Loading...
HomeMy WebLinkAboutPermit M14-0087 - MUSEUM OF FLIGHT - FANS, DUCTWORK AND GRILLES/DIFFUSERSMUSEUM OF FLIGHT 9404 EAST MARGINAL WY S M14-0087 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.Rov 3324049019 9404 E MARGINAL WAY S Project Name: MUSEUM OF FLIGHT MECHANICAL PERMIT Permit Number: Issue Date: Permit Expires On: M 14-0087 5/6/2014 11/2/2014 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: MUSEUM OF FLIGHT FOUNDATION 9404 EAST MARGINAL WAY S , SEATTLE, WA, 98108 ALEX BURKHART 727 S KENYON ST, SEATTLE, WA, 98108 EVERGREEN REFRIGERATION LLC 727 S KENYON ST, SEATTLE, WA, 98108 EVERGRL954R2 /1/ Phone: (206) 763-1744 Phone: (206) 763-1744 Expiration Date: 1/6/2016 DESCRIPTION OF WORK: INSTALLATION OF (2) EXHAUST FANS, DUCTWORK, AND GRILLES/DIFFUSERS Valuation of Work: $2,961.00 Type of Work: NEW Fuel type: Fees Collected: $233.88 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer Distric: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: Internations Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: 2012 2012 2012 2012 International Fuel Gas Code: WA Cities Electrical Code: WA State Energy Code: Permit Center Authorized Signature: '4?1_ 2012 2012 2012 Date: S `" (ON" q I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Date: 5 (1. AA Print Name:,,.b,'.,— This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***MECHANICAL PERMIT CONDITIONS*** 2: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1800 MECHANICAL FINAL 0701 ROUGH -IN MECHANICAL CITY OF TUKW._ Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. Project No. MAN - 00t1 Date Application Accepted: Date Application Expires: o(-22 ICI � 2 7.I�f (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION King Co Assessor's Tax No.: 33 » M 0 et Site Address: '" l LI M d I E_ / - tn i,I4l✓ I S Suite Number: Floor: Tenant Name: //4 v5e,01, A Fic-511-k- New Tenant: ❑ Yes y.No PROPERTY OWNER Name: fit vsw 1,,, - Flai.t C ivvl.&+1%):9 Address: q cla t+ ,iq-k— filzinchi.A. L./A- J 5 , City: >ei:Gitc State: \r% A. Zip: i ca6 CONTACT PERSON — person receiving all project communication Name:/ byre Address: 7V7 5 yA, 5t._ - City: C'e , State: \Atk Zip: iv A Phone: -2,0, 3^ ti,.fq ax: 2,06-163 2.3?' Email: a(t46eocc,,, [iv-.L.,,,, MECHANICAL CONTRACTOR INFORMATION Company Name: V'ere h r h rt e 4A-0 Address: 7Z7 5 ► 1iv,►`(ec1,,,,,54_, City: 5 c.State: j. Zip: Gt z (-q Phone: 206—�K,3 -- 1.-7i N Fax: Zok, — 3 —Z,3 gel Contr Reg No.: Gvg.6124,A 54EL Date: ) 16 11.4 Tukwila Business License No.: 4 Vf S. d 1,21 77 Valuation of project (contractor's bid price): $ - 14 6 i Pis Describe the scope of work in detail: , 4/1,5 1 -f w,o .e )G +' dvs / ci,, ,,✓!toi,2 orClie5 /dss. Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement ❑ Fuel Type: Electric ❑ Gas ❑ Other: H:\Applications\Forms-Applications On Line \201 I Applications\Mechanical Permit Application Revised 8-9-1 I.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct 2- Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser 2 Thermostat Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: at — Date: 4/ /LL( Print Name: AA Q Day Telephone: Z'i ? Mailing Address: -121 V1 iiO"t S�' r^IA- City State Zip H:\Applications\Forms-Applications On Line \2011 Applications \M chanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 2 of 2 DESCRIPTIONS PermitTRAK Cash Register Receipt City of Tukwila ACCOUNT QUANTITY I PAID 670.13_ EL14-0376! Address: 17420 SOUTHCENTER PK n: 2623049110 $68.25 ELECTRICAL $65.00 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 $65.00 TECHNOLOGY FEE $3.25 TECHNOLOGY FEE R000.322.900.04.00 $3.25 M13-0235 Address: 17420 SOUTHCENTER PKWY Apn: 2623049110 $368.00 MECHANICAL $368.00 PERMIT FEE R000.322.100.00.00 $242.40 PLAN CHECK FEE R000.322.102.00.00 $60.60 ADDITIONAL PLAN REVIEW R000.345.830.00.00 $65.00 M14-0087 Address: 9404 E MARGINAL WAY S Apn: 