Loading...
HomeMy WebLinkAboutPermit M14-0143 - SOUND MENTAL HEALTH - VAV BOXES, HEAT TRANSFER FAN AND BATHROOM FANSOUND MENTAL HEALTH 6400 SOUTHCENTER BLVD M14-0143 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 0003200003 6400 SOUTHCENTER BLVD Project Name: SOUND MENTAL HEALTH Permit Number: Issue Date: Permit Expires On: M 14-0143 7/25/2014 1/21/2015 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: MSI 6400 TUKWILA 1932 1ST AVE STE 1000 C/O MARTIN SMITH INC, SEATTLE, WA, 98101 PERRY CHRISTIAN 7717 DETROIT AVE SW , SEATTLE, WA, 98106 MACDONALD MILLER FACIL SOLUTIO PO BOX 47983 , SEATTLE, WA, 98146- 7983 Phone: (206) 768-4284 Phone: (206) 768-4180 MACDOFS980RU Expiration Date: DESCRIPTION OF WORK: RELOCATE (4) VAV BOXES AND (102) GRD'S PER PLANS. INSTALL (17) VAV BOXES, (1) HEAT TRANSFER FAN, (10 BATHROOM EXHAUST FAN AND (56) GRD'S PER PLANS Valuation of Work: $50,500.00 Type of Work: Fuel type: ELECT Fees Collected: $884.14 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: Permit Center Authorized Signature: 2012 2012 2012 2012 International Fuel Gas Code: WA Cities Electrical Code: WA State Energy Code: 2012 2012 2012 Date: !✓)— -t ✓/ hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: ( rQn (/ /����� Date: 7" ``S/ Print Name: /- a-(l "�- This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Readily accessible access to roof mounted equipment is required. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: ***MECHANICAL PERMIT CONDITIONS*** 10: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 11: Manufacturers installation instructions shall be available on the job site at the time of inspection. 20: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 15: H.V.A.C. units rated at greater than 2,000 cfm require auto -shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2437) 16: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air -moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 13: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2437) 14: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 17: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2437) 18: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2437) 19: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 12: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 21: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 22: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1400 FIRE FINAL 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL 0702 SMOKE DETECTOR TEST CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. t4'14'-f- 0 11( 3 Project No. Date Application Accepted: l+-_( Date Application Expires: (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION Site Address: Tenant Name: King Co Assessor's Tax No.: 0003200003 6400 Southcenter Blvd Tukwila, WA 98188 SOUND MENTAL HEALTH Suite Number: PROPERTY OWNER Name: SOUND MENTAL HEALTH Address: 6400 SOUTHCENTER BLVD City: TUKWILA State: WA Zip: 98188 CONTACT PERSON — person receiving all project communication Name: PERRY CHRISTIAN Address: 7717 DETROIT AVE SW City: SEATTLE State: WA Zip: 98106 Phone: (206) 768-4284 Fax: (206) 768-4285 Email: perry.christian@macmiller.com New Tenant: Floor: 2 ❑ Yes m..No MECHANICAL CONTRACTOR INFORMATION Company Name: MACDONALD MILLER Address: 7717 DETROIT AVE SW City: SEATTLE State: WA Zip: 98106 Phone: (206) 768-4278 Fax: (206) 768-4279 Contr Reg No.: MACDOFS980RU Exp Date: 01/03/2015 Tukwila Business License No.: BUS-0100868 Valuation of project (contractor's bid price): $ Describe the scope of work in detail: RELOCATE (4) VAV BOXES AND (102) GRD'S PER PLANS. INSTALL (17) VAV BOXES, (1) HEAT TRANSFER FAN, (1) BATHROOM EXHAUST FAN ADN (56) GRD'S PER PLANS. 50,500 Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement VI Fuel Type: Electric VI Gas Other: H:\Applications\Forms-Applications On Line\2011 Applications\Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser 158 Thermostat Wood/gas stove Emergency generator Other mechanical equipment 23 Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING O R AUTHORIZ Signature: Date: 07/14/2014 Print Name: DARLA DOLL Day Telephone: (206) 768-4278 Mailing Address: 7717 DETROIT AVE SW SEATTLE WA 98106 City State Zip H:Wpplications\Forms-Applications On Line\2011 Applications\Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTR ACCOUNT I QUANTITY I PAID 84.14 M14-0143! Address: 6400 SOUTHCENTERBLVD Apn 0003200003 ,, Tian' ° `",,n� $884.14 MECHANICAL - $850.13 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $647.60 PLAN CHECK FEE R000.322.102.00.00 0.00 $170.03 TECHNOLOGY FEE . $34.01 = TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R2584 R000.322.900.04.00 0.00 $34.01 $884.14 Date Paid: Monday, July 14, 2014 Paid By: MACDONALD-MILLER FACILITY SOLU Pay Method: CHECK 3977 Printed: Monday, July 14, 2014 2:10 PM 1 of 1 RSYSTEMS d= 3 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 431-2451 Project: 50JAk AkeA1Ak NSA riN Type of Inspection: 1 SmaK _ So-1 'P ovMAJ Address: (o40 0 S L 3101>. Date Called: C ,` N A 1_-- .-.. Special Instructions: rJ 0 l 1 f Date Wanted: `/Jc ! amr 14 p• Requester: Phone No: 5-7 I 31 4 EApproved per applicable codes. Corrections required prior to approval. COMMENTS: nvPr,kA (...-) A--1P.\r AP { J,...., �Ji 7-....-✓ / Inspector: °NA Li> REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Dater .2-Y I jt INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 M!4-0r4'3 Project:, 1 '50 V ^- P `Ul Te f Inspection: yp((-oJ (ft 1- A ME - Address: t Date Called: �--i 1 Special Instructions: .? 2 Date Wanted: C / ya m., /4 p.m. Requester: ilo e-- $1 f , 2--33 ( Approved per applicable codes. Corrections required prior to approval. COMMENTS: Dater 2 t r REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project: '`. Jv n AA M e4 ike'.� ( Type offlnspection: t_. .^ ° S , -- . .1 :. Addres .,: 00 s a Date C lled: _ V '$'— Special Instructions: Date Wanted:�q r / `-7 I m. p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: / /A on 1` ..e)J 6)F 1 \i/1‘154.AJ( )J( 7_.) ,'1 .SJIil t r Date1�n /� / 4 • REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. Xerox Building REVIEWED FOR CODE COMPLIANCE APPROVED JUL 2 4 2014 City of Tukwila BUILDING DIVISION Location Building owner Program user Company Comments By Dataset name Calculation time TRACE® 700 version Location Latitude Longitude Time Zone Elevation Barometric pressure Air density Air specific heat Density -specific heat product Latent heat factor Enthalpy factor Summer design dry bulb Summer design wet bulb Winter design dry bulb Summer clearness number Winter clearness number Summer ground reflectance Winter ground reflectance Carbon Dioxide Level Design simulation period Cooling load methodology Heating load methodology 6400 Southcenter Blvd Perry Christian MacDonald Miller Facility Soloutions MacDonald -Miller Facility Solutions C:1Userslchristianp\Documents\Trane Trace files\Sound Mental Health\72145179-SMH 061814.TRC 03:33 PM on 07/09/2014 6.3 Seattle, Washington 47.0 deg 122.0 deg 8 386 ft 29.5 in. Hg 0.0749 0.2444 1.0988 4,836.9 4.4953 83 64 24 0.95 0.95 0.20 0.20 400 lb/cu ft Btu/Ib•°F Btu/h•cfm•°F Btu•min/h•cu ft Ib•min/hr•cu ft °F °F °F ppm January - December CLTD-CLF fASHRAE TFM1 UATD M 1-14 0 t4 RECEVED CITY OF TUKWILA JUL 142014 PERMIT CENTER I RACEioo comprehensive building analysts software from Trane Room Checksums By MacDonald -Miller Facility Solutions 200 Waiting COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 60 / 49 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h O 0 0 0 O 313 15,116 0 1,051 0 0 214 0 0 0 0 -3 16,164 527 779 195 4,400 0 497 0 5,675 195 122 -122 O 0 0 0 -147 277 0 0 21,962 730 Net Total Btu/h 0 0 313 15,116 1,051 214 0 0 0 -3 16,691 973 4,400 497 5,870 0 -18 0 0 0 -147 1,659 277 0 0 0 Percent Of Total (%) 0 0 1 62 4 1 0 0 0 0 69 4 18 2 24 0 0 0 0 0 -1 7 1 0 0 CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Space Sensible Btu/h 0 0 0 15,116 1,051 0 0 0 0 52 16,220 779 2,695 497 3,970 122 0 0 0 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond O Roof Cond 74 Glass Solar 5 Glass/Door Cond O Wall Cond O Partition/Door O Floor 0 Adjacent Floor O Infiltration 80 Sub Total ==> 4 13 2 20 0 0 0 Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat OvlUndr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 24,333 100.00 20,312 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -13,431 0 0 0 0 -588 -14,019 0 0 -728 -728 -147 0 0 0 -14,893 Coil Peak Percent Tot Sens Of Total Btu/h (%) O 0.00 0 0.00 -665 2.84 0 0.00 -13,431 57.48 -762 3.26 0 0.00 0 0.00 O 0.00 -588 2.52 -15,446 66.11 O 0.00 0 0.00 -728 3.11 -728 3.11 O 0.00 -3,663 15.68 0 0 O 0.00 147 -0.63 0 0.00 -3,321 14.22 O 0.00 -355 1.52 O 0.00 O 0.00 -23,365 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow ton MBh 2.0 24.0 0.0 0.0 2.0 0.0 0.0 24.0 Enter DB/WB/HR MBh cfm °F °F gr/Ib 22.7 924 76.8 60.9 55.7 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 51.6 54.7 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 291 0 0 0 291 572 45 O 0 457 80 O 0 % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Own Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 84.7 76.3 68.4 76.6 68.4 76.8 56.8 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 924 924 924 924 72 72 12 277 936 84 0 0 0 0 Heating 924 924 277 924 72 72 12 277 289 84 0 0 0 0 ENGINEERING CKS Cooling Heating 7.8 7.8 3.18 3.18 461.30 145.24 82.62 -80.29 11 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -21.0 0.0 -2.4 -5.0 0.0 0.0 -23.4 SELECTION Coil Airflow Ent Lvg cfm °F °F 924 64.0 84.7 O 0.0 0.0 72 24.0 53.7 277 53.7 70.0 O 0.0 00 fl,ir .0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 1 of 63 Room Checksums By MacDonald -Miller Facility Solutions 201 Waiting COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 17 Outside Air: OADB/WB/HR: 81 / 62 / 54 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 1,440 2,400 0 3,840 Net Total Btu/h O 0 0 0 508 508 O 0 O 0 O 0 0 0 O 0 0 508 508 360 1,799 O 2,400 0 0 360 4,199 207 -207 0 O 0 314 O 0 0 0 0 -101 -101 257 42 42 O 0 0 0 0 4,046 602 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Percent Space Of Total Sensible (%) Btu/h O 0 O 0 10 0 O 0 O 0 0 0 O 0 O 0 O 0 O 0 10 0 34 46 0 80 0 6 0 0 0 -2 5 1 0 0 0 5,220 100.00 1,440 1,470 0 2,910 384 0 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 44 45 0 88 12 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 3,294 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 918 918 -271 0 0 0 647 Coil Peak Percent Tot Sens Of Total Btu/h (%) 0 0.00 O 0.00 -1,229 37.22 O 0.00 O 0.00 O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 -1,229 37.22 0 0.00 0 0.00 918 -27.81 918 -27.81 0 0.00 -3,148 95.37 0 0 0 0.00 109 -3.30 0 0.00 -647 19.60 0 0.00 696 -21.08 O 0.00 0 0.00 -3,301 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.4 5.2 0.0 0.0 0.0 0.0 0.4 5.2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 4.4 142 78.5 61.4 55.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 48.1 41.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass Floor 538 Part 0 Int Door 0 ExFlr 0 Roof 538 Wall 0 Ext Door 0 ft2 (%) 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BldTD Fn Frict TEMPERATURES Cooling Heating 55.0 70.0 76.2 68.4 76.5 68.4 78.5 24.0 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 150 150 150 150 62 62 0 62 150 62 0 0 0 0 Heating 150 150 62 150 62 62 0 62 62 62 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton fV/ton Btu/hr•ft' No. People Cooling 41.6 0.28 347.70 1,248.06 9.61 6 Heating 41.6 0.28 -6.14 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -1.3 0.0 -2.0 -1.1 0.0 0.0 -3.3 Lvg °F 150 62.3 70.0 0 0.0 0.0 62 24.0 53.7 62 53.7 70.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 2 of 63 Room Checksums By MacDonald -Miller Facility Solutions 202 Reception COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 64 / 62 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Net Sens. + Lat. Sens. + Lat Total Btu/h Btu/h Btu/h 0 0 0 0 0 0 0 65 65 O 0 0 0 0 0 0 0 0 O 0 O 0 0 0 0 0 0 O 65 65 273 900 1,365 2,538 32 0 0 0 2,570 68 0 0 68 -32 0 -22 29 0 0 108 341 900 1,365 2,606 0 198 0 0 0 -22 178 29 0 0 0 Percent Of Total (%) 0 0 2 0 0 0 0 0 0 0 2 11 29 45 85 0 6 0 0 0 -1 6 1 0 0 0 3,055 100.00 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 273 500 1,365 2,138 73 0 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 12 23 62 97 3 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 2,211 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -51 0 0 0 -51 -1,242 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 0 0.00 -233 18.76 O 0.00 0 0.00 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 -233 18.76 O 0.00 O 0.00 O 0.00 0 0.00 0 0.00 -815 65.61 O 0 0 0.00 28 -2.27 0 0.00 -228 18.36 0 0.00 6 -0.47 0 0.00 0 0.00 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.3 3.0 0.0 0.0 0.0 0.0 0.3 3.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 2.6 99 77.3 61.4 57.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 50.5 50.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass ft' (%) Floor 102 Part 0 Int Door 0 ExFlr 0 Roof 102 Wall 0 Ext Door 0 O 0 O 0 O 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 70.5 76.0 68.4 76.3 68.4 77.3 44.7 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 101 101 101 101 16 16 0 30 101 16 0 0 0 0 Heating 101 101 30 101 16 16 0 30 30 16 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hrft' No. People Cooling 16.0 0.99 399.36 404.88 29.64 2 Heating 16.0 0.99 -12.18 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -0.7 0.0 -0.5 -0.5 0.0 0.0 -1.2 SELECTION Coil Airflow Ent Lvg cfm °F °F 101 64.0 70.5 0 0.0 0.0 16 30 0 0 24.0 53.7 0.0 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 3 of 63 Room Checksums By MacDonald -Miller Facility Solutions 203 Conference Room COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 60 / 49 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) 0 0 0 0 0 0 O 0 0 0 0 0 O 833 833 3 0 0 12,291 0 12,291 40 12,291 49 661 0 661 2 661 3 O 135 135 0 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 -8 -8 0 140 1 12,945 968 13,913 46 13,092 52 2,606 652 3,258 11 2,606 10 5,600 0 5,600 18 3,430 14 5,631 0 5,631 18 5,631 22 13,838 652 14,489 47 11,668 47 325 -325 0 0 325 1 O 0 -28 0 0 0 O 0 0 0 0 0 0 O 0 0 0 0 -258 -258 -1 2,049 7 347 347 1 0 0 0 0 0 0 0 0 27,108 1,383 30,512 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 25,085 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 O -1,772 7.56 O 0 0.00 -8,189 -8,189 34.95 O -456 1.95 0 0 0.00 O 0 0.00 O 0 0.00 -1,569 -1,569 6.70 -9,758 -11,987 51.15 O 0 0.00 O 0 0.00 -1,940 -1,940 8.28 -1,940 -1,940 8.28 -391 0 0.00 0 -5,892 25.14 0 0 0 0 0 0.00 258 -1.10 0 0.00 -3,663 15.63 0 0.00 -211 0.90 0 0.00 0 0.00 -12,089 -23,434 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/lb Main Clg 2.5 30.2 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 2.5 30.2 28.7 0.0 0.0 1,141 76.9 60.9 O 0.0 0.0 O 0.0 0.0 55.5 Leave DB/WB/HR °F °F gr/Ib 53.7 51.5 54.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass Floor 776 Part 0 Int Door 0 ExFlr 0 Roof 776 Wall 378 Ext Door 0 ft' (%) O 0 309 82 O 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 79.6 76.3 68.4 76.6 68.4 76.9 53.3 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 1,141 1,141 1,141 1,141 117 117 31 342 1,172 148 0 0 0 0 Heating 1,141 1,141 342 1,141 117 117 31 342 373 148 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hrft' No. People Cooling 10.2 1.47 454.25 308.82 38.86 14 Heating 10.2 1.47 -30.20 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -19.6 0.0 -3.8 -6.2 0.0 0.0 -23.4 SELECTION Coil Airflow Ent Lvg cfm °F °F 1,141 64.0 0 0.0 117 342 0 0 24.0 53.7 0.0 0.0 79.6 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 4 of 63 Room Checksums By MacDonald -Miller Facility Solutions 204 Conference Room COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 64 / 62 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo/Hr: 7 / 11 OADB: 76 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu/h Btu/h Btu/h (%) Btu/h o 0 0 0 0 O 0 0 0 0 O 158 158 1 0 6,296 0 6,296 46 7,846 764 0 764 6 -216 0 108 108 1 0 O 0 0 0 O 0 0 0 O 0 0 0 0 120 120 1 7 7,180 266 7,446 54 7,638 819 205 1,024 7 819 2,400 0 2,400 17 1,470 1,365 0 1,365 10 1,365 4,585 205 4,790 35 3,655 77 -77 0 0 68 0 0 549 4 0 0 0 0 0 0 0 O 0 0 0 -75 -75 -1 895 7 149 149 1 O 0 0 0 0 O 0 0 11,842 468 13,753 100.00 11,361 Percent Of Total (%) 0 0 0 69 -2 0 0 0 0 0 67 7 13 12 32 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 0 -557 4.05 0 0 0.00 -7,657 -7,657 55.66 0 -427 3.10 O 0 0.00 O 0 0.00 0 0 0.00 -493 -493 3.59 -8,150 -9,134 66.40 O 0 0.00 0 0 0.00 -610 -610 4.43 -610 -610 4.43 -123 0 0.00 0 -2,256 16.40 0 0 0 0 0 0.00 95 -0.69 0 0.00 -1,791 13.02 O 0.00 -59 0.43 O 0.00 O 0.00 -8,883 -13,756 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.1 13.6 0.0 0.0 0.0 0.0 1.1 13.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib Leave DB/WB/HR °F °F gr/Ib 12.4 495 76.8 61.1 56.7 53.7 51.4 53.7 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 244 0 0 0 244 353 0 0 0 289 82 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 85.6 76.0 68.4 76.3 68.4 76.8 55.6 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 517 517 517 517 45 45 10 155 527 54 0 0 0 0 Heating 517 517 155 517 45 45 10 155 165 54 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'Iton Btu/hr•ft' No. People Cooling 8.6 2.12 456.42 215.43 55.70 6 Heating 8.6 2.12 -56.38 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -12.3 0.0 -1.5 -2.8 0.0 0.0 -13.8 517 64.0 O 0.0 45 24.0 155 53.7 0 0.0 O 0.0 Lvg °F 85.6 0.0 53.7 70.0 0.0 0.0 TRACE@ 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 5 of 63 Room Checksums By MacDonald -Miller Facility Solutions 205 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 11 Outside Air: OADB/WB/HR: 76 / 61 / 57 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Net Sens. + Lat. Sens. + Lat Total Btu/h Btu/h Btu/h O 0 0 O 0 0 O 104 104 6,943 0 6,943 -96 0 -96 0 45 45 O 0 O 0 0 0 0 10 10 6,856 149 7,005 452 113 565 1,350 0 1,350 512 0 512 2,314 113 2,427 47 -47 0 0 0 36 O 0 0 0 0 -40 -40 704 118 118 0 0 0 0 0 9,218 293 CLG SPACE PEAK Mo/Hr: 7 / 11 OADB: 76 Percent Space Percent Of Total Sensible Of Total (%) Btu/h (%) O 0 0 O 0 0 1 0 0 68 6,943 81 -1 -96 -1 O 0 0 O 0 0 O 0 0 O 0 0 O 5 0 68 6,852 80 6 452 5 13 750 9 5 512 6 24 1,714 20 0 0 0 0 0 0 7 1 0 0 0 10,250 100.00 47 1 0 0 0 0 0 0 8,613 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 -386 5.06 O 0 0.00 -3,374 -3,374 44.19 0 -188 2.46 O 0 0.00 O 0 0.00 0 0 0.00 -342 -342 4.48 -3,715 -4,289 56.19 0 0 0.00 0 0 0.00 -423 -423 5.53 -423 -423 5.53 -85 0 0.00 O -1,271 16.65 0 0 0 0 0 0.00 56 -0.73 0 0.00 -1,499 19.64 0 0.00 -208 2.72 O 0.00 O 0.00 -4,223 -7,633 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.8 10.1 0.0 0.0 0.0 0.0 0.8 10.1 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 9.5 392 76.1 60.8 56.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 51.6 0.0 0.0 0.0 0.0 54.5 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 169 0 0 0 169 156 0 0 127 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 79.8 75.9 68.4 76.2 68.4 76.1 58.9 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 392 392 392 392 25 25 7 118 399 32 0 0 0 0 Heating 392 392 118 392 25 25 7 118 124 32 0 0 0 0 ENGINEERING CKS % OA cfm/fe cfm/ton fV/ton Btu/hrft' No. People Cooling 6.4 2.32 464.39 200.25 59.93 3 Heating 6.4 2.32 -45.17 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -6.8 0.0 -0.8 -2.1 0.0 0.0 -7.6 SELECTION Coil Airflow Ent Lvg cfm °F °F 392 64.0 0 0.0 25 118 0 0 24.0 53.7 0.0 0.0 79.8 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 6 of 63 Room Checksums By MacDonald -Miller Facility Solutions 206 Office COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: 7 / 11 OADB/WB/HR: 76 / 61 / 57 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 7 / 10 OADB: 73 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) O 0 0 0 0 0 0 0 0 0 0 0 O 104 104 1 0 0 5,927 0 5,927 65 6,305 81 -96 0 -96 -1 -275 -4 O 46 46 1 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 10 0 -19 0 5,841 150 5,991 66 6,012 77 452 113 565 6 452 6 1,350 0 1,350 15 750 10 512 0 512 6 512 7 2,314 113 2,427 27 1,714 22 47 -47 0 0 49 1 O 0 36 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 -40 -40 0 623 7 104 104 1 0 0 0 0 0 0 0 0 8,202 280 9,142 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 7,775 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 0 -386 5.23 O 0 0.00 -3,374 -3,374 45.70 O -188 2.55 O 0 0.00 0 0 0.00 0 0 0.00 -342 -342 4.63 -3,715 -4,289 58.11 O 0 0.00 0 0 0.00 -423 -423 5.72 -423 -423 5.72 -85 0 0.00 0 -1,271 17.22 0 0 0 O 0 0.00 56 -0.76 O 0.00 -1,314 17.80 O 0.00 -141 1.91 O 0.00 0 0.00 -4,223 -7,381 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.8 9.0 0.0 0.0 0.0 0.0 0.8 9.