Loading...
HomeMy WebLinkAboutPermit M14-0154 - SAHALE SNACKS - FANSSAHALE SNACKS 3411 S 120 PL M14-0154 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.eov 1023049069 3411 S 120TH PL 100 Project Name: SAHALE SNACKS MECHANICAL PERMIT Permit Number: M14-0154 Issue Date: 8/29/2014 Permit Expires On: 2/25/2015 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: SABEY CORPORATION 12201 TUKWILA INTL BLVD 4THFL , SEATTLE, WA, 98168 RUSTIN GILBERT 12646 INTERURBAN AVE S , TUKWILA, WA, 98168 TCMS OF SEATTLE LLC 12856 INTERURBAN AVE S , TUKWILA, WA, 98168 TCMSSSL905CB Expiration Date: Phone: (206) 588-8787 Phone: (206) 588-8998 DESCRIPTION OF WORK: INSTALL A SUPPLY FAN AND A RETURN FAN, CONNECT TO EXISTING DUCT FOR SPACE Valuation of Work: $30,000.00 Type of Work: NEW Fuel type: ELECT Fees Collected: $585.58 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: 125 Sewer District: VALLEY VIEW SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: 2012 2012 2012 2012 International Fuel Gas Code: WA Cities Electrical Code: WA State Energy Code: 2012 2012 2012 Permit Center Authorized Signature: LOA `--J2 Date: :9 4H it I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit doers not presume to give authority to violate or cancel the provisions of any other state or local laws regulating/construction or the performance of work. I am authorized to sign and obtain this development permit andfagree% the conditions attached to this permit. Signature: Print Name: ,/herrt Date: O/2 V/(71 This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Readily accessible access to roof mounted equipment is required. 2: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 3: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 4: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 5: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 6: ***MECHANICAL PERMIT CONDITIONS*** 7: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 8: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 9: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1800 MECHANICAL FINAL 0701 ROUGH -IN MECHANICAL CITY OF TUKK' 1 Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. M ILA — 0131 Project No. �l Date Application Accepted: %11,\ 41 Date Application Expires: `-- % (For of/ice use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION King Co Assessor's Tax No.: l UZ 3Ot/g O6°j Site Address: 39 ((1enS(gt. *1 bu Qtt�t,e_ P Suite Number: 100 Floor: Tenant Name: $atAtt-x_ New Tenant: Pr —Yes ❑.. No PROPERTY OWNER Name: S0. b >° y CO IT cc, (o1 � r`: ,1 Address: City: State: Zip: CONTACT PERSON — person receiving all project communication Name: k S 1,. 6.1 (�J ic.„.t_ (� Address: 114'-u 1N_I �ow j'+ a-cr�.f �C Ca City: ,,/ State: , fix Zip:12 6, Phone: 2.0b i s-? '??7 Fax: Email: C "h 4. C-N 1 1 orkr a tt.tvts c v re3 MECHANICAL CONTRACTOR INFORMATION Company Name . t 5.t —CC „4^ A k V 4� ``� '^L '^ Address: City. State: J' 6� Zip:�17, ✓�1 Phone: Z 06 5?2VY7Fax: Contr Reg No.m pc_ yosciPp Date: Tukwila Business License No.: c'� _0 ?Is 0 o 9 / cc.) I'Vl Valuation of project (contractor's bid price): $ �t con / Describe the scope of work in detail: .1r.$Ie,Q,L 0. S I e�d4W-A ram, C T r G k stf . Use: Residential: New Commercial: New Fuel Type: Electric ❑ ❑ Replacement Replacement Gas ❑ Other: f k�S H:\Applications\Forms-Applications On Line\2011 Applications\Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct Ventilation system • Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove 9 Emergency generator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIF THAT I HAVE : AD AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERI BY THE LA S OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OW R ; -.0 R ZED AGENT: Signature: f rfi Date: %/z' < < 7 Print Name: f- IAS'1'«1 (p-°- tT Day Telephone: 2 06 ( if 9?