3324049019 $233.88 MECHANICAL $224.88 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 $32.50 PERMIT FEE R000.322.100.00.00 $147.40 PLAN CHECK FEE R000.322.102.00.00 $44.98 TECHNOLOGY FEE $9.00 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R1878 R000.322.900.04.00 $9.00 $670.13 Date Paid: Tuesday, April 22, 2014 Paid By: EVERGREEN REFRIGERATION, LLC Pay Method: CHECK 006436 Printed: Tuesday, April 22, 2014 12:29 PM 1 of 1 SYSTEMS INSPECTION NO. INSPECTION RECORD Retain a copy with permit �Y1 I LI-0057 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project: (Yk) (50-L.vl i� ,. - 4"1'Et ttr Type of Inspection: 1-" i ki A Ad4ress:: 7- i io"j c/16 faJ4 Date Called: — _ Special Instructions: Date Wanted z ? it/ �7 '' `t /atr t"p.m. Requester: - Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: C Date z 7- / / I jj REINSPECTION FEE REQUI ED. Prior to ne$t inspection, fee must be paid at4300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit 1L/ 5O0 7 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project: y'YlL(si)iAi t-k-k(►5Cs Type of Inspection: - (-Zt\tcrb--1/Q Address: ,q4. pLj E ►oA c,,fi t_ Date Called: Special Instructions: Date(teWanted:. r , i Li p } Requeste tMML{ Phone No: ozoG-L?9--3/7c [Sl!kpproved per applicable codes. Corrections required prior to approval. COMMENTS: Date: l ` r-t REINSPECTION FEE REQUIRED. Prior tr.)next inspection. fee must be aid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Summary MECH-SUM Revised June 2013 ,.; 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Project Info OA ' ,, �1°, ' `� Project Address 9404 E Marginal Way S Date 2/12/2014 Tukwila, WA 98108 For Building Dept. Use REVIEWED CODE C OMp L , APPROV 1-16 licant Name: Alex Burkhart Applicant Address: 727 South Kenyon St. Seattle, WA 98108 Applicant Phone: 206-763-1744 ext. 247 1p Briefly describe system type Description mechanical and features. Plans Installation of two (2) exhaust fans. MAY 01 20 Drawings must contain notes requiring compliance with commissioning provis rat4"f13FioTrt IM/1 INC 0 Includes Compliance Option ®IVI_01 Simple System 0 Complex System 0 Systems Analysis Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Cooling Equipment Schedule Equip. ID Equip Type Brand Name1 Model No.1 Capacity2 Btu/h OSA CFM or Econo? SEER or EER IPLV3 Econmizer Option or Exception Heat Recovery Y/N Heating Equipment Schedule Equip. ID Equip Type Brand Name1 Model No.1 Capacity2 Btu/h OSA cfm or Econo? Input Btuh Output Btuh Efficiency4 Heat Recovery Y/N Fan Equipment Schedule Equip. ID Equip Type Brand Name1 Model No.1 CFM SP1 HP/BHP Flow Controls Location of Service EF-1 Broan L300 285 0.375" 0.20 CV Ceiling EF-2 Broan L250 240 0.375" 0.20 cv Ceiling Service Water Heating Equipment Schedule Equip. ID Equip Type Brand Name1 Model No.1 Input Capacity Sub - Category EF7 Location of Service RFrOiv=n OR ANC D 4 ION 1 If available. 2 As tested according to Table C403.2.3(1)A thru C403.2.3(8). 3 If required. ' COP, HSPF, Combustion Ems, optpluxwlLA applicable. 5 Flow control types: variable air volume (VAV), constant volume (CV), or variable speed (VS). 6 Economizer exception number per APR 2 2 2014 PERMIT CENTER Mechanical Permit Plans Checklist - Page 1 of 3 MECH-CHK 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013 Project Address 9404 E Marginal Way S Date 2/12/2014 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on Plans Building Department Notes GENERAL PROVISIONS Equipment Sizing & Performance Yes C403.2.1 Load calculations Load calculations performed per ASHRAE Std 183 or equivalent per Chapter 3 M 1 Yes C403.2.2 Equipment and system sizing Output capacity of heating and cooling equipment and systems do not exceed calculated loads, note exceptions taken M1 Yes C403.2.5 Minimum ventilation Ventilation (natural or mechanical) provided per IMC; indicate mechanical ventilation is