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb Leave DB/WB/HR °F °F gr/lb 8.4 346 76.1 60.8 56.3 53.7 51.5 54.1 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass Floor 169 Part 0 Int Door 0 ExFlr 0 Roof 169 Wall 156 Ext Door 0 ft' (%) O 0 127 82 O 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 80.9 75.9 68.4 76.2 68.4 76.1 57.9 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 354 354 354 354 25 25 7 106 361 32 0 0 0 0 Heating 354 354 106 354 25 25 7 106 113 32 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton ft'/ton Btu/hrft' No. People Cooling 7.1 2.09 470.12 224.56 53.44 3 Heating 7.1 2.09 -43.68 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -6.6 0.0 -0.8 -1.9 0.0 0.0 -7.4 SELECTION Coil Airflow Ent Lvg cfm °F °F 354 64.0 0 0.0 25 106 0 0 24.0 53.7 0.0 0.0 80.9 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 7 of 63 Room Checksums By MacDonald -Miller Facility Solutions 207 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 11 Outside Air: OADB/WB/HR: 76 / 61 / 57 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Undertlr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 7 / 11 OADB: 76 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) o 0 0 0 0 0 0 0 0 0 0 0 O 104 104 1 0 0 6,943 0 6,943 68 6,943 81 -96 0 -96 -1 -96 -1 0 45 45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 10 0 5 0 6,856 149 7,005 68 6,852 80 452 113 565 6 452 5 1,350 0 1,350 13 750 9 512 0 512 5 512 6 2,314 113 2,427 24 1,714 20 47 -47 0 0 47 1 O 0 36 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 -40 -40 0 704 7 118 118 1 O 0 0 0 0 O 0 0 9,218 293 10,250 100.00 8,613 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Undertlr Sup Ht Pkup Supply Air Leakage Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 0 -386 5.06 0 0 0.00 -3,374 -3,374 44.19 0 -188 2.46 O 0 0.00 0 0 0.00 0 0 0.00 -342 -342 4.48 -3,715 -4,289 56.19 O 0 0.00 0 0 0.00 -423 -423 5.53 -423 -423 5.53 -85 0 0.00 0 -1,271 16.65 0 0 0 0 0 0.00 56 -0.73 O 0.00 -1,499 19.64 O 0.00 -208 2.72 0 0.00 O 0.00 -4,223 -7,633 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.8 10.1 0.0 0.0 0.0 0.0 0.8 10.1 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 9.5 392 76.1 60.8 56.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 51.6 54.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass Floor 169 Part 0 Int Door 0 ExFlr 0 Roof 169 Wall 156 Ext Door 0 ft' (%) 0 0 127 82 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 79.8 75.9 68.4 76.2 68.4 76.1 58.9 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 392 392 392 392 25 25 7 118 399 32 0 0 0 0 Heating 392 392 118 392 25 25 7 118 124 32 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton fe/ton Btu/hrft' No. People Cooling 6.4 2.32 464.39 200.25 59.93 3 Heating 6.4 2.32 -45.17 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -6.8 0.0 -0.8 -2.1 0.0 0.0 -7.6 392 64.0 0 0.0 25 118 0 0 24.0 53.7 0.0 0.0 Lvg °F 79.8 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 8 of 63 Room Checksums By MacDonald -Miller Facility Solutions 208 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 64 / 62 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) o 0 0 0 0 0 O 0 0 0 0 0 O 74 74 3 0 0 O 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 74 74 3 0 0 308 77 385 14 308 19 1,350 0 1,350 50 750 45 512 0 512 19 512 31 2,170 77 2,247 83 1,570 95 36 -36 0 0 82 5 O 0 269 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -30 -30 -1 132 5 22 22 1 O 0 0 0 0 O 0 0 2,206 106 2,713 100.00 1,652 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 -263 20.71 0 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 0 -263 20.71 O 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 -58 0 0.00 O -1,107 87.27 0 0 0 0 0 0.00 38 -3.02 O 0.00 -11 0.83 0 0.00 73 -5.79 O 0.00 O 0.00 -58 -1,268 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.7 0.0 0.0 0.0 0.0 0.2 2.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib Leave DB/WB/HR °F °F gr/lb 2.0 73 78.1 61.9 58.0 53.7 48.6 43.6 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass Floor 115 Part 0 Int Door 0 ExFlr 0 Roof 115 Wall 0 Ext Door 0 ft' (%) O 0 O 0 O 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 70.7 76.0 68.4 76.3 68.4 78.1 25.3 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 75 75 75 75 22 22 0 23 75 22 0 0 0 0 Heating 75 75 23 75 22 22 0 23 23 22 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hrft' No. People Cooling 29.1 0.65 335.42 513.19 23.38 3 Heating 29.1 0.65 -11.03 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -0.6 0.0 -0.7 -0.4 0.0 0.0 -1.3 Lvg °F 75 64.0 70.7 O 0.0 0.0 22 24.0 53.7 23 53.7 70.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 9 of 63 Room Checksums By MacDonald -Miller Facility Solutions 209 Corridor COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 17 Outside Air: OADB/WB/HR: 81 / 62 / 54 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 1,068 1,256 0 2,323 Net Total Btu/h O 0 0 0 377 377 O 0 O 0 O 0 0 0 0 0 0 377 377 267 1,335 O 1,256 0 0 267 2,590 153 -153 0 O 0 121 O 0 0 O 0 -39 -39 159 26 26 O 0 0 0 0 2,476 478 Percent Of Total (%) 0 0 12 0 0 0 0 0 0 0 12 41 39 0 80 0 4 0 0 0 -1 5 1 0 0 0 3,233 100.00 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 1,068 698 0 1,765 285 0 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 52 34 0 86 14 0 0 0 2,050 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -201 0 0 0 -201 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 0 0.00 -911 57.03 0 0.00 0 0.00 0 0.00 O 0.00 O 0.00 0 0.00 0 0.00 -911 57.03 0 0.00 0 0.00 O 0.00 O 0.00 0 0.00 -1,210 75.73 0 0 O 0.00 42 -2.62 O 0.00 -66 4.11 O 0.00 547 -34.25 O 0.00 O 0.00 -1,598 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.3 3.2 0.0 0.0 0.0 0.0 0.3 3.2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 2.7 87 77.8 61.2 55.5 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 47.8 40.7 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass ft' (%) Floor 399 Part 0 Int Door 0 ExFlr 0 Roof 399 Wall 0 Ext Door 0 0 0 O 0 O 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BldTD Fn Frict TEMPERATURES Cooling Heating 55.0 72.0 76.2 68.4 76.5 68.4 77.8 30.4 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 93 93 93 93 24 24 0 28 93 24 0 0 0 0 Heating 93 93 28 93 24 24 0 28 28 24 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hrft' No. People Cooling 25.7 0.23 349.40 1,494.32 8.03 3 Heating 25.7 0.23 -4.00 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -0.8 0.0 -0.8 -0.5 0.0 0.0 -1.6 SELECTION Coil Airflow Ent Lvg cfm °F °F 93 64.0 0 0.0 24 28 0 0 24.0 53.7 0.0 0.0 72.0 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 10 of 63 Room Checksums By MacDonald -Miller Facility Solutions 210 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 64 / 62 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu/h (%) O 0 0 O 0 0 74 74 3 0 0 0 O 0 0 O 0 0 O 0 0 0 O 0 0 O 0 74 74 3 308 77 385 14 1,350 0 1,350 50 512 0 512 19 2,170 77 2,247 83 36 -36 0 0 0 0 269 10 0 0 0 O 0 0 0 0 -30 -30 -1 132 5 22 22 1 O 0 0 O 0 O 0 0 2,206 106 2,713 100.00 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 308 750 512 1,570 82 0 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 19 45 31 95 5 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,652 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 O -263 20.71 0 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O -263 20.71 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 -58 0 0.00 O -1,107 87.27 O 0 0 O 0 0.00 38 -3.02 O 0.00 -11 0.83 O 0.00 73 -5.79 O 0.00 O 0.00 -58 -1,268 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.7 0.0 0.0 0.0 0.0 0.2 2.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F or/lb 2.0 73 78.1 61.9 58.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 48.6 43.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 115 0 0 0 115 0 0 0 0 O 0 O 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return RetlOA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 70.7 76.0 68.4 76.3 68.4 78.1 25.3 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 75 75 75 75 22 22 0 23 75 22 0 0 0 0 Heating 75 75 23 75 22 22 0 23 23 22 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 29.1 0.65 335.42 513.19 23.38 3 Heating 29.1 0.65 -11.03 HEATING COIL SELECTION Capacity Coil Airflow MBh cfm Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -0.6 0.0 -0.7 -0.4 0.0 0.0 -1.3 Ent Lvg °F °F 75 64.0 O 0.0 22 24.0 23 53.7 O 0.0 0 0.0 70.7 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 11 of 63 Room Checksums By MacDonald -Miller Facility Solutions 211 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 11 Outside Air: OADB/WB/HR: 76 / 61 / 57 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 7 / 10 OADB: 73 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h 0 0 0 0 0 0 0 0 0 0 0 104 104 1 0 5,927 0 5,927 65 6,305 -96 0 -96 -1 -275 O 46 46 1 0 O 0 0 0 0 0 0 0 0 0 0 0 0 10 10 0 -19 5,841 150 5,991 66 6,012 452 113 565 6 452 1,350 0 1,350 15 750 512 0 512 6 512 2,314 113 2,427 27 1,714 47 -47 0 0 49 O 0 36 0 0 O 0 0 0 0 0 0 0 0 0 -40 -40 0 623 7 104 104 1 0 0 0 0 0 0 0 0 8,202 280 9,142 100.00 Percent Of Total (%) 0 0 0 81 -4 0 0 0 0 0 77 6 10 7 22 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 7,775 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -3,374 0 0 0 0 -342 -3,715 0 0 -423 -423 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 -386 5.23 0 0.00 -3,374 45.70 -188 2.55 O 0.00 O 0.00 O 0.00 -342 4.63 -4,289 58.11 O 0.00 O 0.00 -423 5.72 -423 5.72 -85 0 0.00 0 -1,271 17.22 O 0 0 O 0 0.00 56 -0.76 0 0.00 -1,314 17.80 0 0.00 -141 1.91 0 0.00 0 0.00 -4,223 -7,381 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.8 9.0 0.0 0.0 0.0 0.0 0.8 9.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 8.4 346 76.1 60.8 56.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 51.5 54.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFIr Roof Wall Ext Door 169 0 0 0 169 156 0 0 127 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 80.9 75.9 68.4 76.2 68.4 76.1 57.9 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 354 354 354 354 25 25 7 106 361 32 0 0 0 0 Heating 354 354 106 354 25 25 7 106 113 32 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 7.1 2.09 470.12 224.56 53.44 3 Heating 7.1 2.09 -43.68 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -6.6 0.0 -0.8 -1.9 0.0 0.0 -7.4 SELECTION Coil Airflow Ent Lvg cfm °F °F 354 64.0 0 0.0 25 106 0 0 24.0 53.7 0.0 0.0 80.9 0.0 53.7 70.0 0.0 0.0 TRACE@ 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 12 of 63 Room Checksums By MacDonald -Miller Facility Solutions 212 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 11 Outside Air: OADBNVB/HR: 76 / 61 / 57 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo/Hr: 7 / 11 OADB: 76 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) O 0 0 0 0 0 O 0 0 0 0 0 O 104 104 1 0 0 6,943 0 6,943 68 6,943 81 -96 0 -96 -1 -96 -1 0 45 45 0 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 10 10 0 5 0 6,856 149 7,005 68 6,852 80 452 113 565 6 452 5 1,350 0 1,350 13 750 9 512 0 512 5 512 6 2,314 113 2,427 24 1,714 20 47 -47 0 0 47 1 O 0 36 0 0 0 O 0 0 0 0 0 0 O 0 0 0 0 -40 -40 0 704 7 118 118 1 O 0 0 0 0 O 0 0 9,218 293 10,250 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat OvlUndr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 8,613 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 O -386 5.06 O 0 0.00 -3,374 -3,374 44.19 0 -188 2.46 0 0 0.00 O 0 0.00 0 0 0.00 -342 -342 4.48 -3,715 -4,289 56.19 0 0 0.00 O 0 0.00 -423 -423 5.53 -423 -423 5.53 -85 0 0.00 0 -1,271 16.65 0 0 0 0 0 0.00 56 -0.73 0 0.00 -1,499 19.64 0 0.00 -208 2.72 0 0.00 0 0.00 -4,223 -7,633 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.8 10.1 0.0 0.0 0.0 0.0 0.8 10.1 COOLING COIL SELECTION Sens Cap. MBh Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib Leave DB/WB/HR °F °F gr/Ib 9.5 392 76.1 60.8 56.3 53.7 51.6 54.5 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 169 0 0 0 169 156 0 0 127 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStoplRh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return ReUOA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 79.8 75.9 68.4 76.2 68.4 76.1 58.9 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 392 392 392 392 25 25 7 118 399 32 0 0 0 0 Heating 392 392 118 392 25 25 7 118 124 32 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'lton Btulhrfe No. People Cooling 6.4 2.32 464.39 200.25 59.93 3 Heating 6.4 2.32 -45.17 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -6.8 0.0 -0.8 -2.1 0.0 0.0 -7.6 SELECTION Coil Airflow Ent Lvg cfm °F °F 392 64.0 0 0.0 25 118 0 0 24.0 53.7 0.0 0.0 79.8 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 13 of 63 Room Checksums By MacDonald -Miller Facility Solutions 213 Office COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h 0 0 0 0 0 0 0 0 0 0 0 Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 64 / 62 Plenum Sens. + Lat Btu/h 0 0 74 0 0 0 0 74 Net Total Btu/h 0 0 74 0 0 0 0 0 0 0 74 Percent Of Total (%) 0 0 3 0 0 0 0 0 0 0 3 308 77 385 14 1,350 0 1,350 50 512 0 512 19 2,170 77 2,247 83 36 -36 0 0 O 0 269 10 O 0 0 0 0 0 0 0 -30 -30 -1 132 5 22 22 1 0 0 0 0 0 0 0 0 2,206 106 2,713 100.00 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 0 0 0 0 0 0 0 308 750 512 1,570 82 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19 45 31 95 5 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,652 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O -263 20.71 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 0 -263 20.71 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 -58 0 0.00 0 -1,107 87.27 0 0 0 0 0 0.00 38 -3.02 O 0.00 -11 0.83 O 0.00 73 -5.79 0 0.00 0 0.00 -58 -1,268 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.7 0.0 0.0 0.0 0.0 0.2 2.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 2.0 73 78.1 61.9 58.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 48.6 43.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass ft' (%) Floor 115 Part 0 Int Door 0 ExFlr 0 Roof 115 Wall 0 Ext Door 0 O 0 0 0 O 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return RetIOA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 70.7 76.0 68.4 76.3 68.4 78.1 25.3 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 75 75 75 75 22 22 0 23 75 22 0 0 0 0 Heating 75 75 23 75 22 22 0 23 23 22 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btulhr•ft' No. People Cooling 29.1 0.65 335.42 513.19 23.38 3 Heating 29.1 0.65 -11.03 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -0.6 0.0 -0.7 -0.4 0.0 0.0 -1.3 SELECTION Coil Airflow Ent Lvg cfm °F °F 75 64.0 0 0.0 22 23 0 0 24.0 53.7 0.0 0.0 70.7 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 14 of 63 Room Checksums By MacDonald -Miller Facility Solutions 214 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 11 Outside Air: OADB/WB/HR: 76 / 61 / 57 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK Mo/Hr: 7 / 10 OADB: 73 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) 0 0 0 0 0 0 O 0 0 0 0 0 O 104 104 1 0 0 5,851 0 5,851 65 6,227 81 -95 0 -95 -1 -272 -4 O 46 46 1 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 10 10 0 -19 0 5,766 150 5,916 65 5,937 77 452 113 565 6 452 6 1,350 0 1,350 15 750 10 512 0 512 6 512 7 2,314 113 2,427 27 1,714 22 47 -47 0 0 49 1 0 0 36 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 -40 -40 0 617 7 103 103 1 0 0 0 0 0 0 0 0 8,127 279 9,059 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 7,700 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 0 -386 5.27 0 0 0.00 -3,337 -3,337 45.58 0 -186 2.54 0 0 0.00 O 0 0.00 0 0 0.00 -342 -342 4.67 -3,679 -4,251 58.05 O 0 0.00 0 0 0.00 -423 -423 5.77 -423 -423 5.77 -85 0 0.00 O -1,271 17.35 0 0 0 0 0 0.00 56 -0.76 O 0.00 -1,297 17.71 O 0.00 -137 1.87 O 0.00 0 0.00 -4,186 -7,322 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.8 9.0 0.0 0.0 0.0 0.0 0.8 9.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 8.3 342 76.1 60.8 56.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 51.5 54.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 169 0 0 0 169 154 0 0 126 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil M in Stop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BldTD Fn Frict TEMPERATURES Cooling Heating 55.0 80.9 75.9 68.4 76.2 68.4 76.1 57.8 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 350 350 350 350 25 25 7 105 357 32 0 0 0 0 Heating 350 350 105 350 25 25 7 105 112 32 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton ft'/to n Btu/heft' No. People Cooling 7.2 2.07 469.78 226.61 52.95 3 Heating 7.2 2.07 -43.33 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -6.5 0.0 -0.8 -1.9 0.0 0.0 -7.3 SELECTION Coil Airflow Ent Lvg cfm °F °F 350 64.0 80.9 0 0.0 0.0 25 24.0 105 53.7 O 0.0 O 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 15 of 63 Room Checksums By MacDonald -Miller Facility Solutions 215 Conference Room COOLING COIL PEAK Peaked at Time: Mo/Hr: 9 / 14 Outside Air: OADB/WB/HR: 78 / 61 / 56 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar • Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Percent Total Of Total Btu/h (%) O 0 0 0 O 0 0 0 0 4 4 0 14,165 0 14,165 67 96 0 96 0 O 136 136 1 O 0 0 O 0 0 O 0 0 0 28 28 0 14,290 139 14,429 69 806 202 1,008 5 2,400 0 2,400 11 1,365 0 1,365 7 4,571 202 4,773 23 43 -43 0 0 O 0 128 1 O 0 0 0 0 O 0 0 -50 -50 0 1,468 7 245 245 1 0 0 0 0 0 0 0 0 18,904 494 20,994 100.00 CLG SPACE PEAK Mo/Hr: 9 / 14 OADB: 78 Space Sensible Btu/h 0 0 0 14,165 96 0 0 0 0 30 14,292 806 1,470 1,365 3,641 43 0 0 0 Percent Of Total (%) 0 0 0 79 1 0 0 0 0 0 80 4 8 8 20 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 17,976 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 O -548 3.50 0 0 0.00 -7,621 -7,621 48.59 O -425 2.71 0 0 0.00 O 0 0.00 O 0 0.00 -485 -485 3.09 -8,106 -9,078 57.89 O 0 0.00 0 0 0.00 -600 -600 3.83 -600 -600 3.83 -121 0 0.00 0 -2,244 14.31 O 0 0 O 0 0.00 94 -0.60 0 0.00 -3,260 20.79 0 0.00 -594 3.79 0 0.00 0 0.00 -8,827 -15,682 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.7 0.0 0.0 20.7 0.0 0.0 1.7 20.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 19.8 0.0 0.0 818 76.0 60.7 O 0.0 0.0 O 0.0 0.0 56.2 Leave DBIWB/HR °F °F gr./lb 53.7 51.7 54.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass Floor 240 Part 0 Int Door 0 ExFlr 0 Roof 240 Wall 352 Ext Door 0 ft2 (%) 0 0 287 82 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStoplRh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 79.8 75.6 68.4 75.8 68.4 76.0 60.4 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 818 818 818 818 44 44 10 245 828 54 0 0 0 0 Heating 818 818 245 818 44 44 10 245 255 54 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hrft' No. People Cooling 5.4 3.41 473.35 138.88 86.40 6 Heating 5.4 3.41 -65.34 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -14.2 0.0 -1.5 -4.4 0.0 0.0 -15.7 SELECTION Coil Airflow Ent Lvg cfm °F °F 818 64.0 0 0.0 44 245 0 0 24.0 53.7 0.0 0.0 79.8 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 16 of 63 Room Checksums By MacDonald -Miller Facility Solutions 216 Copy & Print COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 64 / 62 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Undertlr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) O 0 0 0 0 0 0 0 0 0 70 70 2 0 0 O 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 70 70 2 0 0 292 73 365 8 292 8 343 0 343 8 191 5 3,242 0 3,242 72 3,242 85 3,877 73 3,950 88 3,725 98 34 0 0 0 3,911 -34 0 -14 51 0 0 145 0 127 0 0 0 -14 308 51 0 0 0 0 3 0 0 0 0 7 1 0 0 0 4,491 100.00 78 2 0 0 O 0 O 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 3,802 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -55 0 0 0 -55 -1,536 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 0 0.00 -249 16.20 O 0.00 O 0.00 0 0.00 O 0.00 0 0.00 O 0.00 0 0.00 -249 16.20 0 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -523 34.06 O 0 O 0.00 18 -1.18 0 0.00 -674 43.87 O 0.00 -108 7.05 O 0.00 O 0.00 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow ton MBh 0.4 4.4 0.0 0.0 0.0 0.0 0.4 4.4 Enter DB/WB/HR MBh cfm °F °F gr/lb 4.2 171 76.6 61.0 56.6 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 51.9 55.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass ft2 (%) 109 0 0 0 109 0 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BldTD Fn Frict TEMPERATURES Cooling Heating 55.0 70.3 76.0 68.4 76.3 68.4 76.6 59.6 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 173 173 173 173 10 10 0 52 173 10 0 0 0 0 Heating 173 173 52 173 10 10 0 52 52 10 0 0 0 0 ENGINEERING CKS % OA cfm/ft2 cfm/ton ft'/to n Btu/hrft2 No. People Cooling 6.0 1.59 467.98 294.81 40.70 1 Heating 6.0 1.59 -14.09 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -1.2 0.0 -0.3 -0.9 0.0 0.0 -1.5 SELECTION Coil Airflow Ent Lvg cfm °F °F 173 64.0 0 0.0 10 52 0 0 24.0 53.7 0.0 0.0 70.3 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 17 of 63 Room Checksums By MacDonald -Miller Facility Solutions 217 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 9 / 14 Outside Air: OADB/WB/HR: 78 / 61 / 56 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 9 / 13 OADB: 77 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) o 0 0 0 0 0 O 0 0 0 0 0 O 2 2 0 0 0 6,362 0 6,362 66 6,487 80 36 0 36 0 -44 -1 O 63 63 1 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 13 13 0 9 0 6,411 65 6,476 68 6,452 80 343 86 428 4 343 4 1,350 0 1,350 14 750 9 512 0 512 5 512 6 2,204 86 2,290 24 1,604 20 20 -20 0 0 19 0 0 0 59 1 0 0 0 0 0 0 0 0 0 O 0 0 0 0 -24 -24 0 657 7 110 110 1 0 0 0 0 0 0 0 0 8,636 217 9,569 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 8,076 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 O -293 4.43 0 0 0.00 -2,805 -2,805 42.50 O -156 2.37 O 0 0.00 0 0 0.00 O 0 0.00 -259 -259 3.92 -3,064 -3,513 53.22 0 0 0.00 O 0 0.00 -320 -320 4.85 -320 -320 4.85 -62 0 0.00 O -1,146 17.37 O 0 0 O 0 0.00 47 -0.71 0 0.00 -1,425 21.59 0 0.00 -243 3.68 0 0.00 0 0.00 -3,446 -6,600 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.8 9.5 0.0 0.0 0.0 0.0 0.8 9.5 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DBIWB/HR MBh cfm °F °F gr/lb 8.9 366 75.9 60.8 0.0 0 0.0 0.0 0.0 0 0.0 0.0 56.6 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 51.6 54.