° 7 Mailing Address: r Z G l ( Th -Ft-r+. r %o it /4-1, ,, so Jua'l; i..z- Lt/ A u% e'/ ( > City State Zip H:Wpplications\Forms-Applications On Line\2011 Applications\Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 2 of 2 DESCRIPTIONS PermitTRAI Cash Register Receipt City of Tukwila ACCOUNT QUANTITY PAID 729 M14-0154 Address: 3411 S 120TH PL 100 023049069 2 MECHANICAL $450.45 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $417.95 TECHNOLOGY FEE $22.52 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R2972 R000.322.900.04.00 0.00 $22.52 $472.97 Date Paid: Friday, August 29, 2014 Paid By: TCMS OF SEATTLE LLC Pay Method: CHECK 007965 Printed: Friday, August 29, 2014 2:12 PM 1 of 1 CRWSYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK 112 M14-0154 ( Address: 3411 S 120TH PL 100 in-:11102304.906j 112.E MECHANICAL $11261 PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R2747 R000.322.102.00.00 0.00 $112.61 $112.61 Date Paid: Thursday, July 31, 2014 Paid By: RUSTIN GILBERT Pay Method: CREDIT CARD 013413 Printed: Thursday, July 31, 2014 10:34 AM 1 of 1 CRWSYSTEMS INSPECTION RECORD Retain a copy with permit ,1'11.4 INSPECTION NO. PERMIT NO. �:. ,� /\ CITY OF TUKWILA BUILDING DIVISION �� 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 3670 .I Permit Inspection Request Line (206) 431-2451 Project, Type of Inspection: _ Address: t2, Date Called: Special Instructions: 1 Date Wanted: r� La.m= ( p.m. Requester: Phone No: Approved per applicable codes. D Corrections required prior to approval. COMMENTS: r vv ,, tryNAo tJP _/ ,/ l ' 64 ) InspectO'r: Date: I { I 1 — 14 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. 2012 Washin.ton State Ener• Code Compliance Forms for Commercial Grou. R1 and > 3 sto R2 and R3 Mechanical Summary MECH-SUM 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 & R3 Revised June 2013 Ivroj ect Info Project Address 3ci ( ��Cr ( d4i I cfr �� 1 Date , , CIA VI 61, �In�_ For Building Dept. Use /4. �l"te'�ttci Applicant Name: Q fin (1 RCA- Cr-- �"i/ Z�( Applicant Address: / vt+tAAr A.f) C /�� J! Applicant Phone: Ze6 pica ()Iwo? Project Description Briefly describe mechanical system type and features. Includes Plans --� (A,, _ 'e---� ��„ r.QJL a-- S'�� ( ck -�l -r-t--x _ VI4 L' ( L _eL C Se C/1....e._ 64-Uatekr/1. )&r...ek Include cumentation requiring compliance with commissioning provisions per Section C408. �D/ ✓ Compliance Option imple System Complex System Oystems Analysis Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Cooling Equipment Schedule Equip. ID Equip Type Brand Name' Model No.' Capacity' Btu/h OSA CFM or Econo? SEER or EER IPLV3 Econmizer Option or Exceptions Heat Recovery Y/N OBE CWED FOR COMPLIANCE Heating Equipment Schedule -APPROVED Equip. ID Equip Type Brand Name' Model No.' Capacity' Btu/h OSAcfm or Econo? Input Btuh Output BOG //{{��JJ FF��ffiijenc l rr� 14Recove Heat Y/N "1 City otTukwila BUILDING DIVISION Fan Equipment Schedule Equip. ID Equip Type Brand Name' Model No.' CFM SP' HP/BHP Flow Controls Location of Service . Service Water Heating Equipment Schedule Equip. ID Equip Type Brand Name' Model No.' Input Capacity Sub - Category Er Location of Service 1 If available. 2 As tested according to Table C403.2.3(1)A thru C403.2.3(8). 3 If required. 4 COP, HSPF, Combustion Effi ' y s applicable. 5 Flow control types: variable air volume (VAV), constant volume (CV), or variable speed (VS). 6 Economizer exa�c to Simple Systems C403.3.1 or Complex Systems C403.4.1. 