HomeMy WebLinkAboutPermit M14-0075 - BOEING #2-31 - LOUVERS, DAMPER, FILTER ASSEMBLY, DUCTWORK AND FANBOEING #2-31
8123 E MARGINAL WAY S
M14-0075
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.gov
MECHANICAL PERMIT
Parcel No: 3324049002 Permit Number:. M14-0075
Address: 8123 E MARGINAL WAY S BLDG 2- Issue Date: 4/8/2014
031 Permit Expires On: 10/5/2014
Project Name: BOEING #2-31
Owner:
Name: BOEING COMPANY THE
Address: PO BOX 3707 M/C 20-00 PROPERTY
TAX DEPT, SEATTLE, WA, 98124
Contact Person:
Name: CONNIE HARDIN Phone: (206) 250-4530
Address: 4600 S 134 PL , TUKWILA, WA, 98168
Contractor:
Name: HOLADAY PARKS, INC. Phone: (206) 248-9700
Address: PO BOX 69208 , SEATTLE, WA, 98188
License No: HOLADP1379NO Expiration Date: 9/3/2015
Lender:
Name:
Address:
DESCRIPTION OF WORK:
FURNISH AND INSTALL (2) LOUVERS
FURNISH AND INSTALL (1) MOTORIZED DAMPER
FURNISH AND INSTALL FILTER ASSEMBLY
EXHAUST DUCTWORK
FURNISH AND INSTALL (1) EXHAUST FAN
Valuation of Work: $15,000.00
Type of Work: NEW
Fuel type:
Fees Collected: $389.62
Electrical Service Provided by: SEATTLE CITY LIGHT
Water District: SEATTLE,TUKWILA
Sewer Distric: TUKWILA SEWER SERVICE,SEATTLE
SEWER SERVICE
Current Codes adopted by the City of Tukwila:
Internations Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
2012 International Fuel Gas Code:
2012 WA Cities Electrical Code:
2012 WA State Energy Code:
2012
2012
2012
2012
Permit Center Authorized Signature:
LQL
Date: Lk —11
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or locaJ,faws regulaking construction or the performance of work. I am authorized to sign and obtain this
�a're to fhe condi 'ons attached to this permit.
C
developmerjt permit a(rid
Signature:
Print Name:
Date: ( _r ( t\
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or
if the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
2: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
3: Readily accessible access to roof mounted equipment is required.
4: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector
based on satisfactory completion of this requirement.
6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the
City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or
other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
8: ***MECHANICAL PERMIT CONDITIONS***
9: All mechanical work shall be inspected and approved under a separate permit issued by the City of
Tukwila Permit Center (206/431-3670).
10: Manufacturers installation instructions shall be available on the job site at the time of inspection.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1800 MECHANICAL FINAL
0701 ROUGH -IN MECHANICAL
43so
CITY OF TUKWILA
Community Development Department
Permit Center
6300 Southcenter Blvd, Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
MECHANICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**please print**
SiteAddress:775c hci �(w1J (�
Tenant Name�,�p��� .3t Z:�i '�S1.aNlil_
Name:
e.
Address:
I
State:
Zip 7 2L!
AddreskL 00 S
City: Seajtx
Stat
Phoneicz),‘636 Fax: ZU12,2 tie. 70
Email � �it��L J
King Co Assessor's Tax No.E 00 otY4o
Suite Number:
Floor:
ew Tenant: ❑ Yes �No
Company Name:
Address: (p00 S (3 444" QX
City: State: - .) Zip: R—__ ilci
Phon�(es zsp%4530 FaxZO(o Zqs'Sr ?0 0
Contr Reg No U4DP1'3 7'f ) Exp Date:a
Tukwila Business License No.:
Valuation of project (contractor's bid price): $‘S ion
Describe the scope of work in detail:
LJse: Residential: New
Commercial: New
Fuel Type: Electric ❑ Gas
Replacement
Replacement
• Furnish and Install (2) Louvers
• Furnish and Install (1) motorized damper
• Furnish and install Filter assembly
• Exhaust ductwork
• Furnish and install (1) Exhaust Fan
❑ Other:
111Applications\Forms-Applications On Lin&2011 Applications\Mechanical Permit Application Revised 8-9-11.docx
Revised. August 2011
bh
Page I of 2
Indicate type of mechanical work being installed and the quantity below:
Unit'ype
Qty
Furnace <100k btu
Furnace >100k btu
Floor furnace
Suspended/wall/floor
mounted heater
Appliance vent
Repair or addition to
heat/refrig/cooling
system
Air handling unit
<10,000 cfm
Unit Type
Qty
Air handling unit
>10,000 cfm
Evaporator cooler
Ventilation fan
connected to single duct
Ventilation system
Hood and duct
Incinerator — domestic
Incinerator —
comm/industrial
Fire damper
Diffuser
Thermostat
Wood/gas stove
Emergency generator
Other mechanical
equipment
14L4A4,44r�.r.