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 128 0 0 0 128 0 0 129 106 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return ReUOA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 78.5 75.5 68.5 75.8 68.5 75.9 59.3 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 367 367 367 367 23 23 5 110 373 28 0 0 0 0 Heating 367 367 110 367 23 23 5 110 115 28 0 0 0 0 ENGINEERING CKS % OA cfmlft' cfm/ton ft'/to n Btu/hi-ft' No. People Cooling 6.2 2.87 466.46 162.48 73.86 3 Heating 6.2 2.87 -51.56 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -5.9 0.0 -0.7 -2.0 0.0 0.0 -6.6 SELECTION Coil Airflow Ent Lvg cfm °F °F 367 64.0 0 0.0 23 110 0 0 24.0 53.7 0.0 0.0 78.5 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 18 of 63 Room Checksums By MacDonald -Miller Facility Solutions 218 Corridor COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 17 Outside Air: OADB/WB/HR: 81 / 62 / 54 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h O 0 O 0 O 333 O 0 O 0 0 0 0 0 0 0 0 O 333 945 1,111 0 2,055 136 0 0 0 2,191 236 0 0 236 -136 0 -34 23 0 0 422 Net Total Btu/h 0 0 333 0 0 0 0 0 0 0 333 1,181 1,111 0 2,292 0 107 0 0 0 -34 140 23 0 0 0 Percent Of Total (%) 0 0 12 0 0 0 0 0 0 0 12 41 39 0 80 0 4 0 0 0 -1 5 1 0 0 0 2,861 100.00 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 945 617 0 1,562 252 0 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 52 34 0 86 14 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,814 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -178 0 0 0 -178 Coil Peak Percent Tot Sens Of Total Btu/h (%) O 0.00 O 0.00 -806 57.03 0 0.00 O 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 -806 57.03 O 0.00 0 0.00 O 0.00 O 0.00 O 0.00 -1,071 75.73 O 0 O 0.00 37 -2.62 O 0.00 -58 4.11 O 0.00 484 -34.25 O 0.00 O 0.00 -1,414 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow ton MBh Enter DB/WB/HR MBh cfm °F °F gr/lb 0.2 2.8 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.2 2.8 Leave DB/WB/HR °F °F gr/lb 77 77.8 61.2 55.5 53.7 47.8 40.7 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 353 0 0 0 353 0 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 72.0 76.2 68.4 76.5 68.4 77.8 30.4 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 83 83 83 83 21 21 0 25 83 21 0 0 0 0 Heating 83 83 25 83 21 21 0 25 25 21 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton fV/ton Btu/hr•ft' No. People Cooling 25.7 0.23 349.40 1,494.32 8.03 2 Heating 25.7 0.23 -4.00 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -0.7 0.0 -0.7 -0.4 0.0 0.0 -1.4 SELECTION Coil Airflow Ent Lvg cfm °F °F 83 64.0 0 0.0 21 25 0 0 24.0 53.7 0.0 0.0 72.0 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 19 of 63 Room Checksums By MacDonald -Miller Facility Solutions 219 Shared Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 64 / 62 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu/h (%) O 0 0 0 0 0 387 387 4 O 0 0 O 0 0 O 0 0 O 0 O 0 O 0 0 O 0 387 387 4 1,614 403 2,017 19 3,150 0 3,150 30 3,584 0 3,584 34 8,347 403 8,751 83 184 -184 0 0 O 0 855 8 O 0 0 0 0 O 0 0 -97 -97 -1 586 6 96 96 1 O 0 0 0 0 0 0 0 8,531 606 10,578 100.00 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 HEATING COIL PEAK TEMPERATURES Space Percent Sensible Of Total Btu/h (%) O 0 O 0 0 0 O 0 O 0 0 0 O 0 O 0 0 0 0 0 O 0 1,614 22 1,750 24 3,584 49 6,947 94 408 6 O 0 O 0 O 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 7,355 100.00 Grand Total ==> Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -294 0 0 0 -294 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 0 0.00 -1,379 28.65 O 0.00 0 0.00 O 0.00 O 0.00 O 0.00 0 0.00 0 0.00 -1,379 28.65 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 -3,598 74.76 O 0 O 0.00 120 -2.50 O 0.00 -476 9.88 O 0.00 520 -10.80 O 0.00 O 0.00 -4,812 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.9 10.5 0.0 0.0 0.0 0.0 0.9 10.5 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WBIHR MBh cfm °F °F gr/lb 8.8 325 77.6 61.7 57.8 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 50.2 49.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFIr Roof Wall Ext Door 603 0 0 0 603 0 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Cooling SADB 55.0 Ra Plenum 76.0 Return 76.2 Ret/OA 77.6 Fn MtrTD 0.1 Fn BIdTD 0.3 Fn Frict 0.9 Heating 70.8 68.5 68.5 36.9 0.0 0.1 0.2 AIRFLOWS Cooling 335 335 335 335 71 71 0 100 335 71 0 0 0 0 Heating 335 335 100 335 71 71 0 100 100 71 0 0 0 0 ENGINEERING CKS % OA cfmlft' cfm/ton fV/ton Btulhr•ft' No. People Cooling 21.3 0.56 383.49 690.94 17.37 7 Heating 21.3 0.56 -7.98 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -2.5 0.0 -2.3 -1.8 0.0 0.0 -4.8 SELECTION Coil Airflow Ent Lvg cfm °F °F 335 64.0 0 0.0 71 100 0 0 24.0 53.7 0.0 0.0 70.8 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 20 of 63 Room Checksums By MacDonald -Miller Facility Solutions 220 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 12 Outside Air: OADB/WB/HR: 77 / 62 / 62 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 8 / 12 OADB: 77 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) O 0 0 0 0 0 O 0 0 0 0 0 O 47 47 0 0 0 8,796 0 8,796 71 8,796 84 30 0 30 0 30 0 O 70 70 1 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 29 29 0 12 0 8,855 117 8,972 73 8,838 85 318 80 398 3 318 3 1,350 0 1,350 11 750 7 512 0 512 4 512 5 2,180 80 2,260 18 1,580 15 30 -30 0 0 30 0 O 0 135 1 0 0 0 0 0 0 0 0 0 O 0 0 0 0 -31 -31 0 853 7 142 142 1 O 0 0 0 0 O 0 0 11,064 278 12,331 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 10,448 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 O -272 2.87 0 0 0.00 -5;025 -5,025 53.08 0 -280 2.96 O 0 0.00 0 0 0.00 O 0 0.00 -241 -241 2.54 -5,266 -5,818 61.46 0 0 0.00 O 0 0.00 -298 -298 3.14 -298 -298 3.14 -58 0 0.00 0 -1,119 11.82 O 0 0 0 0 0.00 45 -0.48 0 0.00 -1,961 20.71 0 0.00 -317 3.35 0 0.00 0 0.00 -5,621 -9,467 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.0 12.2 0.0 0.0 0.0 0.0 1.0 12.2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 11.5 475 76.1 60.9 56.8 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 51.8 55.4 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft2 (%) 119 0 0 0 119 232 0 0 190 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 80.8 75.8 68.5 76.1 68.5 76.1 61.6 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 475 475 475 475 22 22 5 143 480 27 0 0 0 0 Heating 475 475 143 475 22 22 5 143 147 27 0 0 0 0 ENGINEERING CKS % OA cfmlft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 4.7 4.00 468.30 117.22 102.37 3 Heating 4.7 4.00 -79.55 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -8.8 0.0 -0.7 -2.6 0.0 0.0 -9.5 475 64.0 0 0.0 22 143 0 0 24.0 53.7 0.0 0.0 Lvg °F 80.8 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 21 of 63 Room Checksums By MacDonald -Miller Facility Solutions 221 Corridor COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Poaked-at-Time: Mo/Hi. 8 / 12 Miri 9T12 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 77 / 62 / 62 OADB: 75 OADB: 24 SADB 55.0 79.3 Ra Plenum 75.8 68.5 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.1 68.5 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 76.1 64.0 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%,) Fn MtrTD 0.1 0.0 Envelope Loads - Envelope Loads Fn BIdTD 0.3 0.1 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.9 0.2 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 74 74 1 0 0 Roof Cond 0 -428 6.51 Glass Solar 7,712 0 7,712 82 7,958 98 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond Wall Cond 21 0 0 62 21 62 0 1 -199 0 -2 0 Glass/Door Cond Wall Cond -3,678 0 -3,678 55.98 -205 3.12 Cooling Heating Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 371 371 Floor 0 0 0 0 0 Floor 0 0 0.00 Terminal 371 371 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 371 111 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 371 371 Sub Total ==> 7,733 136 7,869 83 7,759 95 Sub Total ==> -3,678 -4,311 65.61 Nom Vent 11 11 AHU Vent 11 11 Internal Loads Internal Loads Infil 0 0 Lights 500 125 625 7 500 6 Lights 0 0 0.00 MinStop/Rh 111 111 People 588 0 588 6 327 4 People 0 0 0.00 Return 371 111 Misc -468 0 -468 -5 -468 -6 Misc 0 0 0.00 Exhaust 11 11 Sub Total ==> 621 125 746 8 360 4 Sub Total ==> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 46 -46 0 0 27 0 Ceiling Load -91 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 69 1 0 0 Ventilation Load 0 -567 8.63 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 19 -0.29 ENGINEERING CKS Exhaust Heat -13 -13 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 665 7 RA Preheat Diff. -1,627 24.76 Cooling Heating Ret. Fan Heat 110 110 1 Additional Reheat 0 0.00 % OA 3.0 3.0 Duct Heat Pkup 0 0 0 System Plenum Heat -85 1.29 cfmlft' 1.98 1.98 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfmlton 476.79 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 fe/ton 240.53 Btu/hr•ft' 49.89 -35.14 Grand Total ==> 8,401 311 9,446 100.00 8,146 100.00 Grand Total =_> -3,769 -6,571 100.00 No. People 1 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/Ib ft' (%) MBh cfm °F °F Main Clg 0.8 9.3 9.0 370 76.1 60.9 56.8 53.7 52.0 55.9 Floor 187 Main Htg -6.2 371 64.0 79.3 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat -0.4 11 24.0 53.7 ExFIr 0 Reheat -2.0 111 53.7 70.0 Total 0.8 9.3 Roof 187 0 0 Humidif 0.0 0 0.0 0.0 Wall 170 139 82 Opt Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -6.6 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 22 of 63 Room Checksums By MacDonald -Miller Facility Solutions 222 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 9 / 15 Outside Air: OADB/WB/HR: 78 / 61 / 53 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo/Hr: 9 / 15 OADB: 78 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) O 0 0 0 0 0 o 0 0 0 0 0 0 10 10 0 0 0 6,224 0 6,224 66 6,224 79 72 0 72 1 72 1 0 49 49 1 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 6 6 0 18 0 6,302 59 6,360 68 6,313 80 329 82 411 4 329 4 1,350 0 1,350 14 750 9 512 0 512 5 512 6 2,191 82 2,273 24 1,591 20 22 -22 0 0 22 0 O 0 28 0 0 0 O 0 0 0 0 0 0 O 0 0 0 0 -25 -25 0 647 7 108 108 1 O 0 0 0 0 O 0 0 8,515 203 9,392 100.00 7,926 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 -281 4.45 O 0 0.00 -2,598 -2,598 41.15 O -145 2.30 0 0 0.00 O 0 0.00 O 0 0.00 -249 -249 3.94 -2,846 -3,273 51.84 O 0 0.00 0 0 0.00 -308 -308 4.87 -308 -308 4.87 -60 0 0.00 0 -1,131 17.92 O 0 0 O 0 0.00 46 -0.73 0 0.00 -1,397 22.12 0 0.00 -251 3.98 0 0.00 0 0.00 -3,214 -6,313 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.8 9.3 0.0 0.0 0.0 0.0 0.8 9.3 COOLING COIL SELECTION Sens Cap. MBh 8.7 0.0 0.0 Coil Airflow Enter DB/WB/HR cfm °F °F gr/lb 361 76.0 60.8 56.4 0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 51.6 54.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 123 0 0 0 123 0 0 120 98 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 78.1 75.6 68.5 75.8 68.5 76.0 59.3 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 361 361 361 361 22 22 5 108 366 27 0 0 0 0 Heating 361 361 108 361 22 22 5 108 113 27 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 6.2 2.93 466.42 159.06 75.44 3 Heating 6.2 2.93 -51.33 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -5.6 0.0 -0.7 -1.9 0.0 0.0 -6.3 361 64.0 0 0.0 22 108 0 0 24.0 53.7 0.0 0.0 Lvg °F 78.1 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 23 of 63 Room Checksums By MacDonald -Miller Facility Solutions 223 Office COOLING COIL PEAK Peaked -at -Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Motttr-9 /-l4 OADB/WB/HR: 78 / 61 / 56 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Total Btu/h Mi7FI r: 9 T13 OADB: 77 Percent Space Percent Of Total Sensible Of Total (%) Btu/h (%) O o 0 0 0 0 O 0 0 0 0 0 0 2 2 0 0 0 6,257 0 6,257 67 6,384 81 35 0 35 0 -43 -1 O 62 62 1 0 0 O 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 12 12 0 8 0 6,304 64 6,368 68 6,348 80 302 76 378 4 302 4 1,350 0 1,350 14 750 9 512 0 512 5 512 6 2,164 76 2,240 24 1,564 20 18 0 0 0 8,486 -18 0 -22 108 0 0 207 0 56 0 0 0 -22 645 108 0 0 0 0 17 0 1 0 0 0 0 0 0 0 0 0 0 7 1 0 0 0 9,395 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat OvlUndr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 7,929 100.00 Grand Total =_> Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.8 9.3 0.0 0.0 0.0 0.0 0.8 9.3 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb Leave DB/WB/HR °F °F gr/lb 8.7 359 75.9 60.8 56.6 53.7 51.6 54.4 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 -258 4.03 O 0 0.00 -2,768 -2,768 43.15 O -154 2.41 O 0 0.00 0 0 0.00 0 0 0.00 -228 -228 3.56 -2,997 -3,410 53.15 O 0 0.00 O 0 0.00 -283 -283 4.40 -283 -283 4.40 -55 0 0.00 O -1,101 17.16 O 0 0 0 0 0.00 44 -0.69 0 0.00 -1,407 21.93 0 0.00 -259 4.04 0 0.00 0 0.00 -3,334 -6,415 100.00 AREAS Gross Total Glass Floor 113 Part 0 Int Door 0 ExFIr 0 Roof 113 Wall 128 Ext Door 0 ft' (%) O 0 104 82 O 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Cooling SADB 55.0 Ra Plenum 75.5 Return 75.8 Ret/OA 75.9 Fn MtrTD 0.1 Fn BIdTD 0.3 Fn Frict 0.9 Heating 78.4 68.5 68.5 59.5 0.0 0.1 0.2 AIRFLOWS Cooling 361 361 361 361 22 22 5 108 365 26 0 0 0 0 Heating 361 361 108 361 22 22 5 108 113 26 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 6.0 3.19 466.50 146.10 82.14 3 Heating 6.0 3.19 -56.77 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -5.7 0.0 -0.7 -1.9 0.0 0.0 -6.4 SELECTION Coil Airflow Ent Lvg cfm °F °F 361 64.0 78.4 0 0.0 0.0 22 108 0 0 24.0 53.7 0.0 0.0 53.7 70.0 0.0 0.0 TRACE@ 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 24 of 63 Room Checksums By MacDonald -Miller Facility Solutions 224 Corridor COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 17 Outside Air: OADB/WB/HR: 81 / 62 / 54 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 O 0 O 438 O 0 0 0 O 0 0 0 0 0 0 O 438 Net Percent Total Of Total Btu/h (%) O 0 0 0 438 12 0 0 O 0 0 0 O 0 O 0 O 0 0 0 438 12 1,236 309 1,545 41 1,454 0 1,454 39 O 0 0 0 2,690 309 2,999 80 167 -167 0 0 O 0 132 4 O 0 0 O 0 0 0 0 -43 -43 -1 183 5 30 30 1 O 0 0 O 0 O 0 0 2,857 567 3,739 100.00 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Space Percent Sensible Of Total Btu/h (%) 0 0 O 0 0 0 O 0 0 0 O 0 0 0 0 0 O 0 O 0 0 0 1,236 52 808 34 0 0 2,044 87 312 13 O 0 O 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 2,356 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 0 -1,056 57.64 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O -1,056 57.64 0 0 0 0 -225 0 0 0 -225 0 0 0 0.00 0.00 0.00 0 0.00 0 -1,401 0 0 47 0 -72 0 650 0 0 0.00 76.45 0 0.00 -2.56 0.00 3.95 0.00 -35.48 0.00 0.00 -1,833 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.3 3.7 0.0 0.0 0.0 0.0 0.3 3.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 3.1 101 77.7 61.3 55.8 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 47.8 40.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass Floor 462 Part 0 Int Door 0 ExFlr 0 Roof 462 Wall 0 Ext Door 0 ft' (%) O 0 O 0 O 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStoplRh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 71.9 76.1 68.5 76.4 68.5 77.7 30.2 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 107 107 107 107 28 28 0 32 107 28 0 0 0 0 Heating 107 107 32 107 28 28 0 32 32 28 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'lton Btulhr•ft' No. People Cooling 25.9 0.23 347.28 1,496.35 8.02 3 Heating 25.9 0.23 -3.97 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -0.9 0.0 -0.9 -0.6 0.0 0.0 -1.8 107 64.0 O 0.0 28 24.0 32 53.7 O 0.0 O 0.0 Lvg °F 71.9 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 25 of 63 Room Checksums By MacDonald -Miller Facility Solutions 229 Corridor COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Pcaked at-T-ime. MotFtr:1 /17 Mo/Hr: 7 / 24 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 81 / 62 / 54 OADB: 68 OADB: 24 SADB 55.0 72.0 Ra Plenum 76.2 68.4 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.5 68.4 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 77.8 30.4 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.1 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.3 0.1 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.9 0.2 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 287 287 12 0 0 Roof Cond 0 -694 57.03 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00 Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0.00 Cooling Heating Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 71 71 Floor 0 0 0 0 0 Floor 0 0 0.00 Terminal 71 71 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 71 21 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 71 71 Sub Total ==> 0 287 287 12 0 0 Sub Total ==> 0 -694 57.03 Nom Vent 18 18 AHU Vent 18 18 Internal Loads Internal Loads Infil 0 0 Lights 813 203 1,017 41 813 52 Lights 0 0 0.00 MinStop/Rh 21 21 People 957 0 957 39 531 34 People 0 0 0.00 Return 71 21 Misc 0 0 0 0 0 0 Misc 0 0 0.00 Exhaust 18 18 Sub Total ==> 1,770 203 1,973 80 1,345 86 Sub Total ==> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 117 -117 0 0 217 14 Ceiling Load -153 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 92 4 0 0 Ventilation Load 0 -922 75.73 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 OvlUndr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 32 -2.62 ENGINEERING CKS Exhaust Heat -30 -30 -1 OA Preheat Diff. 0 0.00 Sup. Fan Heat 121 5 RA Preheat Diff. -50 4.11 Cooling Heating Ret. Fan Heat 20 20 1 Additional Reheat 0 0.00 % OA 25.7 25.7 Duct Heat Pkup 0 0 0 System Plenum Heat 417 -34.25 cfm/ft' 0.23 0.23 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 349.40 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 1,494.32 Btu/heft' 8.03 -4.00 Grand Total =_> 1,887 364 2,464 100.00 1,562 100.00 Grand Total =_> -153 -1,217 100.00 No. People 2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft' (%) MBh cfm °F °F Main Clg 0.2 2.4 2.1 67 77.8 61.2 55.5 53.7 47.8 40.7 Floor 304 Main Htg -0.6 71 64.0 72.0 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat -0.6 18 24.0 53.7 ExFIr 0 Reheat -0.4 21 53.7 70.0 Total 0.2 2.4 Roof 304 0 0 Humidif 0.0 0 0.0 0.0 Wall 0 0 0 Opt Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -1.2 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 26 of 63 Room Checksums By MacDonald -Miller Facility Solutions 232 Coffee Bar COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 64 / 62 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 227 267 2,256 2,751 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) O 0 0 0 0 O 0 0 0 0 55 55 2 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 0 0 O 0 0 0 0 O 0 0 0 55 55 2 0 0 57 284 O 267 0 2,256 57 2,808 26 -26 0 O 0 97 O 0 0 O 0 -11 -11 218 36 36 O 0 0 O 0 2,777 110 9 227 8 8 149 6 70 2,256 84 88 2,632 98 0 3 0 0 0 0 7 1 0 0 3,202 100.00 57 2 0 0 O 0 O 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 2,690 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -41 0 0 0 -41 -1,109 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 0 0.00 -194 17.53 O 0.00 0 0.00 O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 -194 17.53 O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 -408 36.80 O 0 O 0.00 14 -1.23 0 0.00 -466 42.05 0 0.00 -54 4.85 0 0.00 0 0.00 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.3 3.2 0.0 0.0 0.0 0.0 0.3 3.2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 3.0 121 76.7 61.1 0.0 0 0.0 0.0 0.0 0 0.0 0.0 57.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 51.9 55.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part hit Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 85 0 0 0 85 0 O 0 O 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStoplRh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 70.3 76.0 68.5 76.2 68.5 76.7 58.7 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 122 122 122 122 8 8 0 37 122 8 0 0 0 0 Heating 122 122 37 122 8 8 0 37 37 8 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btulhr•ft' No. People Cooling 6.6 1.44 464.26 322.44 37.22 1 Heating 6.6 1.44 -13.04 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -0.9 0.0 -0.3 -0.7 0.0 0.0 SELECTION Coil Airflow Ent Lvg cfm °F °F 122 64.0 70.3 0 0.0 0.0 8 24.0 37 53.7 0 0.0 0 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 27 of 63 Room Checksums By MacDonald -Miller Facility Solutions 233 Viewing Room COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked-at11me: T14 Outside Air: OADB/WB/HR: 82 / 64 / 62 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu/h (%) 0 0 0 O 0 0 62 62 1 O 0 0 0 0 0 0 0 0 0 0 O 0 O 0 0 O 0 62 62 1 257 64 321 7 450 0 450 11 3,000 0 3,000 70 3,707 64 3,771 88 29 -29 0 0 O 0 129 3 O 0 0 O 0 O 0 0 -15 -15 0 289 7 48 48 1 O 0 0 O 0 O 0 0 3,736 130 4,284 100.00 Mo/Hr: 7 / 24 OADB: 68 Space Percent Sensible Of Total Btu/h (%) O 0 0 0 O 0 O 0 O 0 O 0 0 0 O 0 O 0 0 0 O 0 257 7 250 7 3,000 84 3,507 98 65 2 O 0 O 0 O 0 3,572 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat OvlUndr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Space Sens Tot Sens Btu/h Btu/h O 0 0 0 O -220 0 0 O 0 O 0 O 0 0 0 O 0 0 0 0 -220 O 0 O 0 0 0 Percent Of Total (%) 0.00 0.00 14.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.98 0.00 0.00 0.00 0 0 0.00 -47 0 0 0 0.00 -1.24 0 0.00 -618 42.20 O 0.00 -102 6.95 0 0.00 O 0.00 0 0.00 -544 37.11 O 0 0 18 -47 -1,465 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.4 4.2 0.0 0.0 0.0 0.0 0.4 4.2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WBIHR MBh cfm °F °F gr/Ib 4.0 161 76.7 61.1 57.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 51.8 55.