7 Efficiency Factor per Table C404.2. CITY OF TUKWILA M Ligan 0 Sy JUL. 31 2014 PERMIT CENTER Mechanical Permit Plans Checklist - Page 1 of 3 State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 & R3 MECH-CHK 2012 Washington Revised June 2013 Project Address Date The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on' Plans Byjlding Department 'Notes GENERAL PROVISIONS Equipment Sizing & Performance C403.2.1 Load calculations Load calculations performed perASHRAE Std 183 or equivalent per Chapter 3 C403.2.2 Equipment and system sizing Output capacity of heating and cooling equipment and systems do not exceed calculated loads, note exceptions taken C403.2.5 Minimum ventilation Ventilation (natural or mechanical) provided per IMC; indicate mechanical ventilation is capable of being reduced to minimum requirement per IMC C403.2.3 & C403.2.3.2 & C403.2.12.1 Equipment minimum efficiency Provide equipment schedules or complete MECH-SUM tables with type, capacity, efficiency, test standard (or other efficiency source) for all mechanical equipment C403.2.13 Electric motor efficiency Provide equipment schedule with hp, rpm, efficiency for all motors; note except. C403.2.10 Fan power limitation Fan system motor hp or bhp does not exceed limits per Table C403.2.10.1(1) C403.2.10.3 & C403.2.13 Fractional hp fan motors Indicate fan motors 1/12 to 1 hp are ECM type or meet minimum efficiency req. C403.2.3 Maximum air cooled chiller capacity Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit C403.2.1 Non-standard water-cooled chillers Full -load and NPLV values for water-cooled centrifugal chiller adjusted for non - standard operational conditions C403.2.12.1.2 Centrifugal fan cooling towers Large capacity cooling towers with centrifugal fan(s) meet efficiency requirements for axial fan open circuit cooling towers C403.2.3 Forced air furnace and unit heaters Indicate intermittent ignition or IID, flue/draft damper & jacket loss C403.2.3.3 Packaged electric heating/cooling equipment List equipment required to be heat pumps on schedule ti � i • C403.2.3.4'• Nuniidification Indicate method of humidification (note requirements for systems with economizer) r HVAO System Controls & Criteria ' i — C403.2.4.1 Thermostatic controls Indicate locations of thermostatic control zones on plans, including perimeter systems , C403.2.4.1'1 Heat pump supplementary heat Indicate staged heating (compression/supplemental) & outdoor lock -out temp C403.2.4.2 Setpoint overlap (deadband) Indicate 5°F deadband minimum for systems controlling both heating & cooling C403.2.4.3 Automatic setback and shutdown Indicate zone t-stat controls with required automatic setback & manual override I'll t C403.2,4.3.3 Automatic optimum) start Indicate system controls that adjust equip start time to match load conditions ' - '' C402.4.5.2 & C403.2.4.4 Dampers Indicate location of OSA, exhaust, relief and return air dampers; include AMCA rated leakage and control type (motorized or gravity; note exceptions taken) C403.2.11 Heating outside a building Indicate radiant heat system and occupancy controls C403.2.4.5 Snow melt systems Indicate shut-off controls based on outdoor conditions C403.2.4.6 Combustion heating equipment Indicate modulating or staged control C403.2.4.7 Group R1 hotel/motel systems Indicate method for guest room automatic setback & set-up of 5°F minimum C403.2.4.8 / 9 Group R2/R3 dwelling unit systems Indicate 5-2 programmable thermostats in primary spaces with minimum of two setback periods; note exceptions taken C403.2.5.1 Demand controlled ventilation Indicate high -occupancy spaces and systems requiring DCV C403.2.5.2 Occupancy sensors Indicate spaces requiring occupancy -based system control and method; or alternate means provided to automatically reduce OSA when partially occupied C403.2.5.3 Enclosed loading dock/parking garage ventilation Indicate enclosed loading dock and enclosed parking garage ventilation system activation and control method C403.2.5.4.1 Kitchen exhaust hoods Indicate kitchen hoods requiring make-up air; indicate make-up air source and conditioning method C403.2.5.4.2 Laboratory exhaust systems Indicate lab exhaust systems requiring heat recovery, method & efficiency; or alternative method taken (VAV, semi -conditioned makeup, or CERM calculation) • C403.2.6.1 Energy recovery - ventilation systems Indicate ventilation systems