Bone rICompresso
QtY
0-3 hp/100,000 btu
3-15 hp/500,000 btu
15-30 hp/1,000,000 btu
30-50 hp/1,750,000 btu
50+ hp/1,750,000 btu
ovv 'r5 1 GLSSCatil i
So ki.k.c.-k.
Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the permit center to comply with current fee schedules.
Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing
and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDI
Signature
AUI
RIZED AGENT:
Print Name: �.t7hr�t`� tti
Mailing Address:4(p00
Date3 'G.. Q ' ( —1
Day Telephone: W V— Z 5 b -{-(S .3
GO&
City State Zip
FI:\Applications \Forms -Applications On Line\2011 Applications\Mechanical Permit Application Revised 8-9-I I.docx
Revised: August 2011
bh
Page 2 of 2
Cash Register Receipt
City of Tukwila
DESCRIPTIONS
PermitTRAK
I ACCOUNT
QUANTITY
PAID
$389.62
M14-0075 Address: 8123 E MARGINAL
WAY S BLDG 2-031 Apn: 3324049002
$389.62
MECHANICAL
$374.63
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00
$32.50
PERMIT FEE
R000.322.100.00.00
$267.20
PLAN CHECK FEE
R000.322.102.00.00
$74.93
TECHNOLOGY FEE
$14.99
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R1646
R000.322.900.04.00
$14.99
$389.62
Date Paid: Monday, March 31, 2014
Paid By: CONNIE HARDIN - HOLADAY PARKS
Pay Method: CREDIT CARD 09599G
Printed: Monday, March 31, 2014 2:23 PM 1 of 1
SYSTEMS
INSPECTION RECORD
Retain a copy with permit
N PECTION NO, PERMIT NO,
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Pro-ect: ,.
PI 6tig, it-2.- o3 i
Type of ins ection:
Art
Address:
e17-3 EaiccoviN' i Liky _El .
Date Ca d:
Special Instructionf:
ii-dickd ay "4 dcf
r ifeci
Date Wanted:
2-2-3- TS-
a.m.
p.m.
Requester:
Phone No:
coftnit. 206 — -Z,C0— ycj 0
Approved per applicable codes.
EJCorrections required prior to approval,
OMMENT
Inspect r:
E
Date:
RE SPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
City of Tukwila Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
September 30, 2014
Connie Hardin
Holaday Parks, Inc.
4600 S 134 Place
Tukwila, WA 98168
RE: Request for Extension
Permit Numbers M14-0073 through M14-0075
Dear Ms. Hardin,
This letter is in response to your written request for an extension to Permits M14-0073, M14-0074, and
M14-0075. The Building Official, Jerry Hight, has reviewed your letter and considered your request to
extend the above referenced permit. It has been determined that the City of Tukwila Building Division
will be granting an extension to the permit for an additional 180 days, through April 3, 2015.
If you should have any questions, please contact our office at (206) 431-3670.
Sincerely,
40(
fer Marshall
t Technician
File: Permit No. M14-0073
W:\Permit CenteAExtension Letters\Permits\2014W114-0073 Permit Extension.docx
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
Jennifer Marshall
From: Connie Hardin <connieh@holadayparks.com>
Sent: Wednesday, September 17, 2014 12:57 PM
To: Jennifer Marshall
Cc: Doug Brown
Subject: FW: IQ07,E3INI1440Q74aridiM1;4:0075
Jennifer,
Can you please extend these for me with the explanation provided below? Thank you.