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass ft' (V) Floor Part Int Door ExFlr Roof Wall Ext Door 96 0 0 0 96 0 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Cooling SADB 55.0 Ra Plenum 76.0 Return 76.2 Ret/OA 76.7 Fn MtrTD 0.1 Fn BIdTD 0.3 Fn Frict 0.9 Heating 70.3 68.5 68.5 58.7 0.0 0.1 0.2 AIRFLOWS Cooling 163 163 163 163 11 11 0 49 163 11 0 0 0 0 Heating 163 163 49 163 11 11 0 49 49 11 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton Wlton Btulhr•ft' No. People Cooling 6.6 1.69 460.71 272.12 44.10 1 Heating 6.6 1.69 -15.27 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -1.1 0.0 -0.4 -0.9 0.0 0.0 -1.5 163 64.0 0 0.0 11 49 0 0 24.0 53.7 0.0 0.0 Lvg °F 70.3 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 28 of 63 Room Checksums By MacDonald -Miller Facility Solutions 234 Observation Room COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h 0 0 0 0 0 0 0 0 0 0 0 Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 64 / 62 Plenum Net Percent Sens. + Lat Total Of Total Btu/h Btu/h (%) O 0 0 0 0 0 76 76 4 0 0 0 O 0 0 O 0 0 O 0 O 0 O 0 0 0 0 76 76 4 316 79 395 18 1,350 0 1,350 62 O 0 0 0 1,666 79 1,745 81 36 -36 0 0 O 0 265 12 O 0 0 O 0 0 0 0 -30 -30 -1 91 4 15 15 1 0 0 0 O 0 O 0 0 1,702 104 2,161 100.00 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 316 28 750 65 0 0 1,066 93 80 7 O 0 O 0 O 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,146 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 -270 22.04 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O -270 22.04 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 -57 0 0 0 0 0.00 -1,116 91.16 0 0 37 0 0 0 124 0 0 0 0.00 -3.05 0.00 0.00 0.00 -10.15 0.00 0.00 -57 -1,224 100.00 Main Cig Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.1 0.0 0.0 0.0 0.0 0.2 2.1 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 1.5 50 79.0 62.4 59.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 46.9 37.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 118 0 0 0 118 0 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 71.0 76.0 68.5 76.2 68.5 79.0 24.0 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 52 52 52 52 22 22 0 22 52 22 0 0 0 0 Heating 52 52 22 52 22 22 0 22 22 22 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton Wlton Btu/hr•ft' No. People Cooling 42.4 0.44 291.67 660.23 18.18 3 Heating 42.4 0.44 -10.38 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -0.5 0.0 -0.7 -0.4 0.0 0.0 -1.2 52 62.2 0 0.0 22 22 0 0 24.0 53.7 0.0 0.0 Lvg °F 71.0 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 29 of 63 Room Checksums By MacDonald -Miller Facility Solutions 235 Office COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES •eaked-atfiime. MU/Hr. / / 14 Mo/Hr: 7 / 24 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 82 / 64 / 62 OADB: 68 OADB: 24 SADB 55.0 70.8 Ra Plenum 76.0 68.5 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.2 68.5 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 78.1 24.7 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.1 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.3 0.1 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.9 0.2 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 85 85 3 0 0 Roof Cond 0 -302 22.85 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00 Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0.00 Cooling Heating Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 78 78 Floor 0 0 0 0 0 Floor 0 0 0.00 Terminal 78 78 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 78 23 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 78 78 Sub Total =_> 0 85 85 3 0 0 Sub Total =_> 0 -302 22.85 Nom Vent 23 23 AHU Vent 23 23 Internal Loads Internal Loads Infil 0 0 Lights 353 88 442 16 353 21 Lights 0 0 0.00 MinStop/Rh 23 23 People 1,350 0 1,350 48 750 44 People 0 0 0.00 Return 78 23 Misc 512 0 512 18 512 30 Misc 0 0 0.00 Exhaust 23 23 Sub Total ==> 2,215 88 2,303 83 1,615 95 Sub Total ==> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 40 -40 0 0 89 5 Ceiling Load -64 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 275 10 0 0 Ventilation Load 0 -1,159 87.72 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 39 -2.93 ENGINEERING CKS Exhaust Heat -31 -31 -1 OA Preheat Diff. 0 0.00 Sup. Fan Heat 136 5 RA Preheat Diff. -6 0.43 Cooling Heating Ret. Fan Heat 22 22 1 Additional Reheat 0 0.00 % OA 29.6 29.6 Duct Heat Pkup 0 0 0 System Plenum Heat 107 -8.06 cfm/ft' 0.59 0.59 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 336.46 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'/ton 572.62 Btu/hr•ft' 20.96 -10.01 Grand Total =_> 2,256 124 2,791 100.00 1,704 100.00 Grand Total =_> -64 -1,321 100.00 No. People 3 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/Ib ft' (%) MBh cfm °F °F Main Clg 0.2 2.8 2.1 75 78.1 61.9 58.3 53.7 48.8 44.1 Floor 132 Main Htg -0.6 78 64.0 70.8 Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat -0.8 23 24.0 53.7 ExFlr 0 Reheat -0.4 23 53.7 70.0 Total 0.2 2.8 Roof 132 0 0 Humidif 0.0 0 0.0 0.0 Wall 0 0 0 Opt Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -1.3 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 30 of 63 Room Checksums By MacDonald -Miller Facility Solutions 236 Office COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 64 / 62 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu/h (%) O 0 0 O 0 0 92 92 3 O 0 0 0 0 0 O 0 0 O 0 0 0 0 0 0 O 0 92 92 3 383 96 478 17 1,350 0 1,350 47 512 0 512 18 2,245 96 2,340 82 44 -44 0 0 0 0 283 10 0 0 0 0 0 0 0 0 -32 -32 -1 139 5 23 23 1 O 0 0 0 0 O 0 0 2,288 135 2,845 100.00 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 383 750 512 1,645 97 0 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 22 43 29 94 6 0 0 0 1,741 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -70 0 0 0 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 0 0.00 -327 24.07 0 0.00 O 0.00 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 -327 24.07 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 -1,192 87.72 0 0 0 0.00 40 -2.93 0 0.00 -3 0.23 0 0.00 123 -9.09 O 0.00 O 0.00 -70 -1,359 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.8 0.0 0.0 0.0 0.0 0.2 2.8 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 2.1 77 78.1 62.0 58.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 48.8 44.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass ft' (%) Floor 143 Part 0 Int Door 0 ExFir 0 Roof 143 Wall 0 Ext Door 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStoplRh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 70.8 76.0 68.5 76.2 68.5 78.1 24.4 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 79 79 79 79 24 24 0 24 79 24 0 0 0 0 Heating 79 79 24 79 24 24 0 24 24 24 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/to n Btu/hrft' No. People Cooling 29.8 0.55 337.21 608.56 19.72 3 Heating 29.8 0.55 -9.50 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -0.6 0.0 -0.8 -0.4 0.0 0.0 -1.4 SELECTION Coil Airflow Ent Lvg cfm °F °F 79 64.0 0 0.0 24 24 0 0 24.0 53.7 0.0 0.0 70.8 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 31 of 63 Room Checksums By MacDonald -Miller Facility Solutions 237 Office COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked -at -Time: MolHr:-77-14 M3lHr: 7 / 24 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/WB/HR: 82 / 64 / 62 OADB: 68 OADB: 24 SADB 55.0 70.8 Ra Plenum 76.0 68.5 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.2 68.5 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 78.1 24.4 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.1 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.3 0.1 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.9 0.2 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 92 92 3 0 0 Roof Cond 0 -327 24.07 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00 Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0.00 Cooling Heating Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 79 79 Floor 0 0 0 0 0 Floor 0 0 0.00 Terminal 79 79 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 79 24 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 79 79 Sub Total ==> 0 92 92 3 0 0 Sub Total =_> 0 -327 24.07 Nom Vent 24 24 AHU Vent 24 24 Internal Loads Internal Loads Infil 0 0 Lights 383 96 478 17 383 22 Lights 0 0 0.00 MinStop/Rh 24 24 People 1,350 0 1,350 47 750 43 People 0 0 0.00 Return 79 24 Misc 512 0 512 18 512 29 Misc 0 0 0.00 Exhaust 24 24 Sub Total ==> 2,245 96 2,340 82 1,645 94 Sub Total ==> 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 44 -44 0 0 97 6 Ceiling Load -70 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 283 10 0 0 Ventilation Load 0 -1,192 87.72 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 OvlUndr Sizing 0 0 0 0 0 Exhaust Heat 40 -2.93 ENGINEERING CKS Exhaust Heat -32 -32 -1 OA Preheat Diff. 0 0.00 Sup. Fan Heat 139 5 RA Preheat Diff. -3 0.23 Cooling Heating Ret. Fan Heat 23 23 1 Additional Reheat 0 0.00 % OA 29.8 29.8 Duct Heat Pkup 0 0 0 System Plenum Heat 123 -9.09 cfm/ft' 0.55 0.55 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 337.21 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'lton 608.56 Btu/hr•ft' 19.72 -9.50 Grand Total ==> 2,288 135 2,845 100.00 1,741 100.00 Grand Total==> -70 -1,359 100.00 No. People 3 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft' (%) MBh cfm °F °F Main Clg 0.2 2.8 2.1 77 78.1 62.0 58.3 53.7 48.8 44.1 Floor 143 Main Htg -0.6 79 64.0 70.8 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat -0.8 24 24.0 53.7 ExFlr 0 Reheat -0.4 24 53.7 70.0 Total 0.2 2.8 Roof 143 0 0 Humidif 0.0 0 0.0 0.0 Wall 0 0 0 Opt Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -1.4 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 32 of 63 Room Checksums By MacDonald -Miller Facility Solutions 238 Corridor COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 60 / 49 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo/Hr: 6 / 19 OADB: 72 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) O 0 0 0 0 0 O 0 0 0 0 0 O 328 328 3 0 0 4,402 0 4,402 40 4,954 52 227 0 227 2 -161 -2 0 39 39 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 -6 -6 0 -43 0 4,622 367 4,989 45 4,749 50 813 203 1,017 9 813 9 957 0 957 9 531 6 3,242 0 3,242 29 3,242 34 5,012 203 5,216 47 4,587 48 120 -120 0 0 126 1 O 0 -10 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 -51 -51 0 768 7 130 130 1 0 0 0 0 0 0 0 0 9,755 530 11,043 100.00 9,463 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 -695 8.97 O 0 0.00 -2,805 -2,805 36.18 O -156 2.02 O 0 0.00 O 0 0.00 0 0 0.00 -615 -615 7.93 -3,419 -4,271 55.10 0 0 0.00 O 0 0.00 -760 -760 9.80 -760 -760 9.80 -148 0 0.00 O -922 11.89 0 0 0 0 0 0.00 51 -0.66 O 0.00 -1,806 23.29 O 0.00 -44 0.57 O 0.00 O 0.00 -4,328 -7,752 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.9 10.9 0.0 0.0 0.0 0.0 0.9 10.9 COOLING COIL SELECTION Sens Cap. MBh 10.6 0.0 0.0 Coil Airflow Enter DB/WB/HR cfm °F °F gr/Ib 427 76.6 61.0 56.3 0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F or/lb 53.7 51.9 55.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass fe (%) 304 0 0 0 304 0 0 129 106 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 79.2 76.3 68.5 76.5 68.5 76.6 62.2 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 431 431 431 431 18 18 12 129 443 30 0 0 0 0 Heating 431 431 129 431 18 18 12 129 141 30 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton fV/ton Btu/hr•ft' No. People Cooling 4.2 1.42 473.73 334.45 35.88 2 Heating 4.2 1.42 -25.50 HEATING COIL SELECTION Capacity Coil Airflow MBh cfm Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -7.2 0.0 Ent Lvg °F °F 431 64.0 79.2 0 0.0 0.0 -0.6 18 -2.3 129 0.0 0 0.0 0 -7.8 24.0 53.7 0.0 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 33 of 63 Room Checksums By MacDonald -Miller Facility Solutions 239 Office COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES r'eakcd at-Tttne. Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> attir. 7 / 1-8 OADB/WB/HR: 79 / 60 / 49 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h MblAfi 77 19 OADB: 77 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) O o 0 0 0 0 O 0 0 0 0 0 0 152 152 3 0 0 2,568 0 2,568 45 2,683 59 218 0 218 4 119 3 0 33 33 1 0 0 O 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 -3 -3 0 10 0 2,782 185 2,967 52 2,811 62 377 94 472 8 377 8 1,350 0 1,350 24 750 17 512 0 512 9 512 11 2,239 94 2,334 41 1,639 36 56 -56 0 0 62 1 O 0 -12 0 0 0 O 0 0 0 0 0 0 O 0 0 0 0 -48 -48 -1 368 6 62 62 1 0 0 0 0 0 0 0 0 5,077 237 5,670 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 4,513 100.00 Grand Total =_> Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 O -322 5.83 O 0 0.00 -2,712 -2,712 49.02 O -151 2.73 0 0 0.00 O 0 0.00 0 0 0.00 -285 -285 5.15 -2,997 -3,470 62.73 0 0 0.00 0 0 0.00 -353 -353 6.37 -353 -353 6.37 -69 0 0.00 0 -1,186 21.44 0 0 0 0 0 0.00 49 -0.89 0 0.00 -621 11.22 0 0.00 49 -0.88 0 0.00 0 0.00 -3,418 -5,532 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.5 5.6 0.0 0.0 0.0 0.0 0.5 5.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 5.2 205 76.8 60.9 55.8 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 51.2 52.9 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFlr Roof Wall Ext Door 141 0 0 0 141 0 0 125 102 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStoplRh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Cooling Heating SADB 55.0 85.2 Ra Plenum 76.3 68.5 Return 76.5 68.5 Ret/OA 76.8 51.5 Fn MtrTD 0.1 0.0 Fn BIdTD 0.3 0.1 Fn Frict 0.9 0.2 AIRFLOWS Cooling 205 205 205 205 23 23 6 62 211 29 0 0 0 0 Heating 205 205 62 205 23 23 6 62 67 29 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 11.4 1.46 439.59 301.82 39.76 3 Heating 11.4 1.46 -39.23 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -4.8 0.0 -0.8 -1.1 0.0 0.0 -5.5 SELECTION Coil Airflow Ent Lvg cfm °F °F 205 64.0 0 0.0 23 62 0 0 24.0 53.7 0.0 0.0 85.2 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 34 of 63 Room Checksums By MacDonald -Miller Facility Solutions 240 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 64 / 62 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) o 0 0 0 0 0 0 0 0 0 0 0 O 86 86 3 0 0 0 0 0 0 0 0 O 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 86 86 3 0 0 359 90 448 16 359 21 1,350 0 1,350 48 750 44 512 0 512 18 512 30 2,221 90 2,310 82 1,621 95 41 -41 0 0 91 5 0 0 277 10 0 0 O 0 0 0 0 0 0 O 0 0 0 0 -31 -31 -1 136 5 22 22 1 O 0 0 0 0 O 0 0 2,261 126 2,800 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,711 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 -306 23.08 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 O -306 23.08 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 -65 0 0.00 0 -1,165 87.72 0 0 0 O 0 0.00 39 -2.93 O 0.00 -5 0.39 O 0.00 110 -8.26 O 0.00 O 0.00 -65 -1,328 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.8 0.0 0.0 0.0 0.0 0.2 2.8 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 2.1 76 78.1 61.9 0.0 0 0.0 0.0 0.0 0 0.0 0.0 58.3 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 48.8 44.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 134 0 0 0 134 0 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 70.8 76.0 68.5 76.2 68.5 78.1 24.6 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 78 78 78 78 23 23 0 23 78 23 0 0 0 0 Heating 78 78 23 78 23 23 0 23 23 23 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton fe/ton Btulhr•ft' No. People Cooling 29.6 0.58 336.60 579.26 20.72 3 Heating 29.6 0.58 -9.91 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -0.6 0.0 -0.8 -0.4 0.0 0.0 -1.3 78 64.0 0 0.0 23 23 0 0 24.0 53.7 0.0 0.0 Lvg °F 70.8 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 35 of 63 Room Checksums By MacDonald -Miller Facility Solutions 241 Corridor COOLING COIL PEAK Peaked-at-T e: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Mu/Hi. OADB/WB/HR: 81 / 62 / 54 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu/h (%) O 0 0 O 0 0 292 292 12 O 0 0 0 0 0 O 0 0 0 0 O 0 O 0 0 O 0 292 292 12 824 206 1,030 41 969 0 969 39 O 0 0 0 1,793 206 1,999 80 111 -111 0 0 O 0 88 4 0 0 0 0 0 0 0 0 -29 -29 -1 122 5 20 20 1 0 0 0 O 0 O 0 0 1,905 378 2,492 100.00 M6TI:i r: 7 / 24 OADB: 68 Space Percent Sensible Of Total Btu/h (%) 0 0 O 0 0 0 0 0 0 0 0 0 O 0 O 0 0 0 O 0 O 0 824 52 538 34 O 0 1,363 87 208 13 O 0 O 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,571 100.00 Grand Total =_> Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -150 0 0 0 -150 Coil Peak Percent Tot Sens Of Total Btu/h (%) O 0.00 0 0.00 -704 57.64 O 0.00 0 0.00 O 0.00 O 0.00 O 0.00 0 0.00 O 0.00 -704 57.64 0 0.00 0 0.00 O 0.00 O 0.00 0 0.00 -934 76.45 O 0 O 0.00 31 -2.56 O 0.00 -48 3.95 0 0.00 433 -35.48 0 0.00 O 0.00 -1,222 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.5 0.0 0.0 0.0 0.0 0.2 2.5 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb Leave DB/WB/HR °F °F gr/lb 2.1 67 77.7 61.3 55.8 53.7 47.8 40.8 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 308 0 0 0 308 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStoplRh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Cooling SADB 55.0 Ra Plenum 76.1 Return 76.4 Ret/OA 77.7 Fn MtrTD 0.1 Fn BldTD 0.3 Fn Frict 0.9 Heating 71.9 68.5 68.5 30.2 0.0 0.1 0.2 AIRFLOWS Cooling 71 71 71 71 18 18 0 21 71 18 0 0 0 0 Heating 71 71 21 71 18 18 0 21 21 18 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'lton Btu/hr•ft' No. People Cooling 25.9 0.23 347.29 1,496.35 8.02 2 Heating 25.9 0.23 -3.97 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -0.6 0.0 -0.6 -0.4 0.0 0.0 -1.2 SELECTION Coil Airflow Ent Lvg cfm °F °F 71 64.0 71.9 0 0.0 0.0 18 21 0 0 24.0 53.7 0.0 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 36 of 63 ton MBh Main Clg 2.1 25.4 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 2.1 25.4 Room Checksums By MacDonald -Miller Facility Solutions 242 Waiting COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 60 / 49 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Percent Total Of Total Btu/h (%) O 0 0 0 0 0 0 0 O 591 591 2 14,802 0 14,802 58 795 0 795 3 O 159 159 1 0 0 0 O 0 0 O 0 0 0 -19 -19 0 15,577 750 16,328 64 1,466 367 1,833 7 4,800 0 4,800 19 935 0 935 4 7,201 367 7,568 29 216 -216 0 0 O 0 -49 0 O 0 0 0 0 O 0 0 -215 -215 -1 1,742 7 298 298 1 O 0 0 0 0 O 0 0 22,995 983 25,671 100.00 CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Space Percent Sensible Of Total Btu/h (%) 0 0 O 0 O 0 14,802 69 795 4 O 0 O 0 0 0 O 0 164 1 15,761 74 1,466 7 2,940 14 935 4 5,341 25 216 1 0 0 0 0 O 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 21,319 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 O -1,253 5.50 O 0 0.00 -9,914 -9,914 43.48 O -553 2.43 0 0 0.00 O 0 0.00 O 0 0.00 -1,847 -1,847 8.10 -11,760 -13,566 59.50 O 0 0.00 O 0 0.00 -1,370 -1,370 6.01 -1,370 -1,370 6.01 -267 0 0 0 -13,397 O 0.00 -4,695 20.59 0 0 0 0.00 219 -0.96 0 0.00 -3,225 14.14 0 0.00 -161 0.71 O 0.00 0 0.00 -22,798 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib Leave DB/WB/HR °F °F gr/Ib 24.2 970 76.8 60.9 55.9 53.7 51.7 54.7 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 548 0 0 0 548 0 0 458 374 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStoplRh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 82.6 76.3 68.5 76.5 68.5 76.8 54.3 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 970 970 970 970 93 93 37 291 1,007 129 0 0 0 0 Heating 970 970 291 970 93 93 37 291 328 129 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 9.6 1.77 458.92 259.24 46.29 12 Heating 9.6 1.77 -41.60 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -19.8 0.0 -3.0 -5.2 0.0 0.0 -22.8 970 64.0 O 0.0 93 24.0 291 53.7 O 0.0 O 0.0 Lvg °F 82.6 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 37 of 63 Room Checksums By MacDonald -Miller Facility Solutions 243 Reception COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK edkedat Tme. Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h 0 0 0 0 0 0 0 0 0 0 0 Nl6/I9r77-1 OADB/WB/HR: 83 / 64 / 60 Plenum Net Percent Sens. + Lat Total Of Total Btu/h Btu/h (%) O 0 0 O 0 0 190 190 7 0 0 0 O 0 0 O 0 0 O 0 0 0 O 0 0 O 0 190 190 7 706 177 883 32 450 0 450 16 853 0 853 31 2,010 177 2,186 79 84 -84 0 0 O 0 226 8 O 0 0 O 0 O 0 0 -29 -29 -1 156 6 26 26 1 O 0 0 0 0 O 0 0 2,094 279 2,755 100.00 Mo/Hr: 7 / 24 OADB: 68 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 706 250 853 1,810 179 0 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 36 13 43 91 9 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,988 100.00 Grand Total ==> Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -129 0 0 0 -129 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 0 0.00 -604 43.05 O 0.00 O 0.00 O 0.00 O 0.00 0 0.00 O 0.00 O 0.00 -604 43.05 0 0.00 O 0.00 O 0.00 O 0.00 0 0.00 -1,053 75.13 O 0 O 0.00 35 -2.51 O 0.00 -103 7.31 O 0.00 322 -22.98 O 0.00 O 0.00 -1,402 100.00 Main Clg Aux Cig Opt Vent Total Total Capacity ton MBh 0.2 2.7 0.0 0.0 0.0 0.0 0.2 2.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DBIWB/HR MBh cfm °F °F gr/Ib 2.5 86 77.9 61.7 57.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 50.4 50.