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 10/5/2014, your permit will become null and void
and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
(OA
r Marshall
Technician
File o: M14-0074
6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
PERMIT COORD COPY
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: M14-0074 DATE: 03/31/14
PROJECT NAME: BOEING #2-10
SITE ADDRESS: 8123 EAST MARGINAL WAY S
X Original Plan Submittal
Response to Correction Letter #
Revision # before Permit Issued
Revision # after Permit Issued
DEPARTMENTS:
O-Vk
Building Division ip
Public Works
n
Fire Prevention
Structural
I Li
Planning Division
Permit Coordinator it
PRELIMINARY REVIEW:
Not Applicable
(no approval/review required)
DATE: 04/01/14
Structural Review Required
REVIEWER'S INITIALS: DATE:
n
APPROVALS OR CORRECTIONS:
Approved
Corrections Required
(corrections entered in Reviews)
Approved with Conditions
Denied
(ie: Zoning Issues)
DUE DATE: 04/29/14
n
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire D Ping ❑ PW ❑ Staff Initials:
12/18/2013
HOLADAY PARKS INC
Page 1 of 4
0 Washington State Depar Intent of
Labor & Industries
HOLADAY PARKS INC
Owner or tradesperson
PARKS, GERALD T JR
Principals
PARKS, GERALD T JR NAILON, JUNE
ANNETTEO'CONNOR, BONNY KBECK, DAVID
CLARENCEVAN DER VEEN, ERIC
M (End: 08/14/2013)PIZZEY, GRACE
KATHERINE (End: 08/14/2013)VAN DER VEEN,
JULIE ELIZABETH (End: 08/14/2013)
CONNELL, DANIEL AARON (End: 08/14/2013)
GIRI, BUIT (End: 08/14/2013)KIEL, RINALD
HOWARD (End: 08/14/2013)WHITMYRE,
CHRISTIAN (End: 08/14/2013)NELSON,
MICHAEL (End: 11/04/2010)PARKS, DAVID
L (End: 11/04/2010)TALBOT, PAUL
(End: 11/04/2010)
Doing business as
HOLADAY PARKS INC
WA UBI No.
578 004 089
4600 S 134TH PL
SEATTLE, WA98168
206-248-9700
KING County
Business type
Corporation
Governing persons
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor
License specialties
GENERAL
License no.
HOLADPI379N0
Effective — expiration
01 /21 /1983 — 09/03/2015
Bond
LIBERTY MUTUAL INS CO
Bond account no.
23000452
Active.
Meets current requirements.
$12,000.00
Received by L&I Effective date
08/23/2002 09/01/2002
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 04/08/2014