Connie
From: Doug Brown
Sent: Wednesday, September 17, 2014 12:54 PM
To: Connie Hardin
Subject: RE: M14-0073, M14-0074, and M14-0075
Connie, we need an extension due to the work not being r- : dy. There have been numerous delays that are out of our
control. We will be starting in the 2-10 building soon but i will not be before the expiration of the permit. The other
work is coming (next couple of months)but no definite date yet.
Please consider this our request for an extension.
Thanks
Doug Brown
Project Manager
Holaday-Parks, Inc.
206.248.9700 main
206.852.1483
dougb@holadayparks.com
From: Connie Hardin
Sent: Tuesday, September 09, 2014 9:29 AM
To: Doug Brown
Subject: FW: M14-0073, M14-0074, and M14-0075
Let me know what you want to do about this.
From: Jennifer Marshall [mailto:Jennifer.Marshall@TukwilaWA.gov]
Sent: Monday, September 08, 2014 11:24 AM
To: Connie Hardin
Subject: RE: M14-0073, M14-0074, and M14-0075
n, IJ o -cm--N Sp ti
-N p _1142 19A-y
011704
If you are unable to schedule inspections then a written request for extension is required. You can request a 180
day extension but need to provide an explanation/reason for the extension request.
i
City of Tukwila
Department of Community Development
9/2/2014
CONNIE HARDIN
4600 S 134 PL
TUKWILA, WA 98168
RE: Permit No. M14-0075
BOEING #2-31
8123 EAST MARGINAL WAY S
Dear Permit Holder:
Jim Haggerton, Mayor
Jack Pace, Director
In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National
Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and
become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of
such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun
for a period of 180 days. Your permit will expire on 10/5/2014.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each
inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire.
Address your extension request to the Building Official and state your reason(s) for the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 10/5/2014, your permit will become null and void
and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
fer Marshall
it Technician
File No: Ml4-0075
6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
PLAN R�:YIEW%ROUTING SLIP
PERMIT NUMBER: M14-0075 DATE: 03/31/14
PROJECT NAME: BOEING #2-31
SITE ADDRESS: 8123 EAST MARGINAL WAY S
X Original Plan Submittal
Response to Correction Letter #
Revision # before Permit Issued
Revision # after Permit Issued
DEPARTMENTS:
Building Division
Public Works
OWI(I
Wpc-
Fire Prevention
Structural
Planning Division
Permit Coordinator Ili
PRELIMINARY REVIEW:
Not Applicable
(no approval/review required)
DATE: 04/01/14
Structural Review Required
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
Approved
Approved with Conditions
Corrections Required Denied
(corrections entered in Reviews) (ie: Zoning Issues)
DUE DATE: 04/29/14
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
12/18/2013
HOLADAY PARKS INC
Page 1 of 4
j Washington State Department of
Labor & Industries
HOLADAY PARKS INC
Owner or tradesperson
PARKS, GERALD T JR
Principals
PARKS, GERALD T JR NAILON, JUNE
ANNETTEO'CONNOR, BONNY KBECK, DAVID
CLARENCEVAN DER VEEN, ERIC
M (End: 08/14/2013)PIZZEY, GRACE
KATHERINE (End: 08/14/2013)VAN DER VEEN,
JULIE ELIZABETH (End: 08/14/2013)
CONNELL, DANIEL AARON (End: 08/14/2013)
GIRI, BUIT (End: 08/14/2013)KIEL, RINALD
HOWARD (End: 08/14/2013)WHITMYRE,
CHRISTIAN (End: 08/14/2013)NELSON,
MICHAEL (End: 11/04/2010)PARKS, DAVID
L (End: 11/04/2010)TALBOT, PAUL
(End: 11/04/2010)
Doing business as
HOLADAY PARKS INC
WA UBI No.
578 004 089
4600 S 134TH PL
SEATTLE, WA98168
206-248-9700
KING County
Business type
Corporation
Governing persons
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor
License specialties
GENERAL
License no.
HOLADPI379NO
Effective — expiration
01 /21 /1983 — 09/03/2015
Bond
LIBERTY MUTUAL INS CO
Bond account no.
23000452
Active.
Meets current requirements.
$12,000.00
Received by L&I Effective date
08/23/2002 09/01/2002
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379NO&SAW= 04/08/2014