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 264 0 0 0 264 0 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups TEMPERATURES Cooling SADB 55.0 Ra Plenum 76.0 Return 76.3 Ret/OA 77.9 Fn MtrTD 0.1 Fn BIdTD 0.3 Fn Frict 0.9 Heating 71.3 68.5 68.5 34.3 0.0 0.1 0.2 AIRFLOWS Cooling 90 90 90 90 21 21 0 27 90 21 0 0 0 0 Heating 90 90 27 90 21 21 0 27 27 21 0 0 0 0 ENGINEERING CKS % OA cfmlft' cfm/ton ft'/ton Btu/heft' No. People Cooling 23.0 0.34 398.14 1,161.77 10.33 1 Heating 23.0 0.34 -5.31 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -0.7 0.0 -0.7 -0.5 0.0 0.0 -1.4 SELECTION Coil Airflow Ent Lvg cfm °F °F 90 64.0 0 0.0 21 27 0 0 24.0 53.7 0.0 0.0 71.3 0.0 53.7 70.0 0.0 0.0 TRACE@ 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 38 of 63 Room Checksums By MacDonald -Miller Facility Solutions 245 Shared Office COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h Mo/Hr: 7 / 18 OADBNVB/HR: 79 / 60 / 49 Plenum Sens. + Lat Btu/h CLG SPACE PEAK Mo/Hr: 6 / 19 OADB: 72 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) 0 0 0 0 0 0 O 0 0 0 0 0 O 243 243 3 0 0 3,442 0 3,442 42 3,970 59 263 0 263 3 -188 -3 O 40 40 0 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 -5 -5 0 -32 0 3,700 283 3,983 49 3,751 56 602 151 753 9 602 9 1,350 0 1,350 16 750 11 1,536 0 1,536 19 1,536 23 3,488 151 3,638 44 2,888 43 89 -89 0 0 94 1 O 0 -15 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 -62 -62 -1 549 7 93 93 1 O 0 0 0 0 O 0 0 7,276 375 8,186 100.00 6,732 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 O -514 7.02 O 0 0.00 -3,262 -3,262 44.50 0 -182 2.48 O 0 0.00 O 0 0.00 O 0 0.00 -455 -455 6.21 -3,717 -4,413 60.20 O 0 0.00 0 0 0.00 -563 -563 7.67 -563 -563 7.67 -110 0 0.00 0 -1,441 19.65 O 0 0 0 0 0.00 63 -0.86 O 0.00 -1,032 14.07 O 0.00 54 -0.74 O 0.00 O 0.00 -4,389 -7,331 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.7 8.1 0.0 0.0 0.0 0.0 0.7 8.1 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 7.7 306 76.8 60.9 55.9 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 51.5 54.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 225 0 0 0 225 151 0 0 123 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 83.0 76.3 68.5 76.5 68.5 76.8 54.7 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 306 306 306 306 29 29 9 92 315 38 0 0 0 0 Heating 306 306 92 306 29 29 9 92 101 38 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton W/ton Btu/hr•ft' No. People Cooling 9.3 1.36 454.38 333.75 35.96 3 Heating 9.3 1.36 -32.58 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -6.4 0.0 -0.9 -1.7 0.0 0.0 -7.3 Lvg °F 306 64.0 83.0 0 0.0 0.0 29 24.0 92 53.7 O 0.0 O 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 39 of 63 Room Checksums By MacDonald -Miller Facility Solutions 246 Shared Office COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES F eakeo at lime: Mo/Hr: 7 / 18 Mo/Hr: 7 / 18 Mo/Hr: Heating Design Cooling Heating Outside Air: OADB/VVB/HR: 79 / 60 / 49 OADB: 79 OADB: 24 SADB 55.0 82.7 Ra Plenum 76.3 68.5 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.5 68.5 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 76.7 60.2 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.1 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.3 0.1 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.9 0.2 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 278 278 2 0 0 Roof Cond 0 -590 4.15 Glass Solar 9,493 0 9,493 58 9,493 68 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond Wall Cond 604 0 0 126 604 126 4 1 604 0 4 0 Glass/Door Cond Wall Cond -7,602 0 -7,602 53.42 -424 2.98 Cooling Heating Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 636 636 Floor 0 0 0 0 0 Floor 0 0 0.00 Terminal 636 636 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 636 191 Infiltration -5 -5 0 46 0 Infiltration -522 -522 3.67 Sec Fan 636 636 Sub Total ==> 10,091 405 10,496 64 10,143 73 Sub Total ==> -8,124 -9,138 64.21 Nom Vent 35 35 AHU Vent 35 35 Internal Loads Internal Loads Infil 10 10 Lights 690 173 863 5 690 5 Lights 0 0 0.00 MinStoplRh 191 191 People 1,800 0 1,800 11 1,000 7 People 0 0 0.00 Return 647 201 Misc 2,048 0 2,048 12 2,048 15 Misc -645 -645 4.53 Exhaust 46 46 Sub Total ==> 4,538 173 4,711 29 3,738 27 Sub Total ==> -645 -645 4.53 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 102 -102 0 0 102 1 Ceiling Load -126 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 -19 0 0 0 Ventilation Load 0 -1,793 12.60 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 77 -0.54 ENGINEERING CKS Exhaust Heat -76 -76 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 1,142 7 RA Preheat Diff. -2,529 17.77 Cooling Heating Ret. Fan Heat 192 192 1 Additional Reheat 0 0.00 % OA 5.6 5.6 Duct Heat Pkup 0 0 0 System Plenum Heat -204 1.43 cfm/ft° 2.47 2.47 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 469.99 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 W/ton 190.57 Btulhrft' 62.97 -55.16 Grand Total ==> 14,731 591 16,446 100.00 13,983 100.00 Grand Total =_> -8,895 -14,232 100.00 No. People 4 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/Ib °F °F gr/lb IV (%) MBh cfm °F °F Main Clg 1.4 16.3 15.7 636 76.7 61.0 56.2 53.7 51.9 55.7 Floor 258 Main Htg -13.1 636 64.0 82.7 Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat -1.2 35 24.0 53.7 ExFIr 0 Reheat -3.4 191 53.7 70.0 Total 1.4 16.3 Roof 258 0 0 Humidif 0.0 0 0.0 0.0 Wall 351 287 82 Opt Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -14.2 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 40 of 63 Room Checksums By MacDonald -Miller Facility Solutions 247 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 60 / 49 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) O 0 0 0 0 0 O 0 0 0 0 0 O 189 189 2 0 0 7,572 0 7,572 66 7,572 78 269 0 269 2 269 3 O 88 88 1 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 -4 -4 0 31 0 7,838 277 8,114 71 7,873 81 468 117 585 5 468 5 1,350 0 1,350 12 750 8 512 0 512 4 512 5 2,330 117 2,447 21 1,730 18 69 -69 0 0 69 1 O 0 -14 0 0 0 O 0 0 0 0 0 0 O 0 0 0 0 -54 -54 0 790 7 132 132 1 O 0 0 0 0 O 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 10,237 403 11,417 100.00 9,672 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (°A ) 0 0 0.00 O 0 0.00 0 -400 5.03 O 0 0.00 -3,355 -3,355 42.18 O -187 2.35 0 0 0.00 O 0 0.00 0 0 0.00 -354 -354 4.45 -3,709 -4,296 54.01 O 0 0.00 0 0 0.00 -438 -438 5.50 -438 -438 5.50 -85 0 0.00 O -1,289 16.20 0 0 0 0 0 0.00 55 -0.69 0 0.00 -1,734 21.80 0 0.00 -253 3.18 0 0.00 0 0.00 -4,232 -7,955 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.9 11.3 0.0 0.0 0.0 0.0 0.9 11.3 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb Leave DB/WB/HR °F °F gr/lb 10.8 440 76.7 61.0 56.2 53.7 51.9 55.6 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass Floor 175 Part 0 Int Door 0 ExFlr 0 Roof 175 Wall 155 Ext Door 0 ft' (%) O 0 127 82 O 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BldTD Fn Frict TEMPERATURES Cooling Heating 55.0 78.8 76.3 68.5 76.5 68.5 76.7 59.9 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 440 440 440 440 26 26 7 132 447 33 0 0 0 0 Heating 440 440 132 440 26 26 7 132 139 33 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 5.8 2.51 468.27 186.19 64.45 3 Heating 5.8 2.51 -45.46 HEATING COIL SELECTION Capacity Coil Airflow MBh cfm Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -7.1 0.0 -0.8 -2.4 0.0 0.0 -8.0 Ent Lvg °F °F 440 64.0 78.8 0 0.0 0.0 26 24.0 53.7 132 53.7 70.0 0 0.0 0.0 0 0.0 0.0 TRACE@ 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 41 of 63 Room Checksums By MacDonald -Miller Facility Solutions 248 Conference Room COOLING COIL PEAK CLG SPACE PEAK Peakedat-T-fme. Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> M81 7T121 OADB/WB/HR: 82 / 64 / 62 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 736 4,400 1,365 6,501 0 0 177 0 0 0 0 177 184 0 0 184 Net Percent Total Of Total Btu/h (%) O 0 O 0 177 2 O 0 O 0 O 0 0 0 O 0 0 0 0 0 177 2 920 11 4,400 54 1,365 17 6,685 83 84 -84 0 0 O 0 858 11 0 0 0 0 0 O 0 0 -97 -97 -1 400 5 66 66 1 O 0 0 0 0 O 0 0 6,585 245 8,089 100.00 Mo/Hr: 7 / 24 OADB: 68 Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 O 0 0 0 0 0 O 0 0 0 O 0 0 0 0 0 O 0 736 15 2,695 54 1,365 27 4,796 96 186 4 0 0 O 0 O 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 4,982 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -134 0 0 0 -134 Coil Peak Tot Sens Btu/h Percent Of Total (%) 0 0.00 O 0.00 -629 15.68 O 0.00 O 0.00 0 0.00 O 0.00 0 0.00 O 0.00 0 0.00 -629 15.68 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -3,614 90.12 0 0 0 0.00 121 -3.01 0 0.00 O 0.00 0 0.00 112 -2.79 O 0.00 O 0.00 -4,010 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.7 8.0 0.0 0.0 0.0 0.0 0.7 8.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb Leave DB/WB/HR °F °F gr/lb 6.0 222 78.2 62.0 58.4 53.7 49.1 45.2 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass W (%) 275 0 0 0 275 0 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BldTD Fn Frict TEMPERATURES Cooling Heating 55.0 70.5 76.0 68.5 76.2 68.5 78.2 24.0 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 227 227 227 227 72 72 0 72 227 72 0 0 0 0 Heating 227 227 72 227 72 72 0 72 72 72 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 31.5 0.82 339.30 411.59 29.16 11 Heating 31.5 0.82 -14.58 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -1.7 0.0 -2.3 -1.3 0.0 0.0 -4.0 227 63.8 0 0.0 72 72 0 0 24.0 53.7 0.0 0.0 Lvg °F 70.5 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 42 of 63 Room Checksums By MacDonald -Miller Facility Solutions 249 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 60 / 49 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) O 0 0 0 0 0 0 0 0 0 0 0 O 189 189 2 0 0 7,043 0 7,043 65 7,043 77 271 0 271 3 271 3 O 69 69 1 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 -4 -4 0 31 0 7,310 258 7,568 70 7,345 80 468 117 585 5 468 5 1,350 0 1,350 12 750 8 512 0 512 5 512 6 2,330 117 2,447 23 1,730 19 69 -69 0 0 69 1 O 0 -14 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 -54 -54 -1 747 7 125 125 1 O 0 0 0 0 O 0 0 9,709 377 10,820 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 9,145 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -3,374 0 0 0 0 -354 -3,727 0 0 -438 -438 -85 0 0 0 -4,250 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 0 0.00 -400 5.12 O 0.00 -3,374 43.16 -188 2.41 0 0.00 O 0.00 0 0.00 -354 4.53 -4,316 55.22 O 0.00 O 0.00 -438 5.60 -438 5.60 O 0.00 -1,289 16.49 O 0 O 0.00 55 -0.70 O 0.00 -1,617 20.68 O 0.00 -212 2.71 O 0.00 O 0.00 -7,815 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.9 10.7 0.0 0.0 0.0 0.0 0.9 10.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 10.3 416 76.7 61.0 56.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 51.9 55.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 175 0 0 0 175 156 0 0 127 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 79.3 76.3 68.5 76.5 68.5 76.7 59.4 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 416 416 416 416 26 26 7 125 423 33 0 0 0 0 Heating 416 416 125 416 26 26 7 125 132 33 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 6.1 2.38 467.13 196.45 61.08 3 Heating 6.1 2.38 -44.66 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -7.0 0.0 -0.8 -2.2 0.0 0.0 -7.8 SELECTION Coil Airflow Ent Lvg cfm °F °F 416 64.0 0 0.0 26 125 0 0 24.0 53.7 0.0 0.0 79.3 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 43 of 63 Room Checksums By MacDonald -Miller Facility Solutions 250 Office COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Mo/Hr: 7 / 18 OADB/WB/HR: 79 / 60 / 49 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h 0 0 0 0 0 O 0 0 0 0 O 190 190 2 0 7,615 0 7,615 66 7,615 271 0 271 2 271 0 88 88 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -4 -4 0 32 7,882 278 8,160 71 7,917 471 118 589 5 471 1,350 0 1,350 12 750 512 0 512 4 512 2,333 118 2,451 21 1,733 69 -69 0 0 69 O 0 -14 0 0 O 0 0 0 0 0 O 0 0 0 -54 -54 0 794 7 133 133 1 O 0 0 0 0 O 0 0 10,284 405 11,470 100.00 Percent Of Total (%) 0 0 0 78 3 0 0 0 0 0 81 5 8 5 18 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 9,720 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -3,374 0 0 0 0 -356 -3,729 0 0 -440 -440 Coil Peak Tot Sens Btu/h Percent Of Total (off) O 0.00 O 0.00 -402 5.03 0 0.00 -3,374 42.20 -188 2.35 O 0.00 O 0.00 O 0.00 -356 4.45 -4,320 54.04 0 0.00 O 0.00 -440 5.50 -440 5.50 -86 0 0.00 0 -1,292 16.16 0 0 -4,255 0 0 0 0.00 55 -0.69 0 0.00 -1,743 21.81 O 0.00 -254 3.18 O 0.00 O 0.00 -7,994 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.9 11.3 0.0 0.0 0.0 0.0 0.9 11.3 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 10.9 442 76.7 61.0 56.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 51.9 55.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 176 0 0 0 176 156 0 0 127 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 78.8 76.3 68.5 76.5 68.5 76.7 59.9 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 442 442 442 442 26 26 7 133 449 33 0 0 0 0 Heating 442 442 133 442 26 26 7 133 140 33 0 0 0 0 ENGINEERING CKS % OA cfmlft' cfm/ton ft'/to n Btu/hrft' No. People Cooling 5.8 2.51 468.38 186.38 64.38 3 Heating 5.8 2.51 -45.42 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -7.2 0.0 -0.8 -2.4 0.0 0.0 -8.0 SELECTION Coil Airflow Ent Lvg cfm °F °F 442 64.0 78.8 0 0.0 0.0 26 133 0 0 24.0 53.7 0.0 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 44 of 63 Room Checksums By MacDonald -Miller Facility Solutions 251 Conference Room COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 64 / 62 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) O 0 0 0 0 O 0 0 0 0 177 177 2 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 O 0 0 0 O 0 0 0 O 0 0 0 0 O 0 0 0 177 177 2 0 0 736 184 920 11 736 15 4,400 0 4,400 54 2,695 54 1,365 0 1,365 17 1,365 27 6,501 184 6,685 83 4,796 96 84 0 0 0 6,585 -84 0 -97 66 0 0 245 0 858 0 0 0 -97 400 66 0 0 0 0 11 0 0 0 -1 5 1 0 0 0 8,089 100.00 186 4 O 0 O 0 O 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underfir Sup Ht Pkup Supply Air Leakage 4,982 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -134 0 0 0 -134 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 0 0.00 -629 15.68 0 0.00 0 0.00 O 0.00 O 0.00 O 0.00 O 0.00 0 0.00 -629 15.68 0 0.00 0 0.00 0 0.00 O 0.00 O 0.00 -3,614 90.12 0 0 O 0.00 121 -3.01 0 0.00 0 0.00 O 0.00 112 -2.79 O 0.00 O 0.00 -4,010 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.7 8.0 0.0 0.0 0.0 0.0 0.7 8.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 6.0 222 78.2 62.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 58.4 0.0 0.0 Leave DB/WB/HR °F °F gr./lb 53.7 49.1 45.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 275 0 0 0 275 0 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 70.5 76.0 68.5 76.2 68.5 78.2 24.0 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 227 227 227 227 72 72 0 72 227 72 0 0 0 0 Heating 227 227 72 227 72 72 0 72 72 72 0 0 0 0 ENGINEERING CKS % OA cfmlft' cfm/ton fP/ton Btu/hrft' No. People Cooling 31.5 0.82 339.30 411.59 29.16 11 Heating 31.5 0.82 -14.58 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -1.7 0.0 -2.3 -1.3 0.0 0.0 -4.0 SELECTION Coil Airflow Ent Lvg cfm °F °F 227 63.8 0 0.0 72 72 0 0 24.0 53.7 0.0 0.0 70.5 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 45 of 63 Room Checksums By MacDonald -Miller Facility Solutions 252 Corridor COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 17 Outside Air: OADB/WB/HR: 81 / 62 / 54 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 1,429 1,680 0 3,109 Net Total Btu/h 0 0 0 0 506 506 0 0 0 0 0 0 0 0 O 0 0 506 506 357 1,786 0 1,680 O 0 357 3,467 193 -193 0 O 0 153 O 0 0 O 0 -50 -50 211 34 34 O 0 0 O 0 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Percent Space Percent Of Total Sensible Of Total (%) Btu/h (%) O 0 0 O 0 0 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 0 0 41 1,429 52 39 934 34 O 0 0 80 2,362 87 0 4 0 0 0 -1 5 1 0 0 0 3,303 655 4,321 100.00 361 13 O 0 O 0 O 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 2,724 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 0 -1,221 57.64 O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 O -1,221 57.64 0 0 0 0 -260 0 0 0 -260 -1,619 0 0 54 0 -84 0 752 0 0 0 0 0 0.00 0.00 0.00 0 0.00 0 0.00 76.45 0 0.00 -2.55 0.00 3.95 0.00 -35.48 0.00 0.00 -2,119 100.00 Main Gig Aux Clg Opt Vent Total Total Capacity ton MBh 0.4 4.3 0.0 0.0 0.0 0.0 0.4 4.3 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 3.6 116 77.7 61.3 55.8 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 47.8 40.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 534 0 0 0 534 0 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStoplRh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BldTD Fn Frict TEMPERATURES Cooling Heating 55.0 71.9 76.1 68.5 76.4 68.5 77.7 30.2 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 124 124 124 124 32 32 0 37 124 32 0 0 0 0 Heating 124 124 37 124 32 32 0 37 37 32 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton ft'/to n Btu/hrft' No. People Cooling 25.9 0.23 347.28 1,496.35 8.02 4 Heating 25.9 0.23 -3.97 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -1.1 0.0 -1.0 -0.7 0.0 0.0 -2.1 124 64.0 0 0.0 32 37 0 0 24.0 53.7 0.0 0.0 Lvg °F 71.9 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 46 of 63 Room Checksums By MacDonald -Miller Facility Solutions 253 Office COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: 7 / 18 OADB/WB/HR: 79 / 60 / 49 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) O 0 0 0 0 0 0 0 0 0 0 0 O 189 189 2 0 0 7,000 0 7,000 65 7,000 77 269 0 269 2 269 3 0 69 69 1 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 -4 -4 0 . 31 0 7,266 257 7,523 70 7,301 80 468 117 585 5 468 5 1,350 0 1,350 13 750 8 512 0 512 5 512 6 2,330 117 2,447 23 1,730 19 69 -69 0 0 69 1 0 0 -14 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 -54 -54 -1 743 7 125 125 1 O 0 0' 0 0 O 0 0 9,665 376 10,771 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 9,100 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 O -400 5.14 O 0 0.00 -3,355 -3,355 43.11 O -187 2.40 O 0 0.00 0 0 0.00 O 0 0.00 -354 -354 4.55 -3,709 -4,296 55.20 0 0 0.00 O 0 0.00 -438 -438 5.62 -438 -438 5.62 -85 0 0.00 0 -1,289 16.56 0 0 0 0 0 0.00 55 -0.71 O 0.00 -1,607 20.64 O 0.00 -209 2.69 0 0.00 O 0.00 -4,232 -7,784 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.9 10.6 0.0 0.0 0.0 0.0 0.9 10.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib Leave DB/WB/HR °F °F gr/Ib 10.2 414 76.7 61.0 56.2 53.7 51.9 55.5 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 175 0 0 0 175 155 0 0 127 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 79.3 76.3 68.5 76.5 68.5 76.7 59.3 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 414 414 414 414 26 26 7 124 421 33 0 0 0 0 Heating 414 414 124 414 26 26 7 124 131 33 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 6.2 2.37 466.97 197.35 60.81 3 Heating 6.2 2.37 -44.48 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -7.0 0.0 -0.8 -2.2 0.0 0.0 -7.8 414 64.0 O 0.0 26 24.0 124 53.7 O 0.0 O 0.0 Lvg °F 79.3 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 47 of 63 Room Checksums By MacDonald -Miller Facility Solutions 254 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 60 / 49 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) O 0 0 0 0 0 0 0 0 0 0 0 O 190 190 2 0 0 7,615 0 7,615 66 7,615 78 271 0 271 2 271 3 0 88 88 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -4 -4 0 32 0 7,882 278 8,160 71 7,917 81 471 118 589 5 471 5 1,350 0 1,350 12 750 8 512 0 512 4 512 5 2,333 118 2,451 21 1,733 18 69 -69 0 0 69 1 O 0 -14 0 0 0 O 0 0 0 0 0 0 O 0 0 0 0 -54 -54 0 794 7 133 133 1 O 0 0 0 0 O 0 0 10,284 405 11,470 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat OvlUndr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 9,720 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 O -402 5.03 0 0 0.00 -3,374 -3,374 42.20 0 -188 2.35 O 0 0.00 0 0 0.00 O 0 0.00 -356 -356 4.45 -3,729 -4,320 54.04 0 0 0.00 O 0 0.00 -440 -440 5.50 -440 -440 5.50 -86 0 0.00 O -1,292 16.16 O 0 0 O 0 0.00 55 -0.69 O 0.00 -1,743 21.81 0 0.00 -254 3.18 O 0.00 O 0.00 -4,255 -7,994 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.9 11.3 0.0 0.0 0.0 0.0 0.9 11.3 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DBIWBIHR MBh cfm °F °F gr/lb 10.9 442 76.7 61.0 56.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 51.9 55.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass ft2 (%) Floor 176 Part 0 Int Door 0 ExFlr 0 Roof 176 Wall 156 Ext Door 0 O 0 127 82 O 0 % OA cfm/ft' cfm/ton ft'Iton Btu/hr•ft' No. People Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BldTD Fn Frict TEMPERATURES Cooling Heating 55.0 78.8 76.3 68.5 76.5 68.5 76.7 59.9 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 442 442 442 442 26 26 7 133 449 33 0 0 0 0 Heating 442 442 133 442 26 26 7 133 140 33 0 0 0 0 ENGINEERING CKS Cooling Heating 5.8 5.8 2.51 2.51 468.38 186.38 64.38 -45.42 3 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -7.2 0.0 -0.8 -2.4 0.0 0.0 -8.0 SELECTION Coil Airflow Ent Lvg cfm °F °F 442 64.0 78.8 0 0.0 0.0 26 133 0 0 24.0 53.7 0.0 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 48 of 63 Room Checksums By MacDonald -Miller Facility Solutions 255 Conference Room COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 64 / 62 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Net Total Btu/h Percent Of Total, (%) O 0 0 0 0 0 193 193 2 O 0 0 0 0 0 O 0 0 O 0 O 0 O 0 0 O 0 193 193 2 803 201 1,003 12 4,800 0 4,800 55 1,365 0 1,365 16 6,968 201 7,169 83 92 -92 0 0 0 0 936 11 0 0 0 O 0 0 0 0 -106 -106 -1 426 5 70 70 1 O 0 0 O 0 O 0 0 7,060 266 8,688 100.00 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Space Percent Sensible Of Total Btu/h (%) O 0 O 0 O 0 0 0 O 0 0 0 O 0 O 0 0 0 O 0 0 0 803 15 2,940 55 1,365 26 5,108 96 203 0 0 0 4 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 5,311 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -146 0 0 0 -146 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 -686 15.71 0 0.00 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 -686 15.71 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -3,943 90.32 0 0 0 0.00 132 -3.02 0 0.00 O 0.00 0 0.00 132 -3.01 O 0.00 O 0.00 -4,365 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.7 8.6 0.0 0.0 0.0 0.0 0.7 8.