capable of being reduced to minimum requirement per IMC M1 Yes C403.2.3 & C403.2.3.2 &efficiency C403.2.12.1 Equipment minimum Provide equipment schedules or complete MECH-SUM tables with type, capacity, efficiency, test standard (or other efficiency source) for all mechanical equipment M1 N/A C403.2.13 Electric motor efficiency Provide equipment schedule with hp, rpm, efficiency for all motors; note except. N/A C403.2.10 Fan power limitation Fan system motor hp or bhp does not exceed limits per Table C403.2.10.1(1) N/A C403.2.10.3 & C403.2.13 Fractional hp fan motors Indicate fan motors 1/12 to 1 hp are ECM type or meet minimum efficiency req. N/A C403.2.3 capacity Maximum air cooled chiller Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit N/A C403.2.1 Non-standard water-cooled chillers Full -load and NPLV values for water-cooled centrifugal chiller adjusted for non-standard operational conditions N/A C403.2.12.1.2 Centrifugal fan cooling towers Large capacity cooling towers with centrifugal fan(s) meet efficiency requirements for axial fan open circuit cooling towers N/A C403.2.3 Forced air furnace and unit heaters Indicate intermittent ignition or !ID, flue/draft damper & jacket loss N/A C403.2.3.3 heating/cooling equipment Packaged electric List equipment required to be heat pumps on schedule N/A C403.2.3.4 Humidification Indicate method of humidification (note requirements for systems with economizer) HVAC System Controls & Criteria Yes C403.2.4.1 Thermostatic controls Indicate locations of thermostatic control zones on plans, including perimeter systems M1 Yes C403.2.4.1.1 Heat pump supplementary heat Indicate staged heating (compression/supplemental) & outdoor lock -out temp M1 Yes C403.2.4.2 Setpoint overlap (deadband) Indicate 5°F deadband minimum for systems controlling both heating & cooling M 1 Yes C403.2.4.3 Automatic setback and shutdown Indicate zone t-stat controls with required automatic setback & manual override M 1 Yes C403.2.4.3.3 Automatic (optimum) start Indicate system controls that adjust equip start time to match load conditions M1 Y25 C402.4.5.2 &Dampers C403.2.4.4 Indicate location of OSA, exhaust, relief and return air dampers; include AMCA rated leakage and control type (motorized or gravity; note exceptions M1 Yes C403.2.11 Heating outside a building Indicate radiant heat system and occupancy controls M 1 N/A C403.2.4.5 Snow melt systems Indicate shut-off controls based on outdoor conditions N/A C403.2.4.6 Combustion heating equipment Indicate modulating or staged control N/A C403.2.4.7 Group R1 hotel/motel systems Indicate method for guest room automatic setback & set-up of 5°F minimum N/A C403.2.4.8 / 9 Group R2/R3 dwelling unit systems Indicate 5-2 programmable thermostats in primary spaces with minimum of two setback periods; note exceptions taken Yes C403.2.5.1 ventilation Demand controlled Indicate high -occupancy spaces and systems requiring DCV M1 Yes C403.2.5.2 Occupancy sensors Indicate spaces requiring occupancy -based system control and method; or altemate means provided to automatically reduce OSA when partially M1 Yes C403.2.5.3 Enclosed loading dock/parking garage ventilation Indicate enclosed loading dock and enclosed parking garage ventilation system activation and control method M1 N/A C403.2.5.4.1 Kitchen exhaust hoods Indicate kitchen hoods requiring make-up air; indicate make-up air source and conditioning method N/A C403.2.5.4.2 Laboratory exhaust systems Indicate lab exhaust systems requiring heat recovery, method & efficiency; or altemative method taken (VAV, semi -conditioned makeup, or CERM calculation) N/A C403.2.6.1 Energy recovery - ventilation systems Indicate ventilation systems requiring ER, method & efficiency; note exceptions N/A C403.2.6.2 Energy recovery - condensate systems Indicate on -site steam heating systems requiring energy recovery N/A