requiring ER, method & efficiency; note exceptions C403.2.6.2 Energy recovery - condensate systems Indicate on -site steam heating systems requiring energy recovery C403.2.6.3 Energy gy recovery - condens In ate''rem refrig and requiring ER d of c urr Sergi it ��44 Mechanical Permit Plans Checklist - Page 2 of 3 MECH-CHK Revised June 2013 IL 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 & R3 Project Address 3Lj t ( J0lAkg- 12dt' St, O 'b J /u Date 7 gn y The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on Plans Building Department Notes GENERAL PROVISIONS, CONTINUED HVAC System Controls & Criteria, Continued C403.2.12 Variable flow control - fans/pumps Indicate fan & pump motors requiring VF control & method (VSD or equiv controls) C403.2.12.1 Variable flow control - cooling towers Indicate cooling tower fans requiring variable flow control and method ��S T C403.2.12.2 Large volume fan systems Indicate fan systems requiring airflow reduction based on heating and cooling demand; or exception taken C403.2.12.2 Single zone AC systems Indicate method of cooling demand -based fan control for sys. > 110,000 btuh C403.2.4.10 DDC system capabilities Identify all DDC system input/output control points and indicate capability for trending and demand response setpoint adjustment Ducting Systems C403.2.7.1 & C403.2.7.3 Duct construction Indicate all ductwork constructed and sealed per IMC, C402 leakage requirements and IBC vapor retarder requirements C403.2.7.3.1-3 Duct pressure classifications Identify location of low, medium and high pressure ductwork on plans C403.2.7.3.3 High pressure duct leakage test Indicate high pressure duct leakage testing requirements on plans; provide test results to jurisdiction when completed C403.2.7.1 / 2 Duct insulation Indicate R-value of insulation on ductwork Piping Systems C403.2.8 Piping insulation Indicate R-value of insulation on piping C403.2.8.1 Piping insulation exposed to weather Indicate method of protection from damage/degredation SIMPLE SYSTEMS Qualifying Systems C403.3 Qualifying single zone systems Verify unitary or packaged equipment does not exceed capacity limits, does not have active humidifcation or simultaneous heating/cooling C403.3 Qualifying 2-pipe heating systems Verify 2-pipe heating -only system does not exceed capacity limits C403.3.2 Hydronic system controls Refer to Complex Systems Section C403.4.3 Simple System Economizers C403.3.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equip sched. C403.3.1.1.1 Air economizer capacity Indicate modulating OSA control capability up to 100% OSA, or exception C403.3.1.1.3 Air economizer high limit controls Indicate high limit shut-off control method per Table C403.3.1.1.3(2) C403.1.1.2 Integrated air economizer operation Indicate capability for partial air economizer operation for systems with capacity > 65,000 btuh C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exception(s) COMPLEX SYSTEMS Complex System Economizers C403.4.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equip sched. C403.4.1.4 Economizer heating system impact Verify control method of HVAC systems with economizers does not increase building heating energy usage during normal operation C403.4.1.3 Integrated economizer operation Indicate capability for partial economizer operation for air or water econo systems Moved Water economizer capacity Indicate water econo capable of 100% cooling capacity at 50°F db/45°F wb OSA C403.4.1.2 Water economizer maximum pressure drop Indicate precooling coils and heat exchangers do not exceed pressure drop limit C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exception(s) Mechanical Permit Plans Checklist 2012 Washington State Energy Code Compliance Forms for Commercial, - Page 3 of 3 MECH-CHK Revised June 2013 Group R1, and > 3 story R2 & R3 Project Address Date The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on