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb Leave DB/WB/HR °F °F gr/Ib 6.5 237 78.3 62.0 58.5 53.7 49.0 44.9 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass Floor 300 Part 0 Int Door 0 ExFIr 0 Roof 300 Wall 0 Ext Door 0 IV (%) O 0 O 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 70.6 76.0 68.5 76.2 68.5 78.3 24.0 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 242 242 242 242 78 78 0 78 242 78 0 0 0 0 Heating 242 242 78 242 78 78 0 78 78 78 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hrff No. People Cooling 32.3 0.81 336.71 418.00 28.71 12 Heating 32.3 0.81 -14.55 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -1.8 0.0 -2.5 -1.4 0.0 0.0 -4.4 SELECTION Coil Airflow Ent Lvg cfm °F °F 242 63.7 0 0.0 78 78 0 0 24.0 53.7 0.0 0.0 70.6 0.0 53.7 70.0 0.0 0.0 TRACE@ 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 49 of 63 Room Checksums By MacDonald -Miller Facility Solutions 256 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Air: OADB/WB/HR: 79 / 60 / 49 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Total Btu/h O 0 0 0 0 0 O 189 189 7,043 0 7,043 271 0 271 O 69 69 O 0 0 0 O 0 0 -4 -4 7,310 258 7,568 468 117 585 1,350 0 1,350 512 0 512 2,330 117 2,447 69 -69 0 O 0 -14 O 0 0 0 0 -54 -54 747 125 125 0 0 0 0 0 9,709 377 Percent Of Total (%) 0 0 2 65 3 1 0 0 0 0 70 5 12 5 23 0 0 0 0 0 -1 7 1 0 0 0 10,820 100.00 CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 79 Space Sensible Btu/h 0 0 0 7,043 271 0 0 0 0 31 7,345 468 750 512 1,730 69 0 0 0 Percent Of Total (%) 0 0 0 77 3 0 0 0 0 0 80 5 8 6 19 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 9,145 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 O -400 5.12 O 0 0.00 -3,374 -3,374 43.16 0 -188 2.41 O 0 0.00 0 0 0.00 O 0 0.00 -354 -354 4.53 -3,727 -4,316 55.22 0 0 0.00 0 0 0.00 -438 -438 5.60 -438 -438 5.60 -85 0 0.00 O -1,289 16.49 O 0 0 0 0 0.00 55 -0.70 0 0.00 -1,617 20.68 O 0.00 -212 2.71 O 0.00 O 0.00 -4,250 -7,815 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.9 10.7 0.0 0.0 0.0 0.0 0.9 10.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 10.3 416 76.7 61.0 56.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 51.9 55.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass ft' (%) Floor 175 Part 0 Int Door 0 ExFlr 0 Roof 175 Wall 156 Ext Door 0 0 0 127 82 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BldTD Fn Frict TEMPERATURES Cooling Heating 55.0 79.3 76.3 68.5 76.5 68.5 76.7 59.4 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 416 416 416 416 26 26 7 125 423 33 0 0 0 0 Heating 416 416 125 416 26 26 7 125 132 33 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 6.1 2.38 467.13 196.45 61.08 3 Heating 6.1 2.38 -44.66 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -7.0 0.0 -0.8 -2.2 0.0 0.0 -7.8 SELECTION Coil Airflow Ent Lvg cfm °F °F 416 64.0 0 0.0 26 125 0 0 24.0 53.7 0.0 0.0 79.3 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 50 of 63 Room Checksums By MacDonald -Miller Facility Solutions 257 Conference Room COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Sens. + Lat. Btu/h Mo/Hr: 9 / 16 OADB/WB/HR: 78 / 60 / 51 Plenum Sens. + Lat Btu/h CLG SPACE PEAK Mo/Hr: 9 / 16 OADB: 78 Net Percent Space Total Of Total Sensible Btu/h (%) Btu/h 0 0 0 0 0 0 0 0 0 0 O 39 39 0 0 15,167 0 15,167 64 15,167 219 0 219 1 219 O 174 174 1 0 O 0 0 0 O 0 0 0 0 0 0 0 0 -5 -5 0 31 15,381 213 15,594 66 15,417 816 204 1,020 4 816 4,000 0 4,000 17 2,450 1,365 0 1,365 6 1,365 6,181 204 6,385 27 4,631 48 -48 0 0 48 O 0 -35 0 0 O 0 0 0 0 0 O 0 0 0 -73 -73 0 1,642 7 274 274 1 O 0 0 0 0 O 0 0 Percent Of Total (%) 0 0 0 75 1 0 0 0 0 0 77 4 12 7 23 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 21,611 569 23,786 100.00 20,096 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 -556 3.29 0 0 0.00 -7,582 -7,582 44.83 O -423 2.50 O 0 0.00 O 0 0.00 O 0 0.00 -491 -491 2.90 -8,073 -9,052 53.52 0 0 0.00 0 0 0.00 -608 -608 3.59 -608 -608 3.59 -118 0 0.00 O -3,264 19.30 0 0 0 O 0 0.00 126 -0.74 O 0.00 -3,414 20.18 O 0.00 -701 4.15 O 0.00 O 0.00 -8,799 -16,913 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 2.0 23.5 0.0 0.0 0.0 0.0 2.0 23.5 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 22.2 914 76.0 60.8 56.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 51.6 54.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass n' (%) 243 0 0 0 243 350 0 0 286 82 0 0 0 % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return RetIOA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 78.8 75.6 68.5 75.9 68.5 76.0 58.0 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 914 914 914 914 65 65 10 274 924 74 0 0 0 0 Heating 914 914 274 914 65 65 10 274 284 74 0 0 0 0 ENGINEERING CKS Cooling Heating 7.1 7.1 3.76 3.76 466.97 124.09 96.70 -69.60 10 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -14.8 0.0 -2.1 -4.9 0.0 0.0 -16.9 914 64.0 0 0.0 65 274 0 0 24.0 53.7 0.0 0.0 Lvg °F 78.8 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 51 of 63 Room Checksums By MacDonald -Miller Facility Solutions 258 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 9 / 15 Outside Air: OADB/WB/HR: 78 / 61 / 53 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Total Btu/h 0 0 0 0 0 0 0 9 9 5,998 0 5,998 69 0 69 O 48 48 O 0 O 0 O 0 0 6 6 6,073 57 6,130 318 80 398 1,350 0 1,350 512 0 512 2,180 80 2,260 21 -21 0 0 0 27 0 0 0 0 0 -24 -24 628 105 105 0 0 0 0 0 8,275 196 Percent Of Total (%) 0 0 0 66 1 1 0 0 0 0 67 4 15 6 25 0 0 0 0 0 0 7 1 0 0 0 9,126 100.00 CLG SPACE PEAK Mo/Hr: 9 / 15 OADB: 78 Space Sensible Btu/h 0 0 0 5,998 69 0 0 0 0 17 6,085 318 750 512 1,580 21 0 0 0 Percent Of Total (%) 0 0 0 78 1 0 0 0 0 0 79 4 10 7 21 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 7,686 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 O -272 4.45 O 0 0.00 -2,502 -2,502 40.90 O -140 2.28 0 0 0.00 0 0 0.00 O 0 0.00 -241 -241 3.93 -2,743 -3,155 51.56 O 0 0.00 O 0 0.00 -298 -298 4.86 -298 -298 4.86 -58 0 0.00 0 -1,119 18.29 0 0 0 0 0 0.00 45 -0.74 0 0.00 -1,347 22.02 0 0.00 -245 4.01 0 0.00 0 0.00 -3,098 -6,118 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.8 9.0 0.0 0.0 0.0 0.0 0.8 9.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 8.5 350 76.0 60.8 56.4 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 51.6 0.0 0.0 0.0 0.0 54.5 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass IV (%) Floor 119 Part 0 Int Door 0 ExFlr 0 Roof 119 Wall 116 94 82 Ext Door 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 78.1 75.6 68.5 75.8 68.5 76.0 59.1 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 350 350 350 350 22 22 5 105 355 27 0 0 0 0 Heating 350 350 105 350 22 22 5 105 110 27 0 0 0 0 ENGINEERING CKS % OA cfmlfe cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 6.3 2.94 465.48 158.38 75.77 3 Heating 6.3 2.94 -51.41 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -5.4 0.0 -0.7 -1.9 0.0 0.0 -6.1 SELECTION Coil Airflow Ent Lvg cfm °F °F 350 64.0 0 0.0 22 105 0 0 24.0 53.7 0.0 0.0 78.1 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 52 of 63 Room Checksums By MacDonald -Miller Facility Solutions 260 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 12 Outside Air: OADB/WB/HR: 77 / 62 / 62 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo/Hr: 8 / 12 OADB: 77 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) o 0 0 0 0 0 O 0 0 0 0 0 O 48 48 0 0 0 8,794 0 8,794 71 8,794 84 30 0 30 0 30 0 O 69 69 1 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 29 29 0 13 0 8,853 117 8,970 73 8,836 85 321 80 401 3 321 3 1,350 0 1,350 11 750 7 512 0 512 4 512 5 2,183 80 2,263 18 1,583 15 30 -30 0 0 30 0 0 0 136 1 0 0 O 0 0 0 0 0 0 O 0 0 0 0 -31 -31 0 854 7 142 142 1 O 0 0 0 0 O 0 0 11,066 279 12,334 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 10,449 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 O 0 0.00 O -274 2.90 0 0 0.00 -5,025 -5,025 53.04 0 -280 2.96 0 0 0.00 0 0 0.00 O 0 0.00 -243 -243 2.56 -5,268 -5,822 61.46 O 0 0.00 0 0 0.00 -300 -300 3.17 -300 -300 3.17 -58 0 0.00 0 -1,122 11.84 0 0 0 O 0 0.00 46 -0.48 O 0.00 -1,960 20.69 O 0.00 -315 3.33 O 0.00 O 0.00 -5,626 -9,474 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.0 12.2 0.0 0.0 0.0 0.0 1.0 12.2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 11.5 475 76.1 60.9 56.8 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 51.8 55.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass Floor 120 Part 0 Int Door 0 ExFlr 0 Roof 120 Wall 232 Ext Door 0 ft' (%) 0 0 190 82 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 80.8 75.8 68.5 76.1 68.5 76.1 61.5 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 475 475 475 475 22 22 5 143 480 27 0 0 0 0 Heating 475 475 143 475 22 22 5 143 147 27 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 4.7 3.96 468.27 118.18 101.54 3 Heating 4.7 3.96 -78.95 HEATING COIL SELECTION Capacity Coil Airflow MBh cfm Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -8.8 0.0 -0.7 -2.6 0.0 0.0 -9.5 Ent Lvg °F °F 475 64.0 80.8 O 0.0 0.0 22 24.0 53.7 143 53.7 70.0 O 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 53 of 63 Room Checksums By MacDonald -Miller Facility Solutions 261 Corridor COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: 7 / 11 OADB/WB/HR: 76 / 61 / 57 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 3,876 -54 0 0 0 0 0 3,822 610 717 0 1,328 70 0 0 0 5,220 0 0 139 0 0 23 0 162 153 0 0 153 -70 0 -19 66 0 0 292 Net Total Btu/h 0 0 139 3,876 -54 23 0 0 0 0 3,984 763 717 0 1,480 0 16 0 0 0 -19 400 66 0 0 0 Percent Of Total (%) 0 0 2 65 -1 0 0 0 0 0 67 13 12 0 25 0 0 0 0 0 0 7 1 0 0 0 5,928 100.00 CLG SPACE PEAK Mo/Hr: 7 / 11 OADB: 76 Space Sensible Btu/h 0 0 0 3,876 -54 0 0 0 0 0 3,822 610 399 0 Percent Of Total (%) 0 0 0 79 -1 0 0 0 0 0 78 12 8 0 1,009 21 70 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 4,901 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 O -521 13.37 O 0 0.00 -1,877 -1,877 48.13 0 -105 2.68 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 -1,877 -2,503 64.19 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -111 0 0 0 -1,988 0 -691 0 0 23 0 -866 0 138 0 0 0.00 17.73 0 0.00 -0.59 0.00 22.21 0.00 -3.55 0.00 0.00 -3,899 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.5 5.9 0.0 0.0 0.0 0.0 0.5 5.9 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 5.5 223 76.2 60.9 56.6 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 51.6 54.4 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft2 (%) 228 0 0 0 228 0 0 87 71 82 0 0 0 % OA cfm/ft' cfm/ton ft2/ton Btu/hrft' No. People Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 78.1 76.0 68.5 76.2 68.5 76.2 59.4 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 223 223 223 223 14 14 0 67 223 14 0 0 0 0 Heating 223 223 67 223 14 14 0 67 67 14 0 0 0 0 ENGINEERING CKS Cooling Heating 6.1 6.1 0.98 0.98 456.83 467.07 25.69 -17.10 2 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -3.5 0.0 -0.5 -1.2 0.0 0.0 -3.9 SELECTION Coil Airflow Ent Lvg cfm °F °F 223 64.0 0 0.0 14 67 0 0 24.0 53.7 0.0 0.0 78.1 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 54 of 63 Room Checksums By MacDonald -Miller Facility Solutions 262 Office COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo/Hr:8/12 Mo/Hr:9/12 OADB/WB/HR: 77 / 62 / 62 OADB: 75 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) o 0 0 0 0 0 O 0 0 0 0 0 O 59 59 1 0 0 4,072 0 4,072 56 4,384 73 10 0 10 0 -98 -2 0 29 29 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 37 37 1 -3 0 4,119 89 4,207 58 4,283 72 401 100 502 7 401 7 1,350 0 1,350 19 750 13 512 0 512 7 512 9 2,263 100 2,364 33 1,663 28 37 -37 0 0 22 0 O 0 147 2 0 0 O 0 0 0 0 0 0 O 0 0 0 0 -35 -35 0 476 7 80 80 1 O 0 0 0 0 O 0 0 6,419 197 7,239 100.00 5,968 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 0 -343 6.68 O 0 0.00 -1,820 -1,820 35.42 0 -102 1.98 0 0 0.00 O 0 0.00 0 0 0.00 -303 -303 5.90 -2,123 -2,568 49.97 O 0 0.00 O 0 0.00 -375 -375 7.30 -375 -375 7.30 -73 0 0.00 O -1,213 23.61 0 0 0 O 0 0.00 51 -0.99 O 0.00 -935 18.20 O 0.00 -97 1.90 O 0.00 O 0.00 -2,571 -5,138 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.6 7.2 0.0 0.0 0.0 0.0 0.6 7.2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F or/lb 6.5 264 76.2 61.0 57.1 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 51.3 53.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFlr Roof Wall Ext Door 150 0 0 0 150 0 0 84 69 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BldTD Fn Frict TEMPERATURES Cooling Heating 55.0 78.6 75.8 68.5 76.1 68.5 76.2 55.4 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 272 272 272 272 24 24 6 81 278 30 0 0 0 0 Heating 272 272 81 272 24 24 6 81 87 30 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 8.8 1.81 455.54 251.61 47.69 3 Heating 8.8 1.81 -34.25 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -4.4 0.0 -0.8 -1.5 0.0 0.0 -5.1 272 64.0 0 0.0 24 81 0 0 24.0 53.7 0.0 0.0 Lvg °F 78.6 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 55 of 63 Room Checksums By MacDonald -Miller Facility Solutions 263 Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 9 / 14 Outside Air: OADB/WB/HR: 78 / 61 / 56 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Total Btu/h O 0 0 0 0 0 O 2 2 6,413 0 6,413 36 0 36 0 63 63 0 0 0 0 0 0 0 14 14 6,464 66 6,530 367 92 458 1,350 0 1,350 512 0 512 2,229 92 2,320 22 -22 0 O 0 60 O 0 0 O 0 -24 -24 664 111 111 O 0 0 O 0 8,714 222 CLG SPACE PEAK Mo/Hr: 9 / 13 OADB: 77 Percent Space Percent Of Total Sensible Of Total (%) Btu/h (%) 0 0 0 0 0 0 0 0 0 66 6,535 80 O -44 -1 1 0 0 O 0 0 0 0 0 O 0 0 O 9 0 68 6,501 80 5 367 4 14 750 9 5 512 6 24 1,629 20 0 0 0 0 0 7 1 0 0 0 9,660 100.00 20 0 O 0 O 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 8,150 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h CA) 0 0 0.00 0 0 0.00 0 -313 4.67 O 0 0.00 -2,825 -2,825 42.14 0 -158 2.35 O 0 0.00 O 0 0.00 0 0 0.00 -277 -277 4.13 -3,102 -3,573 53.29 O 0 0.00 0 0 0.00 -343 -343 5.11 -343 -343 5.11 -67 0 0.00 0 -1,174 17.50 0 0 0 O 0 0.00 48 -0.72 O 0.00 -1,433 21.37 O 0.00 -232 3.45 0 0.00 0 0.00 -3,512 -6,705 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.8 9.5 0.0 0.0 0.0 0.0 0.8 9.5 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 9.0 369 75.9 60.8 0.0 0 0.0 0.0 0.0 0 0.0 0.0 56.6 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 51.6 54.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass Floor 137 Part 0 Int Door 0 ExFlr 0 Roof 137 Wall 130 Ext Door 0 ft' (%) O 0 107 82 O 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 78.6 75.5 68.5 75.8 68.5 75.9 59.2 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 371 371 371 371 23 23 5 111 376 29 0 0 0 0 Heating 371 371 111 371 23 23 5 111 117 29 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft2/ton Btu/hr•ft' No. People Cooling 6.3 2.71 466.28 172.26 69.66 3 Heating 6.3 2.71 -48.94 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -6.0 0.0 Lvg °F 371 64.0 78.6 0 0.0 0.0 -0.8 23 -2.0 111 0.0 0 0.0 0 -6.7 24.0 53.7 0.0 0.0 53.7 70.0 0.0 0.0 TRACE@ 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 56 of 63 Room Checksums By MacDonald -Miller Facility Solutions 265 Break Room COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: 7 / 14 OADB/WB/HR: 82 / 64 / 62 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu/h (%) 0 0 0 0 0 0 173 173 2 O 0 0 0 0 0 O 0 0 O 0 0 0 O 0 0 O 0 173 173 2 720 180 900 9 4,400 0 4,400 44 3,365 0 3,365 34 8,485 180 8,665 86 82 -82 0 0 O 0 674 7 O 0 0 O 0 0 0 0 -76 -76 -1 522 5 86 86 1 O 0 0 0 0 O 0 0 8,567 280 10,043 100.00 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 720 2,200 3,365 6,285 182 0 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 11 34 52 97 3 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 6,467 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -131 0 0 0 -131 Coil Peak Percent Tot Sens Of Total Btu/h (%) 0 0.00 0 0.00 -615 15.80 O 0.00 0 0.00 O 0.00 O 0.00 0 0.00 O 0.00 0 0.00 -615 15.80 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 -2,838 72.87 0 0 O 0.00 95 -2.44 0 0.00 -523 13.43 O 0.00 -13 0.33 O 0.00 O 0.00 -3,894 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.8 10.0 0.0 0.0 0.0 0.0 0.8 10.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F grAb 7.5 290 77.4 61.6 57.7 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 49.2 45.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass n' (%) 269 0 0 0 269 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 70.4 76.0 68.5 76.2 68.5 77.4 40.2 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 294 294 294 294 56 56 0 88 294 56 0 0 0 0 Heating 294 294 88 294 56 56 0 88 88 56 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 19.1 1.09 354.88 324.40 36.99 8 Heating 19.1 1.09 -14.48 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -2.1 0.0 -1.8 -1.6 0.0 0.0 -3.9 Lvg °F 294 64.0 70.4 O 0.0 0.0 56 24.0 88 53.7 O 0.0 0 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 57 of 63 Room Checksums By MacDonald -Miller Facility Solutions 266 Corridor COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: 7 / 17 OADB/WB/HR: 81 / 62 / 54 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Net Total Btu/h O 0 O 0 210 210 O 0 0 0 0 0 0 0 0 0 0 210 210 591 148 739 695 0 695 0 0 0 1,287 148 1,435 80 -80 0 O 0 63 O 0 0 O 0 -21 -21 87 14 14 0 0 0 O 0 1,367 271 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Percent Space Percent Of Total Sensible Of Total (%) Btu/h (%) O 0 0 0 0 0 12 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 O 0 0 12 0 0 41 591 52 39 386 34 0 0 0 80 978 87 0 4 0 0 0 -1 5 1 0 0 0 1,788 100.00 149 13 O 0 O 0 O 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,127 100.00 Grand Total==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -108 0 0 0 -108 Coil Peak Percent Tot Sens Of Total Btu/h (%) 0 0.00 O 0.00 -505 57.64 O 0.00 0 0.00 O 0.00 0 0.00 O 0.00 O 0.00 0 0.00 -505 57.64 O 0.00 0 0.00 0 0.00 O 0.00 0 0.00 -670 76.45 O 0 O 0.00 22 -2.55 O 0.00 -35 3.95 O 0.00 311 -35.48 O 0.00 0 0.00 -877 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 1.8 0.0 0.0 0.0 0.0 0.2 1.8 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 1.5 48 77.7 61.3 55.8 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 47.8 40.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass Floor 221 Part 0 Int Door 0 ExFlr 0 Roof 221 Wall 0 Ext Door 0 ft' (%) 0 0 0 0 0 0 % OA cfm/ft' cfm/ton W/ton Btu/hrft' No. People Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return RetlOA Fn MtrTD Fn BldTD Fn Frict TEMPERATURES Cooling Heating 55.0 71.9 76.1 68.5 76.4 68.5 77.7 30.2 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 51 51 51 51 13 13 0 15 51 13 0 0 0 0 Heating 51 51 15 51 13 13 0 15 15 13 0 0 0 0 ENGINEERING CKS Cooling Heating 25.9 25.9 0.23 0.23 347.29 1,496.35 8.02 -3.97 2 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -0.4 0.0 -0.4 -0.3 0.0 0.0 -0.9 SELECTION Coil Airflow Ent Lvg cfm °F °F 51 64.0 71.9 0 0.0 0.0 13 15 0 0 24.0 53.7 0.0 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 58 of 63 Room Checksums By MacDonald -Miller Facility Solutions 267 Office COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo/Hr:9/15 Mo/Hr:9/15 OADB/WB/HR: 78 / 61 / 53 OADB: 78 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Percent Space Total Of Total Sensible Btu/h (%), Btu/h O 0 0 0 0 0 0 0 0 0 O 9 9 0 0 6,173 0 6,173 66 6,173 71 0 71 1 71 O 49 49 1 0 O 0 0 0 O 0 0 0 O 0 0 0 0 6 6 0 18 6,250 58 6,308 68 6,262 Percent Of Total • (%) 0 0 0 78 1 0 0 0 0 0 80 326 82 408 4 326 4 1,350 0 1,350 14 750 10 512 0 512 5 512 7 2,188 82 2,270 24 1,588 20 22 -22 0 0 22 0 0 0 28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -25 -25 0 643 7 108 108 1 O 0 0 0 0 O 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 8,460 201 9,332 100.00 7,872 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 -279 4.45 0 0 0.00 -2,577 -2,577 41.11 0 -144 2.29 0 0 0.00 O 0 0.00 0 0 0.00 -247 -247 3.93 -2,824 -3,247 51.79 0 0 0.00 0 0 0.00 -305 -305 4.86 -305 -305 4.86 -59 0 0.00 O -1,128 17.99 O 0 0 O 0 0.00 46 -0.73 O 0.00 -1,386 22.10 O 0.00 -250 3.99 O 0.00 0 0.00 -3,188 -6,270 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.8 9.2 0.0 0.0 0.0 0.0 0.8 9.2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 8.7 358 76.0 60.8 56.4 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 51.6 54.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFlr Roof Wall Ext Door 122 0 0 0 122 0 0 119 97 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 78.1 75.6 68.5 75.8 68.5 76.0 59.2 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 358 358 358 358 22 22 5 107 363 27 0 0 0 0 Heating 358 358 107 358 22 22 5 107 112 27 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/to n Btu/hr•ft' No. People Cooling 6.2 2.94 466.23 158.80 75.57 3 Heating 6.2 2.94 -51.39 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -5.5 0.0 -0.7 -1.9 0.0 0.0 -6.3 358 64.0 0 0.0 22 107 0 0 24.0 53.7 0.0 0.0 Lvg °F 78.1 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 59 of 63 Room Checksums By MacDonald -Miller Facility Solutions 268 Office COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: 8 / 13 OADB/WB/HR: 79 / 63 / 62 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h Net Total Btu/h O 0 0 0 0 0 O 49 49 8,325 0 8,325 208 0 208 O 100 100 O 0 O 0 O 0 0 40 40 8,572 149 8,722 324 81 405 1,350 0 1,350 512 0 512 2,186 81 2,267 30 -30 0 O 0 182 0 0 0 O 0 -32 -32 833 139 139 0 0 0 0 0 10,788 307 CLG SPACE PEAK Mo/Hr: 9 / 13 OADB: 77 Percent Space Percent Of Total Sensible Of Total (%) Btu/h (%) O 0 0 0 0 0 O 0 0 69 8,772 85 2 -78 -1 1 0 0 O 0 0 0 0 0 O 0 0 0 8 0 72 8,702 84 3 324 3 11 750 7 4 512 5 19 1,586 15 0 2 0 0 0 0 7 1 0 0 0 12,110 100.00 18 0 O 0 O 0 O 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 10,306 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -4,927 0 0 0 0 -245 -5,172 0 0 -303 -303 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 O 0.00 -277 2.96 O 0.00 -4,927 52.75 -275 2.94 0 0.00 O 0.00 0 0.00 -245 2.62 -5,723 61.27 0 0.00 0 0.00 -303 3.24 -303 3.24 -59 0 0.00 O -1,125 12.05 0 0 0 O 0 0.00 46 -0.49 0 0.00 -1,927 20.63 O 0.00 -308 3.30 O 0.00 O 0.00 -5,533 -9,340 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.0 12.0 0.0 0.0 0.0 0.0 1.0 12.