C403.2.6.3 Erecovery - condensersyystems Indicate remote refrig. condensers requiring ER and use of captured energy Mechanical Permit Plans Checklist - Page 2 of 3 MECH-CHK 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013 Project Address 9404 E Marginal Way S Date 2/12/2014 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on Plans Building Department Notes GENERAL PROVISIONS, CONTINUED HVAC System Controls & Criteria, Continued N/A C403.2.12 Variable flow control - fans/pumps Indicate fan & pump motors requiring VF control & method (VSD or equiv controls) N/A C403.2.12.1 towerslow control coolingVariable co Indicate cooling tower fans requiring variable flow control and method N/A C403.2.12.2 Large volume fan systems Indicate fan systems requiring airflow reduction based on heating and cooling demand; or exception taken N/A C403.2.12.2 Single zone AC systems Indicate method of cooling demand -based fan control for sys. > 110,000 btuh N A / C403.2.4.10 DDC system capabilities Identify all DDC system input/output control points and indicate capability for trendina and demand response setooint adiustment Ducting Systems Yes C403.2.7.1 &Duct C403.2.7.3 construction Indicate all ductwork constructed and sealed per IMC, C402 leakage requirements and IBC vapor retarder requirements M 1 N/A �403.2.7.3.1-; Duct pressure classifications Identify location of low, medium and high pressure ductwork on plans N/A C403.2.7.3.3 High pressure duct leakage test Indicate high pressure duct leakage testing requirements on plans; provide test results to jurisdiction when completed Yes C403.2.7.1 / 2Duct insulation Indicate R-value of insulation on ductwork Mi Piping Systems N/A C403.2.8 Piping insulation Indicate R-value of insulation on piping N/A C403.2.8.1 Piping insulation exposed to weather Indicate method of protection from damage/degredation SIMPLE SYSTEMS Qualifying Systems Yes C403.3 Qualifying single zone systems Verify unitary or packaged equipment does not exceed capacity limits, does not have active humidifcation or simultaneous heating/cooling M 1 N/A C403.3 systems Qualifying 2-pipe heating Verify 2-pipe heating -only system does not exceed capacity limits N/A C403.3.2 Hydronic system controls Refer to Complex Systems Section C403.4.3 Simple System Economizers Yes C403.3.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equip sched. M1 Yes C403.3.1.1.1 Air economizer capacity Indicate modulating OSA control capability up to 100% OSA, or exception M1 Yes C403.3.1.1.3 Air economizer high limit controls Indicate high limit shut-off control method per Table C403.3.1.1.3(2) M1 Yes C403.1.1.2 Integrated air economizer operation Indicate capability for partial air economizer operation for systems with capacity > 65,000 btuh M 1 Y25 C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exceotion(s) M 1 COMPLEX SYSTEMS Complex System Economizers Yes C403.4.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equip sched. M 1 Yes C403.4.1.4 Economizer heating system impact Verify control method of HVAC systems with economizers does not increase building heating energy usage during normal operation M1 Yes C403.4.1.3 Integrated economizer operation Indicate capability for partial economizer operation for air or water econo systems M1 N/A Moved Water economizer capacity Indicate water econo capable of 100% cooling capacity at 50°F db/45°F wb OSA N/A C403.4.1.2 Water economizer maximum pressure drop Indicate precooling coils and heat exchangers do not exceed pressure drop limit N/A C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exceotion(s) Mechanical Permit Plans Checklist - Page 3 of 3 MECH-CHK Revised June 2013 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Project Address 9404 E Marginal Way S Date 2/12/2014 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on Plans Building Department Notes COMPLEX SYSTEMS, CONTINUED