Plans Building Department Notes COMPLEX SYSTEMS, CONTINUED Specific System Requirements C403.4.2 & C403.2,12 Variable flow control - fans Indicate fans requiring variable flow control and method C403.4.2.1 VAV fan static pressure sensors Indicate sensor locations on plans; include at least one sensor per major duct branch C403.4.2.2 VAV fan static pressure setpoint Indicate fan system static pressure setpoint based on zone requiring most pressure C403.4.5 VAV systems serving multi- zones Indicate supply air systems serving multiple zones that are required to be VAV, method of primary air control, and zones served; note exceptions taken C403.4.5.4 VAV system supply air reset Indicate controls that automatically reset supply air temp in response to loads C403.4 Large capacity cooling systems Indicate method of multi -stage or variable control for building cooling system capacity > 300 tons C403.4.7 Hot gas bypass limitation Indicate cooling equipment unloading or capacity modulation method C403.4.3 Large capacity boiler systems Indicate multi -stage or modulating burner for single boilers > 500,000 btuh C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers C403.4.3.5 Chiller / boiler plant pump isolation Indicate capability to automatically reduce overall plant flow and shut-off flow through chillers & boilers when not in use C403.4.2 & C403.4.3.6 Variable flow control - pumps Indicate pumps requiring variable flow control & method C403.2.12.1 & C403.4.4 Variable flow control -cooling towers Indicate cooling tower fans requiring variable flow control and method C403.4.3.4 Hydronic system part load controls Indicate heating & chilled water systems have the capability to automatically reset supply water temp AND reduce flow by 2 50% for systems > 300,000 btuh C403.4.3.2 Two -pipe changeover systems Indicate deadband, heating/cooling mode scheduling and changeover temperature range C403.4.3.3.1 Water loop heat pump - deadband Indicate capability of central equipment to provide min. 20°F water supply temp deadband between heat rejection and heat addition modes C403.4.3.3 Water loop heat pump - heat rejection Provide heat exchanger that separates cooling tower and heat pump loop in Climate Zone 5 C403.4.3.3.3 Water loop heat pump - isolation Indicate 2-way isolation valve on each heat pump and variable flow control for systems with total pump power > 10 hp C403.4.6 Condenser water heat recovery Indicate system provided to pre -heat service water and efficiency C403.5 Cooler / freezer - anti -sweat heaters Indicate w/sf & control method for walk-in cooler/freezer door anti -sweat heaters C403.5 / 6 Cooler / freezer - evaporator and condenser fans Indicate motor type for evaporator and condenser fans < 1 hp SERVICE WATER HEATING Service Water Systems C404.2 Water -heating equip min. efficiency Provide equipment schedule or complete MECH-SUM table with type, capacity, efficiency, test standard (or other efficiency source) C404.3 Temperature controls Indicate temperature controls have required setpoint capability C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply & discharge C404.5 Insulation under water heater Indicate R-10 insulation under tank C404.6 Service water piping insulation Indicate R-value of insulation on piping; note exceptions taken C404.7 / 8 Circulation systems and heat trace shut-off Indicate shut-off capability based on occupancy and periods of limited demand C404.9 Group R-2 service hot water meters Indicate method of usage metering for dwell. units served by central HW system Pools & In -Ground Permanently Installed Spas C404.10.1 Pool heating equip min. efficiency Provide equipment schedule or complete MECH-SUM table with type, capacity, efficiency, test standard (or other eff. source); heat pump heaters 2 4 COP C404.10.1 / 2 Pool heater on /off controls Indicate automatic on/off control based on scheduling & accessible