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 11.3 463 76.2 61.0 56.8 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 51.8 55.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 121 0 0 0 121 0 0 227 186 82 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 80.7 75.8 68.5 76.1 68.5 76.2 61.4 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 469 469 469 469 22 22 5 141 474 27 0 0 0 0 Heating 469 469 141 469 22 22 5 141 146 27 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/to n Btu/hr•ft' No. People Cooling 4.7 3.88 470.42 121.38 98.86 3 Heating 4.7 3.88 -77.19 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -8.6 0.0 -0.7 -2.5 0.0 0.0 -9.3 SELECTION Coil Airflow Ent Lvg cfm °F °F 469 64.0 0 0.0 22 141 0 0 24.0 53.7 0.0 0.0 80.7 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 60 of 63 Room Checksums By MacDonald -Miller Facility Solutions 269 Corridor COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 12 Outside Air: OADB/WB/HR: 77 / 62 / 62 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo/Hr: 8 / 12 OADB: 77 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) O o 0 0 0 0 O 0 0 0 0 0 0 92 92 1 0 0 8,014 0 8,014 75 8,014 88 22 0 22 0 22 0 O 65 65 1 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 O 0 0 0 0 8,036 157 8,193 77 8,036 88 623 156 779 7 623 7 733 0 733 7 407 4 0 0 0 0 0 0 1,357 156 1,513 14 1,031 11 58 -58 0 0 58 1 O 0 85 1 0 0 O 0 0 0 0 0 0 0 0 0 0 0 -16 -16 0 745 7 123 123 1 0 0 0 0 0 0 0 0 9,450 362 10,643 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 9,125 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -3,849 0 0 0 0 0 -3,849 0 0 0 0 -114 0 0 0 -3,962 Coil Peak Percent Tot Sens Of Total Btu/h (%) O 0.00 O 0.00 -533 7.46 0 0.00 -3,849 53.86 -215 3.00 0 0.00 0 0.00 0 0.00 O 0.00 -4,596 64.32 0 0 0 0.00 0.00 0.00 O 0.00 O 0.00 -707 9.89 O 0 0 0.00 24 -0.33 0 0.00 -1,800 25.18 O 0.00 -67 0.94 O 0.00 O 0.00 -7,146 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.9 10.5 0.0 0.0 0.0 0.0 0.9 10.5 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib Leave DB/WB/HR °F °F gr/Ib 10.1 415 76.1 60.9 56.8 53.7 51.9 55.7 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft' (%) 233 0 0 0 233 178 0 0 145 82 0 0 0 % OA cfm/ft' cfm/ton ft'Iton Btu/hr•ft No. People Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStoplRh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 78.7 75.8 68.5 76.1 68.5 76.1 63.5 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 415 415 415 415 14 14 0 125 415 14 0 0 0 0 Heating 415 415 125 415 14 14 0 125 125 14 0 0 0 0 ENGINEERING CKS Cooling Heating 3.4 3.4 1.78 1.78 473.93 265.96 45.12 -30.67 2 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -6.7 0.0 -0.5 -2.2 0.0 0.0 -7.2 415 64.0 O 0.0 14 24.0 125 53.7 0 0.0 O 0.0 Lvg °F 78.7 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 61 of 63 Room Checksums By MacDonald -Miller Facility Solutions 270 Shared Office COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 64 / 62 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) O 0 0 0 0 0 0 0 0 0 590 590 4 0 0 0 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 590 590 4 0 0 2,459 615 3,074 21 2,459 25 4,050 0 4,050 28 2,250 23 4,608 0 4,608 32 4,608 46 11,117 615 11,731 82 9,317 94 281 0 0 0 11,398 -281 0 -136 129 0 0 918 0 1,202 0 0 0 -136 789 129 0 0 0 0 8 0 0 0 -1 6 1 0 0 0 14,306 100.00 622 6 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 9,938 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 0 -2,101 31.45 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 0 -2,101 31.45 0 0 0 0 -448 0 0 0 -448 0 0 0 0.00 0.00 0.00 0 0.00 0 0.00 -5,062 75.75 O 0 O 0.00 169 -2.53 O 0.00 -578 8.65 O 0.00 890 -13.32 O 0.00 O 0.00 -6,682 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.2 14.2 0.0 0.0 0.0 0.0 1.2 14.2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 12.0 437 77.7 61.7 57.9 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/Ib 53.7 50.1 0.0 0.0 0.0 0.0 49.1 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass Floor 919 Part 0 Int Door 0 ExFlr 0 Roof 919 Wall 0 Ext Door 0 ft2 (%) 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict TEMPERATURES Cooling Heating 55.0 70.9 76.0 68.5 76.2 68.5 77.7 35.6 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 452 452 452 452 100 100 0 136 452 100 0 0 0 0 Heating 452 452 136 452 100 100 0 136 136 100 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/to n Btu/hrft' No. People Cooling 22.1 0.49 383.12 778.58 15.41 9 Heating 22.1 0.49 -7.27 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -3.4 0.0 -3.3 -2.4 0.0 0.0 -6.7 452 64.0 0 0.0 100 136 0 0 24.0 53.7 0.0 0.0 Lvg °F 70.9 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 62 of 63 Room Checksums By MacDonald -Miller Facility Solutions 277 Copy & Print Corridor COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 82 / 64 / 62 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 1,009 1,186 3,242 5,437 Net Percent Total Of Total Btu/h (%) O 0 0 O 0 0 242 242 4 O 0 0 O 0 0 0 0 0 O 0 O 0 0 0 0 0 0 242 242 4 252 1,261 O 1,186 O 3,242 252 5,690 115 -115 0 O 0 272 O 0 0 0 0 -31 -31 413 68 68 O 0 0 O 0 19 18 49 86 CLG SPACE PEAK Mo/Hr: 7 / 24 OADB: 68 Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 0 0 O 0 0 0 O 0 O 0 O 0 O 0 0 0 O 0 1,009 20 659 13 3,242 63 4,910 95 0 255 5 4 0 0 O 0 0 0 0 0 6 1 0 0 0 5,553 416 6,653 100.00 O 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 5,165 100.00 Grand Total ==> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -184 0 0 0 -184 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0.00 0 0.00 -862 34.97 O 0.00 0 0.00 O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 -862 34.97 O 0.00 0 0.00 O 0.00 O 0.00 O 0.00 -1,143 46.38 O 0 O 0.00 38 -1.55 O 0.00 -779 31.62 0 0.00 281 -11.41 O 0.00 O 0.00 -2,465 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.6 6.6 0.0 0.0 0.0 0.0 0.6 6.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/lb 6.0 229 76.8 61.2 57.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 51.0 52.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC Floor Part Int Door ExFlr Roof Wall Ext Door AREAS Gross Total Glass ft2 (%) 377 0 0 0 377 0 0 O 0 0 O 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BldTD Fn Frict TEMPERATURES Cooling Heating 55.0 70.7 76.0 68.5 76.2 68.5 76.8 54.2 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 235 235 235 235 23 23 0 71 235 23 0 0 0 0 Heating 235 235 71 235 23 23 0 71 71 23 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft2/ton Btu/hr•ft2 No. People Cooling 9.6 0.62 428.69 687.62 17.45 3 Heating 9.6 0.62 -6.54 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -1.7 0.0 -0.7 -1.3 0.0 0.0 -2.5 235 64.0 0 0.0 23 24.0 71 53.7 O 0.0 O 0.0 Lvg °F 70.7 0.0 53.7 70.0 0.0 0.0 TRACE@ 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 63 of 63 System Checksums By MacDonald -Miller Facility Solutions AC-2 COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 17 Outside Air: OADB/WB/HR: 81 / 62 / 54 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 7 / 17 OADB: 81 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) O 0 0 0 0 0 0 0 0 0 0 0 O 9,802 9,802 3 0 0 131,640 0 131,640 39 131,640 50 10,205 0 10,205 3 10,205 4 O 2,245 2,245 1 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 836 836 0 1,175 0 142,681 12,047 154,728 45 143,020 54 27,804 76,999 44,413 149,216 3,738 0 0 0 6,951 0 0 34,755 76,999 44,413 6,951 156,167 -3,738 0 -2,441 3,595 0 0 0 6,655 0 0 0 -2,441 22,110 3,595 0 0 0 10 27,804 11 23 43,808 17 13 44,413 17 46 116,026 44 0 2 0 0 0 -1 6 1 0 0 0 295,635 16,414 340,814 100.00 3,738 1 O 0 O 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage 262,784 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 0 0 0.00 O -23,618 9.15 0 0 0.00 -96,357 -96,357 37.32 0 -5,374 2.08 O 0 0.00 0 0 0.00 0 0 0 -8,872 -8,872 3.44 -105,230 -134,222 51.98 0 0 0.00 0 0 0.00 -10,058 -10,058 3.89 -10,058 -10,058 3.89 -5,031 0 0.00 O -70,648 27.36 O 0 0 O 0 0.00 2,658 -1.03 O 0.00 -45,956 17.80 0 0.00 O 0.00 0 0.00 -120,319 -258,227 100.00 Total Capacity ton MBh Main Clg 28.0 336.4 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 28.0 336.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 306.3 11,958 77.0 61.1 56.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 53.7 51.1 52.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass ft' (%) Floor 10,329 Part 0 Int Door 0 ExFlr 0 Roof 10,329 Wall 4,448 Ext Door 0 O 0 3,634 82 O 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict Series Fan -Powered VAV TEMPERATURES Cooling Heating 55.0 77.8 76.1 68.5 76.4 68.5 77.0 53.7 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 14,009 14,009 11,958 14,009 1,398 1,398 176 4,222 12,133 1,573 0 0 0 0 Heating 14,009 14,009 4,222 14,009 1,398 1,398 176 4,222 4,397 1,573 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hrft' No. People Cooling 11.7 1.16 426.52 368.43 32.57 176 Heating 10.0 1.36 -25.00 HEATING COIL Capacity MBh Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -212.7 0.0 -45.5 -75.8 0.0 0.0 -258.2 SELECTION Coil Airflow Ent Lvg cfm °F °F 14,009 64.0 0 0.0 1,398 4,222 0 0 24.0 53.7 0.0 0.0 77.8 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 1 of 2 ton MBh Main Clg 12.8 153.3 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 12.8 153.3 System Checksums By MacDonald -Miller Facility Solutions AC-3 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Mo/Hr: 7 / 15 OADB/WB/HR: 83 / 64 / 60 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr: 7 / 17 OADB: 81 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h (%) O 0 0 0' 0 0 O 0 0 0 0 0 O 3,396 3,396 2 0 0 56,380 0 56,380 36 58,396 49 6,786 0 6,786 4 6,034 5 O 1,128 1,128 1 0 0 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 1,144 1,144 1 687 1 64,310 4,524 68,834 44 65,116 55 13,476 3,369 16,846 11 13,476 11 33,916 0 33,916 22 19,822 17 18,074 0 18,074 12 18,074 15 65,466 3,369 68,835 44 51,372 43 1,571 -1,571 0 0 1,810 2 0 0 7,210 5 0 0 O 0 0 0 0 0 0 O 0 0 0 0 -1,088 -1,088 -1 9,937 6 1,608 1,608 1 O 0 0 0 0 O 0 0 131,347 6,842 155,336 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage 118,298 100.00 Grand Total =_> HEATING COIL PEAK Mo/Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -57,102 0 0 0 0 -5,186 -62,288 0 0 -5,494 -5,494 -2,375 0 0 0 -70,158 Coil Peak Tot Sens Btu/h 0 0 -10,769 0 -57,102 -3,195 0 0 0 Percent Of Total (%) 0.00 0.00 7.96 0.00 42.19 2.36 0.00 0.00 0 -5,186 3.83 -76,252 56.34 0 0.00 0 0.00 -5,494 4.06 -5,494 4.06 0 -32,689 0 0 1,309 0 -22,210 0 0.00 24.15 0 0.00 -0.97 0.00 16.41 0.00 0 0.00 0 0.00 -135,336 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr/Ib 137.4 0.0 5,324 77.1 0 0.0 Leave DB/WB/HR °F °F gr/lb 61.2 56.6 53.7 51.0 52.2 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Xerox Building 72145179-SMH 061814.TRC AREAS Gross Total Glass Floor 4,715 Part 0 Int Door 0 ExFIr 0 Roof 4,715 Wall 2,588 Ext Door 45 ft' (%) 0 0 2,104 81 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BldTD Fn Frict Series Fan -Powered VAV TEMPERATURES Cooling Heating 55.0 79.9 76.1 68.4 76.3 68.4 77.1 53.9 0.1 0.0 0.3 0.1 0.9 0.2 AIRFLOWS Cooling 6,530 6,530 5,383 6,530 647 647 103 1,976 5,486 749 0 0 0 0 Heating 6,530 6,530 1,976 6,530 647 647 103 1,976 2,079 749 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft'/ton Btu/hr•ft' No. People Cooling 12.0 1.14 421.40 369.11 32.51 80 Heating 9.9 1.39 -28.70 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -114.3 0.0 -21.1 -35.5 0.0 0.0 -135.3 6,530 63.9 0 0.0 647 1,976 0 0 24.0 53.7 0.0 0.0 Lvg °F 79.9 0.0 53.7 70.0 0.0 0.0 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 Alternative - 2 System Checksums Report Page 2 of 2 System Zone Room ** Load / Airflow Summary By MacDonald -Miller Facility Solutions Floor Area ft' People Coil Cooling Sensible Btu/h Coil Cooling Total Btu/h Space Design Max SA cfm Air Changes ach/hr VAV Minimum SA cfm VAV Minimum Main Coil Heating Sensible Btu/h Heating Fan Percent Max SA OA cfm Clg Htg Alternative 2 224 Corridor 232 Coffee Bar 233 Viewing Room 234 Observation Room 235 Office 236 Office 237 Office 240 Office 241 Corridor VAV-201 VAV-201 219 Shared Office 266 Corridor 270 Shared Office VAV-207 VAV-207 217 Office 220 Office 221 Corridor VAV-209 VAV-209 222 Office 223 Office 269 Corridor VAV-210 VAV-210 267 Office 268 Office VAV-211 VAV-211 262 Office 263 Office VAV-212 VAV-212 265 Break Room * This report does not display heating only systems. Project Name: Dataset Name: Xerox Building Rm Peak Rm Peak Rm Peak Rm Peak Rm Peak Rm Peak Rm Peak Rm Peak Rm Peak Zn Peak Zn Block Rm Peak Rm Peak Rm Peak Zn Peak Zn Block Rm Peak Rm Peak Rm Peak Zn Peak Zn Block Rm Peak Rm Peak Rm Peak Zn Peak Zn Block Rm Peak Rm Peak Zn Peak Zn Block Rm Peak Rm Peak Zn Peak Zn Block Rm Peak 462 85 96 118 132 143 143 134 308 1,621 1,621 603 221 919 1,743 1,743 128 119 187 434 434 123 113 233 469 469 122 121 243 243 150 137 287 287 269 3.2 0.6 1.0 3.0 3.0 3.0 3.0 3.0 2.2 22.0 22.0 7.0 1.5 9.0 17.5 17.5 3.0 3.0 1.3 7.3 7.3 3.0 3.0 1.6 7.6 7.6 3.0 3.0 6.0 6.0 3.0 3.0 6.0 6.0 8.0 3,112 3,013 3,992 1,459 2,077 2,128 2,128 2,087 2,075 22,407 21,909 8,797 1,489 11,976 22,358 22,215 8,869 11,488 9,029 29,581 27,913 8,744 8,696 10,138 27,503 25,379 8,683 11,269 19,859 19,080 6,449 8,960 15,279 15,338 7,533 3,705 3,163 4,233 2,145 2,766 2,820 2,820 2,776 2,470 27,233 27,003 10,473 1,772 14,164 26,505 26,439 9,453 12,182 9,329 31,160 29,602 9,279 9,281 10,513 28,999 26,899 9,219 11,963 21,088 20,250 7,154 9,544 16,568 16,532 9,951 107 1.74 32 30 122 10.80 37 30 163 12.70 49 30 52 3.31 22 42 78 4.41 23 30 79 4.16 24 30 79 4.16 24 30 78 4.36 23 30 71 1.74 21 30 830 31 830 31 335 4.16 100 30 51 1.74 15 30 452 3.69 136 30 838 30 838 30 367 21.53 110 30 475 29.96 143 30 371 14.87 111 30 1,214 30 1,214 30 361 21.99 108 30 361 23.95 108 30 415 13.36 125 30 1,137 30 1,137 30 358 22.02 107 30 469 29.07 141 30 827 30 827 30 272 13.58 81 30 371 20.30 111 30 642 30 642 30 294 8.20 88 30 -930 -846 -1,115 -505 -574 -590 -590 -577 -620 -6,347 -6,347 -2,493 -445 -3,420 -6,357 -6,357 -5,861 -8,745 -6,205 -20,812 -20,812 -5,584 -5,706 -6,691 -17,981 -17,981 -5,542 -8,615 -14,157 -14,157 -4,356 -5,949 -10,304 -10,304 -2,065 75 25.9 25.9 86 6.6 6.6 114 6.6 6.6 30 42.4 42.4 54 29.6 29.6 55 29.8 29.8 55 29.8 29.8 55 29.6 29.6 50 25.9 25.9 574 21.7 21.7 574 21.7 21.7 234 21.3 21.3 36 25.9 25.9 317 22.1 22.1 587 22.0 22.0 587 22.0 22.0 257 6.2 6.2 333 4.7 4.7 259 3.0 3.0 849 4.7 4.6 849 4.7 4.6 252 6.2 6.2 253 6.0 6.0 291 3.4 3.4 796 5.5 5.1 796 5.5 5.1 251 6.2 6.2 328 4.7 4.7 579 5.7 5.4 579 5.7 5.4 190 8.8 8.8 260 6.3 6.3 450 7.4 7.4 450 7.4 7.4 206 19.1 19.1 TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 72145179-SMH 061814.TRC Load/Airflow Summary Report Page 1 of 3 Coil Coil Space VAV Main Coil Heating Floor Cooling Cooling Design Air Minimum VAV Heating Fan Percent Area People Sensible Total Max SA Changes SA Minimum Sensible Max SA OA System Zone Room ** ft' # Btu/h Btu/h cfm ach/hr cfm % Btu/h cfm Clg Htg 277 Copy & Print Corridor Rm Peak 377 2.6 5,964 6,579 235 4.68 71 30 -1,728 165 9.6 9.6 VAV-213 Zn Peak 646 10.6 13,497 16,530 529 30 -3,793 371 14.9 14.9 VAV-213 Zn Block 646 10.6 13,497 16,530 529 30 -3,793 371 14.9 14.9 255 Conference Room Rm Peak 300 12.0 6,450 8,612 242 6.04 78 32 -1,824 164 32.3 32.3 VAV-215 Zn Peak 300 12.0 6,450 8,612 242 32 -1,824 164 32.3 32.3 VAV-215 Zn Block 300 12.0 6,450 8,612 242 32 -1,824 164 32.3 32.3 258 Office Rm Peak 119 3.0 8,480 9,016 350 22.04 105 30 -5,397 245 6.3 6.3 260 Office Rm Peak 120 3.0 11,490 12,185 475 29.72 143 30 -8,751 333 4.7 4.7 261 Corridor Rm Peak 228 1.6 5,533 5,858 223 7.34 67 30 -3,453 156 6.1 6.1 VAV-216 Zn Peak 467 7.6 25,899 27,455 1,048 30-17,601 734 6.1 5.5 VAV-216 Zn Block 467 7.6 22,692 24,474 1,048 30-17,601 734 6.1 5.5 257 Conference Room Rm Peak 243 10.0 22,224 23,499 914 28.22 274 30 -14,808 640 7.1 7.1 VAV-217 Zn Peak 243 10.0 22,224 23,499 914 30 -14,808 640 7.1 7.1 VAV-217 Zn Block 243 10.0 22,224 23,499 914 30 -14,808 640 7.1 7.1 253 Office Rm Peak 175 3.0 10,204 10,641 414 17.75 124 30 -6,953 290 6.2 6.2 254 Office Rm Peak 176 3.0 10,895 11,331 442 18.85 133 30 -7,162 310 5.8 5.8 256 Office Rm Peak 175 3.0 10,253 10,690 416 17.83 125 30 -6,985 291 6.1 6.1 VAV-218 Zn Peak 526 9.0 31,353 32,662 1,272 30-21,099 891 6.0 6.0 VAV-218 Zn Block 526 9.0 31,353 32,662 1,272 30-21,099 891 6.0 6.0 247 Office Rm Peak 175 3.0 10,842 11,279 440 18.86 132 30 -7,124 308 5.8 5.8 249 Office Rm Peak 175 3.0 10,253 10,690 416 17.83 125 30 -6,985 291 6.1 6.1 250 Office Rm Peak 176 3.0 10,895 11,331 442 18.85 133 30 -7,162 310 5.8 5.8 VAV-219 Zn Peak 526 9.0 31,990 33,300 1,299 30-21,270 909 5.9 5.9 VAV-219 Zn Block 526 9.0 31,990 33,300 1,299 30 -21,270 909 5.9 5.9 251 Conference Room Rm Peak 275 11.0 6,036 8,018 227 6.18 72 32 -1,681 155 31.5 31.5 252 Corridor Rm Peak 534 3.7 3,597 4,282 124 1.74 37 30 -1,075 87 25.9 25.9 VAV-220 Zn Peak 809 14.7 9,865 12,532 351 31 -2,755 242 29.5 29.5 VAV-220 Zn Block 809 14.7 9,520 12,373 351 31 -2,755 242 29.5 29.5 246 Shared Office Rm Peak 258 4.0 15,676 16,246 636 18.50 191 30 -13,076 445 5.6 5.6 VAV-222 Zn Peak 258 4.0 15,676 16,246 636 30 -13,076 445 5.6 5.6 VAV-222 Zn Block 258 4.0 15,676 16,246 636 30 -13,076 445 5.6 5.6 245 Shared Office Rm Peak 225 3.0 7,678 8,090 306 10.21 92 30 -6,402 214 9.3 9.3 VAV-223 Zn Peak 225 3.0 7,678 8,090 306 30 -6,402 214 9.3 9.3 VAV-223 Zn Block 225 3.0 7,678 8,090 306 30 -6,402 214 9.3 9.3 248 Conference Room Rm Peak 275 11.0 6,036 8,018 227 6.18 72 32 -1,681 155 31.5 31.5 VAV-224 Zn Peak 275 11.0 6,036 8,018 227 32 -1,681 155 31.5 31.5 VAV-224 Zn Block 275 11.0 6,036 8,018 227 32 -1,681 155 31.5 31.5 242 Waiting Rm Peak 548 12.0 24,157 25,366 970 13.28 291 30 -19,772 679 9.6 9.6 243 Reception Rm Peak 264 1.0 2,484 2,727 90 2.57 27 30 -723 63 23.0 23.0 VAV-225 Zn Peak 812 13.0 26,403 27,856 1,061 30-20,495 742 10.8 10.7 VAV-225 Zn Block 812 13.0 26,641 27,946 1,061 30-20,495 742 10.8 10.7 * This report does not display heating only systems. Project Name: Dataset Name: Xerox Building TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 72145179-SMH 061814.TRC Load/Airflow Summary Report Page 2 of 3 System Zone Room " Coil Coil Space VAV Main Coil Heating Floor Cooling Cooling Design Air Minimum VAV Heating Fan Percent Area People Sensible Total Max SA Changes SA Minimum Sensible Max SA OA ft' # Btu/h Btu/h cfm ach/hr cfm % Btu/h cfm Clg Htg 238 Corridor Rm Peak 304 2.1 10,635 10,908 431 10.62 129 30 -7,157 301 4.2 4.2 239 Office Rm Peak 141 3.0 5,152 5,606 205 10.92 62 30 -4,767 144 11.4 11.4 VAV-226 Zn Peak 445 5.1 15,787 16,513 636 30 -11,925 445 6.6 6.6 VAV-226 Zn Block 445 5.1 15,787 16,514 636 30-11,925 445 6.6 6.6 AC-2 Sys Peak 10,329 175.6 347,053 380,072 14,009 -212,688 9,787 11.7 10.0 AC-2 Sys Block 10,329 175.6 306,266 336,419 14,009 -212,687 9,787 11.7 10.0 200 Waiting Rm Peak 291 11.0 22,737 24,043 924 23.82 277 30 -21,005 647 7.8 7.8 201 Waiting Rm Peak 538 6.0 4,345 5,173 150 2.09 62 42 -1,272 88 41.6 41.6 202 Reception Rm Peak 102 2.0 2,556 3,023 101 7.40 30 30 -717 70 16.0 16.0 VAV-202 Zn Peak 931 19.0 29,106 31,707 1,175 31-22,993 805 12.9 12.8 VAV-202 Zn Block 931 19.0 29,545 31,810 1,175 31-22,346 805 12.9 12.8 203 Conference Room Rm Peak 776 14.0 28,683 30,154 1,141 11.03 342 30 -19,636 799 10.2 10.2 VAV-203 Zn Peak 776 14.0 28,683 30,154 1,141 30-19,636 799 10.2 10.2 VAV-203 Zn Block 776 14.0 28,683 30,154 1,141 30-19,636 799 10.2 10.2 204 Conference Room Rm Peak 244 6.0 12,435 13,591 517 15.89 155 30 -12,301 362 8.6 8.6 VAV-204 Zn Peak 244 6.0 12,435 13,591 517 30 -12,301 362 8.6 8.6 VAV-204 Zn Block 244 6.0 12,435 13,591 517 30 -12,301 362 8.6 8.6 205 Office Rm Peak 169 3.0 9,505 10,127 392 17.39 118 30 -6,814 274 6.4 6.4 206 Office Rm Peak 169 3.0 8,409 9,031 354 15.70 106 30 -6,562 248 7.1 7.1 207 Office Rm Peak 169 3.0 9,505 10,127 392 17.39 118 30 -6,814 274 6.4 6.4 VAV-205 Zn Peak 507 9.0 27,419 29,286 1,138 30-20,191 796 6.7 6.6 VAV-205 Zn Block 507 9.0 27,419 29,286 1,138 30-20,191 796 6.7 6.6 211 Office Rm Peak 169 3.0 8,409 9,031 354 15.70 106 30 -6,562 248 7.1 7.1 212 Office Rm Peak 169 3.0 9,505 10,127 392 17.39 118 30 -6,814 274 6.4 6.4 214 Office Rm Peak 169 3.0 8,327 8,949 350 15.55 105 30 -6,503 245 7.2 7.2 VAV-206 Zn Peak 507 9.0 26,241 28,108 1,096 30-19,879 767 7.0 6.9 VAV-206 Zn Block 507 9.0 26,241 28,108 1,096 30-19,879 767 7.0 6.9 215 Conference Room Rm Peak 240 6.0 19,822 20,737 818 25.56 245 30 -14,235 573 5.4 5.4 VAV-208 Zn Peak 240 6.0 19,822 20,737 818 30 -14,235 573 5.4 5.4 VAV-208 Zn Block 240 6.0 19,822 20,737 818 30 -14,235 573 5.4 5.4 208 Office Rm Peak 115 3.0 1,998 2,689 75 4.90 23 30 -555 53 29.1 29.1 209 Corridor Rm Peak 399 2.8 2,685 3,204 93 1.75 28 30 -818 65 25.7 25.7 210 Office Rm Peak 115 3.0 1,998 2,689 75 4.90 23 30 -555 53 29.1 29.1 213 Office Rm Peak 115 3.0 1,998 2,689 75 4.90 23 30 -555 53 29.1 29.1 216 Copy & Print Rm Peak 109 0.8 4,241 4,437 173 11.91 52 30 -1,199 121 6.0 6.0 218 Corridor Rm Peak 353 2.5 2,376 2,835 83 1.75 25 30 -724 58 25.7 25.7 229 Corridor Rm Peak 304 2.1 2,046 2,441 71 1.75 21 30 -623 50 25.7 25.7 VAV-227 Zn Peak 1,510 17.1 17,642 21,284 645 30 -5,029 452 21.6 21.6 VAV-227 Zn Block 1,510 17.1 17,324 21,082 645 30 -5,028 452 21.6 21.6 AC-3 Sys Peak 4,715 80.1 166,174 179,692 6,530 -114,265 4,554 12.0 9.9 AC-3 Sys Block 4,715 80.1 137,426 153,287 6,530 -113,617 4,554 12.0 9.9 * This report does not display heating only systems. Project Name: Dataset Name: Xerox Building TRACE® 700 v6.3 calculated at 03:33 PM on 07/09/2014 72145179-SMH 061814.TRC