Specific System Requirements N/A C403.4.2 & c403.2.12 Variable flow control - fans Indicate fans requiring variable flow control and method N/A C403.4.2.1 VAV fan static pressure sensors Indicate sensor locations on plans; include at least one sensor per major duct branch N/A C403.4.2.2 VAV fan static pressure setpoint Indicate fan system static pressure setpoint based on zone requiring most pressure N/A C403.4.5 VAV systems serving multi- zones Indicate supply air systems serving multiple zones that are required to be VAV, method of primary air control, and zones served; note exceptions taken N A /loads C403.4.5.4 VAV system supply air reset Indicate controls that automatically reset supply air temp in response to N/A C403.4 Large capacity cooling systems Indicate method of multi -stage or variable control for building cooling system capacity > 300 tons N/A C403.4.7 Hot gas bypass limitation Indicate cooling equipment unloading or capacity modulation method N/A C403.4.3 systems Large capacity boiler Indicate multi -stage or modulating bumer for single boilers > 500,000 btuh N/A C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers N/Aisolation C403.4.3.5 Chiller / boiler plant pump Indicate capability to automatically reduce overall plant flow and shut-off flow through chillers & boilers when not in use N/A C403.4.2 & C403.4.3.6 Variable flow control - pumps Indicate pumps requiring variable flow control & method N/A C404.2.12.103.4.4 & C403.4.4 Varcooling towers flow control - cooling Indicate cooling tower fans requiring variable flow control and method N/A C403.4.3.4 Hydronic system part load controls Indicate heating & chilled water systems have the capability to automatically reset supply water temp AND reduce flow by >_ 50% for systems > 300,000 N/A C403.4.3.2 Two -pipe changeover systems Indicate deadband, heating/cooling mode scheduling and changeover temperature range N/A C403.4.3.3.1 Water loop heat pump - deadband Indicate capability of central equipment to provide min. 20°F water supply temp deadband between heat resection and heat addition modes N/A C403.4.3.3 Water loop heat pump - heat rejection Provide heat exchanger that separates cooling tower and heat pump loop in Climate Zone 5 N/A C403.4.3.3.3 Water loop heat pump - isolation Indicate 2-way isolation valve on each heat pump and variable flow control for systems with total pump power > 10 hp N/A C403.4.6 recovery Condenser water heat Indicate system provided to pre -heat service water and efficiency N/A C403.5 Cooler / freezer - anti -sweat heaters Indicate w/sf & control method for walk-in cooler/freezer door anti -sweat heaters N/A C403.5 / 6 Cooler / freezer -evaporator and condenser fans Indicate motor type for evaporator and condenser fans < 1 hp SERVICE WATER HEATING Service Water Systems N/A C404.2 Water -heating equip min. efficiency Provide equipment schedule or complete MECH-SUM table with type, capacity, efficiency, test standard (or other efficiency source) N/A C404.3 Temperature controls Indicate temperature controls have required setpoint capability N/A C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply & discharge N/A C404.5 Insulation under water heater Indicate R-10 insulation under tank N/A C404.6 Service water piping insulation Indicate R-value of insulation on piping; note exceptions taken N/A C404.7 / g Circulation systems and heat trace shut-off Indicate shut-off capability based on occupancy and periods of limited demand N/A C404.9 Group R-2 service hot water meters Indicate method of usage metering for dwell. units served by central HW system Pools & In -Ground Permanently Installed Spas N/A C404.10.1 Pool heating equip min. efficiency Provide equipment schedule or complete MECH-SUM table with type, capacity, efficiency, test standard (or other eff. source); heat pump heaters > 4 COP N/A C404.10.1 / 2 Pool