on/off switch on heater that operates independent of thermostat setting; or exception taken C404.10.3 Pool covers Indicate vapor retardant cover and insulation rating as required C404.10.3 Pool assembly insulation Indicate rating of insulation on sides and bottom of pools heated to > 90°F C404.10.4 Heat recovery Indicate method, exhaust air temperature reduction and recovered energy use VILE (c.S1 Coimufthz 9 J4 STRUCTURAL CALCULATIONS SAHALE SNACKS HVAC FAN REPLACEMENT Seattle, WA TCMS, Temp Control Mechanical Service Corp. July 21, 2014 Project No. 140178 6 Pages REVIEWED FOR CODE COMPLIANCE APPROVED AUG 21 2014 BUILDING Tukwila (VISION * * *LIMITATIONS* * * ENGINEER WAS RETAINED IN A LIMITED CAPACITY FOR THIS PROJECT. DESIGN IS BASED UPON INFORMATION PROVIDED BY THE CLIENT, WHO IS SOLELY RESPONSIBLE FOR THE ACCURACY OF THE SAME. NO RESPONSIBILITY AND / OR LIABILITY IS ASSUMED BY, OR IS TO BE ASSIGNED TO THE ENGINEER FOR ITEMS BEYOND THAT SHOWN ON THESE SHEETS. 116057'1S 16d Se. `j/aoreouuaa, ZU,¢ 98684 503, 737. 4344 �7LS-caodu to y@comecut, get M i--0 5)4 RECEIVED CITY OF TUKWILA JUL, 31 2014 PERMIT CENTER NEW HVAC FAN INSTALLATION Existing loads: Roof dead load, wdl = 10 psf Roof live load (snow), wil = 25 psf Area tributary to beam, Atdb = 24 ft Total existing load on beam, w = (wdl + WO* Atrlb = 840.000pIf New fan load: P = 500 lb Beam length: L = 57 ft Fan location: 19 ft from support EXISTING ROOF BEAM ANALYSIS & DESIGN (NDS) STRUCTURAL GLUED LAMINATED TIMBER (GLULAM) BEAM ANALYSIS & DESIGN (NDS) In accordance with the ANSUAF&PA NDS-2012 using the ASD method 0.899 TEDDS calculation version 1.6.00 Load Envelope - Combination 1 0.0— 0 ft A klp_tt 0.0 365.132 hI A 57 Bending Moment Envelope 365.1 57 1 dQcJt� cft>r9 PJ12 RNS Consulting LLC 11605 NE 16th St. Vancouver, WA 98684 (503) 737-4344 Project Sahale Snack Project Job # 140178 Address Seattle, WA Client TCMS By R.P. Date 7/18/2014 Page 1 of 6 bps 25.6 25.623- 0.0- -25.623- Applied loading Beam loads Span 1 loads Load combinations Load combination 1 Analysis results Design moment Total load on member Reaction at support A Shear Force Envelope fll A M = 365131.8 Ib ft Wtot = 51246.6 Ib RA max = 25623 lb Unfactored dead load reaction at support A Unfactored snow load reaction at support A Reaction at support B R8_max = 25623 Ib Unfactored dead load reaction at support B Unfactored snow load reaction at support B -25.6 57 1 B Dead self weight of beam x 1 Dead UDL 240 lb/ft from 0.00 Snow UDL 600 Ib/ft from 0.00 Support A Span 1 Support B Design shear RA min = 25623 lb RA Dead = 8523 lb RA_Snow = 17100 Ib RBmin = 25623 Ib RB_Dead = 8523 lb RB_snow = 17100 Ib in to 684.00 in in to 684.00 in Dead x 1,00 Live x 1.00 Snow x 1.00 Dead x 1.00 Live x 1.00 Snow x 1.00 Dead x 1.00 Live x 1.00 Snow x 1.00 F = 25623.3 Ib cR Af , Mkt ling RNS Consulting LLC 11605 NE 16th St. Vancouver, WA 98684 (503) 737-4344 Project Sahale Snack Project Address Seattle, WA Client Job # 140178 TCMS By R.P. Date 7/18/2014 Page 2 of 6 Glulam section details Net finished section breadth Number of sections Stress class Member details Service condition Length of bearing Load duration b = 6.75 in N=1 24F-V4 DF/DF Lb=8in Ten years Bearing perpendicular to grain - c Adjusted compression Fb_pe 1.3.10.2 ,P = 650 Ib)n2 Applied compression fc_pem = 475 lb/in2 PASS - Design compressive stress exceeds applied compressive stress at bearing Net finished section depth d = 36 in Alignment of laminations Horizontal Strength in bending - c1.3.3.1 Design bending stress Fe = 2175 Ib/in2 Strength in shear parallel to grain - c1.3.4.1 Design shear stress F, = 265 Ib/in2 Deflection - c1.3.5.1 Allowable deflection Sadm = 2.873 in Actual bending stress fb = 3005 Ib/in2 FAIL - Design bending stress is less than actual bending stress Actual shear stress f„ = 158 lb/in2 PASS - Design shear stress exceeds actual shear stress Total deflection S. = 4.713 