Load/Airflow Summary Report Page 3 of 3 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M14-0143 DATE: 07/14/14 PROJECTNAME: SOUND MENTAL HEALTH SITE ADDRESS: 6400 SOUTHCENTER BLVD X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: /�� c 74(, 4 Li -B'uilding Division 11 Public Works ' 1(114 Fire Prevention (In tit • 72 Structural Planning Division Permit Coordinator III PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 07/15/14 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required DUE DATE: 08/12/14 Approved with Conditions Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 MACDONALD/MILLER FAC SOL Page 1 of 3 0 Washington State Department of Labor & Industries MACDONALD/MILLER FAC SOL INC Owner or tradesperson SIMONDS, DERRICK R Principals SIMONDS, DERRICK R, PRESIDENT WEBSTER, MARK E, VICE PRESIDENT GOUGH, DAVID ANTHONY, DIRECTOR HOEL, STEPHANIE W, MEMBER SIGMUND, FREDRIC, PRESIDENT (End: 01/04/2011) LOVELY, STEVE C, VICE PRESIDENT (End: 01/04/2011) HACK, RICHARD, SECRETARY (End: 01/04/2011) KOPET, TYLER, TREASURER (End: 01/04/2011) TURLEY, DOUGLAS, CHIEF EXECUTIVE OFFICER (End: 01/04/2011) TURLEY, DOUGLAS, CHIEF OPERATING OFFICER (End: 01/04/2011) Doing business as MACDONALD/MILLER FAC SOL INC WA UBI No. 602 254 260 PO BOX 47983 SEATTLE, WA 98106 206-768-4180 KING County Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. MACDOFS980RU Effective — expiration 12/31/2002— 01/03/2015 https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602254260&LIC=MACDOFS980RU&SAW= 07/25/2014 J:\7214\5179 Sound Mental Health FILE COPY Permit No. 3 Plan review approval Is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Field Copy and conditions Is acknowledged: By: rA, Date: '7 / 1i --f City of Tukwila BUILDING DIVISION ABBV FULL NAME ABBV FULL NAME ABBV FULL NAME A AC AD AFF AL BDD BOB BOD BOTT BTU BTUH BWG BWR C CAP CC CFM CHWR CHWS COMB CONN CWR CWS DB DIFF DMPR DN EC EGC EER ELEV EMS COMPRESSED AIR LINE AIR CONDITIONING UNIT ACCESS DOOR (WALLIROOFIDUCT - SEE DRAWING) ABOVE FINISHED FLOOR ALUMINUM BACKDRAFT DAMPER BOTTOM OF BEAM BOTTOM OF DUCT BOTTOM BRITISH THERMAL UNITS BRITISH THERMAL UNITS PER HOUR BOTTOM WALL GRILLE BOTTOM WALL REGISTER CONDENSATE CAPACITY CONTROLS CONTRACTOR CUBIC FEET PER MINUTE CHILLED WATER RETURN CHILLED WATER SUPPLY COMBUSTION CONNECT CONDENSER WATER RETURN CONDENSER WATER SUPPLY DUCT BOARD DIFFUSER DAMPER DOWN ELECTRICAL CONTRACTOR EGGCRATE ENERGY EFFICIENCY RATIO ELEVATION ENERGY MANAGEMENT SYSTEM ESP EXH EXTR FAC FD FLA FOB FOT FRD FSD G GALV GC GPM GR GWB HG HP HWR HWS ID INT LIQ M-M MBH MC MCA MD MIN MT MUA NOM EXTERNAL STATIC PRESSURE EXHAUST EXTRACTOR FIRE ALARM CONTRACTOR FIRE DAMPER FULL LOAD AMPS FLAT ON BOTTOM FLAT ON TOP FRICTION DAMPER FIRE SMOKE DAMPER GAS LINE GALVANIZED GENERAL CONTRACTOR GALLONS PER MINUTE GRILLE GYPSUM WALL BOARD HOT GAS LINE HORSE POWER HOT WATER RETURN HOT WATER SUPPLY INSIDE DIMENSION INTERLOCK LIQUID LINE MACDONALD-MILLER ONE THOUSAND BTUH MECHANICAL CONTRACTOR MINIMUM CIRCUIT AMPACITY MOTORIZED DAMPER MINIMUM MOUNT MAKE-UP AIR NOMINAL OSA OBD OD RA REG REQ'D RIO SA SCD SD SL SM SP SS SSSC STL SUC SUSP TSTAT TC TOD TOS TV TWG TWR TYP UNO VD VFD 0 OUTSIDE AIR OPPOSED BLADE DAMPER OUTSIDE DIMENSION RETURN AIR REGISTER (GRILLE WITH DAMPER) REQUIRED ROUGH IN ONLY SUPPLY AIR SMOKE CONTROL DAMPER SMOKE DAMPER SOUND LINING SHEET METAL STATIC PRESSURE START/STOP SOLID STATE SPEED CONTROLLER STEEL SUCTION LINE SUSPENDED THERMOSTAT TEMPERATURE CONTROL TOP OF DUCT TOP OF STEEL TURN VANES TOP WALL GRILLE TOP WALL REGISTER TYPICAL UNLESS NOTED OTHERWISE VOLUME DAMPER VARIABLE FREQUENCY DRIVE VOLTAGE PHASE & DUCT DIAMETER FUSE SYMBOL CFM MANUFACTURER & MODEL NUMBER SIZE AS NOTED TYPE T-BAR LAY -IN MODULAR CORE DIFFUSER NOTES EXISTING OSIZE CFM ©SIZE CFM SHOEMAKER 701-MA AS NOTED T-BAR LAY -IN MODULAR CORE DIFFUSER SHOEMAKER 905-DW AS NOTED SURFACE MT RET/EXH GRILLE M-M METAL EGGCRATE 12/24 RETURN/EXH M-M METAL EGGCRATE 24/24 RETURN/EXH DESCRIPTION SYMBOL DESCRIPTION SYMBOL BARE SHEETMETAL 14x12 ROUND SHEETMETAL WRAPPED W/ INSULATION (2") 120W SOUNDLINE SHEETMETAL (1" LINING) 14x12SL CLEANROOM QUALITY DUCTWORK 14x12C SHEETMETAL WRAPPED W/ INSULATION (2") 1 4x 1 2W BARE FLAT OVAL SHEETMETAL 14x120 BARE ROUND SHEETMETAL 120 FLAT OVAL FLAT SHEETMETAL W/ INSULATION (2") 14x 120W EXPOSED QUALITY SHEETMETAL 14x12Q DUCTBOARD (1" FIBERGLASS) 14x12DB EXAMPLE OF NEW 14x12 EXAMPLE OF NOT IN CONTRACT (NIC) 14x12 EXAMPLE OF DEMO FLEX DUCT �r�r�rv,N EXAMPLE OF EXISTING 14X12 FLEX CONNECTOR SITE MAP NO SCALE 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2012 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE AND STATE AND LOCAL CODES AND ORDINANCES. 3. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH CHAPTER 6 OF THE 2012 IMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28" DIA AND LARGER WHICH ARE SUSPENDED MORE THAN 12" BELOW STRUCTURAL SYSTEM. 4. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT. 5. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS, PER 2012 WSEC. - DUCT WRAP, WHERE INDICATED, SHALL BE 1 1/2" 0.75 LB/CU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUM. FOIL VAPOR BARRIER (R-4.2 MIN.). - SOUND LINING, WHERE INDICATED, SHALL BE 1" AP ARMAFLEX WITH EROSION RESISTANCE UP TO 10,000 FT/MIN (R-4.2 MIN.). - DUCT BOARD, WHERE INDICATED, SHALL BE 1" RIGID FRK FACED El 475 FIBERGLASS DUCT BOARD SYSTEM, UL 181 LISTED AS A CLASS 1 AIR DUCT (R-4.3 MIN.). AIR DUCT (R-4.3 MIN.). 6. FLEX DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER, 1 1/2" FIBERGLASS INSULATION, AND NON -PERFORATED INTERIOR LINER WITH WIRE HELIX. DUCT SHALL BE A UL 181 LISTED CLASS 1 AIR DUCT. FLEX DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 12' IN LENGTH UNLESS NOTED OTHERWISE. 7. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2012 IBC. 8. PROVIDE FIRE DAMPERS, SMOKE DAMPERS AND FIRE/SMOKE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 716.5 OF THE 2012 IBC. PROVIDE CEILI FIRE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 716.6.2 OF THE 2012 IBC. INSTALL FIRE DAMPERS SMOKE DAMPERS AND FIRE/SMOKE DAMPERS IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS, THE TERMS OF THEIR LISTING, AND THE REQUIREMENTS OF THE CODE. 9. PROVIDE RETURN DUCT SMOKE DETECTOR AUTOMATIC SHUT DOWN OF ALL NEW HEATING, COOLING, OR VENTILATION EQUIPMENT MOVING IN EXCESS OF 2000 CFM IN ACCORDANCE WITH SECTION 606 OF THE 2012 IMC. POWER AND INTERLOCK WIRING WITH THE BUILDING FIRE ALARM SYSTEM IS BY THE ELECTRICAL CONTRACTOR. REVIEWED FOR CODE COMPLIANCE APPROVED G JUL "A 2014 6AA City of BUILDING 10. HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR. MINIMUM ACCESS DOOR SIZE FOR VALVES AND DAMPERS TO BE 18" X 18". 11. MOTORS STARTERS NOT LISTED AS BEING PROVIDED IN THE HVAC EQUIPMENT SCHEDULES ARE TO BE PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR. 12. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT AND PIPE DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL AIR AND WATER DESIGN FLOW RATES. 13. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE: SUBMITTAL DATA, NAMES AND ADDRESSES OF AT LEAST ONE SERVICE AGENCY, HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM. 14. COMMISSIONING IS REQUIRED ON THIS PROJECT IN ACCORD WITH WASHINGTON STATE ENERGY CODE (WSEC) SECTION 1416 AND WITH LEED NC 2.1 FUNDAMENTAL BUILDING SYSTEMS COMMISSIONING AND ADDITIONAL COMMISSIONING. 15. A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER 16. DAMPERS USED FOR OUTDOOR AIR INTAKE, EXHAUST, OR RELIEF SHALL HAVE THE FOLLOWING MAXIMUM LEAKAGE RATES AT 1" W.G. (PER AMCA STANDARD 500): MOTORIZED DAMPERS:10 CFM/S.F. GRAVITY DAMPERS: 20CFM/S.F. (40 CFM/S.F. FOR DAMPERS SMALLER THAN 24" IN EITHER DIMENSION). 17. OUTSIDE AIR INTAKE, EXHAUST, AND RELIEF DAMPERS SERVING CONDITIONED SPACES MUST BE MOTORIZED (FAIL CLOSED) PER WSEC 1412.4.1, EXCEPT AS ALLOWED BY WSEC. ila ISION APN# 000320-003 LEGAL DESCRIPTION: GILLIAM W H-D C # 40 BEG 1336.78 FT W AND 1501.5 FT N OF SE COR OF SEC 23-23-4 TH E 250 FT TH S 325.5 FT TO N LN OF CO RD # 622 TH WLY ALG SD N LN TO PT S OF BEG TH N TO BEG LESS CO RD DEMO (22) VAV BOXES, (52) DIFFUSERS, REGISTERS AND GRILLES, MISC EXHAUST, MEDIUM AND LOW PRESSURE DUCTWORK. RELOCATE (4) VAV BOXES, (102) DIFFUSERS, REGISTERS AND GRILLES, (20) THERMOSTATS. INSTALL (1) NEW EXHAUST FAN TO SERVE NEW BATHROOMS, (1) HEAT TRANSFER FAN TO SERVE NEW IDF ROOM, (17) VAV BOXES, (58) DIFFUSERS, REGISTERS AND GRILLES, NEW EXHAUST, MEDIUM AND LOW PRESSURE DUCTWORK AS SHOWN. BALANCE (24) ZONES. TITLE PROJECT ENGINEER ACCOUNT MANAGER SHEET METAL SUPERINTENDENT AIR BALANCE FOREMAN CONTROLS FOREMAN COMMISSIONING FOREMAN NAME TITLE TM0.01 SCHEDULES - HVAC TM0.02 SCHEDULES - HVAC DM2.02 SECOND FLOOR DEMO PLAN - HVAC NAME PERRY CHRISTIAN BROCK LEE NATHAN WAAGEN STEVE BAKER LINDSEY ANDREWS BRIAN WHEELER SEPARATE PER"IIIT REQUIRED FOR: 0 Mechanical Electrical Plumbing [Gas Piping City of Tukwila BUILDING DIVISION REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. COMPANY MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER PHONE NUMBER 206-768-4284 206-768-3838 206-786-8157 206-768-3824 206-768-4208 206-571-2659 NAME TITLE TM2.02 SECOND FLOOR PLAN - HVAC TM2.03 ROOF PLAN - HVAC TM3.01 EXTERIOR ELEVATIONS - HVAC EMAIL PERRY.CH RISTIAN@MACMI LLER.COM BROCK.LEE@MACMILLER.COM NATHAN.WAAGEN@MACMILLER.COM STEVE.BAKER@MACMILLER.COM LINDSEY.ANDREWS@MACM I LLER.COM BRIAN.WHEELER@MACMILLER.COM Site Location outhcenter Blvd Tukwila Pkwy VICINITY MAP NO SCALE RECEIVED CITY OF TUKWILA JUL 14 2014 PERMIT CENTER I I I I I I I I I I I I I I I I SOUND MENTAL HEALTH ENGINEER: B GEZON CHECKED BY: B GEZON Cv.) 1 :I T E 0 iv E 0 ca E H REVISIONS: W 0 z 0 V LJ� r� v ) z 0 0 I.L 0 LL 0 W U) F- 0 LAST REVISED: 06-13-14 DATE PLOTTED: CAD: ISSUE DATE: R VI LLAN U EVA DRAWING NUMBER: 0-2129-72145179-00 SHEET NUMBER: TM0.01 MFG & MODEL NO. KW VOLT/PH SIZE W" x H" MAX CFM MIN CFM STEPS MAX DT °F VALVE CFM HEATER FAN UNIT NO. EDH-204 EDH-205 SYSTEM SERVED VAV-204 EDH-206 EDH-210 EDH-211 EDH-212 VAV-205 VAV-206 VAV-210 6.0 14 480/3 480/3 15 x 13 23 x 15 CONTROL 24V 24V NOTES DEMO 1 DEMO 1 4.0 277/1 277/1 14 x 14 24V 24V DEMO 1 DEMO 1 VAV-211 VAV-212 3.5 12 277/1 480/3 23x15 24V 24V DEMO 1 DEMO 1 EDH-216 EDH-217 EDH-218 VAV-216 5.0 277/1 24V DEMO 1 VAV-217 14 x 14 24V DEMO 1 VAV-218 10 480/3 23 x 15 24V DEMO 1 EDH-219 VAV-219 10 480/3 23x15 24V DEMO 1 EDH-221 EDH-222 EDH-223 EDH-226 VAV-221 VAV-222 VAV-223 5.0 5 277/1 277/1 14 x 14 24V 24V DEMO 1 DEMO 1 8 480/3 24V DEMO 1 VAV-226 20 480/3 23 x 15 24V DEMO 1 NOTES: 1. EXISTING A C1 EDI UNIT NO. EF-1 EF-2 EF-3 AREA SERVED GENERAL EXHAUST BATHROOMS 227 & 228 MFG & MODEL NO. EXITAIRE GX-2493 GREENHECK GB-091 TYPE ROOF ROOF CFM ESP RPM FLA 3900 0.75 700 0.375 1250 5.8 HP 1.5 0.25 VOLT/PH 460/3 115/1 WT BDD LBS 88 BREAK ROOM GREENHECK BSQ-080 INLINE 350 0.25 1725 5.8 0.25 115/1 80 NOTES EXISTING NEW 1,3,4,6 EXISTING, REBALANCE 4 EF-4 IDF 273 GREENHECK CSP-A700 INLINE 555 0.25 1100 350W 115/1 N 35 NEW 1,5,6,7 NOTES: 1. POWER WIRING AND DISCONNECT SWITCH BY ELECTRICAL CONTRACTOR. 2. MOTOR STARTER BY ELECTRICAL CONTRACTOR. 3. MOTORIZED DAMPER THAT MEETS 2012 WSEC SECTIONS C402.4.5.2 AND C403.2.4.4. 4. FAN CONTROLLED VIA TIMECLOCK, PROVIDED AND INSTALLED BY EC. 5. FAN SIZED AT 20 DEG DELTA T, AMBIENT COULD REACH 93 DEG F. 6. HIGH EFFICIENCY MOTORS. 7. TSTAT (MT. AT 48" AFF, SET AT 80° F) UNIT NO. AC-1 MFG & MODEL NO. TRANE SAHA6004 NOM TONS 60 HEAT KW STG CFM 24000 TSP 3 FAN HP 30 OA CFM 3900 EER/ SEER IPLV ELECTRICAL VOLT/PH MCA 460/3' 203 WT LBS 12000 NOTES EXISTING 1,2,4 AC-2 AC-3 TRANE SAHA4004 40 16000 2.5 25 3000 460/3 145 8100 EXISTING 1,2,5 TRANE SXHCC304 30 12000 2.5 5 1800 460/3 84 6000 EXISTING 1-3,6 NOTES: 1. SMOKE DETECTOR LOCATED IN SUPPLY PLENUM, INTEGRATED ALL SD'S TO SHUT DOWN UNITS AND MAIN CENTRAL AIR SYSTEM. POWER TO SD'S BY EC SD'S CONTACTORS FOR SHUT DOWN CONTROLS BY MC 2. HIGH EFFICIENCY MOTOR AND VFD FOR VAV CONTROL. 3. 100% OSA ECONOMIZER. 4. 3HP RETURN AIR FAN 7,000 CFM @ .5" SP 5. 3HP RETURN AIR FAN 8,000 CFM @ .5" SP 6. 3HP RETURN AIR FAN 10,000 CFM @ .5" SP REVIEWED FOR CODE COMPLIANCE APPROVED JUL 2 4 2014 City of Tukwila BUILDING DIVISION , 2014 9:38:25 UNIT NO. 202 203 MFG & MODEL NO. CARRIER 45TV VVT CARRIER 45TV_VVT INLET SIZE 8 10 MAX 800 1300 MIN 150 230 KW 5 3 DT 19.7 7.26 CFM 800 1300 VOLT/PH 277/1 277/1 STGS 2 2 HP 1/10 1/4 VOLT/PH 277/1 277/1 SPD 204 CARRIER 45TV VVT 10 1300 230 6 14.5 1300 277/1 2 1/4 277/1 205 206 208 CARRIER 45TV VVT CARRIER 45TV VVT CARRIER 45TV_VVT 12 8 14 1900 800 2500 325 150 420 3 5 / 11.8 6.29 1900 800 2500 277/1 277/1 277/1 2 2 2 1/2 1/10 3/4 277/1 277/1 277/1 209 210 211 212 214 216 217 218 219 CARRIER CARRIER 45TV VVT CARRIER 45TV VVT CARRIER CARRIER 45TV VVT CARRIER 45TV VVT CARRIER 45TV VVT CARRIER 45TV VVT CARRIER 45TV_VVT 8 8 14 8 10 14 12 800 800 2500 800 1300 2500 1900 150 150 420 150 230 420 325 4 3.5 5 3 15.7 13.8 / 19.7 7.26 #### / 800 800 2500 800 1300 2500 1900 277/1 277/1 277/1 277/1 277/1 277/1 277/1 2 2 2 2 2 2 2 1/10 1/10 3/4 1 /10 1/4 3/4 1/2 277/1 277/1 277/1 277/1 277/1 277/1 277/1 221 CARRIER 45TV_VVT 12 1900 325 5 8.28 1900 277/1 2 1/2 277/1 222 223 225 226 CARRIER 45TV_VVT CARRIER 45TV VVT CARRIER 45TV_VVT CARRIER 45TV VVT 8 12 14 14 800 1900 2500 2500 150 325 420 420 5 19.7 / # / 800 1900 2500 2500 277/1 277/1 277/1 277/1 2 2 2 2 1/10 1/2 3/4 3/4 277/1 277/1 277/1 277/1 NOTES DEMO & REPLACE 1 DEMO & REPLACE 1 DEMO & REPLACE 1 DEMO & REPLACE 1 DEMO & REPLACE 1 DEMO 1 DEMO & REPLACE 1 DEMO & REPLACE 1 DEMO & REPLACE 1 DEMO & REPLACE 1 DEMO & REPLACE 1 DEMO & REPLACE 1 DEMO & REPLACE 1 DEMO & REPLACE 1 DEMO & REPLACE 1 DEMO & REPLACE 1 DEMO & REPLACE 1 DEMO & REPLACE 1 DEMO & REPLACE 1 228 229 CARRIER 35DV VVT CARRIER 35DV VVT 8 800 150 DEMO 1 EXISTING DEMO NOTES: 1. VAV BOX HAS SUPPLEMENTAL ELECTRIC DUCT HEATER, SEE ELECTRIC DUCT HEATER SCHEDULE. 2. ATS SUB CONTRACTOR TO REMOVE AND STOCKPILE ALL EXISTING CONTROLS. NOTE TO ELECTRICAL: - 460V/3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277V/1PH POWER TO THE FAN MOTOR. UNIT NO. 201 MFG & MODEL NO. 202 NAILOR 35PE-0312 203 NAILOR 35PE-0312 204 NAILOR 35PE-0208 205 NAILOR 35PE-0312 206 NAILOR 35PE-0312 207 208 NAILOR 35PE-0310 209 NAILOR 35PE-0312 210 NAILOR 35PE-0312 222 223 224 225 226 227 228 NAILOR 35PE-0310 NAILOR 35PE-0208 NAILOR 35PE-0310 NAILOR 35PE-0210 NAILOR 35PE-0312 NAILOR 35PE-0312 NAILOR 35PE-0210 NAILOR 35PE-0310 NAILOR 35PE-0210 CARRIER 35DV_VVT INLET VALVE CFM HEATER SIZE MAX MIN KW DT CFM VOLT/PH STGS HP VOLT/PH SPD 12 880 325 12 1200 200 21 1050 460/3 12 1170 200 6 21 900 460/3 8 520 150 4 21 600 277/1 12 1145 200 12 12 10 12 12 8 10 10 12 12 8 1100 850 820 1220 1145 830 650 530 250 1050 920 1280 1305 375 10 1080 200 325 200 200 200 200 150 230 150 200 150 200 200 150 4.5 6.5 5.5 5.5 4.5 6.5 6.5 21 900 460/3 21 900 460/3 21.8 650 277/1 21.5 950 460/3 21.6 800 460/3 21.8 21.5 21.5 800 650 950 950 277/1 277/1 460/3 277/1 460/3 460/3 277/1 277/1 460/3 277/1 NOTES: 1. DISCONNECT BY ELECTRICAL. 2. PARALLEL FAN POWERED TERMINAL UNIT WITH HEAT -, SIZE AS LISTED, PRESSURE INDEPENDENT, FACTORY OPTIONS INCLUDE: - EXTENDED DAMPER 1/2" DIAM. SHAFT - FACTORY INSTALLED 1" THROW -AWAY FILTERS - CONTROLS BY OTHERS - FACTORY PROVIDE WIRING HARNESS WITH LOW VOLTAGE INTERLOCK CONDUCTORS EXTENDED FROM HIGH VOLTAGE CABINET TO LOW VOLTAGE CONTROLS CABINET. - 1" MATT -FACED UNIT INSULATION - VARIABLE SPEED FAN CONTROL - 24V TRANSFORMER, 50 VA MIN RATING - HEAT STAGING & FAN CONTROL THROUGH FACTORY WIRED RELAYS - AUTO RESET 120°F HIGH LIMIT TSTAT - NON MAGNETIC QUIET ACTING HEATER CONTACTOR - FN2 90 DEG CONTROLS ENCLOSURE 3. EXISTING BOX TO BE REBALANCED TO SPECIFIED CFM. NOTE TO ELECTRICAL: - 460V/3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277W1PH POWER TO THE FAN MOTOR. 2 277/1 277/1 277/1 277/1 277/1 277/1 277/1 277/1 277/1 277/1 277/1 277/1 277/1 277/1 277/1 277/1 277/1 277/1 VAR VAR VAR VAR VAR VAR VAR VAR VAR VAR VAR VAR VAR VAR NOTES RELOCATED 1,3 RELOCATED 1,3 EXISTING 1,3 NOT USED EXISTING 1,3 EXISTING 1,3 NOT USED RELOCATED 1,3 RELOCATED 1,3 EXISTING RECEIVED CITY OF TUKWILA JUL 1 4 2014 PERMIT CENTER 0 "CS 0 H ENGINEER: B GEZON CHECKED BY: B GEZON CAD: R VILLANUEVA DRAWING NUMBER: Z. 0 .71 co cts o 1 l< ce co 0 IEXP►RES 2i19/AO REVISIONS: (73 0 0 0 0 0 LAST REVISED: 06-13-14 DATE PLOTTED: ISSUE DATE: Friday, July 11 SHEET NUMBER: TM0.02 11. 2014 9:42:34 AM PRIVATE 1FI a„ EDH-2O:3 VAV- 20 1Ox10 (TYP 2) PF`.A..€, 10x10 0 (TYP 3) PHIVA€ E1 OFFICE ..2`)'1..' 1Ox10 PRIVATE OFFICE 211 PRIVATE 0(TiCL 2 .-....1 12 8x8 4I1IIERIMICNNESIMMILIMMIE1 10x10 PRIVATE OETiCE-- 214 10x10 CONPL-REN r 215 j 12x12 WA' IN i A I r" ICL OFFICE g al EDH VAV-20,6:. EDH-20"6' 10x10 COPY/PRIIV 10x10 (TYP 3) 10x10 (TYP 2) 10x10 TYP _ €MEN'S R1- 1 228 WOMI::..N'S RE":TROOM 227 egifigmEn 10x;10 (TYP 2) EDH-226 ELEC. 226 l 216 AV - 20 ,1TYP CORRIDOR PRIVATE: L FICE 10x10 (TYP 6) 'NjAI !INC krcE0TION 10k10 00 0R <.,i,iv.IDO .,a...T 1,60, IILI111110MIIIIMMO IMINrR PVIPWR t;ORR OFF .... -....... COR'RIDOR.,,: I269II VAV -223 [5E-E.:, R.R3 COR[4:L10 f��0xT110 rICE 220 PRIVATE OF-TICE 170 10 DEMO NOTES 1. DEMO ALL UNDAMAGED GRD'S AS SHOWN TO A STOCKPILE. ENSURE ALL RELOCATED GRD'S ARE CLEANED AND IN GOOD WORKING ORDER. 2. DEMO ALL ASSOCIATED ELECTRIC DUCT HEATERS WITH VAV BOXES AS SHOWN. » N ITO VAV-224 10x10 ROOM j cal PRIV PRI -z 10 X-10 267 BREAK ROOM 2651 P-1Wx10 � 263 I 1110 OCR P,RIN1 try; (T)'P 2) SPACE HEATER �I 748 Rillio,(71111%r1 1:x8.-. SI IAiRE:E) OFFICE 246 12x12 10�10` (TYP 3-3; VAV-=215 0 IDOR'. OFFICE 1247 PI RIVA1 OFFICE 249 ;->RIVA_TE__ OFFICE 250 -MAV--218 D1=i; 218 PRIVATE OFFICE: 1 262 VAV-216 i PRIVATE 110CFCCE EON ty PRIVATE OFFICE 253 I 10x10 fTIYrR...F3) OFFICE. _ I'RIVAEE OFFICE 256 260 PRIVATE 1 alft[thCE 258 143 REVIEWED FOR CODE COMPLIANCE APPROVED JUL 2 4 2014 City of Tukwila BUILDING DIVISION CONFERENCE ROOM RECEIVED --- ` CITY OF TUKWILA 10x1(TYP 3) JUL 1 4 2014 (TYP PERMIT CENTER z 1/8" = 1'-0" L W 3 00 1 0 153 o U 0 Cla I I 1 I I I I I I I J W J Z 5W 0 Z 0 ENGINEER: B GEZON CHECKED BY: B GEZON CAD: ISSUE DATE: A HAMILTON DRAWING NUMBER: C-2129-72145179-00 SHEET NUMBER: z —J 0 0 I .macmiller.com WA Lic No: MACDOFS980RU W 0 REVISIONS: IiJ 0 z 0 Z 0 0 z 0 0 I..L 0 LL 0 W 0 Z LAST REVISED: 06-13-14 DATE PLOTTED: DM2.02 NI N .42 rn w 0 2 t 0 0 0 0 i 2014 9:42:23 AM 0260 0 (TYP 2) 10x10 • O 195 (TYP 6) ROOIV 12x12 • ®395 035512x12 0I ' CII_ 12x12 AV-V 395 P R IVy 1 9 OFFICE 211 12x12 A\L-v 355 RRI\!/'1E OFFICE 212 12x12 0395 I'VAV-204 1 18x 1'4SL•• VAV-206 PRIVATE OFFICE 214 d.12x12 1355 TVAV-208 140:;, .._. , ,'C>RR-2( '.P...3 ifRI;.'AT w. .10s�i 24x24 WOIvIE:.N`S RESTROOM [227 RF `iIR 23 c14SL u 1 VAV-202 CORRIDOR 12x12 430 PRIVATE O.........06 239 I 10x10 0270 �TY.P 4) N FLFC. 226 I 2217 12x12 410 (TYP 2) C;Ci.:.'Y rRII�J1 1216 10x10 217 O 310510 PRIVATE OFFICE 220 VAV=-2d9 CORRIi)0R° 18x12SL LO 100'1 rTh PRIVATE OFFICE VAV... 21 CAP 35x14 OBCF....RV i-XI)C;1 ROB 60 222 10x10 REVIEWED FOR CODE COMPLIANCE APPROVED JUL 2 4 2014 City of Tukwila BUILDING DIVISION 365 (TYP 2) OFFICE SHEET NOTES 1. TIME CLOCK LOCATION TO BE CONFIRMED BY OWNER. LOW VOLTAGE WIRING AND ROUTING TO EF-2 BY EC. 2. 120 EXHAUST DUCT UP TO EF-2 ON ROOF. FIELD VERIFY EXACT LOCATION AND ROUTING. A -213-" 7%1 VAV-225 AN ITC) r 2.15 10x10 • 0320 (TYP 2) Tom; 10x10 18x12S CORR O47 12x12 PRIVAQ..I OFFICE 2i��3 PRIVATE OFFICE 767 --1-0X10 �360 .1 BREAK ROOM = 2t 10 3T,5F OFFICE 263 10x10 PRIVATE 275 OFFICE 262 MI 12x12 A 475 NFN( ROOM I 248 • mJ • 10x10, 250 N C ONEE. ROO` 255tist 0143 PRIVA1 E.. OFFICE VAV+215 VAV`. I SHARED OFFICE 2 46....I 112x 12 O4140IVA _- 247 I VAV=219 12x12 A420 OFFICE 249 ' J 445 PRIMA OFFICE 25O I vav-I11i 8 1. 12x12 44151 OFFICE 253 I J O 12x12 445 PRIVATE OFFICE 254 ...................... .: VAV-2171 0AI 12x12 420\TF. OFFICE 1 256 1 126a 103e110ATF 0350-HOE 258. CONFERENCE ROOM RECEIVED x2 CITY OF TUKWILA (TYP 2) JUL 1 4 201 4 PERMIT CENTER zAciuk ico co O r•-• a) CO c7). ai 0 —6 3 U (1 O as�o) V 0 • °0 CZ 41 co 0 N o I I I I I I I I I I I I I I I I 1 1 1 1 1 1 171-1 N 0 I� L cc w I I I I I I l< SOUND MENTAL HEALTH ENGINEER: B GEZON CHECKED BY: B GEZON CAD: A HAM I LTO N DRAWING NUMBER: 0-2129-72145179-00 SHEET NUMBER: WA Lic No: MACDOFS980RU REVISIONS: w 0 REVISIONS: z 0 U L.L F- z 0 0 0 LL 0 w (/) F- 0 z LAST REVISED: 06-13-14 DATE PLOTTED: ISSUE DATE: TM2.02 1/8" = 1'-0" J:\7214\5179 Sound Mental Health 2014 9:42:09 AM A B C D E F 3 4 5 G H 2 3 EXISTING MECHANICAL CREEN AC-3 AC-2 0 EF-1 AC-1 5 6 6 7 8 A B C D REVIEWED FOR CODE COMPLIANCE APPROVED JUL 2 4 2014 E City of Tukwila BUILDING DIVISION F G 1041.% I LI 8 RECEIVED CITY OF TUKWILA JUL 1 4 2014 PERMIT CENTER I I I I I I I I I I I I I I I I LLI 0 REVISIONS: 1 I I 1 I I I:4:I i Q 0 N 0 1- L,J 11 I I I I I\ SOUND MENTAL HEALTH ENGINEER: P CHRISTIAN CHECKED BY: B GEZON CAD: A HAM I LTO N DRAWING NUMBER: 0-2129-72145179-00 SHEET NUMBER: REVISIONS: LAST REVISED: 06-13-14 DATE PLOTTED: ISSUE DATE: TM2.03 1/8" = 11-0" 7 AC-1 RL v'IE IE ,J 1.-OR CODE COMPLIANCE APPROVED JUL 2 4 2014 City of Tukwila BUILDING DIVISION riD / EXISTING ME AC-2 AC-3 a 0 0 HANICAL SCREEN I EF-2T 11'-5 ji AC-1 1 CD EF-1 EXTERIOR ELEVATION LOOKING SOUTH TM3.01 AC-2 1/8" = 1'-0" EXISTING MECHANICAL SC If 1 EEN (2) EXTERIOR ELEVATION LOOKING EAST TM3.01 1/8" = 1'-0" RECEIVED CITY OF TUKWILA JUL 1 4 2014 PERMIT CENTER z 4 O 0 0 0 I I I I I I I I I I I I I I I I N 0 cn L1J d I I I I I I l< SOUND MENTAL HEALTH z O 11.1 1.1J m W 1— z W U OCO 5 0CD 1— REVISIONS: Gi z 0 z 0 0 I.L z 0 0 I.L. 0 LI_ 0 W ( J 0 z ENGINEER: LAST REVISED: P CHRISTIAN 06-13-14 CHECKED BY: B GEZON CAD: A HAMILTON DATE PLOTTED: ISSUE DATE: DRAWING NUMBER: 0-2129-72145179-00 SHEET NUMBER: TM3.01 1/8" = 1'-0"