heater on / off controls Indicate automatic on/off control based on scheduling & accessible on/off switch on heater that operates independent of thermostat setting; or N/A C404.10.3 Pool covers Indicate vapor retardant cover and insulation rating as required N/A C404.10.3 Pool assembly insulation Indicate rating of insulation on sides and bottom of pools heated to > 90°F N/A C404.10.4 Heat recovery Indicate method, exhaust air temperature reduction and recovered energy use PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M14-0087 DATE: 04/22/14 PROJECT NAME: MUSEUM OF FLIGHT SITE ADDRESS: 9404 E MARGINAL WAY S X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Building Division I Public Works A)/,-Lam-,y Fire Prevention Structural Planning Division Permit Coordinator 1111 PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 04/29/14 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required Denied (corrections entered in Reviews) (ie: Zoning Issues) Approved with. Conditions DUE DATE: 05/27/14 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 EVERGREEN REFRIGERATION I T,C Page 1 of 3 411111111 Washington State Department of Labor & Industries EVERGREEN REFRIGERATION LLC Owner or tradesperson PATTON, RODGER Principals PATTON, RODGER, PARTNER/MEMBER PATTON, MATTHEW, PARTNER/MEMBER Patton, Adam, PARTNER/MEMBER Patton, Douglas, PARTNER/MEMBER EVERGREEN REFRIGERATION LLC, PARTNER/MEMBER PATTON, DAVID, PARTNER/MEMBER (End: 01 /21 /2014) Doing business as EVERGREEN REFRIGERATION LLC WA UBI No. 602 512 953 727 S KENYON ST SEATTLE, WA98108 206-763-1744 KING County Business type Limited Liability Company License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. EVERGRL954R2 Effective — expiration 01/06/2006— 01/06/2016 Bond Merchants Bonding Co (Mutual) Bond account no. WA15097 $12,000.00 Received by L&I Effective date 12/15/2011 01 /01 /2012 Bond history Insurance AMERICAN FIRE AND CASUALTY COM $1,000,000.00 Policy no. BAW54192293 https://secure.lni.wa.gov/verify/Detail.aspx?UBI''=602512953&LIC=EVERGRL954R2&SAW= 05/06/2014 VICINITY MAP SCALE : NONE SEPARATE PEPNHT REQUIRED FCNN a M, anad Plumbinio Mips aatl;>j atffIrtiltvol1iti ._ . EXHAUST FAN SCHEDULE MARK MANF. MODEL CFM S.P. VOLTS PHASE Hp/A NOTES EF 1 BROAN L300 285 0.375" 115 1 2.7 A LOCATED ON CEILING EF 2 BROAN L250 240 0.375" • 115 1 2.2 A LOCATED ON CEILING POINT OF CONNECTION EXISTING 10x6 EXHAUST DUCT JI rrt9i Li_ I \ \;, II / i L _ __Ihew ew en's -� _ ii, - - / • ,-.' / 41 C) 41,- , , -i- \ / HVAC FLOOR PLAN SCALE :1/4" = 1'-0" RELOCATE EXISTING CEILING DIFFUSER, EXTEND EXISTING 8" DUCT COMMISSIONING PLAN ALL COMMISSI❑NING OF HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS AS REQUIRED BY SECTION C408 'SYSTEM COMMISSIONING' OF THE 2012 WASHINGT❑N STATE ENERGY CODE (WSEC) SHALL BE PERFORMED BY EVERGREEN REFRIGERATION, LLC, THE ACTIVITIES TO BE ACCOMPLISHED ARE PER THE SECTIONS LISTED IN THE 'COMMISSIONING COMPLIANCE CHECKLIST' SHOWN BELOW. AT THE COMPLETION OF THE ACTIVITIES REQUIRED FOR COMMISSIONING AS DEFINED BY SECTION C408 OF WSEC THE 'C❑MMISSI❑NING COMPLIANCE CHECKLIST' WILL BE REVIEWED WITH THE BUILDING OWNER OR THE OWNER'S REPRESENTATIVE AND THIS CERTIFICATION WILL BE SIGNED AND DATED. THIS WILL SATISFY TO THE CODE OFFICIAL THAT THE REPORT HAS BEEN ACCEPTED AS REQUIRED BY SECTION C408.1.2.1 OF WSEC. Project Information COMMISSIONING COMPLIANCE CHECKLIST Project Name: Project Address: Commissioning Authority: Commissioning Plan (Section C408.1.1) ❑ Commissioning Plan was used during construction and Included Items below • A narrative description of activities and the personnel Intended to accomplish each one • Measurable criteria for performance • Functions to be tested Systems Balancing (Section C408,2,2) Systems Balancing has been completed Air and Hydronic systems are proportionately balanced In a planner to first minimize throttling