in FAIL - Design deflection exceeds total deflection EXISTING ROOF BEAM W/NEW FAN LOAD ANALYSIS & DESIGN (NDS) STRUCTURAL GLUED LAMINATED TIMBER (GLULAM) BEAM ANALYSIS & DESIGN (NDS) In accordance with the ANSI/AF&PA NDS-2012 using the ASD method 0.899 TEDDS calculation version 1.6.00 Load Envelope -Combination 1 0.0—e tt A 57 B 4Ln PP RNS Consulting LLC 11605 NE 16th St. Vancouver, WA 98684 (503) 737-4344 Project Sahale Snack Project Address Seattle, WA Job # 140178 Client TCMS By R.P. Date 7/18/2014 Page 3 of 6 klp_ft 0.0— Bending Moment Envelope 369.897— 33079 ftl A kips 26.0 25.957— _,., 0.0 -25.790— Applied loading Beam Toads Span 1 loads Load combinations Load combination 1 1 ftl A 369.9 57 Shear Force Envelope 8.4 57 -25.8 Analysis results Design moment M = 369897.2 Ib ft Total load on member Wlol = 51746.6 Ib Reaction at support A RA max = 25957 Ib Unfactored dead load reaction at support A Unfactored snow load reaction at support A Reaction at support B RB_max = 25790 Ib Dead self weight of beam x 1 8 Dead UDL 240 lb/ft from 0.00 in to 684.00 in Snow UDL 600 lb/ft from 0.00 in to 684.00 in Dead point load 500 Ib at 228.00 in Support A Span 1 Support B Dead x 1.00 Live x 1.00 Snow x 1.00 Dead x 1.00 Live x 1.00 Snow x 1.00 Dead x 1.00 Live x 1.00 Snow x 1.00 Design shear F = 25956.6 Ib RA min = 25957 Ib RA Dead = 8857 Ib RA_snow = 17100 Ib RB_min = 25790 Ib ,R,ALs' „.e c'tig /Ye RNS Consulting LLC 11605 NE 16th St. Vancouver, WA 98684 (503) 737-4344 Project Sahale Snack Project Job # 140178 Address Seattle, WA Client TCMS By R.P. Date 7/18/2014 Page 4 of 6 • Unfactored dead load reaction at support B Unfactored snow load reaction at support B Glulam section details Net finished section breadth Number of sections Stress class Member details Service condition Length of bearing Load duration b = 6.75 in N=1 24F-V4 DF/DF Lb=8in Ten years Bearing perpendicular to grain - c1.3.10.2 Adjusted compression Re Dead = 8690 Ib Re snow = 17100 Ib -PI 8" ,w Net finished section depth d = 36 in Alignment of laminations Horizontal Fc_perp' = 650 Ib/in2 Applied compression fc_pe,p = 481 Ib/in2 PASS - Design compressive stress exceeds applied compressive stress at bearing Strength in bending - c1.3.3.1 Design bending stress Fti = 2175 Ib/in2 Strength in shear parallel to grain - c1.3.4.1 Design shear stress F,' = 265 Ibfin2 Deflection - c1.3.5.1 Allowable deflection Sadm = 2.873 in Actual bending stress fb = 3044 Ib/in2 FAIL - Design bending stress is less than actual bending stress Actual shear stress f„ = 160 Ib/in2 PASS - Design shear stress exceeds actual shear stress Total deflection Sa = 4.775 in FAIL - Design deflection exceeds total deflection cR&AL5' (' ualng Pie RNS Consulting LLC 11605 NE 16th St. Vancouver, WA 98684 (503) 737-4344 Project Sahale Snack Project Job # 140178 Address Seattle, WA Client TCMS By R.P. Date 7/18/2014 Page 5 of 6 Comparison by chapter 34, section 3404.3 Existing bending stress in beam: fbl = 3005 psi Bending stress with new fan load: fb2 = 3044 psi % difference: ((fb2 - fbl) / fb1)*100 =1.298 Existing deflection in beam: = 4.713 in Deflection with new fan load: A2 = 4.775 in % difference: ((A2 - A1) / Ai)*100 = 1.316 Differences are Tess than 5%, therefore existing beam is adequate s?sVSnhuriln9 RNS Consulting LLC 11605 NE 16th St. Vancouver, WA 98684 (503) 737-4344 Project Sahale Snack Project Job # 140178 Address Seattle, WA Client TCMS By R.P. Date 7/18/2014 Page 6 of 6 No.: W C Date: 09-MAY-2014 ' r L. DATA SHEET Three-phase induction motor - Squirrel cage rotor Customer .