Loading...
HomeMy WebLinkAboutPermit M14-0207 - COSTCO WHOLESALE - HEAT PUMPCOSTCO WHOLESALE 400 COSTCO DR M14-0207 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov 3523049089 400 COSTCO DR Project Name: COSTCO WHOLESALE MECHANICAL PERMIT Permit Number: M14-0207 Issue Date: 12/1/2014 Permit Expires On: 5/30/2015 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: COSTCO WHOLESALE CORPORATIO 999 LAKE DR PROPERTY TAX DEPT 006, ISSAQUAH, WA, 98027 ALLEN TURNER 19430 68 AVE S , KENT, WA, 98032 KEY MECHANICAL CO OF WA 19430 68TH AVE S #B, KENT, WA, 98032-1193 KEYMEW*240NZ Phone: (253) 872-7392 Phone: (253) 872-7392 Expiration Date: DESCRIPTION OF WORK: REPLACE EXISTING 25-TON HEAT PUMP WITH LIKE UNIT. Valuation of Work: $13,975.00 Type of Work: REPLACEMENT Fuel type: GAS Fees Collected: $376.54 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: 2012 2012 2012 2012 International Fuel Gas Code: WA Cities Electrical Code: WA State Energy Code: 2012 2014 2012 Permit Center Authorized Signature: Ri Date: 1 )—' `�' I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: Date: C 2/ t / 4- This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Readily accessible access to roof mounted equipment is required. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: ***MECHANICAL PERMIT CONDITIONS*** 10: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 11: Manufacturers installation instructions shall be available on the job site at the time of inspection. 12: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 13: H.V.A.C. units rated at greater than 2,000 cfm require auto -shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2437) 14: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air -moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 15: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2437) 16: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2437) 17: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2437) 18: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 19: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 20: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 21: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 22: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1400 FIRE FINAL 1800 MECHANICAL FINAL 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL Tenant Name: CITY OF TUKw_�A Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical, Permit'No. Project No. Date ApplicationAccepted: Date Application+Expires: (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION King Co Assessor's Tax No.: 252304906305 Site Address: 400 Costco Drive / Tukwila WA 98188 Suite Number: Floor: 1st Costco Wholesale New Tenant: ❑ Yes E..No PROPERTY OWNER Name: Costco Whlolesale Corporation Address: 999 Lake Drive City: Issaquah State: WA Zip: 98027 CONTACT PERSON - person receiving all project communication Name: Allen Turner Address: 19430 68th Ave S. City: Kent State: WA Zip: 98032 Phone: (253) 872-7392 Fax: (253) 872-7398 Email: aturner@keymechanical MECHANICAL CONTRACTOR INFORMATION; Company Name: Key Mechanical Address: 19430 68th Ave S. City: Kent State: WA Zip: 98032 Phone: (253) 872-7392 Fax: (253) 872-7398 Contr Reg No.: KEYMEW*240NZ Exp Date: 04/01/2015 Tukwila Business License No.: BUS-0101287 Valuation of project (contractor's bid price): $ 13,975 Describe the scope of work in detail: 1 t,..t G, 2 5 T'pt4 14 oT lc)• 4 ' \v t -r u L.T Use: Residential: Commercial: New ❑ Replacement El New ❑ Replacement Fuel Type: Electric El Gas Other: H:\Applications\Forms-Applications On Line\2011 Applications\Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of 2 1, r Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <l 00k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm 1 Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty, Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu I. 