losses • Test ports are provided on each pump for measuring pressure across the pump Functional Testing (Sections C408,2,3) HVAC Equipment Functional Testing has been completed (Section C408.2.3.1) HVAC equipment has been tested to demonstrate the Installation and operation of components, systems and pl syansstem-by-systeandspecificm aInterfacingtions relationships in accordance with approved ❑ HVAC Controls Functional Testing has been completed (Section C408.2,3.2) HVAC controls have beentested to ensure that control devices are calibrated, adjusted anoperate properly. Sequence of o e ation hh ve been functionally tested to ensure they operate in acc ^cia ce with approved plans and spec icatlons ❑ Economizers Functional Testing has been completed (Section C408.2,3.3) Economizers operate in accordance with manufacturer's specifications Supporting Documents (Section C408.1.3.2) • Manuals, record documents and training have been completed or are scheduled • System documentation has been provided to the owner or scheduled date' • Record documents have been submitted to owner or scheduled dates • Training has been completed or scheduled date' Commissioning Report (Section C408.1.2) Preliminary Commissioning Report submitted to Owner and Includes Items below • Deficiencies found during testing required by this section which have not been corrected at the time of report preparation • Deferred tests, which cannot be performed at the time of report preperation due to climatic conditions. Certification ❑ I hereby certify that all requirements for Commissioning have been completed in accordance with the Washington State Energy Code, Including all Items above. Building Owner or Owner's Representative Date REVISIONS No changes shall be made to the scope of work without prior approval of '-u%wila Building Division. NOTE: ; ;v,sons will require a new plan submittal cni may include additional plan review fees. REVIEWED FOR CODE COMPLIANCE APPROVED MAYYf 01 2014 City of uk i1a BUILDING ISION FILE liThr4c Permit No. W\'�1�• Plan review approval la subject to errors and omissions, Approval of constructton documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Field Copy ,, ed: BY 4//4-.1 City Of 1lakwlla BUILDING DIVISION GENERAL NOTES DUCTWORK 1.1 ALL DUCT DIMENSIONS ON PLAN ARE CLEAR INSIDE DIMENSIONS, ADD 2" TO EACH DIMENSION TO OBTAIN OUTSIDE DIMENSION. ADD 4"TO EACH DIMENSION IF DUCTWORK IS ON THE EXTERIOR OF BUILDING. 1.2 THE FIRST NUMBER ON ALL DUCT DIMENSIONS IS THE WIDTH AND THE SECOND NUMBER IS THE HEIGHT. 1.3 MATERIALS WITHIN DUCTS OR PLENUMS SHALL HAVE A FLAME SPREAD RATING LESS THAN 25 AND A FLAME SMOKE DEVELOPMENT RATING LESS THAN 50, PER IMC 602.2.1. 1.4 SEAL ALL TRANSVERSE JOINTS FOR DUCTWORK WITH STATIC PRESSURE BETWEEN 1/2 INCHES AND 2 INCHES. DUCTWORK WHICH IS DESIGNED TO OPERATE AT PRESSURES ABOVE 1/2 INCH WATER COLUMN STATIC PRESSURE SHALL BE SEALED IN ACCORDANCE WITH STANDARD RS-7. 1.5 ALL DUCT GAUGES PER SMACNA, IMC 603-4. 1.6 ALL DUCT SUPPORTS PER SMACNA, IMC 603-10. 1.7 ATTACH DIFFUSERS AND GRILLES TO T-BAR GRID PER WA STATE & LOCAL CODES. 1.8 BALANCING DAMPERS ARE TO BE INSTALLED ON ALL BRANCH DUCTS OR DIFFUSERS. INSULATION 2.1 INSULATE OR LINE DUCTWORK PER WA. STATE ENERGY AND MECHANICAL CODES. 2.2 INSULATE REFRIGERANT & CONDENSATE PIPING PER STATE & LOCAL ENERGY CODES. GENERAL CONTRACTOR 3.1 GENERAL CONTRACTOR TO PROVIDE AND CUT OPENINGS FOR ALL ROOFTOP, CEILING, FLOOR, AND WALL PENETRATIONS, INCLUDING WEATHERPROOF SEALING AND FIRE PROOF LINING PER IMC & IBC. 3.2 GENERAL CONTRACTOR TO VERIFY PENETRATION LOCATION AND DIMENSIONS WITH ERL BEFORE FRAMING OPENINGS. 3.3 GENERAL CONTRACTOR TO PROVIDE ALL DEMOLITION, PATCHING, AND PAINTING AS REQUIRED FOR MECHANICAL WORK. 3.4 GENERAL CONTRACTOR TO PROVIDE ADEQUATE STRUCTURAL SUPPORT AS REQUIRED FOR MECHANICAL WORK. 3.5 GENERAL CONTRACTOR TO PROVIDE ADEQUATE ENGINEERING AS REQUIRED FOR MECHANICAL WORK. 3.6 GENERAL CONTRACTOR TO PROVIDE SERVICE ACCESS PER CODE TO ALL MECHANICAL EQUIPMENT. 