• Product line : W22 NEMA Premium - Ball Bearings Frame : 182/4T Output : 5 HP Frequency : 60 Hz Poles : 4 Full load speed : 1755 Slipo: 2.50083 CODE F Voltage 208-230/460 V OR Rated current : 14.3 12.9/6.45 A COMPLrA Locked rotor current : 96.8/48.4 A NCE Locked rotor current (II/In) : 7.5 APPROVED No-load current : 6.40/3.20 A AU� Full load torque : 14.8 ib.ft A 1 2014 Locked rotor torque : 230 % Breakdown torque : 320 % Design : B TemperatureInsulat'on lass : F City rise : 80 K BUILD IGr�kw�la Locked rotor time : 15 s (hot) DIVISION Service factor : 1.25 Duty cycle : S1 Ambient temperature : -20°C - +40°C Altitude : 1000 Degree of Protection : IP55 Approximate weight : 95 lb Moment of inertia : 0.40033 sq.ft.lb Noise level : 56 dB(A) D.E. N.D.E. Bearings 6207 ZZ 6206 ZZ Regreasing interval — — Grease amount — — Load Power factor Efficiency (%) 100% 0.80 89.5 75% 0.74 89.5 50% 0.62 88.5 Notes: Performed by Checked RECFRvPn VLL1O5L1 CITY OF TUKWILA JUL 3 1 2014 PERMIT CENTER ■w _ No.: Date: 09-MAY-2014 PERFORMANCE CURVES RELATED TO RATED OUTPUT Three-phase induction motor - Squirrel cage rotor 100 _ 1.0 0.0 _'� 11111i-mos • 0' 0 01 iioiohuohl c I1IDU%ri■■■■I _ AiiBIRIilI iu,•uuu••mui 0 10 20 30 40 50 60 70 80 90 100 110 120 130 Percent of rated output (%) Customer .• Product line : W22 NEMA Premium - Ball Bearings Frame : 182/4T Locked rotor current (II/In) : 7.5 Output : 5 HP Duty cycle : S1 Frequency : 60 Hz Service factor : 1.25 Full load speed : 1755 Design : B Voltage : 208-230/460 V Locked rotor torque : 230 % Rated current : 14.3-12.9/6.45 A Breakdown torque : 320 % Insulation class : F Notes: Performed by Checked 1 ■w _ No.: Date: 09-MAY-2014 CHARACTERISTIC CURVES RELATED TO SPEED Three-phase induction motor - Squirrel cage rotor 5.0 10 n A - Torque related to rated torque (C/Cn) O O 7' N N G) W A ? O CT O CT o GT o U1 O CJ7 B - Current related to rated current (I/In) '. 0 0 Co 0 0 0 0 0 0 C CO tl) 4 C) c C - B 0 10 20 30 40 50 60 70 80 90 100 Speed related to rated speed (%) Customer .• Product line : W22 NEMA Premium - Ball Bearings Frame : 182/4T Locked rotor current (II/In) : 7.5 Output : 5 HP Duty cycle : S1 Frequency : 60 Hz Service factor : 1.25 Full load speed : 1755 Design : B Voltage : 208-230/460 V Locked rotor torque : 230 % Rated current : 14.3-12.9/6.45 A Breakdown torque : 320 % Insulation class : F Notes: Performed by Checked Notes: Performed by: Checked: Customer: W22 NEMA Premium - Ball Bearings Three-phase induction motor 09-MAY-2014 Frame 182/4T - IP55 PERMIT CCORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M14-0154 PROJECT NAME: SAHALE SNACKS SITE ADDRESS: 3411 S 120 PL - STE 100 X Original Plan Submittal Response to Correction Letter # DATE: 07/31/14 Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: Building Division Public Works n 2 bWI'111 Fire Prevention Structural Planning Division Permit Coordinator n PRELIMINARY REVIEW: Not Applicable n (no approval/review required) REVIEWER'S INITIALS: DATE: 08/05/14 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required n n (corrections entered in Reviews) Approved with Conditions Denied (ie: Zoning Issues) DUE DATE: 09/02/14 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire 0 Ping ❑ PW 0 Staff Initials: 12/18/2013 TCMS OF SEATTLE LLC Page 1 of 2 0 Washington State Department of Labor & Industries TCMS OF SEATTLE LLC Owner or tradesperson MOORE, WILLIAM J Principals MOORE, WILLIAM J, PARTNER/MEMBER Doing business as TCMS OF SEATTLE LLC WA UBI No. 602 845 504 Parent company MOORE HOLDING CORP 12646 INTERURBAN AVE S SEATTLE, WA98168 206-588-8787 KING County Business type Limited Liability Company License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties GENERAL License no. TCMSSSL905CB Effective — expiration 02/01/2010— 02/10/2016 Bond DEVELOPERS SURETY & INDEM CO Bond account no. 269810C Received by L&I 02/01/2010 Insurance Phoenix Insurance Company, The Policy no. C09640N520 Received by L&I 10/09/2013 Active. Meets current requirements. $12,000.00 Effective date 01/27/2010 Expiration date Until Canceled $1,000, 000.00 Effective date 10/01/2013 Expiration date 10/01/2014 Insurance history https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602845504&LIC=TCMSSSL905CB&SAW= 08/29/2014