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING O r OR AU AGENT: Signature: Date: 11/13/2014 Print Name: Allen Turner Day Telephone: (253) 872-7392 Mailing Address: 19430 68th Ave S Kent WA 98032 City State Zip H:\Applications\Forms-Applications On Line \2011 Applications\Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 2 of 2 DESCRIPTIONS PermitTRAK Cash Register Receipt City of Tukwila ACCOUNT I QUANTITY PAID 478.92 M14-0207 Address: 400 COSTCO DR Apn:3523049089 $376.54 MECHANICAL $362.06 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $257.15 PLAN CHECK FEE R000.322.102.00.00 0.00 $72.41 TECHNOLOGY FEE $14.48 TECHNOLOGY FEE R000.322.900.04.00 0.00 $14.48 PG14-0170 , Address: 400 COSTCO DR - Apn: 3523049089 102.38 GAS $97.50 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $65.00 TECHNOLOGY FEE $4.88 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R3573 R000.322.900.04.00 0.00 $4.88 $478.92 Date Paid: Monday, November 17, 2014 Paid By: KEY MECHANICAL CO. OF WASHINGT Pay Method: CHECK 2622 Printed: Monday, November 17, 2014 9:41 AM 1 of 1 ?SYSTEMS 2_ frtly-ozo INSPECTION NO. PERMIT NO. CITY OF TUKVVILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 INSPECTION RECORD Retain a copy with permit Project( Type of Inspectiqn: Address: L-100 0 OQI(‘ LD 2) 1.,...) Date Called: r>,... Special Instructions: Date Wanted; 1 ,2--P-m- (a.m. Requyst : ) Phone No: ,-- figApproved per applicable codes. D.Corrections required prior to approval. COMMENTS: C.:1)p yv4 \-er7tA0 We' I spettor: ii-IitAki I 1 1 i 7 INSPECTION FEE REQUIRED. Prior to next inspection, fee must he ' Aid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. Date: i ID.— 12-'1 I /4 fik 114-0207 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 436-9350 INSPECTION RECORD Retain a copy with permit Project: .1 Y- 04-1 OA/ Type of Inspection: Add.rf ss: 1-11)0 Q e-x---0 0 "2.__ Date Calldd: Special Instructions: Date Wanted: I 2. - 17- /Li a.m. P.m. 'Requester: Phone No: s`cd Approved per applicable codes. EJCorrections required prior to approval. COMMENTS: 4)0 /ct•A' t ) A 1114 .\AQ (..A..)11--(1 Inpector: REINSPECTION FE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NUMBER PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 206-575-4407 Project: 66S'Fe 0 Type of Inspection: Mec k-, &o, A Address: Li U n C os-I-ca D Y Suite #: Contact Person: Special Instructions: Phone No.: Approved per applicable codes. Corrections required prior to approval. COMMENTS: PPe,-t1.,-, 1Av1awU./, ei-isi=,,G UDC, de L evipi.- i,VGs I G } v /1/1 t c t-. , 4, I A,o,p-ove- Needs Shift Inspection: / Sprinklers: / Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: Inspector: Aim 5 ) I Date: �-% 7- (C.i Hrs.: $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Address: Company Name: City: State: Zip: Word/Inspection Record Form.Doc 3/14/14 T.F.D. Form F.P. 113 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M14-0207 PROJECT NAME: COSTCO WHOLESALE DATE: 11/17/2014 SITE ADDRESS: 400 COSTCO DR X Original Plan Submittal Response to Correction Letter # Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: t <<4©4 Building Division I Public Works Awl ,wG Fire Prevention Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 11/ 18/14 Structural Review Required REVIEWER'S INITIALS: DATE: n APPROVALS OR CORRECTIONS: DUE DATE: 12/16/14 Approved Corrections Required n n (corrections entered in Reviews) Approved with Conditions Denied (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 KEY MECH CO OF WASHINGTON Page 1 of 2 41/1114 Washington State Department of Labor & Industries KEY MECH CO OF WASHINGTON Owner or tradesperson HEISLER, ROBERT L Principals HEISLER, ROBERT L LEONARD, FRANK W SANDAHL, LEE F Doing business as KEY MECH CO OF WASHINGTON WA UBI No. 600 196 154 19430 68TH AVE S STE B KENT, WA98032 253-872-7392 KING County Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties GENERAL License no, KEYMEW*240NZ Effective — expiration 08/09/1976— 04/01/2015 Bond LIBERTY MUTUAL INS CO Bond account no. 023011682 Received by L&I 03/23/2009 Bond history Insurance Hartford Fire Ins Co Policy no. 52UENOE0154 Received by L&I 03/31/2014 Active. Meets current requirements. $12,000.00 Effective date 04/01/2009 Expiration date Until Canceled $1,000,000.00 Effective date 03/31/2013 Expiration date https://secure.lni.wa.gov/verify/Detail.aspx?UBI=600196154&LIC=KEYMEW*240NZ&SAW= 12/01/2014