3.7 GENERAL CONTRACTOR TO LEVEL ALL FACTORY CURBS PROVIDED BY ERL PROVIDE ALL CANT STRIPS AND CURB INSULATION, AND SEAL AGAINST LEAKS. 3.8 GENERAL CONTRACTOR TO PROVIDE ALL CUTTING AND PATCHING OF T-BAR CEILING AS REQUIRED FOR HVAC INSTALLATION. 3.9 GENERAL CONTRACTOR TO PROTECT ALL OPENINGS THROUGH FLOORS PROVIDED FOR DUCTWORK INSTALLATION IN ACCORDANCE WITH TABLE 601 OF INTERNATIONAL BUILDING CODE, WHERE REQUIRED BY SECTION 707 OF IBC. ELECTRICAL 4.1 ERL TO INSTALL ALL LOW VOLTAGE CONTROL WIRING, CONDUIT WILL BE PROVIDED BY ELECTRICAL CONTRACTOR. 4.2 ELECTRICAL CONTRACTOR TO PROVIDE ALL ELECTRICAL CONNECTIONS, DISCONNECTS, AND STARTERS FOR MECHANICAL EQUIPMENT. 4.3 ELECTRICAL CONTRACTOR TO VERIFY EQUIPMENT SIZES, LOADS AND LOCATIONS WITH ERL MECHANICAL PLAN AND WITH FIELD CONDITIONS. 4.4 ELECTRICAL CONTRACTOR TO INTERLOCK BATHROOM EXHAUST FANS WITH LIGHT SWITCH. 4.5 ERL TO PROVIDE 7-DAY NIGHT SETBACK, PROGRAMMABLE TYPE T-STAT WITH CAPABILITY OF 5°F DEADBAND. 4.6 ERL TO VERIFY FINAL LOCATION OF THERMOSTAT WITH CUSTOMER. 4.7 ELECTRICAL CONTRACTOR TO PROVIDE ELECTRICAL GCFI OUTLET WITHIN 25 FT OF EACH PIECE OF MECHANICAL EQUIPMENT. PLUMBING 5.1 PLUMBING CONTRACTOR TO FURNISH AND INSTALL ALL GAS PIPING FOR MECHANICAL EQUIPMENT PER CODE. 5.2 PLUMBING CONTRACTOR OFFSET VENTS 10 FEET MINIMUM FROM ALL HVAC FRESH AIR INTAKES OR 2' ABOVE HIGHEST POINT OF INTAKE, IMC 401.4.1. 5.3 CONDENSATE DRAINS FROM RTU BY ERI TO DRAIN WITHIN 12" OF UNIT. CONDENSATE DRAINS FOR AIR HANDLERS BY PLUMBER. ENERGY CODE COMPLIANCE 6.1 AT A MINIMUM, EACH FLOOR IS TO BE CONSIDERED A SEPARATE ZONE. VERIFY THERMOSTATIC CONTROL FOR EACH ZONE AS INDICATED ON PLANS. 6.2 OUTSIDE AIR INTAKES, EXHAUST OUTLETS, AND RELIEF OUTLETS SERVING CONDITIONED SPACES SHALL BE EQUIPPED WITH DAMPERS WHICH CLOSE AUTOMATICALLY WHEN THE SYSTEM IS OFF OR UPON POWER FAILURE, PER WSEC SEC. C402.4.5.4 6.3 AIR ECONOMIZERS WHERE REQUIRED BY CODE ARE INDICATED BY THE EQUIPMENT SCHEDULE AT 100% CAPABILITY, CONTROL AND OPERATION OF THE ECONOMIZER SHALL COMPLY WITH WSEC SEC. C403.4.1 MECHANICAL CODE COMPLIANCE 7.1 WHERE REQUIRED PROVIDE AUTOMATIC SHUTOFF ACTIVATED BY SMOKE DETECTORS IN EACH SYSTEM DELIVERING HEATING OR COOLING AIR IN EXCESS OF 2000 CFM. DETECTORS SHALL BE LOCATED IN THE MAIN RETURN AIR PER IMC 606. VA2012 SYMBOL LEGEND SYMBOL ABBV. DESCRIPTION 3 DUCT SECTION SUPPLY r DUCT SECTION - RETURN/EXHAUST I14'x8' RECTANGULAR DUCT I14' ROUND DUCT `,III ,11S FLEXIBLE DUCT MVD MANUAL VOLUME DAMPER I , 1 f l BDD BDD BACKDRAFT DAMPER I MD MOTORIZED DAMPER FD FIRE DAMPER _4 FSD FIRE/SMOKE DAMPER (120V POWER REQ.) -41► igH CEILING RADIATION DAMPER SD • SD SMOKE DETECTOR TO T THERMOSTAT QS S SENSOR R R R REFRIGERANT LINES G G G NATURAL GAS LINES %: CEILING DIFFUSER (SUPPLY) J CEILING DIFFUSER (RETURN/EXHAUST) 3 EXHAUST FAN (CEILING MOUNTED) [Cori INLINE FAN 4 PROPELLER FAN i i ( SIDEWALL DIFFUSER I 4E' DUCT FITTING ill ZD ZONE DAMPER P © UNIT TAG 0 DUCT RISER U w w r4; w' 1 t VD M SEATTLE, WASHINGTON 98108 727 SOUTH KENYON EVERGRL954R2 NOT PUBLISHED. ALL RIGHTS RESERVED. THE DRAWING AND SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF EVE- RGREEN REFRIGERATION INC. NO PART THEREOF SHALL BE REPRODUCED, COPIED, ADAPTED, DISC- LOSED OR DISTRIBUTED TO OTHERS, SOLD, PUB- LISHED OR OTHERWISE USED WITHOUT THE PRIOR WRITTEN CONSENT OF AND APPROPRIATE COMPEN- SATION TO EVERGREEN REFRIGERATION INC. VISUAL CONTACT WITH THE ABOVE DRAWINGS OR SPECIFIC- ATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. 4 r- O W a DESIGN DEVELOPMENT 4 N N 4 O bJ 0 ISSUED FOR CONSTRUCTION BUILT DRAWINGS ■ ■ u HVAC COVER SHEET (4) co J z� LLB Itj 0 < w F- CD Q REVISIONS NO DATE ITEM RECEIVED CITY OF TUKWILA APR 2;2 2014 PERMIT CENTER DWG. BY: GN CHK. BY MG/CS JOB NO.: 413334 SHEET: